CA ERFO KLAMATH NF 18N31(1) Plan Set_Final.pdf
PDF 16 MB Posted
- Solicitation number
- 6982AF22B000015
About this file
This notice provides details for a federal contract solicitation for bridge construction services. The Department of Transportation Federal Highway Administration is seeking bids to replace the Upper West Branch Bridge located on the Klamath National Forest in California. The related Invitation for Bid can be found in the attachments section of this notice under the filename "IFB CA ERFO KLAMATH NF 18N31(1) UPPER WEST BRANCH BRIDGE." Bids are due by April 15th, 2022. The contract is set aside for small businesses. The selected vendor will be responsible for demolishing the existing structure and constructing a new bridge to current design standards.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CURTIS R SCOTT Digitally signed by CURTIS R SCOTT Date: 2022.03.04 15:45:26 -07'00' jointjt.J westWWinteriorint.
vertical point of intersectionVPIincrementincr.
vehicles per hourvphinclusive, includingincl.
verticalvert.inside diameterIDI design speedVVhighwayhwy.
typicaltyp.high waterHW Material Source point of tangent to spiralTShorizontalhoriz.
transversetransv.hexagonhex.
Boring Location (Existing, Proposed) temporary construction easementTCEhomestead entry surveyHES temporary bench markTBMheadwallhdwl.H GEOLOGIC SYMBOLS tangenttan.girdergdr.
townshipT.galvanizedgalv.
tangent lengthTTgage (gauge)ga.G Cattleguard (Existing, Proposed) symmetricalsym.footingftg.
structuralstruc.finishfin.
Fence w/ Gate (Existing, Proposed) straightstr.flared end sectionFES stiffenerstiff.federalFed.
Fence (Existing, Proposed) standardstd.fill facef.f.F stationsta.exteriorext. FENCE & CATTLEGUARD SYMBOLS point of spiral to tangentSTexpansion jointexp. jt.
streetst.excavationexc.
specificationspec.edge of waterEW Fiber Roll (Slope Protection) spacing, Spaces or Spacedspa.and wifeet ux shouldershldr.and otherset al Temporary Inlet Protection sectionsec.edge of roadER point of spiral to curveSCequationEQ or eq.
Silt Fence seasonal average daily trafficSADTedge of pavementEOP southSSEngineer(s)engr(s).
Fiber Roll (Ditch and/or Cut Slope) routerte.embankmentemb.
rightRt. or RTelevationelev.
Riprap reference hubRHelevation with numberEl. 94.066 retaining wallret. wallsuperelevation ratee Rolled Erosion Control Product
ReservationRes.eastEE reservoirres.drawing(s)dwg(s).
Diversion Berm requiredreqd.donation land claimDLC reinforcementreinf.districtDist.
Check Dam reconstructionreconst.distancedist.
roadwayrdwy.diaphragmdiaph.
Bonded Fiber Matrix Mulching roadrd.diagonaldiag.
right-of-wayR/Wdiameterdia. or D EROSION & SEDIMENT CONTROL SYMBOLS rangeR.drop inletDI radiusRRdesign hour volumeDHV quantitiesquant., QtyQdecrementdecr.D Riprap Apron (Proposed) pavementpvmt.culvertculv.
point of tangentPTcontingent sumCTSM Underdrain (Existing, Proposed) pounds per square inchpsicentersctrs.
projectproj.point of curve to spiralCS With Drop Inlet (Existing, Proposed) point on tangentPOTcreekcr.
point on spiralPOScorrugatedcorr.
With Headwalls (Existing, Proposed) point on curvePOCcontinuouscont.
platepl.construction jointconstr. jt.
With End Sections (Existing, Proposed) point of intersectionPIconstructionconstr.
perforateperf.concreteconc.
Pipe Culvert (Existing, Proposed) point of compound curvePCCcolumncol.
point of curvePCPcountyCo.
Box Culvert (Existing, Proposed) outside diameterODcorrugated metal pipeCMP other faceo.f.clearclr.
Bridge (Existing, Proposed) on centerso.c.Ocenter to centerc-c numberno. or #concrete box culvertCBCC negativeneg.bearingbrg.
normal crownNCbridgebr.
Spring northNNbalance pointBP mountain(s)mtn(s).bench markBM River monumentmon.backBK minimummin.beginning, beginbeg.
Wetland maximummax.both facesb.f.B materialmatl.asphaltasph.
Large Creek maintenancemaint.approachappr.
magneticmag.Malternatealt.
Lake, Pond or Reservoir low waterLWaheadAH leftLt. or LTaggregateaggr.
Drainage or Small Creek lump sumLPSMaverage daily trafficADT longitudinallong.abutmentabut.A Flow Arrow latitudelat.diameter� laminationlam.curve delta� Ditch (Existing, Proposed) length of curveLLcenterline
DRAINAGE SYMBOLSABBREVIATIONS
SPRING
DI
:4
A
M
D e c e m b e r
S h e e t
N
C
A \e rf o n (1
R o a d w a y \C
A D
D S h e e ts
\A -G e n s h t\ s y m
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
STATE PROJECT
NUMBER
SHEET
CA
CA ERFO KLAMATH NF 18N31(1)
A2
UPPER WEST BRANCH BRIDGE
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone Section Corner (Found)16
Sanitary Sewer Section Corner (Found, Projected)4
Power Section Corner (Found, Projected)
Oil Right-of-Way Line (Proposed)
Gas Right-of-Way Line (Existing)
Fiber Optic Property Line
CATV
Parcel Number
Underground Utility (Existing, Proposed) Monument (As described)
Telephone Pedestal (Existing, Proposed) Temporary (Proposed)
Telephone Booth (Existing, Proposed) Permanent (Proposed)
Street Light (Existing, Proposed) Permanent (Existing)
Support Pole Anchor (Existing, Proposed) Easements
Support Pole (Existing, Proposed) National Wildlife Refuge
Surface (Existing, Proposed) National Park
Underground (Existing, Proposed) National Forest
Irrigation Ditch Bureau of Land Management
Bureau of Indian Affairs UTILITY SYMBOLS
1/16 Section
Post Mounted (Existing, Proposed) 1/4 Section
Portable (Proposed) Section
Delineator (Existing, Proposed) Township or Range Line
Commercial (Existing, Proposed) City
Signs County
State SIGN SYMBOLS
National
Roadway Obliteration Boundaries
Roadway Centerline (With Station ticks)
Proposed
RIGHT-OF-WAY SYMBOLS
ExistingSurvey Control Point
Edge of Roadway Trail
Toe of FillSpot Elevation
Transition Double Track
Top of Cut Single Track
Slope Stake Limits Railroad
Clearing/Construction LimitsNorth Arrow
Coordinate Grid Tick
ROADWAY SYMBOLS
Building (Existing, Proposed)
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
MAPPING SYMBOLS
Guardwall (Existing, Proposed)Treeline
Guardrail (Existing, Proposed) Tree
PROJECT SPECIFIC SYMBOLSGUARDRAIL, BARRIER & WALL SYMBOLSLANDSCAPING & VEGETATION SYMBOLS
N
CP
36 31
36 31
0.00EL.
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone Section Corner (Found)16
Sanitary Sewer Section Corner (Found, Projected)4
Power Section Corner (Found, Projected)
Oil Right-of-Way Line (Proposed)
Gas Right-of-Way Line (Existing)
Fiber Optic Property Line
CATV
Parcel Number
Underground Utility (Existing, Proposed) Monument (As described)
Telephone Pedestal (Existing, Proposed) Temporary (Proposed)
Telephone Booth (Existing, Proposed) Permanent (Proposed)
Street Light (Existing, Proposed) Permanent (Existing)
Support Pole Anchor (Existing, Proposed) Easements
Support Pole (Existing, Proposed) National Wildlife Refuge
Surface (Existing, Proposed) National Park
Underground (Existing, Proposed) National Forest
Irrigation Ditch Bureau of Land Management
Bureau of Indian Affairs UTILITY SYMBOLS 1/16 Section
Post Mounted (Existing, Proposed) 1/4 Section
Portable (Proposed) Section
Delineator (Existing, Proposed) Township or Range Line
Commercial (Existing, Proposed) City
Signs County
State SIGN SYMBOLS National
Roadway Obliteration Boundaries
Roadway Centerline (With Station ticks)
Proposed
RIGHT-OF-WAY SYMBOLS
ExistingSurvey Control Point
Edge of Roadway Trail
Toe of FillSpot Elevation
Transition Double Track
Top of Cut Single Track
Slope Stake Limits Railroad
Clearing/Construction LimitsNorth Arrow
Coordinate Grid Tick ROADWAY SYMBOLS
Building (Existing, Proposed)
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
MAPPING SYMBOLS
Guardwall (Existing, Proposed)Treeline
Guardrail (Existing, Proposed) Tree
PROJECT SPECIFIC SYMBOLSGUARDRAIL, BARRIER & WALL SYMBOLSLANDSCAPING & VEGETATION SYMBOLS
:4
J a n u a ry
S h e e
C
A \e rf o n (1
R o a d w a y \C
A D
D S h e e ts
\A -G e n s h t\ s y m
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 2 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
STATE PROJECT
NUMBER
SHEET
CA
A3
REVISIONS (OR CHANGE NOTICES)
DESCRIPTION
NO.
