This solicitation is for a road reconstruction project on Forest Route 07 in Tahoe National Forest, California. The project includes reconstructing 2.51 miles of the roadway beginning at the eastern forest boundary near State Route 89, with an option to improve an additional 0.68 miles if funding allows. Work will consist of pulverizing the existing asphalt and adding crushed aggregate base, with some sections requiring full depth reclamation blending asphalt emulsion or Portland cement. The roadway will then be paved to match existing width and striped, with signage replaced as needed. The estimated cost range is $2.5-4 million, with construction anticipated from June to October 2021. This project is advertised as a total small business set-aside.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1 of 2
A2
ABBREVIATIONS
SYMBOLS AND
CONVENTIONAL PLAN
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
DI
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
SPRING
D jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
EROSION & SEDIMENT CONTROL SYMBOLS
joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
Ø
Riprap
Rolled Erosion Control Product
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
Fiber Roll (Slope Protection)
Temporary Inlet Protection
Silt Fence
Fiber Roll (Ditch and/or Cut Slope)
STATE PROJECT
P
M N C
A R o a d w a y C
A D
D S h e e ts A G e n s h t\ s y m .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
CA
FIBREBOARD ROAD
FTFS 0007(1)
Sheet 2 of 2
A3
ABBREVIATIONS
SYMBOLS AND
CONVENTIONAL PLAN
36 31
36 31
6 1
ˆ
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS PROJECT SPECIFIC SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
STATE PROJECT
P
M N C
A R o a d w a y C
A D
D S h e e ts A G e n s h t\ s y m .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
CA
MAINLINE
TYPICAL SECTIONS
NO SCALE
Notes:
Dimensions shown are approximate and may be varied by the CO.
Existing superelevated and widened sections are not shown.
2.
1.
Variable
Existing Slope Variable Existing Slope
Traveled WayTraveled Way
Match existing Match existing
See Detail A
Shldr
0.5'
Shldr
0.5'
Construction Limits
DETAIL A
3.
Construct 30° pavement edge (safety edge)
4.
3.
with cement
6" Full depth reclamation
1:4
4.
for structural section details
See Mainline Typical Section to stay on the existing bench.
Steepen the foreslopes as necessary, but not steeper than 1:2, Construct a 1:4 or flatter foreslope unless otherwise directed by the CO.
pavement conditions.
Pavement Report for more information on existing
Reclaim to the depth specified in the typical section. See the
Fog seal and appearance.
Shape and compact as necessary for drainage after placement of asphalt concrete pavement.
Roadway Aggregate, Method 2 (pay item 30201-2000) into the mainline base section. Shoulder up with from this section. Incorporate pulverized material
Remove all pulverized asphalt material
Place in two lifts
3" Asphalt Pavement
0.5' Clear Zone 0.5' Clear Zone
Average Existing Width
21'
A5
5.
5.
32+50 to 188+50
EXISTING TYPICAL SECTION
0.4'
5.
30° first lift)
(applied prior to
Prime coat
(between lifts)
Tack Coat
32+50 to 188+50
TYPICAL SECTION
10'10' 5.5.
construction begins.
the contractor according to Subsection 152.05(m) of the SCRs before work performed. Dimensions of the roadway should be measured by existing width or as directed by CO. Payment will be made for actual
Typical Section lane width does not represent widened sections, matchvaries from 3" to 4".
Existing aggregate base depth varies from 3" to 4".
Existing asphalt pavement depth
STATE PROJECT
P
M N C
A R o a d w a y C
A D
D S h e e ts A G e n s h t\
R ty p .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
CA
Variable
W
Variable
3' minimum
1.3'
W
1.3' d
4' (typ.)
4' (typ.)
APPROACH ROADS
TYPICAL SECTIONS
4' (typ.)
Variable
V a ria b le
A
B
A
B
M a in li e
SECTION B-B
Shoulder edge V a ria b le
(1:6 desi rable )1:4 o r flat ter
M a in li
A
A B
B
SECTION A-A
b y t h e C o n tr a c ti n g O ff ic e r
R ig h t-o f-w a y o r a s s ta k d
Paved length
NO SCALE
(1:6 desirable)
1:4 or flatter base edge
Aggregate
Approach Road b y t h e C o n tr a c ti n g O ff ic e r
R ig h t-o f-w a y o r a s s ta k d
Approach Road
Flatten slope
3.
