This document is a tabulation of bids report for a federal contract solicitation to construct the Upper West Branch Bridge project located on the Klamath National Forest in California. The solicitation was issued by the Department of Transportation Federal Highway Administration and opened on April 26, 2022. Three bids were received in response, with Hooker Creek, Inc. submitting the lowest bid of $1,984,538. The engineer's estimate for the project was $1,450,000. The solicitation included line items for mobilization, surveying, quality control, testing, erosion control, clearing, grubbing, excavation, backfill, concrete work, precast beams, rebar, railings, waterproofing, drilled shafts, terminal sections, labor, seeding, mulching and traffic control. The report lists the bid amounts received for each line item from the three bidders as well as the engineer's estimate. A contract award has not yet been made as of the tabulation date of April 27, 2022.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 04/27/22

1 out of 8Source Selection Information - See FAR 2.101 & 3.104

Project No: CA ERFO KLAMATH NF 18N31(1)

Project Name: Upper West Branch Bridge

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF22B000015

Division: Central Federal Lands

State: CA County: Siskiyou

Federal Land: Klamath National Forest Opened at: Lakewood

Opened by: Josephine Helms

Date: 04/26/22

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed:

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Hooker Creek, Inc. $1,984,538.00 1015 Anderson St.

Red Bluff, CA 96080

West Coast Contractors, Inc. $2,120,053.00 61050 Highway 101 Coos Bay, OR 97420

Hayes & Sons, Inc. $2,289,726.00 2606 Kuck Road Montague, CA 96064

Engineer's Estimate $1,450,000.00

2 out of 8Source Selection Information - See FAR 2.101 & 3.104

Project No: CA ERFO KLAMATH NF 18N31(1)

Project Name: Upper West Branch Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0100 15101-0000 MOBILIZATION

Hooker Creek, Inc. Lump Sum $198,000.00 West Coast Contractors, Inc. Lump Sum $210,000.00 Hayes & Sons, Inc. Lump Sum $300,000.00 Engineer's Estimate ALL LPSM Lump Sum $256,700.00

A0120 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE

Hooker Creek, Inc. $75,000.00 $3,750.00 West Coast Contractors, Inc. $100,000.00 $5,000.00 Hayes & Sons, Inc. $40,000.00 $2,000.00 Engineer's Estimate 0.050 MILE $60,000.00 $3,000.00

A0140 15214-1000 SURVEY AND STAKING, BRIDGE

Hooker Creek, Inc. Lump Sum $10,000.00 West Coast Contractors, Inc. Lump Sum $16,000.00 Hayes & Sons, Inc. Lump Sum $15,000.00 Engineer's Estimate ALL LPSM Lump Sum $7,000.00

A0160 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES

Hooker Creek, Inc. $65,000.00 $6,500.00 West Coast Contractors, Inc. $42,000.00 $4,200.00 Hayes & Sons, Inc. $50,000.00 $5,000.00 Engineer's Estimate 0.100 MILE $20,000.00 $2,000.00

A0180 15301-0000 CONTRACTOR QUALITY CONTROL

Hooker Creek, Inc. Lump Sum $105,000.00 West Coast Contractors, Inc. Lump Sum $30,000.00 Hayes & Sons, Inc. Lump Sum $110,000.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00

A0200 15401-0000 CONTRACTOR TESTING

Hooker Creek, Inc. Lump Sum $35,000.00 West Coast Contractors, Inc. Lump Sum $25,000.00 Hayes & Sons, Inc. Lump Sum $150,000.00 Engineer's Estimate ALL LPSM Lump Sum $34,000.00

3 out of 8Source Selection Information - See FAR 2.101 & 3.104

Project No: CA ERFO KLAMATH NF 18N31(1)

Project Name: Upper West Branch Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0220 15501-0000 CONSTRUCTION SCHEDULE

Hooker Creek, Inc. Lump Sum $7,500.00 West Coast Contractors, Inc. Lump Sum $6,000.00 Hayes & Sons, Inc. Lump Sum $10,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00

A0240 15705-0100 SOIL EROSION CONTROL, SILT FENCE

Hooker Creek, Inc. $4.50 $5,850.00 West Coast Contractors, Inc. $13.00 $16,900.00 Hayes & Sons, Inc. $10.00 $13,000.00 Engineer's Estimate 1,300 LNFT $10.00 $13,000.00

A0260 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Hooker Creek, Inc. $6.00 $3,000.00 West Coast Contractors, Inc. $8.00 $4,000.00 Hayes & Sons, Inc. $15.00 $7,500.00 Engineer's Estimate 500 LNFT $10.00 $5,000.00

A0280 20101-0000 CLEARING AND GRUBBING

Hooker Creek, Inc. $50,000.00 $15,000.00 West Coast Contractors, Inc. $50,000.00 $15,000.00 Hayes & Sons, Inc. $20,000.00 $6,000.00 Engineer's Estimate 0.300 ACRE $25,000.00 $7,500.00