DATE INIT.
Created 11/10/21 SJS
:1
P
N o v e m b e r
S u r v e y
C o n tr o l
C A
\e r f o n
\R o a d w a y
\C A
D D
S h e e ts
\A G e n s h t\ S u r v e y
C o n tr o l_ S h e e t.
d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SURVEY CONTROL
STATE PROJECT
NUMBER
SHEET
CA
A4
Creek Bridge
Upper Doolittle
18N15
Mill Creek Bridge
Branch Bridge
Upper West
Camp
Happy
17N11
17N16
17N11
G r a y b a c k
R d
G ra y b a ck R d
G ra y b a ck R d
N
N
17N47
N
N
18N24 hazard trees may be in effect.
access both bridge ends at both locations. Road closures due to
1. Coordinate with CO and Forest Service for latest and clear routes to
Note:
N
R d
G ra y b a c k
G ra y b a c k R d
NATIONAL FOREST
KLAMATH
NATIONAL FOREST
KLAMATH
SITE MAP
:4
F e b r u a r y
S it e M a p
C A
\e r f o n \R o a d w a y \C
A D
D S h e e ts
\A G e n s h t\
S it e M a p .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CA
A5 approx. 6"
Existing aggregate base depth pavement)
(top of
Profile grade pavement
3" Asphalt concrete
6" Roadway Aggregate, Method 2
See Detail A
3. Rounded cut slope limit
Slope stake
1:4
DETAIL A
Asphalt concrete pavement sides of roadway)
(Detail applies to both right and left
Shoulder up with Roadway Aggregate, Method 2
Construct 30° pavement edge (safety edge) base
Aggregate for structural details
See Proposed Typical Section
8" block
Hinge point
Finished grade for guardrail details
See Standards 617
Existing ground limit
Slope stake
Method 2
9" Roadway Aggregate, 2.
Fil l s lop e
1:4
VariesVaries
Average 14 ft
Sta 0+65 to 4+15
EXISTING TYPICAL SECTION
Sta 3+28 to 4+15
Sta 0+65 to 2+38
PROPOSED TYPICAL SECTION
-2% Normal crown -2% Normal crown
2% min. superelevation 4% max. superelevation
METHOD OF SUPERELEVATION ON CURVES
See Cross Sections for cross slope grade changes the actual cut height.
cut heights less than B, reduce the B and F dimensions to
Round all earth slopes and all rippable rock slopes. For 3.
See the cross sections for cut and fill slope ratios. 2.
stability.
adjusted by the CO to assure adequate drainage and excavation and embankment slope ratios may be
The gradient and width of roadway ditches and the 1.
NOTE:
2.Cu t s lo peditch
GradedTraveled wayTraveled way
Subgrade Subgrade
8' Typ. 3' 3'8' Typ.
p a v e m e n t tr a v e le d w a y
E d g e o f
Variable fill slope
TYPICAL SECTION
MGS GUARDRAIL
Support
Lateral
See Guardrail Summary for locations
1:45' and clearing limits Seeding
11' Typ. 11' Typ. and clearing limits Seeding
6' Clear zone
Construction limits
F= 5'
B=5' 5'
6' Clear zone from 12 to 16 ft Existing width varies
3'
0.0170.049TOTALS (mi)
90260TOTALS (ft)
--873+28 to 4+15
90--2+38 to 3+28
--1730+65 to 2+38
(ft)
Bridge
(ft)
Roadway Station to Station
LENGTH OF PROJECT
30°
0.43'
2'
T y p
APPROACHES
UPPER WEST BRANCH BRIDGE
TYPICAL SECTIONS
:2
F e b r u a r y
W e s t
B ra n c h T y p
C A
\e r f o n \R o a d w a y \C
A D
D S h e e ts
\A G e n s h t\
R ty p ic a l.
d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CA
A6
Subgrade edge base edge
Aggregate pavement edge
Asphalt concrete M a in li n e
R
Subgrade edge base edge
Aggregate A
A
Approach Road
End Section A-A b y t h e C o n tr a c ti n g
O f f ic e r
M a tc h e x is ti n g o r a s s ta k e d x = 15' min. for type 2 approach x = 0' for type 1 approach
V a ria b le s Variable
Method 2
9" Roadway Aggregate, s = 1:4 for type 2 approach s = 1:3 for type 1 approach d = 3' for type 2 approach d = 2' for type 1 approach
Mainline stationing road centerline.
existing radii or widths. R1 is on the left side of the approach
Vary radii to fit unusual field conditions. Do not reduce 4.
be varied ±20°.
Under special conditions, the approach road angle shown may 3.
mainline roadway construction.
Construct cut and fill slopes for approach roads to match with 2.
be field verified.
Stations shown are approximate locations. Actual locations to 1.
NOTE:
road connection on plan and profile sheet
Example of symbol showing standard approach
NO SCALE
90°
TYPICAL SECTION
TYPES 1 & 2
APPROACH ROAD
SECTION A-A
TYPICAL SYMBOL
to fit field conditions
* Adjust total length 151512*151A1+50 Rt.
to fit field conditions
* Adjust total length 151512*151A1+50 Lt.
REMARKS
(ft)
R
(ft)
R
(ft)
W
LENGTH (ft)
TOTAL
LENGTH (ft)
AGG BASE
CLASS
TYPE
STATION
APPROACH ROAD SUMMARY
*Match Existing
Paved apronn/a*A3
200�ADT 5028E2
ADT < 199�100 4024D2
ADT < 100�25 4022C2
ADT < 252520B2
Minimum 2-way Use2518A2
Logging Truck Use4016D1
Farm Equipment2516C1
Minimum 1-way use2514B1
Field Access1512A1
SAMPLE APPLICATION
(ft) R
RADIUS
MIN.
(ft) W
WIDTH
MIN.
