Tabulation of Bids - Glacier Point Road.pdf
PDF 838 KB Posted
- Attached to
- CA FTNP YOSE 15(2) Glacier Point Road Federal contract opportunity
- Solicitation number
- 6982AF21B000032
About this file
This document is a tabulation of bids report for a federal highway construction project. The project involves repairs and improvements to Glacier Point Road in Yosemite National Park, including reconditioning 8.59 miles of shoulders and ditches, full depth reclamation of 5.15 miles at a 6-inch depth and 3.485 miles at an 8-inch depth, placement of 1,240 cubic yards of aggregate-topsoil course, and other work. The solicitation was issued by the Department of Transportation Federal Highway Administration on October 21, 2021. Four bids were received by the October 26, 2021 deadline from Goodfellow Brothers, Inc., Steve Manning Construction Inc., Herback General Engineering, LLC, and Granite Construction Company, ranging from $12.3 million to $16.2 million. The engineer's estimate was $15.1 million. The contract is anticipated to be awarded by the date listed in the document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary Glacier Point - 10212021.doc | DOC document | |
| A004 CA YOSE 15(2) Glacier Point Road.pdf | ||
| Questions and Answers 10.18.2021 .docx | DOCX document | |
| A003 CA YOSE 15(2) Glacier Point Road.pdf | ||
| Interested Vendors List 10-14-2021.docx | DOCX document | |
| A002 - CA FNTP YOSE 15(2) Glacier Point Road.pdf | ||
| A002 CA FNTP YOSE 15(2) Glacier Point Road.pdf | ||
| Questions and Answers 10.13.2021 (2).docx | DOCX document | |
| Questions and Answers 10.13.2021.docx | DOCX document | |
| Interested Vendors List 10-12-2021.docx | DOCX document | |
| Interested Vendors 10-07-2021.docx | DOCX document | |
| Glacier Point_Cross Sections.pdf | ||
| Glacier Point Road Plans with schedule.options.pdf | ||
| YOSE15(2)_FinalHydMemo.pdf | ||
| FP-14.pdf | ||
| A001 CA FTNP YOSE 15(2) Glacier Point Road.pdf | ||
| CA FTNP YOSE 15(2) Glacier Point Rd - Final Pavement Report.pdf | ||
| CA FTNP YOSE 15(2) Glacier Point Road - IFB.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 10/26/21
2 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: X
Schedule Type: Options
Solcitation No: 6982AF21B000032
Division: Central Federal Lands
State: CA County: Mariposa
Federal Land: Yosemite National Park Opened at: Lakewood
Opened by: Josephine Helms
Date: 10/21/21
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed:
Title: Contract Specialist
Date: 10/26/2021
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Goodfellow Brothers, Inc $12,301,829.00
Steve Manning Construction Inc $15,066,140.00
Herback General Engineering, LLC $16,017,680.73 2531 Nowlin Road Minden, NV 89423
Granite Construction Company $16,154,830.40 2716 Granite Court Fresno, CA 93706
Engineer's Estimate $15,145,048.00
3 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0020 15101-0000 MOBILIZATION
Goodfellow Brothers, Inc Lump Sum $145,000.00 Steve Manning Construction Inc Lump Sum $1,500,000.00 Herback General Engineering, LLC Lump Sum $813,000.00 Granite Construction Company Lump Sum $1,470,000.00 Engineer's Estimate ALL LPSM Lump Sum $1,749,145.00
X0040 15210-3000 CENTERLINE, VERIFICATION AND STAKING
Goodfellow Brothers, Inc $7,000.00 $54,229.00 Steve Manning Construction Inc $8,000.00 $61,976.00 Herback General Engineering, LLC $12,500.00 $96,837.50 Granite Construction Company $6,200.00 $48,031.40 Engineer's Estimate 7.747 MILE $7,000.00 $54,229.00
X0060 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
Goodfellow Brothers, Inc $1,700.00 $30,600.00 Steve Manning Construction Inc $2,300.00 $41,400.00 Herback General Engineering, LLC $1,232.00 $22,176.00 Granite Construction Company $1,500.00 $27,000.00 Engineer's Estimate 18 EACH $1,500.00 $27,000.00
X0080 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
Goodfellow Brothers, Inc $12,000.00 $6,732.00 Steve Manning Construction Inc $13,000.00 $7,293.00 Herback General Engineering, LLC $12,500.00 $7,012.50 Granite Construction Company $11,000.00 $6,171.00 Engineer's Estimate 0.561 MILE $9,000.00 $5,049.00
X0100 15301-0000 CONTRACTOR QUALITY CONTROL
Goodfellow Brothers, Inc Lump Sum $250,000.00 Steve Manning Construction Inc Lump Sum $100,000.00 Herback General Engineering, LLC Lump Sum $120,100.00 Granite Construction Company Lump Sum $4,275,000.00 Engineer's Estimate ALL LPSM Lump Sum $400,000.00
X0120 15401-0000 CONTRACTOR TESTING
Goodfellow Brothers, Inc Lump Sum $135,000.00 Steve Manning Construction Inc Lump Sum $100,000.00 Herback General Engineering, LLC Lump Sum $294,000.00 Granite Construction Company Lump Sum $80,000.00 Engineer's Estimate ALL LPSM Lump Sum $400,000.00
4 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0140 15501-0000 CONSTRUCTION SCHEDULE
Goodfellow Brothers, Inc Lump Sum $1,200.00 Steve Manning Construction Inc Lump Sum $70,000.00 Herback General Engineering, LLC Lump Sum $18,900.00 Granite Construction Company Lump Sum $2,500.00 Engineer's Estimate ALL LPSM Lump Sum $70,000.00
X0160 15705-0100 SOIL EROSION CONTROL, SILT FENCE
Goodfellow Brothers, Inc $20.00 $10,600.00 Steve Manning Construction Inc $18.00 $9,540.00 Herback General Engineering, LLC $11.50 $6,095.00 Granite Construction Company $9.50 $5,035.00 Engineer's Estimate 530 LNFT $7.00 $3,710.00
X0180 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
Goodfellow Brothers, Inc $400.00 $26,000.00 Steve Manning Construction Inc $300.00 $19,500.00 Herback General Engineering, LLC $420.00 $27,300.00 Granite Construction Company $550.00 $35,750.00 Engineer's Estimate 65 EACH $225.00 $14,625.00
X0200 15802-0000 WATERING FOR DUST CONTROL
Goodfellow Brothers, Inc Lump Sum $205,000.00 Steve Manning Construction Inc Lump Sum $120,000.00 Herback General Engineering, LLC Lump Sum $128,000.00 Granite Construction Company Lump Sum $300,000.00 Engineer's Estimate ALL LPSM Lump Sum $150,000.00
X0220 20201-0000 SELECTIVE CLEARING (FLUSH CUT AND PRUNING)
