A004 CA YOSE 15(2) Glacier Point Road.pdf

PDF 842 KB Posted

Attached to
CA FTNP YOSE 15(2) Glacier Point Road Federal contract opportunity
Solicitation number
6982AF21B000032
Issued by
Department of Transportation Federal Highway Administration

About this file

This document is an amendment to a federal solicitation for road construction services. The amendment provides changes to contract clauses and special contract requirements for work on CA FTNP YOSE 15(2) Glacier Point Road. Offerors must acknowledge receipt of the amendment by the designated date and time or risk rejection of their bid. The work includes asphalt concrete pavement construction with a one-year warranty period. A new section is added for an Ultrathin Bonded Wearing Course using a polymer modified emulsion membrane and ultrathin wearing course mixture applied in a single pass. Pavement roughness criteria and remedies are also outlined. The Federal Highway Administration Central Federal Lands Highway Division is the issuing agency.

View the file

Other files for this federal contract opportunity

Other files attached to CA FTNP YOSE 15(2) Glacier Point Road, newest first.
File Type Posted
Tabulation of Bids - Glacier Point Road.pdf PDF
Bid Opening Summary Glacier Point - 10212021.doc DOC document
Questions and Answers 10.18.2021 .docx DOCX document
A003 CA YOSE 15(2) Glacier Point Road.pdf PDF
Interested Vendors List 10-14-2021.docx DOCX document
A002 - CA FNTP YOSE 15(2) Glacier Point Road.pdf PDF
A002 CA FNTP YOSE 15(2) Glacier Point Road.pdf PDF
Questions and Answers 10.13.2021 (2).docx DOCX document
Questions and Answers 10.13.2021.docx DOCX document
Interested Vendors List 10-12-2021.docx DOCX document
Interested Vendors 10-07-2021.docx DOCX document
Glacier Point_Cross Sections.pdf PDF
A001 CA FTNP YOSE 15(2) Glacier Point Road.pdf PDF
CA FTNP YOSE 15(2) Glacier Point Rd - Final Pavement Report.pdf PDF
Glacier Point Road Plans with schedule.options.pdf PDF
YOSE15(2)_FinalHydMemo.pdf PDF
FP-14.pdf PDF
CA FTNP YOSE 15(2) Glacier Point Road - IFB.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

C-15

52.236-17 Layout of Work. (APR 1984)

52.236-21 Specifications and Drawings for Construction. (FEB 1997)

52.236-26 Preconstruction Conference. (FEB 1995)

52.242-13 Bankruptcy. (JUL 1995)

52.242-14 Suspension of Work. (APR 1984)

52.243-4 Changes. (JUN 2007)

52.243-6 Change Order Accounting. (APR 1984)

52.244-6 Subcontracts for Commercial Items. (OCT 2020)

52.245-1 Government Property (SEP 2021) - Alternate I (APR 2012)

52.245-9 Use and Charges. (APR 2012)

52.246-12 Inspection of Construction. (AUG 1996)

52.246-21 Warranty of Construction. (MAR 1994)

(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (i) of this clause, that work performed under Section 401. – ASPHALT CONCRETE PAVEMENT BY GYRATORY MIX DESIGN METHOD conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier. (See Section 404 – ASPHALT CONCRETE PAVEMENT WARRANTY)

(b) This warranty shall continue for a period of 1 year from the date of substantial completion of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.

(c) The Contractor shall remedy at the Contractor’s expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor’s expense any damage to Government-owned or controlled real or personal property, when that damage is the result of-

(1) The Contractor’s failure to conform to contract requirements; or

(2) Any defect of equipment, material, workmanship, or design furnished.

(d) The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor’s warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.

Amendment A004 10/15/2021

C-17 address(es): http://www.acquisition.gov/far

(End of clause)

52.252-4 Alterations in Contract. (APR 1984)

Portions of this contract are altered as follows: See FAR 52.246-21(a)&(b)

(End of clause)

52.253-1 Computer Generated Forms. (JAN 1991)

1252.223-71 Accident and Fire Reporting. (APR 2005)

(a) The Contractor shall report to the Contracting Officer any accident or fire occurring at the site of the work which causes:

(1) A fatality or as much as one lost workday on the part of any employee of the Contractor or subcontractor at any tier;

(2) Damage of $1,000 or more to Government-owned or leased property, either real or personal;

(3) Damage of $1,000 or more to Contractor or subcontractor owned or leased motor vehicles or mobile equipment; or

(4) Damage for which a contract time extension may be requested.

(b) Accident and fire reports required by paragraph (a) above shall be accomplished by the following means:

(1) Accidents or fires resulting in a death, hospitalization of five or more persons, or destruction of Government-owned or leased property (either real or personal), the total value of which is estimated at $100,000 or more, shall be reported immediately by telephone to the Contracting Officer or his/her authorized representative and shall be confirmed by telegram or facsimile transmission within 24 hours to the Contracting Officer. Such telegram or facsimile transmission shall state all known facts as to extent of injury and damage and as to cause of the accident or fire.