CLASSTYPE
APPROACH ROADS
TYPICAL SECTION
W
R
Aggregate Base Length
Total length
1.3'W1.3'd
16'x
W
:4
F e b ru a ry
D D e s ig n S u rv
F
C A
\e rf o n
(1
R o a d w a y \C
A D
D
S h e e ts \A
-G e n s h t\ ty p a p
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CA
A7
Sheet and Description
B2 B3 B4 B5 S2
Surfacing Summary
Grading Summary
Miscellaneous Summaries
Miscellaneous Summaries
Upper West Branch Bridge
Allowance Bid
Schedule
A0100 15101-0000 MOBILIZATION LPSM ALL
A0120 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE MILE 0.050 0.050
A0140 15214-1000 SURVEY AND STAKING, BRIDGE LPSM All ALL
A0160 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES MILE 0.100 0.100
A0180 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0200 15401-0000 CONTRACTOR TESTING LPSM ALL
A0220 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0240 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 1,185 115 1,300
A0260 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 400 100 500
A0280 20101-0000 CLEARING AND GRUBBING ACRE 0.246 0.054 0.300
A0300 20304-2000 REMOVAL OF BRIDGE LPSM All ALL
A0320 20420-0000 EMBANKMENT CONSTRUCTION CUYD 346 14 360
A0340 20801-0000 STRUCTURE EXCAVATION CUYD 90 90 Contract Quantity
A0360 20803-0000 STRUCTURAL BACKFILL CUYD 30 30 Contract Quantity
A0380 25126-0000 REMOVE AND RESET BOULDER EACH 14 2 16
A0400 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 255 15 270
A0420 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 93 12 105
A0440 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) CUYD 21 21 Contract Quantity
A0460 55302-1200 PRECAST, PRESTRESSED CONCRETE BOX BEAM, TYPE B3-48 LNFT 360 360 Contract Quantity
A0480 55401-2000 REINFORCING STEEL, EPOXY COATED LB 2,500 2,500 Contract Quantity
A0500 55601-0900 BRIDGE RAILING, STEEL LNFT 175 175 Contract Quantity
A0520 55901-0000 MEMBRANE WATERPROOFING SQYD 160 160 Contract Quantity
A0540 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 16 16 Contract Quantity
A0560 56501-0200 DRILLED SHAFT, 24-INCH DIAMETER LNFT 240 240
A0580 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT EACH 4 4
A0600 61707-0000 STRUCTURE TRANSITION RAILING LNFT 79 79 Contract Quantity
A0620 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 20
A0640 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 20
A0660 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 20
A0680 62201-2750 MOTOR GRADER HOUR 20
A0700 62301-0000 GENERAL LABOR HOUR 20
A0720 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 20
A0740 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 20
A0760 62511-2000 SEEDING, HYDRAULIC METHOD SQYD 1,191 109 1,300
A0780 62516-2000 MULCHING, HYDRAULIC METHOD SQYD 1,191 109 1,300
A0800 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 4 4
A0820 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 2 2
A0840 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 45 45
MileStone: 100% Date Completed: 02/24/22 Report Date: 02/24/22
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A -F eb -2
:2
P
M
Remarks and/or Determination of Estimated Quantity
Pay Item Description Unit
Estimated Quantities
N
C A \e rf o n (1
R o a d w a y\
C A D
D S h ee ts \B
-S u m m su m m a ry
.x ls m ]S h ee t
STATE PROJECT
B1
CA ERFO KLAMATH NF
18N31(1)
CA
SHEET
NUMBER
:2
F e b r u a r y
S u r f a c in g S u m m a r
C A
\e r f o n \R o a d w a y \C
A D
D S h e e ts
\B S u m m \B
S h e e ts
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SURFACING SUMMARY
Asphalt concrete pavement......145.2 lb/ft3
Aggregate base......................139 lb/ft3
Values used for estimating purposes:
STATE PROJECT
NUMBER
SHEET
CA
B2
:2
F e b r u a r y
G r a d in g S u m m a r
C A
\e r f o n \R o a d w a y \C
A D
D S h e e ts
\B S u m m \B
S h e e ts
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GRADING SUMMARY
STATE PROJECT
NUMBER
SHEET
CA
B3
:5
F e b r u a r y
M is c e ll a n e o u s S u m m a r ie s
C A
\e r f o n \R o a d w a y \C
A D
D S h e e ts
\B S u m m \B
S h e e ts
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 1 of 2
MISCELLANEOUS SUMMARIES
STATE PROJECT
NUMBER
SHEET
CA
B4
:5
F e b r u a r y
M is c e ll a n e o u s S u m m a r ie s
C A
\e r f o n \R o a d w a y \C
A D
D S h e e ts
\B S u m m \B
S h e e ts
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 2 of 2
MISCELLANEOUS SUMMARIES
STATE PROJECT
NUMBER
SHEET
CA
B5
18IN DIA
18IN DIA
BTM FRONT ABUT
J H
43IN DIA
40IN DIA
18IN DIA18IN DIA
24IN DIA
14IN DIA
C P
2004FHWA-AC
4FT DIA
BEAM SEAT
4FT DIA
21IN DIA
2FT DIA
BEAM SEAT
2FT DIA
4FT DIA
I N C
M P
3.5FT DIA
2.5FT DIA
3.5FT DIA
20IN DIA
50IN DIA
TOP N. ABUT
5X4
D I R O
N L Y
45IN DIA
4006NAIL
C P
2003FHWA-AC
R = 60.00'
T = 59.46'
L = 93.70'
0+00
5+00
S '1
W
S26°13'51"W
S11°26'24"W
S '2
E
0+00
0 4+00
5+00
STA. 0+65 TO 4+15
ROADWAY PLAN AND PROFILE
UPPER WEST BRANCH BRIDGE
F lo w
C3
& 25' Type Tangent End Terminal
Install 19'-7" Transition Railing
Begin 8' RT EOP
Sta. 3+28
& 25' Type Tangent End Terminal
Install 19'-7" Transition Railing
Begin 8' LT EOP
Sta. 3+28
Easting (X): 6159430.583'
Northing (Y): 2589885.173'
Station 4+15
End Project/Reconstruction
Sta. 3+28.00
End Bridge
Forest Route 18N31� & 25' Type Tangent End Terminal Install 19'-7" Transition Railing End 8' LT/RT EOP Sta. 2+38 LT/RT
C2
Begin 7' to 8' LT EOP Transition Sta. 0+65
Begin 5' to 8' RT EOP Transition Sta. 0+65
Easting (X): 6159500.773' Northing (Y): 2590186.687' Station 0+65 Begin Project/Reconstruction
C1
Begin 8' RT EOP End 5' to 8' RT EOP Transition Sta. 1+25.5
Sta. 2+38.00 Begin Bridge
West Branch / Indian Creek�
100'50'0
Scale in Feet
Profile Grade
Elev. = 2,175.20' Begin 90' Bridge Sta. 2+38
Elev. = 2,177.00' End 90' Bridge Sta. 3+28
Station 0+65 Begin Project/Reconstruction
Existing ground
Station 4+15 End Project/Reconstruction
Begin 8' LT EOP End 7' to 8' LT EOP Transition Sta. 1+25.5
Begin 8' to 10.5' LT EOP Transition End 8' LT EOP Sta. 3+70
Begin 8' to 6' RT EOP Transition End 8' RT EOP Sta. 3+70
End 8' to 6' RT EOP Transition End 8' to 10.5' LT EOP Transition Sta. 4+15
0+00 1+00 2+00 3+00 4+00 5+00
2,150 2,150
2,160 2,160
2,170 2,170
2,180 2,180
2,190 2,190
-10.832%
+6.08 5%
.8
.8
.4
' VC38
6.91K =
'215.25SSD =
' VC125
7K =
' VC40
10K =
,1
.7
,1
.3
+2.000%
(See Sheets S1 - S13) 90' Bridge Length
:2
F e b ru a ry
A
L
IG
N N
P la n
S h e e t]
C
A \e rf o n (1
R o a d w a y \C
A D
D D e s ig n \R o a d w a y S h e e ts
U p p e r_
W e s t_
B ra n c h .d g n
STATE PROJECT
NUMBER
SHEET
CA
C1
Steel or wood post
Fence support mesh (optional)
See note 5
Geotextile
Backfilled and compacted soil
See end posts detail
End posts posts detail
See end
End posts
Toe of slope Edge of shoulder
Edge of shoulder
Toe of slope
Silt fence
Existing ground
Silt fence See note 5
Geotextile
Staple or tie
Steel or wood post
Top of posts tied together
Posts driven tightly together
Steel or wood posts
Fasten fabric to posts each post one full turn
Fold geotextile around
Staple or tie
See note 5
Section B
Geotextile
See note 5
Section A
Geotextile
Limits of clearing
(undisturbed)
Existing ground
END DETAIL
NOTE:
1.Silt fence may be installed using machine slicing as approved by the CO. Install machine-sliced silt fence according to the manufacturer's recommendations.
2.Install silt fence to follow the ground contours as closely as possible.
3.As the slope is constructed, curve the silt fence up the slope to prevent water from running around the ends.
4.Post spacing with fence support mesh = 10 ft. (max.)
Post spacing without fence support mesh = 6 ft. (max.)
5.Furnish geotextile conforming to subsection 713.16(a).
NO SCALE
POST AND GEOTEXTILE INSTALLATION DETAIL
Flo w
Fi ll slo pe See typical section sheet
Flow
ELEVATION
Flow
T o e o f s lo p e
PLAN
SILT FENCE INSTALLATION AT TOE OF FILL
ELEVATION PLAN
Fi ll sl op e
T o e o f s lo p e
Roadway
PLAN
A
A
Fill
Sheet flow
SECTION A-A
SILT FENCE AS PERIMETER CONTROL
END POSTS DETAIL
PLAN
PLAN
POSTS AT JOINTS
SILT FENCE
C157-50 m in m in m in
6" min.
6" min. trench
Varies
Varies for spacing See note 4
See note 3 See note 3
:1
N o v e m b e r
C
S h e
C A
\e r f o n
\R o a d w a y
\C A
D D
S h e e ts
\E
\C
.d g n
DETAIL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD DETAIL
DETAIL APPROVED FOR USE
07/2020 08/2014REVISED:
STATE PROJECT
NUMBER
SHEET
CA
E1 side of fiber roll material on uphill
Place excavated Wood stakes
Fiber roll
Slope
Fill slope uphill side of fiber roll
Place excavated material on uphill side of fiber roll
Place excavated material on
Fill or cut slope
Stagger joints (typ.)
along contours
Install fiber rolls roll 2" min.