A0300 20304-2000 REMOVAL OF BRIDGE

Hooker Creek, Inc. Lump Sum $124,000.00 West Coast Contractors, Inc. Lump Sum $190,000.00 Hayes & Sons, Inc. Lump Sum $55,000.00 Engineer's Estimate ALL LPSM Lump Sum $150,000.00

A0320 20420-0000 EMBANKMENT CONSTRUCTION

Hooker Creek, Inc. $120.00 $43,200.00 West Coast Contractors, Inc. $100.00 $36,000.00 Hayes & Sons, Inc. $100.00 $36,000.00 Engineer's Estimate 360 CUYD $75.00 $27,000.00

4 out of 8Source Selection Information - See FAR 2.101 & 3.104

Project No: CA ERFO KLAMATH NF 18N31(1)

Project Name: Upper West Branch Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0340 20801-0000 STRUCTURE EXCAVATION

Hooker Creek, Inc. $180.00 $16,200.00 West Coast Contractors, Inc. $272.00 $24,480.00 Hayes & Sons, Inc. $600.00 $54,000.00 Engineer's Estimate 90 CUYD $150.00 $13,500.00

A0360 20803-0000 STRUCTURAL BACKFILL

Hooker Creek, Inc. $940.00 $28,200.00 West Coast Contractors, Inc. $239.00 $7,170.00 Hayes & Sons, Inc. $600.00 $18,000.00 Engineer's Estimate 30 CUYD $175.00 $5,250.00

A0380 25126-0000 REMOVE AND RESET BOULDER

Hooker Creek, Inc. $188.00 $3,008.00 West Coast Contractors, Inc. $275.00 $4,400.00 Hayes & Sons, Inc. $500.00 $8,000.00 Engineer's Estimate 16 EACH $500.00 $8,000.00

A0400 30202-2000 ROADWAY AGGREGATE, METHOD 2

Hooker Creek, Inc. $92.00 $24,840.00 West Coast Contractors, Inc. $140.00 $37,800.00 Hayes & Sons, Inc. $75.00 $20,250.00 Engineer's Estimate 270 TON $90.00 $24,300.00

A0420 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

Hooker Creek, Inc. $400.00 $42,000.00 West Coast Contractors, Inc. $640.00 $67,200.00 Hayes & Sons, Inc. $350.00 $36,750.00 Engineer's Estimate 105 TON $300.00 $31,500.00

A0440 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)

Hooker Creek, Inc. $4,460.00 $93,660.00 West Coast Contractors, Inc. $2,438.00 $51,198.00 Hayes & Sons, Inc. $5,000.00 $105,000.00 Engineer's Estimate 21 CUYD $2,000.00 $42,000.00

5 out of 8Source Selection Information - See FAR 2.101 & 3.104

Project No: CA ERFO KLAMATH NF 18N31(1)

Project Name: Upper West Branch Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0460 55302-1200 PRECAST, PRESTRESSED CONCRETE BOX BEAM, TYPE B3-48

Hooker Creek, Inc. $1,820.00 $655,200.00 West Coast Contractors, Inc. $2,235.00 $804,600.00 Hayes & Sons, Inc. $1,725.00 $621,000.00 Engineer's Estimate 360 LNFT $900.00 $324,000.00

A0480 55401-2000 REINFORCING STEEL, EPOXY COATED

Hooker Creek, Inc. $5.00 $12,500.00 West Coast Contractors, Inc. $4.00 $10,000.00 Hayes & Sons, Inc. $12.00 $30,000.00 Engineer's Estimate 2,500 LB $5.00 $12,500.00

A0500 55601-0900 BRIDGE RAILING, STEEL

Hooker Creek, Inc. $445.00 $77,875.00 West Coast Contractors, Inc. $400.00 $70,000.00 Hayes & Sons, Inc. $500.00 $87,500.00 Engineer's Estimate 175 LNFT $400.00 $70,000.00

A0520 55901-0000 MEMBRANE WATERPROOFING

Hooker Creek, Inc. $80.00 $12,800.00 West Coast Contractors, Inc. $63.00 $10,080.00 Hayes & Sons, Inc. $150.00 $24,000.00 Engineer's Estimate 160 SQYD $75.00 $12,000.00

A0540 56401-1000 BEARING DEVICE, ELASTOMERIC

Hooker Creek, Inc. $315.00 $5,040.00 West Coast Contractors, Inc. $800.00 $12,800.00 Hayes & Sons, Inc. $1,200.00 $19,200.00 Engineer's Estimate 16 EACH $1,200.00 $19,200.00

A0560 56501-0200 DRILLED SHAFT, 24-INCH DIAMETER

Hooker Creek, Inc. $1,500.00 $360,000.00 West Coast Contractors, Inc. $1,530.00 $367,200.00 Hayes & Sons, Inc. $1,800.00 $432,000.00 Engineer's Estimate 240 LNFT $1,000.00 $240,000.00