2.
3.
2.
2.
S u b g r a d e e d g e
A g g r e g a te b a s e e d g e
Total length
Paved length
W
Typical culvert location
Total length
WW
with mainline roadway construction.
Construct cut and fill slopes for approach roads to match locations to be field verified.
Stations shown are approximate locations. Actual pavement edge
Asphalt concrete
Aggregate base edge
R
R
Subgrade edge
Aggregate base edge pavement edge
Asphalt concrete
End Section A-A
5.
5.
4.4.
5.
16'
Match existing
End Section A-A
TYPICAL PLAN
TYPE 2
APPROACH ROAD
TYPICAL PLAN
TYPE 1
APPROACH ROAD
6.
5.
4.
3.
2.
1.
A6
TYPICAL SYMBOL
Type road connection on plan sheet
Example of symbol showing standard approach
Match existing cross slopes and paved width.
Match existing profile.
method 2.
Place 3" asphalt pavement on 4" Roadway aggregate, Notes:
4" Roadway Aggregate, method 2 shown may be varied ±20°, as approved by the CO.
Under special conditions, the approach road angle
Va ria ble
Note: See C sheets for R1 and R2 values for type 2 approach roads.
Subgrade edge
STATE PROJECT
P
M N C
A R o a d w a y C
A D
D S h e e ts A G e n s h t\
T Y P
A P R
D S .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
CA
Sheet and Description
B5-B6
Schedule A Tabulation of Quantities
Allowance Bid Schedule
A0100 15101-0000 MOBILIZATION LPSM ALL
A0120 15210-3000 CENTERLINE, VERIFICATION AND STAKING MILE 2.280 2.280
A0140 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0160 15401-0000 CONTRACTOR TESTING LPSM ALL
A0180 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0200 15701-0000 SOIL EROSION CONTROL LPSM ALL
A0220 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0240 20202-0000 SELECTIVE CLEARING SQYD 100 As directed by CO
A0260 20301-0700 REMOVAL OF DELINEATOR (OBJECT MARKER) EACH 60 4 64
A0280 20301-2400 REMOVAL OF SIGN EACH 10 10
A0300 20402-0000 SUBEXCAVATION CUYD 180 As directed by CO
A0320 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 2,628 132 2,760
A0340 30302-3000 SHOULDER AND DITCH RECONDITIONING LNFT 1,500 As directed by CO
A0360 30502-0600 FULL DEPTH RECLAMATION WITH CEMENT, 6-INCH DEPTH SQYD 28,116 1,384 29,500
A0380 30510-0000 CEMENTITIOUS MATERIAL TON 342 18 360
A0400 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 4,745 255 5,000
A0420 40601-0000 FOG SEAL TON 12.1 0.9 13.0
A0440 41102-1000 PRIME COAT, METHOD 1 SQYD 28,463 1,537 30,000
A0460 41105-0000 BLOTTER TON 50 14.75 lb/yd2, assume 20% of area
A0480 41201-0000 TACK COAT TON 11.7 0.8 12.5
A0500 60704-0000 CLEANING CULVERT IN PLACE EACH 15 As directed by CO
A0520 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 16
A0540 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
24-INCH WIDTH HOUR 16
A0560 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 16
A0580 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 16
A0600 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 16
A0620 62301-0000 GENERAL LABOR HOUR 16
A0640 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 8
A0660 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 8
A0680 63301-0000 SIGN SYSTEM EACH 10 1 11
A0700 63308-2000 OBJECT MARKER, TYPE 2 EACH 60 60
A0720 63309-0000 DELINEATOR EACH 116 4 120
A0740 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID MILE 22.8 0.2 23.0
A0760 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 3 3
A0780 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 100 100
MileStone: Final Estimate Date Completed: 04/06/21 Report Date: 04/06/21
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-A p r-
:5 P
M
Remarks and/or Determination of Estimated QuantityPay Item Description Unit
Estimated Quantities N
C A \0
(1
R o a d w a y\
C A D
D S h ee ts \B
-S u m m
S u m
Q Fi n a l.
xl sm ]S h ee t
STATE PROJECT
B1
FTFS 0007(1)
FIBREBOARD ROADCA
SHEET
NUMBER
Sheet and Description
B5-B6
Schedule A Tabulation of Quantities
Allowance Bid Schedule
A0800 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 100 100
A0820 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 11 11
A0840 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN EACH 27 3 30
A0860 63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS MILE 2.28 2.28
A0880 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 800 800
A0900 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 400 400
-A p r-
:5 P
M
MileStone: Final Estimate Date Completed: 04/06/21 Report Date: 04/06/21
N
C A \0
(1
R o a d w a y\
C A D
D S h ee ts \B
-S u m m
S u m
Q Fi n a l.
xl sm ]S h ee t (2
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B2
FTFS 0007(1)
FIBREBOARD ROADCA
B7
Option X Tabulation of Quantities
Allowance Bid Schedule
X0100 15101-0000 MOBILIZATION LPSM ALL
X0120 15210-3000 CENTERLINE, VERIFICATION AND STAKING MILE 0.410 0.410
X0140 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X0160 15401-0000 CONTRACTOR TESTING LPSM ALL
X0180 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
X0200 15701-0000 SOIL EROSION CONTROL LPSM ALL
X0220 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
X0240 20202-0000 SELECTIVE CLEARING SQYD 20 As directed by CO
X0260 20301-0700 REMOVAL OF DELINEATOR (OBJECT MARKER) EACH 10 10
X0280 20301-2400 REMOVAL OF SIGN EACH 6 6
X0300 20402-0000 SUBEXCAVATION CUYD 35 As directed by CO
X0320 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 448 22 470
X0340 30302-3000 SHOULDER AND DITCH RECONDITIONING LNFT 200 As directed by CO
X0360 30502-0600 FULL DEPTH RECLAMATION WITH CEMENT, 6-INCH DEPTH SQYD 5,017 283 5,300
X0380 30510-0000 CEMENTITIOUS MATERIAL TON 61 4 65
X0400 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 837 43 880
X0420 40601-0000 FOG SEAL TON 2.1 0.1 2.2
X0440 41102-1000 PRIME COAT, METHOD 1 SQYD 5,017 283 5,300
X0460 41105-0000 BLOTTER TON 10 14.75 lb/yd2, assume 20% of area
X0480 41201-0000 TACK COAT TON 2.0 0.1 2.1
X0500 60704-0000 CLEANING CULVERT IN PLACE EACH 3 As directed by CO
X0520 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 4
X0540 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
24-INCH WIDTH HOUR 4
X0560 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 4
X0580 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 4
X0600 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 4
X0620 62301-0000 GENERAL LABOR HOUR 4
X0640 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 4
X0660 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 4
X0680 63301-0000 SIGN SYSTEM EACH 6 6
X0700 63308-2000 OBJECT MARKER, TYPE 2 EACH 10 10
X0720 63309-0000 DELINEATOR EACH 30 4 34
X0740 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID MILE 4.1 0.1 4.2
X0760 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 20 20
X0780 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 20 20
X0800 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN EACH 7
X0820 63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS MILE 0.41 0.41
X0840 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 200 200
X0860 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 100 100
-A p r-
:5 P
M
MileStone: Final Estimate Date Completed: 04/06/21 Report Date: 04/06/21
N
C A \0
(1
R o a d w a y\
C A D
D S h ee ts \B
-S u m m
S u m
Q Fi n a l.
xl sm ]S h ee t (3
SUMMARY OF QUANTITIES - Option X
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B3
FTFS 0007(1)
FIBREBOARD ROADCA
B8
Option Y Tabulation of Quantities
Allowance Bid Schedule
Y0100 15101-0000 MOBILIZATION LPSM ALL
Y0120 15210-3000 CENTERLINE, VERIFICATION AND STAKING MILE 0.270 0.270
Y0140 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
Y0160 15401-0000 CONTRACTOR TESTING LPSM ALL
Y0180 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
Y0200 15701-0000 SOIL EROSION CONTROL LPSM ALL
Y0220 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
Y0240 20202-0000 SELECTIVE CLEARING SQYD 10 As directed by CO
Y0260 20301-0700 REMOVAL OF DELINEATOR (OBJECT MARKER) EACH 6 6
Y0280 20301-2400 REMOVAL OF SIGN EACH 2 2
Y0300 20402-0000 SUBEXCAVATION CUYD 25 As directed by CO
Y0320 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 292 18 310
Y0340 30302-3000 SHOULDER AND DITCH RECONDITIONING LNFT 130 As directed by CO
Y0360 30502-0600 FULL DEPTH RECLAMATION WITH CEMENT, 6-INCH DEPTH SQYD 3,267 233 3,500
Y0380 30510-0000 CEMENTITIOUS MATERIAL TON 40 5 45
Y0400 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 545 30 575
Y0420 40601-0000 FOG SEAL TON 1.4 0.2 1.6
Y0440 41102-1000 PRIME COAT, METHOD 1 SQYD 3,267 233 3,500
Y0460 41105-0000 BLOTTER TON 7 14.75 lb/yd2, assume 20% of area
Y0480 41201-0000 TACK COAT TON 1.4 0.1 1.5
Y0500 60704-0000 CLEANING CULVERT IN PLACE EACH 2 As directed by CO
Y0520 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 4
Y0540 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
24-INCH WIDTH HOUR 4
Y0560 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 4
Y0580 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 4
Y0600 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 4
Y0620 62301-0000 GENERAL LABOR HOUR 4
Y0640 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 4
Y0660 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 4
Y0680 63301-0000 SIGN SYSTEM EACH 2 2
Y0700 63308-2000 OBJECT MARKER, TYPE 2 EACH 6 6
Y0720 63309-0000 DELINEATOR EACH 18 2 20
Y0740 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID MILE 2.7 0.1 2.8
Y0760 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 20 15
Y0780 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 20 20
Y0800 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN EACH 5
Y0820 63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS MILE 0.27 0.27
Y0840 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 160 160
Y0860 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 80 80
-A p r-
:5 P
M
MileStone: Final Estimate Date Completed: 04/06/21 Report Date: 04/06/21
N
C A \0
(1
R o a d w a y\
C A D
D S h ee ts \B
-S u m m
S u m
Q Fi n a l.
xl sm ]S h ee t (4
SUMMARY OF QUANTITIES - Option Y
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B4
FTFS 0007(1)
FIBREBOARD ROADCA
B5
OF QUANTITIES
TABULATION
SCHEDULE A
STATE PROJECT
P
M N C
A R o a d w a y C
A D
D S h e e ts B S u m m T a b o f-
Q u a n ti ti e s .d
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
CA
Sheet 2 of 2
B6
OF QUANTITIES
TABULATION
SCHEDULE A
STATE PROJECT
P
M N C
A R o a d w a y C
A D
D S h e e ts B S u m m T a b o f-
Q u a n ti ti e s .d
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
CA
B7
Sheet 1 of 1
OF QUANTITIES
TABULATION
OPTION X
STATE PROJECT
P
M N C
A R o a d w a y C
A D
D S h e e ts B S u m m T a b o f-
Q u a n ti ti e s .d
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
CA
OF QUANTITIES
TABULATION
OPTION Y
Sheet 1 of 1
B8
STATE PROJECT
P
M N C
A R o a d w a y C
A D
D S h e e ts B S u m m T a b o f-
Q u a n ti ti e s .d
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
CA
DETAIL APPROVED FOR USE 12/2012
SUBEXCAVATION
NO SCALE C204-51
See bench detail than 2 ft Bench if greater Varies (2 ft typ.)
max.
2 ft
1 ft min.
6.
5.
4.
3.
2.
1.
NOTE:
REVISED: 08/2014
STATE PROJECT
NUMBER
SHEET
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY DETAIL
DETAIL
P
M N C
A R o a d w a y C
A D
D S h e e ts F C .d g n
U s e r S ta c y .D ic c ic c o
F1
Geotextile class 2, type D the CO.
not construct slopes steeper than 1:2 unless approved by slope adjustments to match the subgrade hinge point. Do
At daylight locations, match the existing fill slope or make roadway cross slope when steeper than 2%.
toward the daylight for drainage, or match the existing subgrade hinge point. Slope the excavation bottom 2%
Daylight to drain when the excavation is within 4 ft of the every 2 ft of subexcavation depth.
in bottom layers. Provide a 1 ft min. bench width for
Widen top of subexcavation area to allow for bench width
Do not place backfill material within the structural section.
Minimum subexcavation dimensions are 6 ft wide x 6 ft long.
of the SCRs, unless otherwise specified.
Replace unsuitable material according to Subsection 204.07
See typical sections for structural section
Finished grade
Backfill with material according to Section 204
TYPICAL SECTION
SUBEXCAVATION
BENCH DETAIL
Total subexcavation width
Width of need according to Section 204
Backfill with material structural section
See typical sections for
Finished grade
Geotextile class 2, type D
CA
STATE PROJECT
A
M N C
A R o a d w a y C
A D
D S h e e ts T P la n P la n S ig n S tr ip e .d
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
CA
FIBREBOARD ROAD
FTFS 0007(1)
200'100'0
Scale in Feet
STATION 32+50 TO 60+00
MARKINGS
SIGNING & PAVEMENT
MAINLINE
W1-2R
Install
W1-2L
Install edge stripe
6" solid white yellow stripe
4" solid double
T1 edge stripe
6" solid white yellow stripe
4" solid double
Station 32+50.00
Begin Schedule A
Begin Project
STATE PROJECT
A
M N C
A R o a d w a y C
A D
D S h e e ts T P la n P la n S ig n S tr ip e .d
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
CA
FIBREBOARD ROAD
FTFS 0007(1)
200'100'0
Scale in Feet
STATION 60+00 TO 90+00
MARKINGS
SIGNING & PAVEMENT
MAINLINE
edge stripe
6" solid white yellow stripe
4" solid double edge stripe
6" solid white yellow stripe
4" solid double
T2
0 1
STATE PROJECT
A
M N C
A R o a d w a y C
A D
D S h e e ts T P la n P la n S ig n S tr ip e .d
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
CA
FIBREBOARD ROAD
FTFS 0007(1)
200'100'0
Scale in Feet
STATION 90+00 TO 120+00
MARKINGS
SIGNING & PAVEMENT
MAINLINE
edge stripe
6" solid white yellow stripe
4" solid double edge stripe
6" solid white yellow stripe
T3
STATE PROJECT
A
M N C
A R o a d w a y C
A D
D S h e e ts T P la n P la n S ig n S tr ip e .d
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
CA
FIBREBOARD ROAD
FTFS 0007(1)
200'100'0
Scale in Feet
STATION 120+00 TO 150+00
MARKINGS
SIGNING & PAVEMENT
MAINLINE
edge stripe
6" solid whiteyellow stripe
4" solid double edge stripe
6" solid white yellow stripe
T4
STATE PROJECT
A
M N C
A R o a d w a y C
A D
D S h e e ts T P la n P la n S ig n S tr ip e .d
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
CA
FIBREBOARD ROAD
FTFS 0007(1)
200'100'0
Scale in Feet
STATION 150+00 TO 180+00
MARKINGS
SIGNING & PAVEMENT
MAINLINE
edge stripe
6" solid white yellow stripe
4" solid double
T5
Station 153+00.00
Begin Option X
End Schedule A edge stripe
6" solid white yellow stripe
4" solid double Station 174+50.00
Begin Option Y
End Option X
W1-2L
Install
W1-2R
Install
STATE PROJECT
A
M N C
A R o a d w a y C
A D
D S h e e ts T P la n P la n S ig n S tr ip e .d
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
CA
FIBREBOARD ROAD
FTFS 0007(1)
0edge stripe
6" solid white yellow stripe
4" solid double
STATION 180+00 TO 188+50
MARKINGS
SIGNING & PAVEMENT
MAINLINE
T6
Station 188+50.00
End Option Y
End Project
200'100'0
Scale in Feet
EPS = Edge of Paved Shoulder
ABBREVIATIONS:
4. Adopted from CALTRANS 2018 Standard Plans.
T8
633-A
PERMANENT SIGNS
STATE PROJECT
A
M N C
A R o a d w a y C
A D
D S h e e ts T C a li fo r n ia P e r m a n e n t
S ig n s .d
U.S. DEPARTMENT OF TRANSPORTATION
SPECIAL
U.S. CUSTOMARY SPECIAL
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
CA
U s e r S ta c y .D ic c ic c o
Sheet 2 of 2
10. Adopted from CALTRANS 2018 Standard Plans.
T9
633-A
PERMANENT SIGNS
STATE PROJECT
A
M N C
A R o a d w a y C
A D
D S h e e ts T C a li fo r n ia P e r m a n e n t
S ig n s .d
U.S. DEPARTMENT OF TRANSPORTATION
SPECIAL
U.S. CUSTOMARY SPECIAL
U s e r S ta c y .D ic c ic c o
NUMBER
SHEET
CA
File details come from the government source that posted it. Updated .