Trench fiber
Fiber roll table for length requirements
See Fiber Rolls at Culverts around culvert inlet
Install fiber rolls flared end section
Culvert inlet with end section with flared
Culvert outlet length requirements
Culverts table for
See Fiber Rolls at around culvert outlet
Install fiber rolls
Fiber Roll
See note 6 control runoff culvert as needed to
Install fiber rolls below
151V:2H and steeper
30Between 1V:3H and 1V:2H
45Between 1V:4H and 1V:3H
601V:4H or flatter spacing (ft)
Fiber Roll Maximum �9" Slope Gradient
FIBER ROLL SPACING TABLE*
NOTE:
1. Repair all rills or gullies and properly compact prior to installation.
2. Install fiber rolls along slope contours. For any 20' section of fiber roll, do not allow the fiber roll to vary more than 5% from level.
3.Stake fiber rolls in place with 1 "x 1" or 1" � wood stakes. Space stakes 4' o.c. max. on slopes and 2' o.c. max. culverts. Stake fiber rolls 6-inches from each end.
4. Drive stakes into undisturbed soil at least 12" deep. Expose stakes 2" above top of fiber roll.
5. For fiber rolls on bare soil, construct trenches parallel to the contour.
Place fiber rolls in continuous contact with trench bottom and sides.
Tamp soil backfill against upstream side of fiber roll to ensure storm water is forced to flow through fiber roll rather than under it.
6. Place fiber rolls all the way around the inlet when the disturbance is on both the road and around the culvert and all water entering the culvert is crossing the disturbance.
NO SCALE
FIBER ROLL JOINT DETAIL
D irection of ru n off
*Approximate spacing shown. Adjust spacing as needed dut to project-specific conditions.
FIBER ROLL LAPPING DETAIL
S lo p e
S ta k e
C le a ri n g
L im it
Flow
Trench 2" min.
FIBER ROLL AS PERIMETER CONTROL
INSTALLATION DETAIL
Flow
Trench 2" min.
STAKE DETAIL
FIBER ROLL SLOPE LAYOUT
Flow
Flow
Flow
SECTION A-A
FIBER ROLL
AT CULVERT INLET
FIBER ROLL
AT CULVERT OUTLET
A A
Flow
*Approximate length shown for rolls across the top of the culvert inlet only.
Adjust length as needed due to project-specific conditions.
3054" or larger
2030" to 48"
1024" or smaller
Fiber Roll length (ft)�9" Culvert Size
FIBER ROLL AT CULVERTS*
Pay lim its
Pay lim its ove rlap12" mi n.
m in m in spacing table See Fiber roll
Se e n ote
Se e n ote
FIBER ROLL
C157-55
:1
N o v e m b e r
C
-5
S h e
C
A \e rf o n
(1
R o a d w a y \C
A D
D
S h e e ts \E
-1
\C
-5
.d g n
DETAIL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD DETAIL
01/2011DETAIL APPROVED FOR USE
09/2020 12/2017REVISED:
STATE PROJECT
NUMBER
SHEET
CA
E2
Curve = C2
PI 2+00.35
D
R = 120.00’
T = 15.58’
L = 30.98’
Curve = C3
PI 3+92.84
D
R = 60.00’
T = 59.46’
L = 93.70’
P C
.3
N
B. ROBINSON
1" = 10’-0" A
BRIDGE PLAN & ELEVATION
Elevations are at profile grade @ C Rdwy.
No Scale
PROFILE GRADE DIAGRAM
L
Drawing No. Description
BRIDGE DRAWING INDEX
BRIDGE PLAN & ELEVATIONRG3235-A
RG3235-B
RG3235-C
RG3235-F
RG3235-I
RG3235-D
RG3235-G
RG3235-E
GENERAL NOTES & ESTIMATE
RG3235-H
LC Rdwy.
Q
Q100
HYDRAULIC DATA
Q
Q200
(cfs)
Q
(ft/s)
V
(ft)
El.WS
(ft)
Scour El.
PLAN
ELEVATION
Q WS El. = 2168.8
EXP
Grade = +2.00%
ABUT. 1
ABUT. 2
top of asphalt pavement.
Note: Deck elevations shown are at
K. EIKERMANN
EXP
L@ C Rdwy.
Approx. existing ground
13.7
13.9
11.5
14.4
2162.8
2167.6
2168.8
2169.5
8’ -0 w in g (t yp
WINGWALL A
WINGWALL B
WINGWALL C
WINGWALL D
Bridge Railing Post spa. (typ. both sides)
14 spa. @ 6’-3" = 87’-6"
(typ.)
(typ.)
El. 2175.20
Sta. 2+38.00
Begin Bridge
El. 2175.20
El. 2175.20
El. 2177.00
Sta. 3+28.00
End Bridge
El. 2177.00
El. 2177.00
(typ. @ all 4 corners) Structure Transition Railing railing (ODOT BR226)
Steel side mounted bridge
2153.0 (abut. 1)
2152.4 (abut. 1)
2146.3 (abut. 2)
S1
2146.8 (abut. 2)
ABUTMENTS
FOUNDATION PLAN
SUMMARY OF BORING LOGS
INTERIOR BOX GIRDER
EXTERIOR BOX GIRDER
BOX GIRDER DETAILS
TRANSITION RAILING
RG3235-J
RG3235-K
RG3235-L
RG3235-M
BRIDGE RAILING
1’-3" 1’-3"
Curve Data:
Curve Data:
REBAR LIST
+2.000
E L
,1
.4
V P I
S ta
.0
B e g in B r id g e
S ta
.0
E n d B r id g e
40’ VC
E L
,1
.8
V P I
38’ VC
Profile Grade I n d ia n C r e e k
W e s t
B r a n c h
Length of Bridge = 90’-0"
1 13 concrete box girder
Precast prestressed shafts (typ.).
WINGWALLS/DRILLED SHAFTS
K. EIKERMANN
S. BELCHER
remain in place (typ.).
concrete abutment to
Portion of existing
El. 2171.8
Low chord to remain in place.
MSE/gabion wingwalls
Portion of existing to remain in place.
MSE/gabion wingwalls
Portion of existing remain in place (typ.).
concrete abutment to
Portion of existing
.0
+7.420 min. of freeboard above 100 year water surface elevation.
Hydraulic capacity requirements: Bridge low chord provides 3 feet
= 2168.8 (measured at upstream face of bridge).
100 year water surface elevation used to determine freeboard
Note: Water surface elevations are at upstream face of bridge.
L. ORTIZ
TYPICAL SECTION & DECK PLAN
NO.
PROJECTSTATE
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.DATEBRIDGE DRAWINGPROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BYREVISIONS
BY
DATENO.
REVISIONS
N
C A \e r f o n 1( 1) \B r id g e \R
G \C
A il e s \D
G N
F il e s \r g p e .d g n
RG3235-
CA
KARL EIKERMANN
U.S. DEPARTMENT OF TRANSPORTATION
of
KLAMATH NATIONAL FOREST
SISKIYOU COUNTY, CALIFORNIA
WEST BRANCH INDIAN CREEK BRIDGE
BRANCH BRIDGE
18N31(1) UPPER WEST
CA ERFO KLAMATH NF
FS DRAWING R-1700
JANUARY 2022
GENERAL NOTES:
s DS
D1
PGA s a v
GENERAL NOTES
Item
ESTIMATE NOTES:
Quantity: Unit:Item No. Notes:
ESTIMATE
(1)
All req’d
All req’d
LPSM
LPSM
Survey and Staking, Bridge
Removal of Bridge
Structure Excavation
Structural concrete, class A(AE)
CUYD
CUYD
LB
LNFT
EACH16
15214-1000
20304-2000
20801-0000
55201-0200
55302-1200
55401-2000
55601-0900
56401-1000
55901-0000
(1)
Precast, prestressed concrete box beam, Type B3-48 LNFT (1)(3)
Bearing Device, elastomeric
SQ YDS
K. EIKERMANN
B. ROBINSON NONE B
(1)(4) eq eq
(5)
CUYD55201-0200
Reinforcing steel, epoxy coated
(1)
20803-0000 Structural Backfill
61707-0000 LNFT (1)(4)Structure Transition Railing
30 CUYD
Membrane Waterproofing 160
(1)
Bridge Railing, steel
S2
(1)
(1)(2)
(6)
(5)
(4)
(3)
(2)
(1)
56501-0200 Drilled Shafts, 24 inch diameter LNFT (6)240
S. BELCHER
For existing bridge inspection report see Forest Service drawings No. R-865 "Bridge Across West Branch Indian Creek" dated May 1966.
EXISTING BRIDGE:
Design pads per AASHTO LRFD Design Method A.
Bearing pads shall conform to AASHTO M251, 60 durometer hardness, elastomeric grade 3 or higher.