6 out of 8Source Selection Information - See FAR 2.101 & 3.104

Project No: CA ERFO KLAMATH NF 18N31(1)

Project Name: Upper West Branch Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0580 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT

Hooker Creek, Inc. $6,200.00 $24,800.00 West Coast Contractors, Inc. $7,500.00 $30,000.00 Hayes & Sons, Inc. $11,250.00 $45,000.00 Engineer's Estimate 4 EACH $7,000.00 $28,000.00

A0600 61707-0000 STRUCTURE TRANSITION RAILING

Hooker Creek, Inc. $475.00 $37,525.00 West Coast Contractors, Inc. $350.00 $27,650.00 Hayes & Sons, Inc. $469.00 $37,051.00 Engineer's Estimate 79 LNFT $150.00 $11,850.00

A0620 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY

Hooker Creek, Inc. $174.00 $3,480.00 West Coast Contractors, Inc. $120.00 $2,400.00 Hayes & Sons, Inc. $165.00 $3,300.00 Engineer's Estimate 20 HOUR $220.00 $4,400.00

A0640 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH

Hooker Creek, Inc. $140.00 $2,800.00 West Coast Contractors, Inc. $125.00 $2,500.00 Hayes & Sons, Inc. $150.00 $3,000.00 Engineer's Estimate 20 HOUR $250.00 $5,000.00

A0660 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY

Hooker Creek, Inc. $189.00 $3,780.00 West Coast Contractors, Inc. $100.00 $2,000.00 Hayes & Sons, Inc. $150.00 $3,000.00 Engineer's Estimate 20 HOUR $225.00 $4,500.00

A0680 62201-2750 MOTOR GRADER

Hooker Creek, Inc. $197.00 $3,940.00 West Coast Contractors, Inc. $100.00 $2,000.00 Hayes & Sons, Inc. $150.00 $3,000.00 Engineer's Estimate 20 HOUR $300.00 $6,000.00

7 out of 8Source Selection Information - See FAR 2.101 & 3.104

Project No: CA ERFO KLAMATH NF 18N31(1)

Project Name: Upper West Branch Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0700 62301-0000 GENERAL LABOR

Hooker Creek, Inc. $76.00 $1,520.00 West Coast Contractors, Inc. $105.00 $2,100.00 Hayes & Sons, Inc. $80.00 $1,600.00 Engineer's Estimate 20 HOUR $115.00 $2,300.00

A0720 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

Hooker Creek, Inc. $175.00 $3,500.00 West Coast Contractors, Inc. $270.00 $5,400.00 Hayes & Sons, Inc. $225.00 $4,500.00 Engineer's Estimate 20 HOUR $200.00 $4,000.00

A0740 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

Hooker Creek, Inc. $200.00 $4,000.00 West Coast Contractors, Inc. $177.00 $3,540.00 Hayes & Sons, Inc. $250.00 $5,000.00 Engineer's Estimate 20 HOUR $220.00 $4,400.00

A0760 62511-2000 SEEDING, HYDRAULIC METHOD

Hooker Creek, Inc. $2.50 $3,250.00 West Coast Contractors, Inc. $5.00 $6,500.00 Hayes & Sons, Inc. $5.00 $6,500.00 Engineer's Estimate 1,300 SQYD $6.00 $7,800.00

A0780 62516-2000 MULCHING, HYDRAULIC METHOD

Hooker Creek, Inc. $4.00 $5,200.00 West Coast Contractors, Inc. $5.00 $6,500.00 Hayes & Sons, Inc. $5.00 $6,500.00 Engineer's Estimate 1,300 SQYD $7.00 $9,100.00

A0800 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

Hooker Creek, Inc. $210.00 $840.00 West Coast Contractors, Inc. $74.00 $296.00 Hayes & Sons, Inc. $400.00 $1,600.00 Engineer's Estimate 4 EACH $500.00 $2,000.00

8 out of 8Source Selection Information - See FAR 2.101 & 3.104

Project No: CA ERFO KLAMATH NF 18N31(1)

Project Name: Upper West Branch Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0820 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B

Hooker Creek, Inc. $170.00 $340.00 West Coast Contractors, Inc. $67.00 $134.00 Hayes & Sons, Inc. $1,000.00 $2,000.00 Engineer's Estimate 2 EACH $250.00 $500.00

A0840 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Hooker Creek, Inc. $32.00 $1,440.00 West Coast Contractors, Inc. $89.00 $4,005.00 Hayes & Sons, Inc. $55.00 $2,475.00 Engineer's Estimate 45 SQFT $60.00 $2,700.00

Total Schedule - All Items

Hooker Creek, Inc. $1,984,538.00 West Coast Contractors, Inc. $2,120,053.00 Hayes & Sons, Inc. $2,289,726.00 Engineer's Estimate $1,450,000.00

2022-04-27T10:42:34-0600