Goodfellow Brothers, Inc $21,000.00 $224,700.00 Steve Manning Construction Inc $18,000.00 $192,600.00 Herback General Engineering, LLC $49,040.00 $524,728.00 Granite Construction Company $20,000.00 $214,000.00 Engineer's Estimate 10.7 ACRE $8,000.00 $85,600.00
X0240 20220-1000 REMOVAL, INDIVIDUAL TREE
Goodfellow Brothers, Inc $4,000.00 $124,000.00 Steve Manning Construction Inc $5,000.00 $155,000.00 Herback General Engineering, LLC $1,787.00 $55,397.00 Granite Construction Company $4,800.00 $148,800.00 Engineer's Estimate 31 EACH $3,000.00 $93,000.00
5 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0260 20301-0700 REMOVAL OF DELINEATOR
Goodfellow Brothers, Inc $70.00 $9,800.00 Steve Manning Construction Inc $20.00 $2,800.00 Herback General Engineering, LLC $45.00 $6,300.00 Granite Construction Company $45.00 $6,300.00 Engineer's Estimate 140 EACH $40.00 $5,600.00
X0280 20301-1800 REMOVAL OF MONUMENT (SURVEY MARKER)
Goodfellow Brothers, Inc $750.00 $750.00 Steve Manning Construction Inc $100.00 $100.00 Herback General Engineering, LLC $135.00 $135.00 Granite Construction Company $600.00 $600.00 Engineer's Estimate 1 EACH $1,500.00 $1,500.00
X0300 20301-1900 REMOVAL OF PIPE CULVERT
Goodfellow Brothers, Inc $4,100.00 $61,500.00 Steve Manning Construction Inc $2,500.00 $37,500.00 Herback General Engineering, LLC $1,982.00 $29,730.00 Granite Construction Company $1,600.00 $24,000.00 Engineer's Estimate 15 EACH $1,800.00 $27,000.00
X0320 20301-2400 REMOVAL OF SIGN
Goodfellow Brothers, Inc $350.00 $5,600.00 Steve Manning Construction Inc $300.00 $4,800.00 Herback General Engineering, LLC $110.00 $1,760.00 Granite Construction Company $110.00 $1,760.00 Engineer's Estimate 16 EACH $100.00 $1,600.00
X0340 20402-0000 SUBEXCAVATION
Goodfellow Brothers, Inc $260.00 $624,000.00 Steve Manning Construction Inc $180.00 $432,000.00 Herback General Engineering, LLC $313.00 $751,200.00 Granite Construction Company $240.00 $576,000.00 Engineer's Estimate 2,400 CUYD $185.00 $444,000.00
X0360 20465-0000 CONSERVE AND PLACE BOULDER
Goodfellow Brothers, Inc $1,300.00 $13,000.00 Steve Manning Construction Inc $1,200.00 $12,000.00 Herback General Engineering, LLC $395.00 $3,950.00 Granite Construction Company $650.00 $6,500.00 Engineer's Estimate 10 EACH $300.00 $3,000.00
6 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0380 21101-1000 ROADWAY OBLITERATION, METHOD 1 (TREATMENT A)
Goodfellow Brothers, Inc $40.00 $10,000.00 Steve Manning Construction Inc $75.00 $18,750.00 Herback General Engineering, LLC $14.00 $3,500.00 Granite Construction Company $20.00 $5,000.00 Engineer's Estimate 250 SQYD $60.00 $15,000.00
X0400 21101-1000 ROADWAY OBLITERATION, METHOD 1 (TREATMENT B)
Goodfellow Brothers, Inc $70.00 $8,750.00 Steve Manning Construction Inc $75.00 $9,375.00 Herback General Engineering, LLC $14.00 $1,750.00 Granite Construction Company $38.00 $4,750.00 Engineer's Estimate 125 SQYD $60.00 $7,500.00
X0420 21101-1000 ROADWAY OBLITERATION, METHOD 1 (TREATMENT E)
Goodfellow Brothers, Inc $30.00 $9,000.00 Steve Manning Construction Inc $75.00 $22,500.00 Herback General Engineering, LLC $14.00 $4,200.00 Granite Construction Company $17.00 $5,100.00 Engineer's Estimate 300 SQYD $60.00 $18,000.00
X0440 21101-1000 ROADWAY OBLITERATION, METHOD 1 (TREATMENT D)
Goodfellow Brothers, Inc $40.00 $18,000.00 Steve Manning Construction Inc $75.00 $33,750.00 Herback General Engineering, LLC $14.00 $6,300.00 Granite Construction Company $30.00 $13,500.00 Engineer's Estimate 450 SQYD $60.00 $27,000.00
X0460 21101-1000 ROADWAY OBLITERATION, METHOD 1 (TREATMENT C)
Goodfellow Brothers, Inc $30.00 $21,000.00 Steve Manning Construction Inc $75.00 $52,500.00 Herback General Engineering, LLC $14.00 $9,800.00 Granite Construction Company $40.00 $28,000.00 Engineer's Estimate 700 SQYD $60.00 $42,000.00
X0480 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2
Goodfellow Brothers, Inc $1,000.00 $119,800.00 Steve Manning Construction Inc $300.00 $35,940.00 Herback General Engineering, LLC $498.00 $59,660.40 Granite Construction Company $600.00 $71,880.00 Engineer's Estimate 119.8 CUYD $300.00 $35,940.00
7 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0500 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3
Goodfellow Brothers, Inc $475.00 $40,375.00 Steve Manning Construction Inc $300.00 $25,500.00 Herback General Engineering, LLC $498.00 $42,330.00 Granite Construction Company $350.00 $29,750.00 Engineer's Estimate 85 CUYD $300.00 $25,500.00
X0520 30202-2000 ROADWAY AGGREGATE, METHOD 2
Goodfellow Brothers, Inc $92.00 $506,000.00 Steve Manning Construction Inc $88.00 $484,000.00 Herback General Engineering, LLC $105.00 $577,500.00 Granite Construction Company $92.00 $506,000.00 Engineer's Estimate 5,500 TON $65.00 $357,500.00
X0540 30301-3000 SHOULDER AND DITCH RECONDITIONING
Goodfellow Brothers, Inc $40,000.00 $343,600.00 Steve Manning Construction Inc $6,900.00 $59,271.00 Herback General Engineering, LLC $17,570.00 $150,926.30 Granite Construction Company $11,000.00 $94,490.00 Engineer's Estimate 8.590 MILE $28,000.00 $240,520.00
X0560 30303-2000 AGGREGATE SURFACE RECONDITIONING
Goodfellow Brothers, Inc $20.00 $27,000.00 Steve Manning Construction Inc $7.00 $9,450.00 Herback General Engineering, LLC $5.60 $7,560.00 Granite Construction Company $9.00 $12,150.00 Engineer's Estimate 1,350 SQYD $20.00 $27,000.00
X0580 30401-5300 FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH
Goodfellow Brothers, Inc $42,000.00 $216,384.00 Steve Manning Construction Inc $85,000.00 $437,920.00 Herback General Engineering, LLC $91,200.00 $469,862.40 Granite Construction Company $88,000.00 $453,376.00 Engineer's Estimate 5.152 MILE $105,000.00 $540,960.00
X0600 30401-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH
Goodfellow Brothers, Inc $62,000.00 $216,070.00 Steve Manning Construction Inc $85,000.00 $296,225.00 Herback General Engineering, LLC $98,885.00 $344,614.23 Granite Construction Company $89,000.00 $310,165.00 Engineer's Estimate 3.485 MILE $110,000.00 $383,350.00
8 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0620 31303-0000 AGGREGATE-TOPSOIL COURSE
Goodfellow Brothers, Inc $230.00 $285,200.00 Steve Manning Construction Inc $190.00 $235,600.00 Herback General Engineering, LLC $114.00 $141,360.00 Granite Construction Company $180.00 $223,200.00 Engineer's Estimate 1,240 CUYD $70.00 $86,800.00
X0660 40101-0600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3
MILLION ESAL
Goodfellow Brothers, Inc $195.00 $4,056,000.00 Steve Manning Construction Inc $250.00 $5,200,000.00 Herback General Engineering, LLC $305.00 $6,344,000.00 Granite Construction Company $135.00 $2,808,000.00 Engineer's Estimate 20,800 TON $230.00 $4,784,000.00
X0680 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
Goodfellow Brothers, Inc $1.00 $205.00 Steve Manning Construction Inc $500.00 $102,500.00 Herback General Engineering, LLC $125.00 $25,625.00 Granite Construction Company $1,225.00 $251,125.00 Engineer's Estimate 205 TON $700.00 $143,500.00
X0720 40601-0000 FOG SEAL
Goodfellow Brothers, Inc $1,300.00 $71,500.00 Steve Manning Construction Inc $1,500.00 $82,500.00 Herback General Engineering, LLC $985.00 $54,175.00 Granite Construction Company $600.00 $33,000.00 Engineer's Estimate 55 TON $1,500.00 $82,500.00
X0740 41102-1000 PRIME COAT, METHOD 1
Goodfellow Brothers, Inc $2.00 $250,000.00 Steve Manning Construction Inc $2.00 $250,000.00 Herback General Engineering, LLC $0.50 $62,500.00 Granite Construction Company $1.00 $125,000.00 Engineer's Estimate 125,000 SQYD $1.30 $162,500.00
9 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0760 41105-0000 BLOTTER
Goodfellow Brothers, Inc $90.00 $68,400.00 Steve Manning Construction Inc $100.00 $76,000.00 Herback General Engineering, LLC $134.00 $101,840.00 Granite Construction Company $130.00 $98,800.00 Engineer's Estimate 760 TON $100.00 $76,000.00
X0780 41201-0000 TACK COAT
Goodfellow Brothers, Inc $900.00 $49,500.00 Steve Manning Construction Inc $1,500.00 $82,500.00 Herback General Engineering, LLC $2,450.00 $134,750.00 Granite Construction Company $600.00 $33,000.00 Engineer's Estimate 55 TON $1,100.00 $60,500.00
X0800 50101-0800 MINOR CONCRETE PAVEMENT, REINFORCED, 8-INCH DEPTH
Goodfellow Brothers, Inc $360.00 $122,400.00 Steve Manning Construction Inc $360.00 $122,400.00 Herback General Engineering, LLC $311.00 $105,740.00 Granite Construction Company $250.00 $85,000.00 Engineer's Estimate 340 SQYD $300.00 $102,000.00
X0820 60201-0600 18-INCH PIPE CULVERT (CORRUGATED METAL, PIPE, POLYMERIC COATED)
Goodfellow Brothers, Inc $650.00 $39,000.00 Steve Manning Construction Inc $308.00 $18,480.00 Herback General Engineering, LLC $341.00 $20,460.00 Granite Construction Company $400.00 $24,000.00 Engineer's Estimate 60 LNFT $300.00 $18,000.00
X0840 60201-0800 24-INCH PIPE CULVERT (CORRUGATED METAL, PIPE, POLYMERIC COATED)
Goodfellow Brothers, Inc $660.00 $155,100.00 Steve Manning Construction Inc $335.00 $78,725.00 Herback General Engineering, LLC $324.00 $76,140.00 Granite Construction Company $330.00 $77,550.00 Engineer's Estimate 235 LNFT $320.00 $75,200.00
X0860 60201-1000 36-INCH PIPE CULVERT (CORRUGATED METAL, PIPE, POLYMERIC COATED)
Goodfellow Brothers, Inc $700.00 $59,500.00 Steve Manning Construction Inc $360.00 $30,600.00 Herback General Engineering, LLC $404.00 $34,340.00 Granite Construction Company $440.00 $37,400.00 Engineer's Estimate 85 LNFT $380.00 $32,300.00
10 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0880 60201-1100 42-INCH PIPE CULVERT (CORRUGATED METAL, PIPE, POLYMERIC COATED)
Goodfellow Brothers, Inc $700.00 $56,000.00 Steve Manning Construction Inc $490.00 $39,200.00 Herback General Engineering, LLC $328.00 $26,240.00 Granite Construction Company $330.00 $26,400.00 Engineer's Estimate 80 LNFT $420.00 $33,600.00
X0900 60201-1300 54-INCH PIPE CULVERT (CORRUGATED METAL, PIPE, POLYMERIC COATED)
Goodfellow Brothers, Inc $740.00 $118,400.00 Steve Manning Construction Inc $530.00 $84,800.00 Herback General Engineering, LLC $345.00 $55,200.00 Granite Construction Company $470.00 $75,200.00 Engineer's Estimate 160 LNFT $550.00 $88,000.00
X0920 60201-1400 60-INCH PIPE CULVERT (CORRUGATED METAL, PIPE, POLYMERIC COATED)
Goodfellow Brothers, Inc $750.00 $30,000.00 Steve Manning Construction Inc $580.00 $23,200.00 Herback General Engineering, LLC $447.00 $17,880.00 Granite Construction Company $640.00 $25,600.00 Engineer's Estimate 40 LNFT $600.00 $24,000.00
X0940 60202-0400 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT (CORRUGATED METAL, PIPE, POLYMERIC COATED)
Goodfellow Brothers, Inc $725.00 $83,375.00 Steve Manning Construction Inc $335.00 $38,525.00 Herback General Engineering, LLC $331.00 $38,065.00 Granite Construction Company $315.00 $36,225.00 Engineer's Estimate 115 LNFT $360.00 $41,400.00
X0960 60202-0500 30-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT (CORRUGATED METAL, PIPE, POLYMERIC COATED)
Goodfellow Brothers, Inc $725.00 $72,500.00 Steve Manning Construction Inc $347.00 $34,700.00 Herback General Engineering, LLC $252.00 $25,200.00 Granite Construction Company $315.00 $31,500.00 Engineer's Estimate 100 LNFT $400.00 $40,000.00
11 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0980 60202-0600 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT (CORRUGATED METAL, PIPE, POLYMERIC COATED)
Goodfellow Brothers, Inc $740.00 $59,200.00 Steve Manning Construction Inc $460.00 $36,800.00 Herback General Engineering, LLC $362.00 $28,960.00 Granite Construction Company $320.00 $25,600.00 Engineer's Estimate 80 LNFT $675.00 $54,000.00
X1000 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT (POLYMERIC COATED)
Goodfellow Brothers, Inc $4,100.00 $16,400.00 Steve Manning Construction Inc $500.00 $2,000.00 Herback General Engineering, LLC $1,163.00 $4,652.00 Granite Construction Company $1,200.00 $4,800.00 Engineer's Estimate 4 EACH $1,000.00 $4,000.00
X1020 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT (POLYMERIC COATED)
Goodfellow Brothers, Inc $4,500.00 $36,000.00 Steve Manning Construction Inc $750.00 $6,000.00 Herback General Engineering, LLC $1,345.00 $10,760.00 Granite Construction Company $1,400.00 $11,200.00 Engineer's Estimate 8 EACH $1,500.00 $12,000.00
X1040 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT (POLYMERIC COATED)
Goodfellow Brothers, Inc $5,600.00 $11,200.00 Steve Manning Construction Inc $1,500.00 $3,000.00 Herback General Engineering, LLC $1,345.00 $2,690.00 Granite Construction Company $2,000.00 $4,000.00 Engineer's Estimate 2 EACH $1,750.00 $3,500.00
X1060 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT (POLYMERIC COATED)
Goodfellow Brothers, Inc $7,000.00 $7,000.00 Steve Manning Construction Inc $1,900.00 $1,900.00 Herback General Engineering, LLC $2,177.00 $2,177.00 Granite Construction Company $2,900.00 $2,900.00 Engineer's Estimate 1 EACH $2,000.00 $2,000.00
12 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1080 60210-1400 END SECTION FOR 60-INCH PIPE CULVERT (POLYMERIC COATED)
Goodfellow Brothers, Inc $8,700.00 $8,700.00 Steve Manning Construction Inc $3,600.00 $3,600.00 Herback General Engineering, LLC $2,805.00 $2,805.00 Granite Construction Company $4,500.00 $4,500.00 Engineer's Estimate 1 EACH $2,500.00 $2,500.00
X1100 60211-0800 END SECTION FOR 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT (POLYMERIC
COATED)
Goodfellow Brothers, Inc $7,650.00 $15,300.00 Steve Manning Construction Inc $900.00 $1,800.00 Herback General Engineering, LLC $1,345.00 $2,690.00 Granite Construction Company $1,900.00 $3,800.00 Engineer's Estimate 2 EACH $1,800.00 $3,600.00
X1120 60211-0900 END SECTION FOR 30-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT (POLYMERIC
COATED)
Goodfellow Brothers, Inc $5,500.00 $11,000.00 Steve Manning Construction Inc $1,500.00 $3,000.00 Herback General Engineering, LLC $1,345.00 $2,690.00 Granite Construction Company $2,300.00 $4,600.00 Engineer's Estimate 2 EACH $2,000.00 $4,000.00
X1140 60403-0000 INLET (CALTRANS TYPE G1)
Goodfellow Brothers, Inc $5,700.00 $5,700.00 Steve Manning Construction Inc $7,000.00 $7,000.00 Herback General Engineering, LLC $7,000.00 $7,000.00 Granite Construction Company $7,400.00 $7,400.00 Engineer's Estimate 1 EACH $5,500.00 $5,500.00
X1160 60403-0000 INLET (CALTRANS TYPE G0)
Goodfellow Brothers, Inc $5,700.00 $28,500.00 Steve Manning Construction Inc $7,000.00 $35,000.00 Herback General Engineering, LLC $5,660.00 $28,300.00 Granite Construction Company $7,400.00 $37,000.00 Engineer's Estimate 5 EACH $6,000.00 $30,000.00
13 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1180 60409-0000 INLET TOP, METAL FRAME AND GRATE
Goodfellow Brothers, Inc $4,600.00 $27,600.00 Steve Manning Construction Inc $2,000.00 $12,000.00 Herback General Engineering, LLC $2,220.00 $13,320.00 Granite Construction Company $800.00 $4,800.00 Engineer's Estimate 6 EACH $1,100.00 $6,600.00
X1200 60502-0000 GEOCOMPOSITE UNDERDRAIN SYSTEM
Goodfellow Brothers, Inc $250.00 $858,750.00 Steve Manning Construction Inc $100.00 $343,500.00 Herback General Engineering, LLC $67.00 $230,145.00 Granite Construction Company $120.00 $412,200.00 Engineer's Estimate 3,435 LNFT $150.00 $515,250.00
X1220 60704-0000 CLEANING CULVERT IN PLACE
Goodfellow Brothers, Inc $4,400.00 $39,600.00 Steve Manning Construction Inc $4,000.00 $36,000.00 Herback General Engineering, LLC $1,829.00 $16,461.00 Granite Construction Company $4,000.00 $36,000.00 Engineer's Estimate 9 EACH $3,000.00 $27,000.00
X1240 60901-1200 CURB, CONCRETE, 14-INCH DEPTH
Goodfellow Brothers, Inc $41.00 $647,800.00 Steve Manning Construction Inc $90.00 $1,422,000.00 Herback General Engineering, LLC $90.00 $1,422,000.00 Granite Construction Company $45.00 $711,000.00 Engineer's Estimate 15,800 LNFT $50.00 $790,000.00
X1260 60908-1000 PAVED DITCH, ASPHALT
Goodfellow Brothers, Inc $46.00 $117,300.00 Steve Manning Construction Inc $120.00 $306,000.00 Herback General Engineering, LLC $47.00 $119,850.00 Granite Construction Company $50.00 $127,500.00 Engineer's Estimate 2,550 SQYD $70.00 $178,500.00
X1280 61501-0500 SIDEWALK, EXPOSED AGGREGATE CONCRETE
Goodfellow Brothers, Inc $500.00 $7,500.00 Steve Manning Construction Inc $268.00 $4,020.00 Herback General Engineering, LLC $338.00 $5,070.00 Granite Construction Company $225.00 $3,375.00 Engineer's Estimate 15 SQYD $750.00 $11,250.00
14 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1300 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT
Goodfellow Brothers, Inc $14,500.00 $72,500.00 Steve Manning Construction Inc $17,950.00 $89,750.00 Herback General Engineering, LLC $20,445.00 $102,225.00 Granite Construction Company $17,200.00 $86,000.00 Engineer's Estimate 5 EACH $25,000.00 $125,000.00
X1320 62011-0700 STONE MASONRY HEADWALL FOR 36-INCH PIPE CULVERT
Goodfellow Brothers, Inc $16,000.00 $32,000.00 Steve Manning Construction Inc $19,800.00 $39,600.00 Herback General Engineering, LLC $22,280.00 $44,560.00 Granite Construction Company $18,700.00 $37,400.00 Engineer's Estimate 2 EACH $40,000.00 $80,000.00
X1340 62011-0800 STONE MASONRY HEADWALL FOR 42-INCH PIPE CULVERT
Goodfellow Brothers, Inc $18,000.00 $18,000.00 Steve Manning Construction Inc $22,550.00 $22,550.00 Herback General Engineering, LLC $24,960.00 $24,960.00 Granite Construction Company $20,800.00 $20,800.00 Engineer's Estimate 1 EACH $46,000.00 $46,000.00
X1360 62011-1100 STONE MASONRY HEADWALL FOR 60-INCH PIPE CULVERT
Goodfellow Brothers, Inc $23,000.00 $23,000.00 Steve Manning Construction Inc $28,600.00 $28,600.00 Herback General Engineering, LLC $31,400.00 $31,400.00 Granite Construction Company $25,900.00 $25,900.00 Engineer's Estimate 1 EACH $67,000.00 $67,000.00
X1380 62011-1800 STONE MASONRY HEADWALL FOR DOUBLE 24-INCH PIPE CULVERT
Goodfellow Brothers, Inc $17,500.00 $17,500.00 Steve Manning Construction Inc $21,450.00 $21,450.00 Herback General Engineering, LLC $24,000.00 $24,000.00 Granite Construction Company $20,300.00 $20,300.00 Engineer's Estimate 1 EACH $42,000.00 $42,000.00
X1400 62011-1900 STONE MASONRY HEADWALL FOR DOUBLE 30-INCH PIPE CULVERT
Goodfellow Brothers, Inc $23,000.00 $23,000.00 Steve Manning Construction Inc $27,500.00 $27,500.00 Herback General Engineering, LLC $32,000.00 $32,000.00 Granite Construction Company $25,900.00 $25,900.00 Engineer's Estimate 1 EACH $57,000.00 $57,000.00
15 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1420 62011-2000 STONE MASONRY HEADWALL FOR DOUBLE 36-INCH PIPE CULVERT
Goodfellow Brothers, Inc $25,500.00 $51,000.00 Steve Manning Construction Inc $33,000.00 $66,000.00 Herback General Engineering, LLC $35,750.00 $71,500.00 Granite Construction Company $28,400.00 $56,800.00 Engineer's Estimate 2 EACH $67,500.00 $135,000.00
X1440 62011-2300 STONE MASONRY HEADWALL FOR DOUBLE 54-INCH PIPE CULVERT
Goodfellow Brothers, Inc $32,500.00 $65,000.00 Steve Manning Construction Inc $44,000.00 $88,000.00 Herback General Engineering, LLC $45,250.00 $90,500.00 Granite Construction Company $35,800.00 $71,600.00 Engineer's Estimate 2 EACH $90,000.00 $180,000.00
X1460 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
Goodfellow Brothers, Inc $175.00 $7,000.00 Steve Manning Construction Inc $200.00 $8,000.00 Herback General Engineering, LLC $170.00 $6,800.00 Granite Construction Company $260.00 $10,400.00 Engineer's Estimate 40 HOUR $230.00 $9,200.00
X1480 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
Goodfellow Brothers, Inc $190.00 $7,600.00 Steve Manning Construction Inc $250.00 $10,000.00 Herback General Engineering, LLC $188.00 $7,520.00 Granite Construction Company $215.00 $8,600.00 Engineer's Estimate 40 HOUR $200.00 $8,000.00
X1500 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
Goodfellow Brothers, Inc $250.00 $10,000.00 Steve Manning Construction Inc $280.00 $11,200.00 Herback General Engineering, LLC $265.00 $10,600.00 Granite Construction Company $230.00 $9,200.00 Engineer's Estimate 40 HOUR $220.00 $8,800.00
X1520 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
Goodfellow Brothers, Inc $280.00 $11,200.00 Steve Manning Construction Inc $320.00 $12,800.00 Herback General Engineering, LLC $265.00 $10,600.00 Granite Construction Company $275.00 $11,000.00 Engineer's Estimate 40 HOUR $250.00 $10,000.00
16 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1540 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
Goodfellow Brothers, Inc $230.00 $9,200.00 Steve Manning Construction Inc $320.00 $12,800.00 Herback General Engineering, LLC $265.00 $10,600.00 Granite Construction Company $255.00 $10,200.00 Engineer's Estimate 40 HOUR $255.00 $10,200.00
X1560 62301-0000 GENERAL LABOR
Goodfellow Brothers, Inc $95.00 $9,500.00 Steve Manning Construction Inc $120.00 $12,000.00 Herback General Engineering, LLC $109.00 $10,900.00 Granite Construction Company $105.00 $10,500.00 Engineer's Estimate 100 HOUR $100.00 $10,000.00
X1570 62302-0000 SPECIAL LABOR (NATIVE AMERICAN MONITOR)
Goodfellow Brothers, Inc $150.00 $90,000.00 Steve Manning Construction Inc $120.00 $72,000.00 Herback General Engineering, LLC $175.00 $105,000.00 Granite Construction Company $200.00 $120,000.00 Engineer's Estimate 600 HOUR $70.00 $42,000.00
X1580 62302-0100 SPECIAL LABOR, SLOPE SCALING
Goodfellow Brothers, Inc $93.00 $4,464.00 Steve Manning Construction Inc $950.00 $45,600.00 Herback General Engineering, LLC $250.00 $12,000.00 Granite Construction Company $500.00 $24,000.00 Engineer's Estimate 48 HOUR $770.00 $36,960.00
X1600 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
Goodfellow Brothers, Inc $150.00 $3,000.00 Steve Manning Construction Inc $300.00 $6,000.00 Herback General Engineering, LLC $250.00 $5,000.00 Granite Construction Company $180.00 $3,600.00 Engineer's Estimate 20 HOUR $210.00 $4,200.00
X1620 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Goodfellow Brothers, Inc $325.00 $13,000.00 Steve Manning Construction Inc $350.00 $14,000.00 Herback General Engineering, LLC $250.00 $10,000.00 Granite Construction Company $300.00 $12,000.00 Engineer's Estimate 40 HOUR $300.00 $12,000.00
17 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1640 62407-0000 PLACING CONSERVED TOPSOIL
Goodfellow Brothers, Inc $25.00 $153,750.00 Steve Manning Construction Inc $45.00 $276,750.00 Herback General Engineering, LLC $56.00 $344,400.00 Granite Construction Company $70.00 $430,500.00 Engineer's Estimate 6,150 CUYD $45.00 $276,750.00
X1660 62510-2000 SEEDING, HYDRAULIC METHOD
Goodfellow Brothers, Inc $1,000.00 $12,000.00 Steve Manning Construction Inc $1,500.00 $18,000.00 Herback General Engineering, LLC $3,045.00 $36,540.00 Granite Construction Company $1,300.00 $15,600.00 Engineer's Estimate 12.0 ACRE $6,000.00 $72,000.00
X1680 62515-2000 MULCHING, HYDRAULIC METHOD
Goodfellow Brothers, Inc $2,100.00 $25,200.00 Steve Manning Construction Inc $2,800.00 $33,600.00 Herback General Engineering, LLC $5,625.00 $67,500.00 Granite Construction Company $2,600.00 $31,200.00 Engineer's Estimate 12.0 ACRE $6,000.00 $72,000.00
X1700 63301-0000 SIGN SYSTEM
Goodfellow Brothers, Inc $500.00 $9,500.00 Steve Manning Construction Inc $750.00 $14,250.00 Herback General Engineering, LLC $465.00 $8,835.00 Granite Construction Company $580.00 $11,020.00 Engineer's Estimate 19 EACH $550.00 $10,450.00
X1720 63308-2000 OBJECT MARKER, TYPE 2
Goodfellow Brothers, Inc $5.00 $950.00 Steve Manning Construction Inc $90.00 $17,100.00 Herback General Engineering, LLC $407.00 $77,330.00 Granite Construction Company $110.00 $20,900.00 Engineer's Estimate 190 EACH $90.00 $17,100.00
X1740 63308-3000 OBJECT MARKER, TYPE 3
Goodfellow Brothers, Inc $5.00 $20.00 Steve Manning Construction Inc $100.00 $400.00 Herback General Engineering, LLC $407.00 $1,628.00 Granite Construction Company $250.00 $1,000.00 Engineer's Estimate 4 EACH $250.00 $1,000.00
18 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1760 63309-1000 DELINEATOR, TYPE SNOW POLE
Goodfellow Brothers, Inc $50.00 $19,050.00 Steve Manning Construction Inc $120.00 $45,720.00 Herback General Engineering, LLC $350.00 $133,350.00 Granite Construction Company $185.00 $70,485.00 Engineer's Estimate 381 EACH $110.00 $41,910.00
X1780 63316-1000 REMOVE AND RESET SIGN
Goodfellow Brothers, Inc $500.00 $7,500.00 Steve Manning Construction Inc $500.00 $7,500.00 Herback General Engineering, LLC $290.00 $4,350.00 Granite Construction Company $150.00 $2,250.00 Engineer's Estimate 15 EACH $250.00 $3,750.00
X1800 63319-0000 POST SLEEVE
Goodfellow Brothers, Inc $5,000.00 $35,000.00 Steve Manning Construction Inc $150.00 $1,050.00 Herback General Engineering, LLC $1,442.00 $10,094.00 Granite Construction Company $1,000.00 $7,000.00 Engineer's Estimate 7 EACH $200.00 $1,400.00
X1820 63326-0000 MUMBLE STRIP (CENTERLINE)
Goodfellow Brothers, Inc $1,500.00 $13,050.00 Steve Manning Construction Inc $1,810.00 $15,747.00 Herback General Engineering, LLC $2,000.00 $17,400.00 Granite Construction Company $6,000.00 $52,200.00 Engineer's Estimate 8.7 MILE $1,000.00 $8,700.00
X1840 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID
Goodfellow Brothers, Inc $940.00 $61,570.00 Steve Manning Construction Inc $770.00 $50,435.00 Herback General Engineering, LLC $1,746.00 $114,363.00 Granite Construction Company $610.00 $39,955.00 Engineer's Estimate 65.500 MILE $2,000.00 $131,000.00
X1860 63402-0400 PAVEMENT MARKINGS, TYPE B, BROKEN
Goodfellow Brothers, Inc $310.00 $1,209.00 Steve Manning Construction Inc $660.00 $2,574.00 Herback General Engineering, LLC $1,746.00 $6,809.40 Granite Construction Company $610.00 $2,379.00 Engineer's Estimate 3.900 MILE $1,500.00 $5,850.00
19 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1880 63405-0050 PAVEMENT MARKINGS, SYMBOLS
Goodfellow Brothers, Inc $850.00 $2,550.00 Steve Manning Construction Inc $200.00 $600.00 Herback General Engineering, LLC $125.00 $375.00 Granite Construction Company $550.00 $1,650.00 Engineer's Estimate 3 EACH $330.00 $990.00
X1900 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
Goodfellow Brothers, Inc Lump Sum $500.00 Steve Manning Construction Inc Lump Sum $120,000.00 Herback General Engineering, LLC Lump Sum $91,200.00 Granite Construction Company Lump Sum $118,000.00 Engineer's Estimate ALL LPSM Lump Sum $90,000.00
X1920 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
Goodfellow Brothers, Inc $45.00 $5,850.00 Steve Manning Construction Inc $40.00 $5,200.00 Herback General Engineering, LLC $32.00 $4,160.00 Granite Construction Company $20.00 $2,600.00 Engineer's Estimate 130 EACH $30.00 $3,900.00
X1940 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER
Goodfellow Brothers, Inc $69.00 $8,970.00 Steve Manning Construction Inc $90.00 $11,700.00 Herback General Engineering, LLC $37.00 $4,810.00 Granite Construction Company $20.00 $2,600.00 Engineer's Estimate 130 EACH $30.00 $3,900.00
X1960 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
Goodfellow Brothers, Inc $19.00 $1,900.00 Steve Manning Construction Inc $10.00 $1,000.00 Herback General Engineering, LLC $11.00 $1,100.00 Granite Construction Company $12.00 $1,200.00 Engineer's Estimate 100 LNFT $5.00 $500.00
X1980 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
Goodfellow Brothers, Inc $60.00 $10,320.00 Steve Manning Construction Inc $52.00 $8,944.00 Herback General Engineering, LLC $25.00 $4,300.00 Granite Construction Company $39.00 $6,708.00 Engineer's Estimate 172 SQFT $30.00 $5,160.00
20 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X2000 63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
Goodfellow Brothers, Inc $994.00 $34,790.00 Steve Manning Construction Inc $1,000.00 $35,000.00 Herback General Engineering, LLC $3,688.00 $129,080.00 Granite Construction Company $1,500.00 $52,500.00 Engineer's Estimate 35.0 MILE $1,600.00 $56,000.00
X2020 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
Goodfellow Brothers, Inc $90.00 $360,000.00 Steve Manning Construction Inc $120.00 $480,000.00 Herback General Engineering, LLC $102.00 $408,000.00 Granite Construction Company $90.00 $360,000.00 Engineer's Estimate 4,000 HOUR $115.00 $460,000.00
X2040 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
Goodfellow Brothers, Inc $120.00 $144,000.00 Steve Manning Construction Inc $170.00 $204,000.00 Herback General Engineering, LLC $123.00 $147,600.00 Granite Construction Company $108.00 $129,600.00 Engineer's Estimate 1,200 HOUR $150.00 $180,000.00
X2060 63602-7000 SYSTEM INSTALLATION, SPEED FEEDBACK SIGN
Goodfellow Brothers, Inc $5,000.00 $20,000.00 Steve Manning Construction Inc $10,000.00 $40,000.00 Herback General Engineering, LLC $6,988.00 $27,952.00 Granite Construction Company $15,000.00 $60,000.00 Engineer's Estimate 4 EACH $10,000.00 $40,000.00
X2080 64620-0000 REMOVE AND RESET (BEAR BOX)
Goodfellow Brothers, Inc $4,000.00 $12,000.00 Steve Manning Construction Inc $1,500.00 $4,500.00 Herback General Engineering, LLC $1,440.00 $4,320.00 Granite Construction Company $3,000.00 $9,000.00 Engineer's Estimate 3 EACH $2,000.00 $6,000.00
X2100 64704-1000 MITIGATION, STREAMBED MATERIAL
Goodfellow Brothers, Inc $937.00 $16,866.00 Steve Manning Construction Inc $510.00 $9,180.00 Herback General Engineering, LLC $795.00 $14,310.00 Granite Construction Company $500.00 $9,000.00 Engineer's Estimate 18 CUYD $1,000.00 $18,000.00
21 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Total Schedule - All Items
Goodfellow Brothers, Inc $12,301,829.00 Steve Manning Construction Inc $15,066,140.00 Herback General Engineering, LLC $16,017,680.73 Granite Construction Company $16,154,830.40 Engineer's Estimate $15,145,048.00
22 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: Y
Schedule Type: Options
Solcitation No: 6982AF21B000032
Division: Central Federal Lands
State: CA County: Mariposa
Federal Land: Yosemite National Park Opened at: Lakewood
Opened by: Josephine Helms
Date: 10/25/21
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Granite Construction Company $1,975,309.00 2716 Granite Court Fresno, CA 93706
Herback General Engineering, LLC $2,271,654.60 2531 Nowlin Road Minden, NV 89423
Goodfellow Brothers, Inc $2,363,379.00
Steve Manning Construction Inc $2,559,686.00
Engineer's Estimate $2,430,000.00
23 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0020 15101-0000 MOBILIZATION
Granite Construction Company Lump Sum $190,000.00 Herback General Engineering, LLC Lump Sum $125,000.00 Goodfellow Brothers, Inc Lump Sum $145,000.00 Steve Manning Construction Inc Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $224,430.00
Y0040 15210-3000 CENTERLINE, VERIFICATION AND STAKING
Granite Construction Company $12,000.00 $60,720.00 Herback General Engineering, LLC $12,200.00 $61,732.00 Goodfellow Brothers, Inc $7,500.00 $37,950.00 Steve Manning Construction Inc $7,700.00 $38,962.00 Engineer's Estimate 5.060 MILE $7,000.00 $35,420.00
Y0060 15301-0000 CONTRACTOR QUALITY CONTROL
Granite Construction Company Lump Sum $400,000.00 Herback General Engineering, LLC Lump Sum $35,320.00 Goodfellow Brothers, Inc Lump Sum $28,000.00 Steve Manning Construction Inc Lump Sum $50,000.00 Engineer's Estimate ALL LPSM Lump Sum $45,000.00
Y0080 15401-0000 CONTRACTOR TESTING
Granite Construction Company Lump Sum $5,000.00 Herback General Engineering, LLC Lump Sum $82,000.00 Goodfellow Brothers, Inc Lump Sum $75,000.00 Steve Manning Construction Inc Lump Sum $50,000.00 Engineer's Estimate ALL LPSM Lump Sum $45,000.00
Y0100 15501-0000 CONSTRUCTION SCHEDULE
Granite Construction Company Lump Sum $500.00 Herback General Engineering, LLC Lump Sum $5,000.00 Goodfellow Brothers, Inc Lump Sum $1,200.00 Steve Manning Construction Inc Lump Sum $15,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
Y0120 15802-0000 WATERING FOR DUST CONTROL
Granite Construction Company Lump Sum $15,000.00 Herback General Engineering, LLC Lump Sum $50,000.00 Goodfellow Brothers, Inc Lump Sum $68,000.00 Steve Manning Construction Inc Lump Sum $30,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
24 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0140 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2
Granite Construction Company $1,250.00 $1,625.00 Herback General Engineering, LLC $498.00 $647.40 Goodfellow Brothers, Inc $4,200.00 $5,460.00 Steve Manning Construction Inc $5,000.00 $6,500.00 Engineer's Estimate 1.3 CUYD $300.00 $390.00
Y0160 41001-2000 SLURRY SEAL, TYPE 2 (FILL RUMBLE STRIPS)
Granite Construction Company $56.00 $71,400.00 Herback General Engineering, LLC $78.00 $99,450.00 Goodfellow Brothers, Inc $95.00 $121,125.00 Steve Manning Construction Inc $90.00 $114,750.00 Engineer's Estimate 1,275 SQYD $25.00 $31,875.00
Y0180 41402-2000 CRACKS, CLEANING AND SEALING
Granite Construction Company $12,850.00 $64,250.00 Herback General Engineering, LLC $15,000.00 $75,000.00 Goodfellow Brothers, Inc $22,000.00 $110,000.00 Steve Manning Construction Inc $25,000.00 $125,000.00 Engineer's Estimate 5.0 MILE $7,000.00 $35,000.00
Y0200 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
Granite Construction Company $150.00 $61,500.00 Herback General Engineering, LLC $142.00 $58,220.00 Goodfellow Brothers, Inc $120.00 $49,200.00 Steve Manning Construction Inc $340.00 $139,400.00 Engineer's Estimate 410 SQYD $200.00 $82,000.00
Y0220 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
Granite Construction Company $75.00 $82,575.00 Herback General Engineering, LLC $115.00 $126,615.00 Goodfellow Brothers, Inc $70.00 $77,070.00 Steve Manning Construction Inc $320.00 $352,320.00 Engineer's Estimate 1,101 SQYD $135.00 $148,635.00
Y0240 42901-0000 ULTRA-THIN BONDED WEARING COURSE
Granite Construction Company $200.00 $800,000.00 Herback General Engineering, LLC $289.00 $1,156,000.00 Goodfellow Brothers, Inc $343.00 $1,372,000.00 Steve Manning Construction Inc $280.00 $1,120,000.00 Engineer's Estimate 4,000 TON $350.00 $1,400,000.00
25 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0260 42905-0000 POLYMER MODIFIED EMULSION MEMBRANE
Granite Construction Company $1,000.00 $80,000.00 Herback General Engineering, LLC $1,400.00 $112,000.00 Goodfellow Brothers, Inc $1,100.00 $88,000.00 Steve Manning Construction Inc $1,250.00 $100,000.00 Engineer's Estimate 80 TON $1,350.00 $108,000.00
Y0280 60901-1200 CURB, CONCRETE, 14-INCH DEPTH
Granite Construction Company $80.00 $32,400.00 Herback General Engineering, LLC $90.00 $36,450.00 Goodfellow Brothers, Inc $45.00 $18,225.00 Steve Manning Construction Inc $90.00 $36,450.00 Engineer's Estimate 405 LNFT $50.00 $20,250.00
Y0300 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
Granite Construction Company $260.00 $2,600.00 Herback General Engineering, LLC $170.00 $1,700.00 Goodfellow Brothers, Inc $175.00 $1,750.00 Steve Manning Construction Inc $200.00 $2,000.00 Engineer's Estimate 10 HOUR $230.00 $2,300.00
Y0320 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
Granite Construction Company $200.00 $2,000.00 Herback General Engineering, LLC $188.00 $1,880.00 Goodfellow Brothers, Inc $200.00 $2,000.00 Steve Manning Construction Inc $250.00 $2,500.00 Engineer's Estimate 10 HOUR $200.00 $2,000.00
Y0340 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
Granite Construction Company $210.00 $2,100.00 Herback General Engineering, LLC $265.00 $2,650.00 Goodfellow Brothers, Inc $230.00 $2,300.00 Steve Manning Construction Inc $280.00 $2,800.00 Engineer's Estimate 10 HOUR $220.00 $2,200.00
Y0360 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
Granite Construction Company $235.00 $2,350.00 Herback General Engineering, LLC $265.00 $2,650.00 Goodfellow Brothers, Inc $275.00 $2,750.00 Steve Manning Construction Inc $320.00 $3,200.00 Engineer's Estimate 10 HOUR $250.00 $2,500.00
26 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0380 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
Granite Construction Company $205.00 $2,050.00 Herback General Engineering, LLC $265.00 $2,650.00 Goodfellow Brothers, Inc $250.00 $2,500.00 Steve Manning Construction Inc $320.00 $3,200.00 Engineer's Estimate 10 HOUR $255.00 $2,550.00
Y0400 62301-0000 GENERAL LABOR
Granite Construction Company $105.00 $2,625.00 Herback General Engineering, LLC $109.00 $2,725.00 Goodfellow Brothers, Inc $90.00 $2,250.00 Steve Manning Construction Inc $120.00 $3,000.00 Engineer's Estimate 25 HOUR $100.00 $2,500.00
Y0420 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
Granite Construction Company $180.00 $1,800.00 Herback General Engineering, LLC $250.00 $2,500.00 Goodfellow Brothers, Inc $150.00 $1,500.00 Steve Manning Construction Inc $350.00 $3,500.00 Engineer's Estimate 10 HOUR $210.00 $2,100.00
Y0440 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Granite Construction Company $300.00 $6,000.00 Herback General Engineering, LLC $250.00 $5,000.00 Goodfellow Brothers, Inc $325.00 $6,500.00 Steve Manning Construction Inc $350.00 $7,000.00 Engineer's Estimate 20 HOUR $300.00 $6,000.00
Y0460 63301-0000 SIGN SYSTEM
Granite Construction Company $580.00 $580.00 Herback General Engineering, LLC $465.00 $465.00 Goodfellow Brothers, Inc $500.00 $500.00 Steve Manning Construction Inc $750.00 $750.00 Engineer's Estimate 1 EACH $550.00 $550.00
Y0480 63326-0000 MUMBLE STRIP (CENTERLINE)
Granite Construction Company $6,000.00 $30,360.00 Herback General Engineering, LLC $2,000.00 $10,120.00 Goodfellow Brothers, Inc $1,650.00 $8,349.00 Steve Manning Construction Inc $1,800.00 $9,108.00 Engineer's Estimate 5.06 MILE $1,000.00 $5,060.00
27 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0500 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID
Granite Construction Company $610.00 $25,010.00 Herback General Engineering, LLC $1,746.00 $71,586.00 Goodfellow Brothers, Inc $940.00 $38,540.00 Steve Manning Construction Inc $800.00 $32,800.00 Engineer's Estimate 41.000 MILE $1,000.00 $41,000.00
Y0520 63405-0050 PAVEMENT MARKINGS, SYMBOLS
Granite Construction Company $200.00 $600.00 Herback General Engineering, LLC $1,746.00 $5,238.00 Goodfellow Brothers, Inc $310.00 $930.00 Steve Manning Construction Inc $200.00 $600.00 Engineer's Estimate 3 EACH $330.00 $990.00
Y0540 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW
Granite Construction Company $200.00 $200.00 Herback General Engineering, LLC $125.00 $125.00 Goodfellow Brothers, Inc $310.00 $310.00 Steve Manning Construction Inc $250.00 $250.00 Engineer's Estimate 1 EACH $150.00 $150.00
Y0560 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
Granite Construction Company Lump Sum $1,000.00 Herback General Engineering, LLC Lump Sum $30,386.00 Goodfellow Brothers, Inc Lump Sum $600.00 Steve Manning Construction Inc Lump Sum $36,000.00 Engineer's Estimate ALL LPSM Lump Sum $90,000.00
Y0580 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
Granite Construction Company $20.00 $2,600.00 Herback General Engineering, LLC $32.00 $4,160.00 Goodfellow Brothers, Inc $45.00 $5,850.00 Steve Manning Construction Inc $40.00 $5,200.00 Engineer's Estimate 130 EACH $30.00 $3,900.00
Y0600 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER
Granite Construction Company $12.00 $1,560.00 Herback General Engineering, LLC $37.00 $4,810.00 Goodfellow Brothers, Inc $70.00 $9,100.00 Steve Manning Construction Inc $90.00 $11,700.00 Engineer's Estimate 130 EACH $30.00 $3,900.00
28 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0620 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
Granite Construction Company $42.00 $7,224.00 Herback General Engineering, LLC $25.00 $4,300.00 Goodfellow Brothers, Inc $60.00 $10,320.00 Steve Manning Construction Inc $68.00 $11,696.00 Engineer's Estimate 172 SQFT $30.00 $5,160.00
Y0640 63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
Granite Construction Company $100.00 $2,040.00 Herback General Engineering, LLC $3,688.00 $75,235.20 Goodfellow Brothers, Inc $2,500.00 $51,000.00 Steve Manning Construction Inc $1,000.00 $20,400.00 Engineer's Estimate 20.4 MILE $1,600.00 $32,640.00
Y0660 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
Granite Construction Company $90.00 $9,000.00 Herback General Engineering, LLC $102.00 $10,200.00 Goodfellow Brothers, Inc $105.00 $10,500.00 Steve Manning Construction Inc $120.00 $12,000.00 Engineer's Estimate 100 HOUR $115.00 $11,500.00
Y0680 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
Granite Construction Company $108.00 $8,640.00 Herback General Engineering, LLC $123.00 $9,840.00 Goodfellow Brothers, Inc $120.00 $9,600.00 Steve Manning Construction Inc $170.00 $13,600.00 Engineer's Estimate 80 HOUR $150.00 $12,000.00
Total Schedule - All Items
Granite Construction Company $1,975,309.00 Herback General Engineering, LLC $2,271,654.60 Goodfellow Brothers, Inc $2,363,379.00 Steve Manning Construction Inc $2,559,686.00 Engineer's Estimate $2,430,000.00
29 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF21B000032
Division: Central Federal Lands
State: CA County: Mariposa
Federal Land: Yosemite National Park Opened at: Lakewood
Opened by: Josephine Helms
Date: 10/25/21
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Herback General Engineering, LLC $14,670,764.07 2531 Nowlin Road Minden, NV 89423
Steve Manning Construction Inc $14,784,988.00
Granite Construction Company $16,658,563.00 2716 Granite Court Fresno, CA 93706
Goodfellow Brothers, Inc $18,120,209.65
Engineer's Estimate $16,144,320.00
30 out of 50
Project No: CA FTNP YOSE 15(2)
Project Name: Glacier Point Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0020 15101-0000 MOBILIZATION
Herback General Engineering, LLC Lump Sum $885,000.00 Steve Manning Construction Inc Lump Sum $1,500,000.00 Granite Construction Company Lump Sum $1,485,000.00 Goodfellow Brothers, Inc Lump Sum $3,160,000.00 Engineer's Estimate ALL LPSM Lump Sum $1,831,083.60
A0040 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
Herback General Engineering, LLC $30,000.00 $65,880.00 Steve Manning Construction Inc $26,500.00 $58,194.00 Granite Construction Company $17,000.00 $37,332.00 Goodfellow Brothers, Inc $25,000.00 $54,900.00 Engineer's Estimate 2.196 MILE $14,000.00 $30,744.00
A0060 15214-2000 SURVEY AND STAKING, RETAINING WALL
Herback General Engineering, LLC Lump Sum $14,000.00 Steve Manning Construction Inc Lump Sum $19,500.00 Granite Construction Company Lump Sum $5,200.00 Goodfellow Brothers, Inc Lump Sum $15,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00
A0080 15214-3000 SURVEY AND STAKING, PARKING AREA
Herback General Engineering, LLC Lump Sum $31,000.00 Steve Manning Construction Inc Lump Sum $27,500.00 Granite Construction Company Lump Sum $24,000.00…