ELASTOMERIC BEARINGS:
construction.
after fabrication. The contractor shall be responsible for the stability of the beams during all phases of conform to ASTM A36. Tie rods shall conform to ASTM A722. All structural metal shall be galvanized f’c = 7500 psi, and an initial strength f’ci = 5000 psi (min.). Structural metal for bearing plates shall concrete beams shall be Class P or Class P(AE), with a minimum 28-day design compressive strength, Prestressed concrete beam shall be as manufactured as detailed on the plans. Concrete for prestressed
PRESTRESSED CONCRETE BEAMS:
estimated effective prestress force is 38,200 lbs. per strand.
AASHTO M203. Each strand shall be pretensioned to a total load of 43,900 lbs. at which load f = 0.75(f ) = 202,500 psi. The final
PRESTRESSING STEEL:
plans will not be paid for. All reinforcing steel shall be epoxy coated, as noted on the plans.
unless noted otherwise on the plans. Minimum splice lengths for all bar sizes shall be as noted on the plans. Bar splices other than those shown on the
All reinforcing steel shall conform to AASHTO M31 or M322, Grade 60 deformed. The minimum concrete cover to the face of any bar shall be 2", REINFORCING STEEL:
of AASHTO M213.
Flexible cellular joint filler shall meet the requirements of AASHTO M153, closed cell rubber. Expansion joint filler shall meet the requirements
", unless noted otherwise on the plans.4 3cast-in-place concrete shall be made with Type ll cement. Chamfer exposed edges of all concrete
All other cast-in-place concrete shall be Structural Concrete, Class A(AE), with a minimum 28-day compressive strength f’c = 4500 psi. All
Cast-in-place concrete for the drilled shafts shall be structural concrete, Class C, with a minimum 28-day compressive strength, f’c = 4500 psi.
CONCRETE:
Maximum final tension in the prestressed beams is limited to 520 psi.
Serviceability stresses limited to current AASHTO Specification values for reinforced concrete elements.
DESIGN CRITERIA:
Site Class = C. Seismic Zone = 3.
Long period acceleration at 1.0 seconds (S = 0.267 g) modified by the Site Coefficient (F = 1.533) to give the long period spectrum acceleration, S = 0.409 g.
Short period acceleration at 0.2 seconds (S = 0.603 g) modified by the Site Coefficient (F = 1.159) to give the short period spectrum acceleration, S = 0.698 g.
Peak Ground Acceleration (PGA = 0.257 g), modified by the Site Coefficient (F = 1.143) to give a spectrum acceleration, A = 0.294 g.
SEISMIC:
Design wind Speed (Strength III Limit State), V = 110 mph, Wind Exposure Category = C.
WIND LOAD:
For Wingwalls h = 2 feet.
LIVE LOAD SURCHARGE: Equivalent to a height of soil. For Abutments h = 3 feet
AT REST PRESSURE: Equivalent to a fluid unit weight of soil = 50 lbs. per cubic foot.
ACTIVE PRESSURE: Equivalent to a fluid unit weight of soil = 35 lbs. per cubic foot.
LATERAL EARTH PRESSURE:
HL-93 (1 lane). Maximum Dynamic Load Allowance (Impact), IM = 33%.
LIVE LOAD:
No allowance for future wearing surface.
ASPHALT PAVING: 140 lbs per cubic foot.
STRUCTUAL STEEL: 490 lbs. per cubic foot.
CONCRETE: 150 lbs. per cubic foot.
DEAD LOAD:
on Federal Highway Projects, FP-14 (dual units).
CONSTRUCTION: Federal Highway Administration Standard Specifications for Construction of Roads and Bridges
DESIGN: AASHTO LRFD Bridge Design Specifications, 8th Edition, 2017.
SPECIFICATIONS:
pbt pu
L. ORTIZ 2 13
Includes cost of excavation, structural concrete, epoxy coated reinforcing steel, temporary casing if required, and testing.
Includes removal of existing bridge superstructure and portions of concrete abutments and MSE/gabion wall as shown in plans.
hardware, and all materials required for construction of the railing.
Includes cost of steel side mounted bridge railing, guard angles, connection required for the manufacture and erection of the girders.
bearing plates, lifting eyes, grout, tie rods, dampproofing at ends of girders, and all other materials
Includes cost of structural concrete, epoxy coated reinforcing steel, prestressing steel, embedments, Estimated quantity of geocomposite sheet drain = 29 square yards.
Includes cost of furnishing and installing geocomposite sheet drain, weepholes, and all joint fillers.
Contract Quantity
N
C A \e r f o n 1( 1) \B r id g e \R
G \C
A e s \D
G N
F il e s \r g g n .d g n
RG3235-
CA
SISKIYOU COUNTY, CALIFORNIA
WEST BRANCH INDIAN CREEK BRIDGE
BRANCH BRIDGE
18N31(1) UPPER WEST
CA ERFO KLAMATH NF
D
R = 120.00’
T = 15.58’
L = 30.98’
Curve Data:
N
W e s t
B r a n c h I n d ia n C r e e k
P C
.3
L
Q WS El. = 2168.8
Profile Grade
(typ.)
Grade = +2.00% remain in place (typ.).
concrete abutment to
Remainder of existing
(typ.).
concrete abutment portion of existing
Remove top 5’-9"
ABUT. 1
ELEVATION
ABUT. 2
1" = 10’-0"
B. ROBINSON
Curve = C3
PI 3+92.84
D
R = 60.00’
T = 59.46’
L = 93.70’
Curve Data:
@ C Rdwy.
Approx. existing ground
FOUNDATION PLAN
FOUNDATION PLAN
L
1’-6"1’-6"
(typ.)
3’-0"
(typ.)
ty p
LC Rdwy.
S ta
.5
C B r g
A b u t.
L S ta
.5
C B r g
A b u t.
FOUNDATION NOTES:
Location
Abut. 1
FOUNDATION TABLE
Abut. 2
Load (@ top of shaft)
Max. Factored Shaft Axial Est. Shaft Tip Elev.
250 kips/shaft (Strength I)
250 kips/shaft (Strength I)
K. EIKERMANN
(t yp .)8’
-0 " w in g s p a ty p
D r il le d s h a ft
Top of shaft
El. 2168.72 shafts (typ.).
Top of shaft
El. 2170.52
Sta. 3+28.00
End Bridge
Sta. 2+38.00
Begin Bridge
S3
C3 13
87’-0" shaft (typ.)
El. 2133.72
El. 2125.52 facilitate new bridge construction.
Remove top layer only to wingwalls to remain in place.
Existing MSE/gabion to remain in place.
MSE/gabion wingwalls
Remainder of existing
MSE/gabion wingwalls.
Remove top layer of existing information for drilled shafts.
See Section 565 of Special Contract Requirements for additional
Highway Division, Geotechnical Services Branch, Lakewood, Colorado.
Transportation, Federal Highway Administration, Central Federal Lands
Branch Bridge, dated November 2021, prepared by U.S. Dept. of
For additional information see Final Geotechnical Report, Upper West
S. BELCHER
Berm El. 2170.2
Berm El. 2172.1
WINGWALL B
WINGWALL A
WINGWALL D
WINGWALL C
necessary (typ.).
of drilled shaft as footing for installation
Drill through existing to be removed.
Existing bridge superstructure
See Rdwy. plans.
removed and reset (typ.).
Existing boulders to be
K. EIKERMANN
N
C A \e r f o n 1( 1) \B r id g e \R
G \C
A e s \D
G N
F il e s \r g f o u n d a ti o n .d g n
RG3235-
CA
SISKIYOU COUNTY, CALIFORNIA
WEST BRANCH INDIAN CREEK BRIDGE
BRANCH BRIDGE
18N31(1) UPPER WEST
CA ERFO KLAMATH NF
FS DRAWING R-1700
JANUARY 2022
BEAM SEAT
18IN DIA
18IN DIA
18IN DIA
20IN DIA
BEAM SEAT
BTM FRONT ABUT
TOP N. ABUT
D
R = 120.00’
T = 15.58’
L = 30.98’
Curve = C3
PI 3+92.84
D
R = 60.00’
T = 59.46’
L = 93.70’
P C
.3
N
LC Rdwy.
PLAN
El. 2175.20
Sta. 2+38.00
Begin Bridge
El. 2177.00
Sta. 3+28.00
End Bridge
Curve Data:
Curve Data:
I n d ia n C r e e k
W e s t
B r a n c h
TYPICAL TEST HOLE LOG
Boring No.