(2) Other accident and fire reports required by paragraph (a) above may be reported by the Contractor using a state, private insurance carrier, or Contractor accident report form which provides for the statement of:

(i) The extent of injury; and

(ii) The damage and cause of the accident or fire.

E-77

CA FTNP YOSE 15(2)

Glacier Point Road

Add the following Section:

Section 404. – Asphalt Concrete Pavement Warranty

Description

404.01 This work consists of providing a warranty for hot or warm mix asphalt concrete pavement.

Construction Requirements

404.02 General. Follow the requirements of FAR Clause 52.246-21 Warranty of Construction, as altered.

404.03 Warranty Requirement. A 1-year warranty is required on all asphalt pavement items.

The 1 year time period begins from the point of substantial completion. All warranty work items will be repaired at no additional cost the government. Table 404-1 contains warranty criteria information.

(a) Warranty Criteria.

Type I roughness, after construction (Final MRI)

" " " " Within 21 days after completing paving

Surface after construction

Type II roughness, before construction (Initial MRI)

" " " " Within 14 days of Notice to Proceed

Original surface before construction

Type II roughness, after construction (Final MRI)

" " " " Within 21 days after completing paving

Surface after construction

Type III roughness

(Final MRI)

" " " " Within 21 days after completing paving

Surface after construction

Process control

(153.03)

Surface tolerance

Straightedge measurements

Subsection 401.16(e)

Contractor determined

See Subsection 401.16(e)

" 24 hours

E-79

CA FTNP YOSE 15(2)

Glacier Point Road

Remedial work will not be required if any one of the following conditions is found to apply as mutually agreed upon by the Contractor and CO:

(1) Determination that the deficiency was due to the failure of the existing underlying layers that were not part of the Contract work.

(2) Determination that the deficiency was the responsibility of a third party or its actions.

(3) Determination that the deficiency was due to an Act of God event.

The warranty for remedial actions performed will not extend beyond the original warranty period (1 year after final acceptance).

404.05 Acceptance The CO will provide written acceptance of the warranted construction upon expiration of the warranty period or satisfactory completion of any required remedial actions, whichever is later.

Measurement

404.06 Do not measure warranty remediation items or the cost of furnishing the warranty bond for payment.

Payment

404.07 No payment will be made for costs associated with warranty remediation or warranty bond.

Section 429—ULTRATHIN BONDED WEARING COURSE

Description

429.01 This work consists of placing an Ultrathin Bonded Wearing Course (BWC). The BWC consists of an application of a polymer modified emulsion membrane followed immediately with an ultrathin wearing course mixture. It is accomplished in a single pass using a spray paving machine.

Asphalt binder grade is PG 64-28 M. The Pressure Aging Vessel test temperature shall be 230° F (110°C).

Asphalt binder is designated according to AASHTO M 320.

Pavement roughness will be measured using a 10-foot straightedge.

Material

Amendment A004 10/15/2021

Joe.Wilson Cross-Out

Joe.Wilson Cross-Out

A003+CA+YOSE+15(2)+Glacier+Point+Road.pdf
YOSE15(2)-SCRs-A003.pdf
Section 106. — ACCEPTANCE OF WORK
Section 109. — MEASUREMENT AND PAYMENT
Section 625. — TURF ESTABLISHMENT
topmostSubform[0]:
Page1[0]:
ContractIDCode[0]:
Page[0]: 1
Pages[0]: 5
AmendmentNo[0]: A004
EffectiveDate[0]: 10/18/2021
ReqNumber[0]:
ProjectNo[0]: CA FTNP YOSE 15(2)
IssuedBy[0]: FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 WEST DAKOTA AVENUE, SUITE 360

LAKEWOOD, COLORADO 80228

ATTENTION: JOSEPHINE HELMS

Code[0]: 6905001
AdministeredBy[0]:
Code[2]:
NameandAddress[0]:
Code[1]:
FacilityCode[0]:
CheckBox9[0]: 1
AmendmentNo[1]: 6982AF21B000032
Dated9B[0]: 9/21/2021
CheckBox10[0]: Off
ModificationNo[0]:
Dated10B[0]:
CheckBox11[0]: 1
Extended[0]: Off
NotExtended[0]: 1
Copies[0]: 0*
AccountingData[0]:
CheckBox13A[0]: Off
A13[0]:
CheckBox13B[0]: Off
CheckBox13C[0]: Off
C13[0]:
CheckBox13D[0]: Off
D13[0]:
IsNot[0]: Off
Is[0]: 1
CopiesReturned[0]: *See Item 14
Description[0]: Clauses (Section C) - remove and replace pages C-15 and C-17 with the attached, corresponding pages.

Special Contract Requirements (SCRs) - remove and replace pages E-77 and E-79 with the attached, corresponding pages.

*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)

NameandTitleSigner[0]:
DateSigned[0]:
NameandTitleOfficer[0]:
DateSigned[1]:

File details come from the government source that posted it. Updated .