Location
Unified Soil Classification
Practical refusal SPT
Core Run
% Core Recovery Shaded
Ground Water
Depth at time of drilling (ATD)
Graphic material description
Depth Terminated
RQD
x x x
Elev.
with AASHTO T206 test (SPT) in accordance standard penetration
Blow count per foot with
LEGEND
TYPICAL TEST
HOLE SYMBOL
Plan View
Approximate location of any sampled hole decomposed rock (SM) boulders, and
Silty sand with gravel, Gravelly silt with sand (ML) and boulders (SC-SM)
Clayey sand with gravel
(GW-GM)
with silt and sand
Well graded gravel
ELEVATION
1" = 10’-0"
B. ROBINSON
K. EIKERMANN
BH21-03
BH21-03
El. 2174.0 ft
El. 2137.5 ft
STA 2+30, 2 ft. RT
SUMMARY OF BORING LOGS
BH21-04
BH21-04
STA 3+34, 10 ft. RT
El. 2175.0 ft
El. 2143.5 ft
D4 13
S4
0.5
36.5
31.5
10.5
0.5
* Highway Division, Geotechnical Services Branch, Lakewood, Colorado.
Transportation, Federal Highway Administration, Central Federal Lands
Branch Bridge, dated November 2021, published by U.S. Dept. of
For additional information see Final Geotechnical Report, Upper West
N
C A \e r f o n 1( 1) \B r id g e \R
G \C
A e s \D
G N
F il e s \r g b o r in g s .d g n
RG3235-
CA
SISKIYOU COUNTY, CALIFORNIA
WEST BRANCH INDIAN CREEK BRIDGE
BRANCH BRIDGE
18N31(1) UPPER WEST
CA ERFO KLAMATH NF
FS DRAWING R-1700
JANUARY 2022
BEAM SEAT
18IN DIA
18IN DIA
18IN DIA
20IN DIA
BEAM SEAT
BTM FRONT ABUT
TOP N. ABUT
" = 1’-0"4
’-0
" w in g w a ll (ty p
ABUTMENT PLAN
sheet drain.
Geocomposite
ABUTMENTS
2’-0"
LC Gdr. AC Gdr. B L
B. ROBINSON
K. EIKERMANN
C Rdwy.L
8’-1" 8’-1"
C Brg. & C Abut.L L
" 3
2’-0"
Elastomeric bearing pad.
See detail. (typ.)
4’-0"4’-0"
1’ -0 ty p.
C Gdr. D L C Gdr. CL
3’-5"Gdr. spa.
30° (typ.)
2’-0"
(typ.)
9’-5"
ABUTMENT ELEVATION
b.f. = Both faces o.f. = Other face f.f. = Fill face
ABBREVIATIONS:
A
Weephole spa. 10’-0" 4’-5"
2 spa. @ 7’-6" = 15’-0"Drilled shaft spa.
jt. filler
" flexible cellular4
1’-11"
A membrane.
on waterproofing
Hot asphalt pavement
SECTION A-A
all girders @ both ends) sleeve with capped top. (typ.
p/s box girder.
Bridge & end
Begin or End
1’-6"1’-6"
3’-0"
Scale: 38" = 1’-0"
LL
(typ.)
(typ. betwn. shafts) ends of p/s girders.
Apply dampproofing to
9’-5"
3’-5"
Sta. 3+28.00
End Bridge
Sta. 2+38.00
Begin Bridge
4’-5"
1’-11"
El. 2177.00 (Abut. 2)
El. 2175.20 (Abut. 1)
ELASTOMERIC BEARING PAD DETAIL
(16 Req’d)
L
6" 6"
No Scale
LC Gdr.
higher.
Elastomeric Grade 3 or
60 Durometer Hardness, C Brg.
BEARING NOTES:
2.
1.
pad design.
AASHTO LRFD design "Method A" used for elastomeric
Grade 3 or higher.
to AASHTO M251 with 60 Durometer hardness, elastomer
Plain (unreinforced) elastomeric bearing pad shall conform details.
reinforcement for wingwall
See RG3235-F
El. 2170.52 (Abut. 2)
El. 2168.72 (Abut. 1)
"2 12"2
5" =10" 2 spa. @
1’-3" 1’-3"10 spa. @ 6" = 5’-0" 1’-3" 3"
5"
1’-0"
A b u t.
A b u t.
Geocomposite sheet drain with
Class 2, Type C geotextile.
Attach to wall per manufacturer’s instructions.
L
-2% wingwall pour (hatched area).
expansion joint filler, then complete and tie rods are tightened, place 1" at exposed face. After gdrs. are in place
" chamfer line4 3roughened surface with
Construction joint (typ.). Provide level
5 13 E
S5
1’-0"1’-0"(typ.)
#4AE1
#4AE5
(6 tot.)
#7AE3
c lr joint filler.
flexible cellular bearing pad w/
" elastomeric4
#7AE4 (6 tot.)
C Brg. & C Drilled shafts
#4AE5 b.f.
Other Face
WINGWALL B
WINGWALL A
Fill face (typ.)
(Abut. 1 Shown, Abut. 2 Similar)
(Abut. 1 Shown, Abut. 2 Similar)
6-#7AE34
6-#7AE3
Drilled shafts)
#4AE2 (typ. @
(typ.)
#4AE1 spa.
#4AE10 spa. (typ.)
#4AE10 (typ.)
2’-0" into abut. seat.
#10AE11 dowel. Embed
(typ.)
#10AE11 dowel
S. BELCHER
See RG3235-F for details.
(typ.)
#4AE1
dowel (typ.)
#10AE11
1’-4"
(typ.)
1’-3" drain grate weephole w/ C 3" Ø
jt. filler
1" exp.
UNLESS NOTED
N
C A \e r f o n 1( 1) \B r id g e \R
G \C
A e s \D
G N
F il e s \r g a b u t.
d g n
RG3235-
CA
SISKIYOU COUNTY, CALIFORNIA
WEST BRANCH INDIAN CREEK BRIDGE
BRANCH BRIDGE
18N31(1) UPPER WEST
CA ERFO KLAMATH NF
" = 1’-0"
UNLESS NOTED
ABBREVIATIONS:
b.f. = both faces o.f. = other face f.f. = fill face
Other face
Fill face
1’-0"
SECTION A-A
WINGWALL ELEVATION
(typ. @ all four wingwalls)
#4WE bars
#5WE4
#4WE3 (typ.)
#5WE2 (typ.)
Geocomposite sheet drain with
Class 2, Type C geotextile.
Attach to wall per manufacturer’s instructions.2%
C 3" Ø weephole w/ drain grate
L
WINGWALL PLAN
(typ. @ all four wingwalls)
8’-0" wingwall (typ.)
"8 58’-4
El. 2170.52 (Abut. 2)
El. 2168.72 (Abut. 1)
El. 2177.00 (Abut. 2)
El. 2175.20 (Abut. 1)
El. 2176.25 (Abut. 2)
El. 2174.45 (Abut. 1)
A
L
48 bar diameter lap
(typ.)
or approved equal.
"OS Splice Clip", "ERICO Quick Wedge", #4 spiral
1" (typ.)
lap length
1’-0" min.
No Scale
No Scale or approved equal.
Standard coupler
"BAR-LOCK MBT"
No Scale
MECHANICAL COUPLER SPLICE
SPIRAL LAP SPLICE
MECHANICAL LAP SPLICE FOR SPIRALS
B B
DRILLED SHAFT ELEVATION
c l.
shaft (typ.)
SPLICE DETAILS (OPTIONAL)
Est. Tip El. 2133.72 (Abut. 1)
Est. Tip El. 2125.52 (Abut. 2)
K. EIKERMANN
El. 2168.72 (Abut. 1)
El. 2170.52 (Abut. 2) m in e m b e d
F6 13
S6
NOTES:
Construction joint m in e m b e d
10" c lr
Drilled shaft integrity test prior to cap pour.
longitudinal bar. Perform shaft tied to rebar cage at nearest
SECTION B-B
S. BELCHER
#4WE1a b.f.
#4WE1g b.f.
8’-0"
A #5WE4 b.f.
s p a
W
E o .f
#4WE3 o.f. (typ.)
#5WE2 f.f. &
3" Ø weephole
Fill face
Geocomposite sheet drain.
#5WE2Other face
#4WE3
wingwall pour (hatched area).
expansion joint filler, then complete and tie rods are tightened, place 1" at exposed face. After gdrs. are in place
" chamfer line4 3roughened surface with
Construction joint (typ.). Provide level abut. cap.
Bottom of
"= 7’-6", #4WE1(a-g) b.f.4 18 spa. @ 113"
Cage alignment details shall be submitted to the CO for approval.3.
measured along the longitudinal axis of the shaft/column.
longitudinal reinforcing shall be staggered by a minimum of 2’-0" as of concrete to the outside face of the component. Mechanical splices of inches measured from the surface 2 1have a clear cover not less than 1
For mechanical splice requirements see FP-14. Splice components shall
Mechanical splices may be used in spiral and longitudinal reinforcing. 2.
Minimum #4 spiral lap splice = 2’-0".1.
s p a
W
E f .f
#5WE2 f.f. (8 tot. typ.)
#8AE8 (Abut. 2)
#8AE6 (Abut. 1) or
#4AE9 spiral (Abut. 2)
#4AE7 spiral (Abut. 1) or 4
A
E p it c h
A b u t.
A
E p it c h
A b u t.
(8 tot.)
#8AE8 (Abut. 2)
#8AE6 (Abut. 1) or
#4AE9 (Abut. 2) spiral
#4AE7 (Abut. 1) or
#5WE5 f.f. & #5WE6 o.f.
5’-0"
jt. filler
1" exp.
WINGWALLS/DRILLED SHAFTS
N
C A \e r f o n 1( 1) \B r id g e \R
G \C
A e s \D
G N
F il e s \r g w in g .d g n
RG3235-
CA
SISKIYOU COUNTY, CALIFORNIA
WEST BRANCH INDIAN CREEK BRIDGE
BRANCH BRIDGE
18N31(1) UPPER WEST
CA ERFO KLAMATH NF
INTERIOR BOX GIRDER
B
B
21’-0"21’-0"
A
A
9"
(typ.)
L
L
3’-0"
3" 3"
(typ. both ends)
1" Ø pipe void drain 1" Ø pipe drain
#5GE1 (typ.)
20-0.6" Ø strands
3" Ø tie rod holes
C diaphragm &
3" Ø tie rod hole (typ.)
Symmetrical about
C spanL
C 3" Ø tie rod holes
SECTION A-A
5" 5"
3"x3" fillet (typ.)
c l.
c l.
c l.
L
VIEW B-B
4’-0" e q s p a
L c l.
c l.
L
BOX GIRDER ELEVATION
"= 1’-0" horiz.2
1 Scale:
"= 1’-0" vert.1
NOTES:
4"8 spa. @ 2"
2"
8 spa. @ 2"
= 1’-6"
4"
2" cl.
between voids.
placed to drain at each end of slab beam. (typ.)
6-#4GE6
#5GE3
#5GE1
2"
Length of Girder = 90’-0"
9"
4’-0" keyway detail (typ).
See RG3235-I for
3"
#5GE5
21 spa. 1’-6" = 31’-6", 2-#5GE1
G E
Cast girders 38" longer than shown to allow for shortening due to prestressing.
After forms are removed from girders clean keyways by water jetting to remove residual form oil and other foreign materials.
See RG3235-I for diaphragm & tie rod details.
" = 1’-0"2
#5GE4 (7 tot.)
#5GE3
#4GE6 (6 tot.)
6"
#5GE1
2" cl.
#5GE2
4’-0"
1’-6" LC brg.
: debond 6’ from beam end
: debond 4’ from beam end
= 4’-0", 2-#5GE1
4 spa. @ 1’-0" 1’-6"
6" 6"
2-#5GE1
"4 15 eq. spa. = 2’-116"
= 1’-6"
4"8 spa. @ 2"
2"
8 spa. @ 2"
= 1’-6"
4"
2"
= 1’-6"
7-#5GE4
#4GE6 (6 tot.)
#5GE4 (7 tot.)
4-0.6" Ø strands
89 spa. @ 6" = 44’-6",#5GE3 (top of slab)
".8 7Estimated camber at erection prior to placement of railing and wearing surface = 2
".8 3Estimated camber at erection after placement of railing and wearing surface = 2
G7 13S. BELCHER B. ROBINSON
S7
2-#5GE1
= 1’-0" 4 spa. @ 3"
10 spa. @ 6" = 5’-0"
C 20-0.6" Ø strandsL
C 4-0.6" Ø strands
C 20-0.6" Ø strands
C 4-0.6" Ø strands
L
C Diaphragm & 3" Ø tie rod holes. See RG3235-I for details.
N
C A \e r f o n 1( 1) \B r id g e \R
G \C
A e s \D
G N
F il e s \r g g ir d e r .d g n
RG3235-
CA
SISKIYOU COUNTY, CALIFORNIA
WEST BRANCH INDIAN CREEK BRIDGE
BRANCH BRIDGE
18N31(1) UPPER WEST
CA ERFO KLAMATH NF
EXTERIOR BOX GIRDER
Concrete
PRESTRESSED BOX GIRDER ESTIMATE
UNIT
INTERIOR
QUANTITY
"8
"4
" fillet8
" fillet4
KEYWAY DETAIL
BOX GIRDER ELEVATION
"= 1’-0" horiz.2
1 Scale:
"= 1’-0" vert.1
LNFT
LBS
CUYD
EXTERIOR
NOTES:
Epoxy coated reinforcing steel
See RG3235-M for Prestressed Box Girder bar list.
Note: Quantities shown are for one box girder only.
" = 1’-0"2
20.8 21.3
2160 2160
3429 3429 to avoid rail post embedments.
Note: Adjust reinforcing steel as necessary
SECTION A-A
5" 5"
3"x3" fillet (typ.)
c l.
c l.
c l.
VIEW B-B
4’-0" e q s p a
L c l.
c l.
4"8 spa. @ 2"
2"
8 spa. @ 2"
= 1’-6"
4" between voids.
placed to drain at each end of slab beam. (typ.)
#5GE3
#5GE1
2"
4’-0"
G
E
#5GE4 (7 tot.)
#5GE3
#4GE6 (6 tot.)
6"
#5GE1
#5GE2
: debond 6’ from beam end
: debond 4’ from beam end
"4 15 eq. spa. = 2’-116"
= 1’-6"
4"8 spa. @ 2"
2"
8 spa. @ 2"
= 1’-6"
4"
2"
= 1’-6"
#4GE6 (6 tot.)
#5GE4 (7 tot.)
B
B
21’-0"21’-0"
A
A
9"
(typ.)
L
L
3’-0"
3" 3"
(typ. both ends)
1" Ø pipe void drain 1" Ø pipe drain #5GE1 (typ.)
20-0.6" Ø strands
3" Ø tie rod holes
C diaphragm &
3" Ø tie rod hole (typ.)
Symmetrical about
C spanL
C 3" Ø tie rod holesL
6-#4GE6
Length of Girder = 90’-0"
9"
#5GE5
21 spa. 1’-6" = 31’-6", 2-#5GE1
4’-0"
1’-6" LC brg.
= 4’-0", 2-#5GE1
4 spa. @ 1’-0" 1’-6"
6"
7-#5GE4
7 spa. @ 6’-3"=43’-9"1’-3"
LC Rail post embedments (typ.)
L
4-0.6" Ø strands for details.
See RG3235-K
C railing insert.L detail (typ).
for keyway
See RG3235-I
2" cl.
".8
3Estimated camber at erection after placement of railing and wearing surface = 2
".8 7Estimated camber at erection prior to placement of railing and wearing surface = 2
See RG3235-I for diaphragm & tie rod details.
remove residual form oil and other foreign materials.
After forms are removed from girders clean keyways by water jetting to prestressing.
" longer than shown to allow for shortening due to 8 3Cast girders
89 spa. @ 6" = 44’-6", #5GE3 (top of slab)
S. BELCHER B. ROBINSON H8 13
S8
3"
6"
2-#5GE1
2-#5GE1
= 1’-0" 4 spa. @ 3"
10 spa. @ 6" = 5’-0"
C 20-0.6" Ø strandsL
C 4-0.6" Ø strands
C 20-0.6" Ø strandsL
C 4-0.6" Ø strands
L. ORTIZ
UNLESS NOTED
embedment spa.
Rail post
C Diaphragm & 3" Ø tie rod holes. See RG3235-I for details.
N
C A \e r f o n 1( 1) \B r id g e \R
G \C
A e s \D
G N
F il e s \r g g ir d e r .d g n
RG3235-
CA
SISKIYOU COUNTY, CALIFORNIA
WEST BRANCH INDIAN CREEK BRIDGE
BRANCH BRIDGE
18N31(1) UPPER WEST
CA ERFO KLAMATH NF
L tie rod hole
LL
"2
3"
To C Span
1" (typ.)
" diaphragm (typ.)2
C box girder
C tie rodL
C tie rodL
10"
4"6"
L
"2 14 " diaphragm (typ.)2
C box girder
C tie rodL
C tie rodL
L tie rod hole L
EXTERIOR BOX GIRDER
PLAN
ELEVATION
PLAN
INTERIOR BOX GIRDER
tie rod hole L L
1" (typ.)
tie rod hole L L
Interior face
No Scale and lubricated.
(to fit tie rod threads)
Nuts tapped oversize.
TIE ROD AND PLATE DETAIL
NOTES:
1" = 1’-0"
SHEAR KEYWAY DETAIL
" = 1’-0"2
1Scale:
Tie rod
Circular washer under nut.
3" Ø formed tie rod hole (typ.)
rods. See notes.
prior to placement of tie
Fill shear key with grout
BOX GIRDER DETAILS
holes.
to prevent grout from entering tie rod
Seal around pipe sleeves as necessary shear key with pvc pipe sleeve (typ.)
Seperate tie rod crossing through with non-shrink grout.
Tie rod recess. Fill
C box girder with non-shrink grout.
Tie rod recess. Fill
3"
To C Span
1" (typ.)
L
Interior face
C box girderLL
PLAN @ END
PLAN @ END
Box girder end
L seal joint
Backer rod to tie rod hole L tie rod hole
" minimum thread each end.2
Box girder end
" 1centered for
1plate (A36) with 1
5" x 5" x 1" thick bearing
K. EIKERMANN S. BELCHER 9 13 I
S9
1’-6" 1’-6" sleeve with capped top.sleeve with capped top.
K. EIKERMANN
shall not be constructed until tie rods have been fully tensioned.
until the tie rods have been properly tensioned. Bridge railing
No traffic or heavy equipment will be permitted on the box girder bridge shall submit for approval proposed method of tightening tie rods.
Tie rods shall be tightened to a minimum tension of 60 kips. The contractor tie rods.
After pouring grout keyway, water cure for 3 days minimum before placing debris until they are filled.
Contractor shall cover and protect the shear keys from weather and compressive strength of 5000 psi at 24 hours.
Keyway grout shall be prepackaged non-shrink type with minimum
Tie rods, plates, nuts and washers shall be galvanized.
heavy hex conforming to ASTM A563, Grade DH.
High strength rods shall conform to ASTM A722, Grade 150. Nuts shall be
N
C A \e r f o n 1( 1) \B r id g e \R
G \C
A e s \D
G N
F il e s \r g g ir d e r .d g n
RG3235-
CA
SISKIYOU COUNTY, CALIFORNIA
WEST BRANCH INDIAN CREEK BRIDGE
BRANCH BRIDGE
18N31(1) UPPER WEST
CA ERFO KLAMATH NF
No Scale
No Scale
No Scale
C Rdwy.L
0% ty p
Box Girder A
Box Girder B
Box Girder C
Box Girder D
L
Tie Rod Spa.
C Tie rod. See RG3235-I for details.
DECK PLAN
TYPICAL SECTION
TYPICAL SECTION & DECK PLAN
details.
See RG3235-I for shear key
Longitudinal shear key (typ.).
16’-0"
Sta. 3+28.00
End Bridge
Sta. 2+38.00
Begin Bridge
L
L
8’-0"8’-0" membrane.
surface on waterproofing
2" asphalt wearing membrane.
on waterproofing
Hot asphalt pavement
SECTION A-A
ends of p/s girders (typ.).
Apply dampproofing to all girders @ both ends) sleeve with capped top. (typ.
A
3’-0" 21’-0"
90’-0"
21’-0" 21’-0" 21’-0"
A
3’-0"
C Rdwy.
p/s box girder.
Bridge & end
Begin or End
K. EIKERMANN
C Brg. & dowel (typ.)L joint filler.
flexible cellular bearing pad w/
3/4" elastomeric side dam.
galvanized guard angle
" 4 1Gutterline & L2"x2"x side dam.
galvanized guard angle
" 4 1Gutterline & L2"x2"x
(typ.).
guard angle side dam
" galvanized 4 1L2"x2"x details.
(typ.). See RG3235-K for bridge railing (ODOT BR226)
Steel side mounted
J
4 prestressed box girders @ 4’-0" = 16’-0"
C Diaphragm & tie rod (typ.).
See RG3235-I for details.
" (typ. @ int. diaph.)2
1" expansion joint filler (typ. between endwall and box gdr.).
1’-6" 1’-6"
Begin or
End Bridge
Profile
Grade
STRUCTURAL BACKFILL PAY LIMITS
Pay Limits for
Structural
Backfill to 704.03 conforming
Backfill material
1’-6" 1’-6"
Excavation
Structure
Pay Limits for
Approx. existing ground @ C Rdwy.L
STRUCTURE EXCAVATION PAY LIMITS
Begin or
End Bridge r d w y s e c ti o n
Existing abutment to be removed.
Existing abutment to remain in place.
K. EIKERMANN
S10
10 13S. BELCHER
2’-0" into abut. seat.
#10AE11 dowel. Embed
Place end post prior to endwall construction to facilitate post bolt placement. (typ.)
" = 1’-0"8 1scale:
UNLESS NOTED
1/4" = 1’-0"
N
C A \e r f o n 1( 1) \B r id g e \R
G \C
A e s \D
G N
F il e s \r g ty p ic a l.
d g n
RG3235-
CA
SISKIYOU COUNTY, CALIFORNIA
WEST BRANCH INDIAN CREEK BRIDGE
BRANCH BRIDGE
18N31(1) UPPER WEST
CA ERFO KLAMATH NF
typ.
/4–6"L noted on project plans
1" unless otherwise typ.
typ.
1’-3"
6"
1"
4"
1’-3" min.
1" * bolts
Ctr. of posts
Ctr. of
7"
Top and btm.
"4
"2
"4
"2
"4
2 "2
"2
"2
"2
"4 12 "2
13 "4
" Upper4
" Bottom8
U p p e r
B o tt o m
"2 12’-3
"4 32’-4
"4 32’-4
1’-7" behind each nut *
Cast 1" dia. voids plate (two places, opposite side)
1" dia. H.S. nut tack welded to to completely cover hole).
post (position plate washer
"x1" slotted holes in8
" dia. holes4 32 -
" long2 1 x 34
1HSS6 x 3 x x 8 x 52
1PL
C End Rail PostL
PLAN
ELEVATION
" 4
" 4
" bolts.4 1" dia. x 34
3for
" dia. holes (ea. angle)8 72-x 6" long 4 32-L6 x 4 x
SECTION A-A
SECTION AT RAIL POST
flange for utility hanger
" dia. holes in outside8 72-
" dia. x 6" bolt.8 slotted holes for
" x 3" 16 132 -
Lower post bolts
1-0.135" thick element
Terminal connector
5HSS8 x 4 x
A
A
1HSS6 x 4 x
Tighten to firm contact.
and 1 nut (4 reqd., each post).
"). 1 lockwasher 16 5" x 2" x 4
3(1 stud x 2" long with 1 plate washer
" reduced weld base 4 3Threaded slotted hole in post.
" 2 1"x 516
13Center line of
BB
" bolts.4 1" dia. x 34
3for
" dia. holes (each angle)8 72-
" bolt.4 3for 1" dia. x 7
" dia. hole (ea. angle)8
Upper post bolts
" dia. x 6" bolt.8
"x3" slotted holes for16 132 -
Lower post bolts x 4" long4 1HSS6 x 4 x
See Anchor Device x 8 x 52
1PL
x 4" long4 1HSS6 x 4 x as required for post chamfer corners 4 1Grind L6 x 4 x x 6" long 4 32 - L6 x 4 x
Rail splice
Silicon (typ.)
Galvanize-Control
(Continuous rails over 2 or more posts) or jam nuts with std. washers and lock nuts
" dia. galv. bolts (A307) 8 52 -
" dia. holes *8 12-1
PLAN
SECTION B-B
ANCHOR DEVICE
SECTION C-C
C
C
RAIL SPLICE DETAILS
" 4 35" 2
17" 4
"4
3"4"
" 2
4"3""4
PL 1 x 6 x 1’-7"
" square bar8 x 6 2 1 x 12
1PL
C postL
1"
2" behind each nut *
Cast 1" dia. voids x 62 1 x 12
1PL
PL 1 x 6 x 1’-7"
" square bar8
" dia. H.S. bolt (*).8 nut ASTM A563, Grade DH for
3" long high strength coupling shear studs
" dia. x 12" welded 4 36-
1from PL
Make splice tube galv. to assure proper fit
Grind all edges prior to
B. ROBINSON
K. EIKERMANN
NONE
Pay Length for Bridge Railing shown on this end for clarity.
Guardrail Connection not
NOTE:
DETAIL D
See Detail D.
" long.2 1 x 34
1HSS6 x 3 x
K11 13
S11
W6x25 post.
longitudinal bars as required.
Adjust location of box girder
NOTE:
box gdr.
p/s concrete
End Bridge.
Begin or x 1’-7" PL 1 x 6
" bolt.4 31" dia. x 7
(ea. angle) for
" dia. hole 8
Upper…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .