This is an Addendum (No. 2) issued by the Town of Dillon for the Disinfection Contact Time (CT) Improvements Project, released on July 30, 2024. The addendum modifies the original contract documents and provides updates for potential bidders, with the bid opening scheduled for Thursday, August 8, 2024, at 2:00 pm via MSTeams. The addendum includes revisions to the project manual, specifically updating the Agreement to extend contract times from 180 to 450 days for substantial completion and from 210 to 480 days for final payment. The document also addresses various technical clarifications, including corrections to drawing references, addition of a pipe and valve schedule, and resolving questions about specific project details.
The addendum indicates that the existing water storage tank must be online and operational during the irrigation season from June 1 through September 15, 2025, with the goal of achieving substantial completion and an operable system by June 1, 2025. The contractor may be required to provide a detailed construction schedule justifying the extended contract length while maintaining service during irrigation. The modifications reflect potential flexibility in project timing, with the town open to negotiating contract times based on a detailed and reasonable construction schedule. The project involves improvements to the water treatment plant's disinfection contact time system, including modifications to clearwell infrastructure and associated piping and instrumentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Dillon Disinfection Project - BID Set Project Manual.pdf | ||
| Dillon Disinfection Project_Bid Set Drawings.pdf | ||
| ToD Addenda 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLUMMER ASSOCIATES, INC. C900 - PAGE 1
4126-004-02 ADDENDUM 2 JULY 2024
C900 - ADDENDUM
Addendum No. 2
Date: July 30, 2024
Issued To: All Plan Holders via bidnetdirect.com
From: Town of Dillon
Project: Disinfection Contact Time (CT) Improvements
This Addendum forms a part of the Contract for the project above. The original Contract Documents and any prior Addenda remain in full force and effect except as modified by the following which shall take precedence over any contrary provisions in the prior documents.
Each Bidder shall acknowledge receipt of this Addendum by affixing his signature below, by noting this
Addendum on his Bid Form and attaching this Addendum acknowledgment page to his Bid.
The undersigned acknowledges receipt of this Addendum and the Bid submitted is in accordance with information, instructions and stipulations set forth herein.
BIDDER
Firm’s Name
By:
Signature Date
Print Name Title
PLUMMER ASSOCIATES, INC. C900 - PAGE 2
GENERAL DESCRIPTION
A. This addendum forms a part of the Bidding and Contract Documents and clarifies, corrects or modifies the Project Manual and Drawings as described below.
B. This addendum consists of a total of 42 pages including the following attachments:
1. Agreement
2. Section 40 05 06.
3. Section 40 05 07.
4. Drawing G-002.
5. Drawing G-006.
6. Drawing PID-002.
7. Drawing C-002.
8. Drawing C-007.
PROJECT QUESTIONS
A. Please confirm the Bid Opening date and time; Addenda 1 had conflicting information.
Response: The Bid Opening is scheduled for Thursday, August 8, 2024, at 2:00pm. The meeting will be open to the public and will be hosted on MSTeams with the following call in information:
B. What is the engineer's estimate for this project?
Response: Please refer to Addenda 1 for response to previously asked question.
C. The specifications refer to a Pipe Schedule and Valve Schedule but are not in specifications or on drawings. Will pipe and valve schedules become available? There is Steel piping called out on drawings but no specifications for steel piping. Specification section 400523 and 400524 are referenced but not included. Will these specifications become available?
Response: Please refer to drawing G-006 added to the Contract Drawings to include requested
Pipe and Valve Schedules. Steel pipe internal to both welded steel tank and clearwell no.2 analytical building is specified under Section 43 01 40.19 Rehabilitation of Aboveground Steel
Water Storage Tanks. Note, this Section 43 01 40.19 includes the steel pipe specifications. Also note that epoxy coating and lining systems for both the steel pipe and the submerged ductile
PLUMMER ASSOCIATES, INC. C900 - PAGE 3
iron pipe to be installed in the existing clearwell are to be the same as the tank coatings as specified in 09 97 13, 24 Steel Water Storage Tank Painting.
Sections 40 05 23 and 40 05 24 are not included in the Contract Documents; refer to updated sections 40 05 06 and 40 05 07 for deletion of references to these sections.
D. The spec references a pipe schedule. Please provide piping schedule.
Response: Please refer to response above.
E. Page C007 references spec section 33 01 11, which doesn't appear to be in the spec book.
Please provide.
Response: Please refer to updated Contract Drawing C-007 correcting the specification section reference error noted.
F. Page C008 references spec section 43 01 40.19, which doesn't appear to be in the spec book.
Please provide.
Response: Please refer to Project Manual pdf page 640 for Section 43 01 40.19 Rehabilitation of
Aboveground Steel Water Storage Tanks.
G. Page C004 note 8 states 24" storm drain RCP pipe to be removed and replaced as necessary. Is removal and replacement required, or anticipated? As in, can we leave it be if we can support it?
Response: Removal of storm drain not required, intent of note is to call special attention to the area of Work. The existing storm drain may remain if it can be properly supported and not damaged during construction.
H. Page PID002 Process Description paragraph calls for a fabricated spool between valves WP-BFV-
701 and WP-BFV-704 for bypassing. Shown in the PID drawing however, are valves WP-BFV-101 and WP-BFV-104. Are valves 101 and 104 intended to be 701 and 704? I believe these valves are shown elsewhere on the drawings, just confirming here.
Response: Please refer to updated Contract Drawing PID-002 correcting the typographical error noted.
I. C004 note 7 states all piping buried with depth less than 8 feet are to be insulated. Does this include the 4" drain line, or is the intent to insulate only process and finished piping?
Response: Note 7 applies to pressure pipe. Gravity pipe such as the 4” drain line does not need to be insulated when bury depth is less than 8 feet.
J. Page C002 states "remove and dispose" for most pieces of piping. Does owner have any interest in salvaging the gate valves or is the intent to get rid of them?
Response: Refer to updated Contract Drawing C-002 for clarification on valve salvage.
K. As mentioned at the jobwalk, the city seemed to be open to changing the contract length for the project. We would like to propose that the 180 days for substantial completion time start whenever the contractor fully mobilizes on-site rather than when the Notice to Proceed is
PLUMMER ASSOCIATES, INC. C900 - PAGE 4
signed. To complete this contract with winter weather, we would propose a springtime mobilization.
Response: Refer to updated Agreement that extends the contract times. The existing water storage tank must be online and operational during the irrigation season June 1 through Sept 15, 2025. Therefore, the goal is to achieve substantial completion and an operable system by June 1, 2025. The Contractor shall manage the construction schedule accordingly. If needed, the Contractor, after award of the project, may provide a detailed construction schedule justifying additional contract length with the ability to maintain service during the irrigation. The schedule will be reviewed by
Owner and Engineer to negotiate modifications to the Agreement contract times as justified and reasonable.
PROJECT MANUAL REVISIONS
A. Agreement
1. 2.1 – Contract days revised from 180 to 450 for substantial completion. Contract days revised from 210 to 480 for final payment ready.
B. Section 40 05 06 – Couplings Adapters and Specials for Process Piping.
1. 1.1.B.5 – Delete paragraph in its entirety.
2. 1.1.B.6 - Delete paragraph in its entirety.
C. Section 40 05 07 – Hangers and Supports for Process Piping.
1. 1.1.B.4 – Delete paragraph in its entirety.
2. 1.1.B.5 - Delete paragraph in its entirety.
3. 1.1.B.7 - Delete paragraph in its entirety.
4. 1.1.B.8 - Delete paragraph in its entirety.
5. 1.1.B.10 - Delete paragraph in its entirety.
CONTRACT DRAWINGS REVISIONS
A. Contract Drawing G-002:
1. Entire drawing replaced to add drawing G-006 to index and re-number drawings accordingly.
B. Contract Drawing G-006:
1. Drawing added to schedule valves and pipe.
C. Contract Drawing PID-002:
1. Typographical errors corrected.
D. Contract Drawing C-002:
1. Clarifying note added.
E. Contract Drawing C-007:
1. Typographical errors corrected.
END OF ADDENDUM
Town of Dillon WTP Disinfection Contact (CT) Improvements Project – June 2024 Agreement: Page AG-1
AGREEMENT
THIS AGREEMENT is made and entered into this _____ day of ___________, 2024, by and between TOWN OF
DILLON, COLORADO (hereinafter called the "TOWN") and _____________ (hereinafter called
"CONTRACTOR").
The TOWN and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows:
ARTICLE 1. WORK.
CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents, or which may be reasonably inferred as necessary to produce the results intended by the Contract Documents. The Work is generally described as follows:
PROJECT: Town of Dillon WTP Disinfection Contact (CT) Improvements___
ARTICLE 2. CONTRACT TIMES.
2.1 The Work shall be substantially completed within 180 275 Contract Days after the date when the Contract
Time commences to run. The Work shall be completed and ready for final payment, in accordance with the
General Conditions, within 210 305 Contract Days after the date when the Contract Times commence to run. The Contract Times shall commence to run on the day indicated in the Notice to Proceed.
ARTICLE 3. CONTRACT PRICE.
3.1 The TOWN shall pay in current funds, and the CONTRACTOR agrees to accept in full payment for performance of the Work, subject to additions and deductions from extra and/or omitted work and determinations of actual quantities as provided in the Contract Documents, the Contract Price of
____________________ dollars ($_____________) as set forth in the Bid Form of the CONTRACTOR dated __________.
3.2 As provided in the General Conditions, estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by the Project Manager as provided in the General
Conditions. Unit prices have been computed as provided in the General Conditions.
ARTICLE 4. PAYMENT PROCEDURES.
CONTRACTOR shall submit Applications for Payment in accordance with the General Conditions. Applications for Payment will be processed by the TOWN as provided in the General Conditions.
4.1 Progress payments. The TOWN shall make progress payments on the basis of CONTRACTOR's
Applications for Payment as recommended by the Project Manager, twenty (20) days from submittal of
CONTRACTOR’s Application during construction as provided below and in the General Conditions. All progress payments will be on the basis of the progress of the Unit Price Work based on the number of units completed as provided in the General Conditions.
4.1.1 Prior to Substantial Completion, progress payments will be made in the amount equal to 95 percent of the completed Work, and/or 95 percent of materials and equipment not incorporated in the Work (but delivered, suitably stored and accompanied by documentation satisfactory to the TOWN as provided in the
General Conditions), but in each case, less the aggregate of payments previously made and such less amounts as the Project Manager shall determine, or the TOWN may withhold, in accordance with the
General Conditions. If Work has been 50% completed as determined by the Project Manager, and if the jpaiz Rectangle jpaiz BLD Text Box Addenda 2 7/30/24
Town of Dillon WTP Disinfection Contact (CT) Improvements Project – June 2024 Agreement: Page AG-2 character and progress of the Work have been satisfactory to the TOWN, the TOWN may determine that as long as the character and progress of the Work remain satisfactory to them and no claims have been made by Subcontractors or material suppliers for unpaid work or materials, there will be no additional retainage on account of Work completed in which case the remaining progress payments prior to Substantial
Completion may be in an amount equal to 100 percent of the Work completed.
4.2 Final payment. Upon final completion and acceptance of the Work in accordance with the General
Conditions, the TOWN shall pay the remainder of the Contract Price as provided in said General
Conditions.
4.3 Payment of interest. In the event that any payment of interest is to be made pursuant to any provision of the contract documents, interest shall be paid at the average rate earned by the TOWN on its invested funds during the quarterly fiscal period prior to the period during which the interest was accrued.
ARTICLE 5. CONTRACTOR'S REPRESENTATIONS.
In order to induce the TOWN to enter into this Agreement CONTRACTOR makes the following representations and commitments:
5.1 CONTRACTOR has examined and carefully studied the Contract Documents, (including any and all
Addenda) and the other related data identified in the Bidding Documents including "technical".
5.2 CONTRACTOR has inspected the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work.
5.3 CONTRACTOR is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress and furnishing of the Work.
5.4 CONTRACTOR has carefully studied all reports of exploration and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions relating to surface or subsurface structures
(except Underground Facilities) at or contiguous to the site which have been identified in the General
Conditions. CONTRACTOR accepts the determination set forth in said General Conditions.
CONTRACTOR acknowledges that such reports and drawings are not CONTRACT DOCUMENTS and may not be complete for CONTRACTOR's purposes. CONTRACTOR acknowledges that the TOWN and the Project Manager do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Contract Documents with respect to such reports, drawings or to Underground
Facilities at or contiguous to the site. CONTRACTOR has conducted, obtained and carefully studied (or assumes responsibility for having done so) all necessary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the performance and furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents.
5.4.1 CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract
Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said
Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the
Town of Dillon WTP Disinfection Contact (CT) Improvements Project – June 2024 Agreement: Page AG-3
Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, including specifically the General Conditions.
5.5 CONTRACTOR is aware of the general nature of work to be performed by the TOWN and others at the site that relates to the Work as indicated in the Contract Documents.
5.6 CONTRACTOR has correlated the information known to CONTRACTOR, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests studies and data with the Contract Documents.
5.7 CONTRACTOR has given the Project Manager written notice of all conflicts, errors, ambiguities or discrepancies that CONTRACTOR has discovered in the Contract Documents and the written resolution thereof by the Project Manager is acceptable to CONTRACTOR, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing the Work.
5.8 CONTRACTOR will use its best skill and workmanship to provide Work of the highest quality.
ARTICLE 6. CONTRACT DOCUMENTS
The Contract Documents which constitute the entire agreement between the TOWN and CONTRACTOR concerning the Work are all written documents which define the Work and the obligations of the Contractor in performing the Work and the TOWN in providing compensation for the Work. The Contract Documents shall consist of those listed below, and there are no Contract Documents other than as listed:
6.1 Invitation to Bid.
6.2 Instruction to Bidders.
6.3 Bid Form and Attachments Thereto.
6.4 This Agreement.
6.5 General Conditions.
6.6 Supplementary Conditions if any.
6.7 Technical Specifications.
6.8 Change Orders, Addenda and other documents which may be required or specified including, but not limited to:
6.8.1 Addenda numbers _____ to _____, inclusive.
6.8.2 Documentation submitted by CONTRACTOR prior to Notice of Award.
6.8.3 Notice of Award
6.8.4 Performance Bond and Payment Bond
6.8.5 Warranty Bond
Town of Dillon WTP Disinfection Contact (CT) Improvements Project – June 2024 Agreement: Page AG-4
6.8.6 Certificates of Insurance
6.8.7 Notice to Proceed
6.8.8 Field Order
6.8.9 Work Change Directive
6.8.10 Change Order
6.8.11 Application for Payment
6.8.12 Certificate of Substantial Completion
6.8.13 Claim Release
6.8.14 Final Inspection Report
6.8.15 Certificate of Final Completion
6.8.16 Guarantee Period Inspection Report
6.9 The following which may be delivered or issued after the Effective Date of the Agreement and are attached hereto: All Written Amendments and other documents amending, modifying, or supplementing the
Contract Documents pursuant to the General Conditions.
6.10 In the event of conflict between the above documents, the prevailing document shall be as follows:
1. Permits from other agencies as may be required.
2. Special Provisions and Detail Drawings.
3. Technical Specifications and Drawings. Drawings and Technical Specifications are intended to be complementary. Anything shown or called for in one and omitted in another is binding as if called for or shown by both.
4. Supplementary Conditions.
5. General Conditions.
6. TOWN Design and Construction Standards.
7. Reference Specifications.
6.11 In case of conflict between prevailing references above, the one having the more stringent requirements shall govern.
6.12 There are no Contract Documents other than those listed above in this Article 6. The Contract Documents may only be amended, modified or supplemented as provided in the General Conditions.
Town of Dillon WTP Disinfection Contact (CT) Improvements Project – June 2024 Agreement: Page AG-5
ARTICLE 7. MISCELLANEOUS.
7.1 Terms used in this Agreement which are defined in the General Conditions shall have the meanings indicated in said General Conditions.
7.2 No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge that assignor from any duty or responsibility under the Contract Documents.
7.3 The TOWN and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, agreements and obligations contained in the Contract Documents.
7.4 CONTRACTOR agrees to comply with all federal, state and city non-discrimination rules and regulations so long as CONTRACTOR is under contract with the TOWN.
7.5 By executing this agreement, CONTRACTOR warrants that:
1. CONTRACTOR has not allowed any competing bidder or employee or agent thereof to see
CONTRACTOR's bid or to know of its content.
2. CONTRACTOR has not discussed the contents of its bid with any competing bidder, or any other person who a reasonably prudent person would believe would be likely to transmit information to a competing bidder.
Failure to abide by the above provisions relating to collusion shall render the contractor liable to the TOWN for damages, including, without limitations, payment of the bid bond as liquidated damages. In addition, the TOWN may void any contract entered into with a bidder guilty of collusion.
ARTICLE 8. OTHER PROVISIONS.
8.1 Third party beneficiaries. The contract is not intended to create any right for the public or any member thereof, any subcontractor or supplier, or any other third party, or to authorize anyone not a party to the contract to maintain a suit to enforce its terms. The duties, obligations, and responsibilities of the parties to the contract, with respect to third parties, shall remain as imposed by law. This section shall not apply to any surety to the extent it is acting under any labor and materials bond or performance bond entered into by the CONTRACTOR.
8.2 Integration. The contract documents represent the entire integrated agreement between the TOWN and the CONTRACTOR and supersede all prior negotiations, representations, or agreement, whether written or oral. No modification, amendment, waiver or notation shall be valid unless incorporated in a written amendment or change order properly executed by both parties.
8.3 Severability. To the extent that the performance of the parties' obligations may be accomplished within the intent of the contract, the terms of the contract are severable, and should any term or provision of the contract be declared invalid or become inoperative for any reason, such invalidity or failure shall not affect the validity of any other contract term or provision.
Town of Dillon WTP Disinfection Contact (CT) Improvements Project – June 2024 Agreement: Page AG-6
8.4 Waiver. If the TOWN fails to enforce any term of the contract for any period, this shall not act as a waiver. No waiver of any breach of any term thereof shall be effective unless set forth in a writing signed by both the Project Manager and CONTRACTOR. The waiver of any breach of a term thereof shall not be construed as waiver of any other term.
8.6 Compliance with laws. At all times during the performance of the contract, CONTRACTOR shall strictly adhere to all applicable federal, state and TOWN laws that have been or may hereafter be established.
This shall include, without limitation, the United States Department of Labor, Occupational Safety and
Health Administration (OSHA) standards for excavating and trenching operations. As used in this section, and hereafter, the term "laws" shall include, without limitation, all federal, state and TOWN codes, charters, ordinances, laws, standards, rules and regulations.
8.7 Choice of law. In all litigation arising out of the contract, the statutory and common law of the State of
Colorado shall be controlling, and venue shall be in the District Court of Summit County, Colorado.
ARTICLE 9. PROHIBITION AGAINST EMPLOYMENT OF ILLEGAL ALIENS.
9.1 By its signature on this Agreement, CONTRACTOR certifies that, as of the time of its signature, it does not knowingly employ or contract with an illegal alien and that, in order to verify that it does not employ any illegal aliens, the CONTRACTOR will participate in the E-Verify Program created in Public Law 104-208, as amended, and expanded in Public Law 108-156, as amended, administered by the United States Department of Homeland Security and the Social Security Administration.
9.2 CONTRACTOR agrees that it shall not knowingly employ or contract with an illegal alien to perform work under this Agreement; and that it shall not enter into a contract with a subcontractor that fails to certify to the CONTRACTOR that the subcontractor shall not knowingly employ or contract with an illegal alien to perform work under this contract.
9.3 CONTRACTOR has verified through participation in the E-Verify Program that the CONTRACTOR does not employ any illegal aliens.
9.4 CONTRACTOR shall not use the E-Verify Program procedures to undertake preemployment screening of job applicants while work under this Agreement is being performed.
9.5 If CONTRACTOR obtains actual knowledge that a subcontractor performing work under this Agreement knowingly employs or contracts with an illegal alien, the CONTRACTOR shall: (1) notify the subcontractor and the Town within three days that the CONTRACTOR has actual knowledge that the subcontractor is employing or contracting with an illegal alien; and (2) terminate the subcontract with the subcontractor if, within three days of receiving the notice required herein, the subcontractor does not stop employing or contracting with the illegal alien; except that the CONTRACTOR shall not terminate the contract with the subcontractor if during such three days the subcontractor provides information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien.
9.6 The CONTRACTOR shall comply with any reasonable request by the Colorado Department of Labor and
Employment made in the course of an investigation that the Department is undertaking pursuant to the authority established in C.R.S. section 8-17.5-101(5).
9.7 If CONTRACTOR violates a provision of this Illegal Alien section, the Town may terminate this
Agreement for breach of contract. If the Agreement is so terminated, the CONTRACTOR shall be liable for actual and consequential damages to the Town. CONTRACTOR understands that, in the event of such a termination, Town is required to notify the office of the Colorado Secretary of State.
Town of Dillon WTP Disinfection Contact (CT) Improvements Project – June 2024 Agreement: Page AG-7
IN WITNESS WHEREOF, the TOWN and CONTRACTOR have signed this Agreement in duplicate. One counterpart each has been delivered to the TOWN and CONTRACTOR. All portions of the Contract Document have been signed, initialed or identified by the TOWN and CONTRACTOR.
This Agreement is effective as of _____________________, 20____.
TOWN: CONTRACTOR:
TOWN OF DILLON _________________________________
By: _______________________ By: __________________________
(CORPORATE SEAL) (CORPORATE SEAL)
Attest: ______________________ Attest: _______________________
Address for giving notices:
Town of Dillon
P. O. Box 8, 275 Lake Dillon Drive
Dillon, CO 80435
Town of Dillon WTP Disinfection Contact (CT) Improvements Project – June 2024 Agreement: Page AG-8
PERFORMANCE BOND
1. KNOW ALL MEN BY THESE PRESENTS, THAT:
(name)
(address) as Principal, hereinafter called Principal, and
(surety name)
(surety address) a corporation organized and existing under the laws of the State of ____________________ and AUTHORIZED TO
DO BUSINESS WITHIN THE STATE OF COLORADO, as Surety, hereinafter called Surety, are held firmly bound unto the TOWN OF DILLON, COLORADO as Obligee, hereinafter called the Obligee, in the amount of:
_______________________ Dollars ($ ____________), lawful money of the United States of America, together with interest as may be provided by law, for the payment whereof Principal and Surety bind themselves, their heirs, executors, successors and assigns, jointly and severally, firmly by these presents.
2. WHEREAS, Principal and the Obligee have entered into a contract dated the ______ day of ___________, 2002 for the following Project:
_____________________(Contract #___________), which contract is by reference made a part hereof, and is hereafter referred to as the Contract.
3. NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the Principal shall promptly, and faithfully perform all terms, conditions and other obligations of the Contract, and any modifications or extensions thereof granted by the Obligee, then this obligation shall be null and void; otherwise this obligation shall remain in full force and effect.
4. The Surety for value received agrees that no extension of time, change in, addition to, or other alteration or modification of the terms, conditions or obligations of the Contract or work to be performed thereunder, or any forbearance on the part of either the Obligee or the Principal to the other shall in any way release or affect the
Surety's liability or obligation on this Bond, and the surety hereby waives notice of any such extension of time, change, addition, modification, alteration or forbearance.
Town of Dillon WTP Disinfection Contact (CT) Improvements Project – June 2024 Agreement: Page AG-9
Signed and sealed on the dates set forth below.
_____________________________ FOR: ___________________________
(witness) (Principal's Name)
BY: ____________________________
(seal) ITS: __________________________ this ___ day of _________, 2002
_____________________________ FOR: __________________________
(witness) (Surety's Name)
BOND# _______________________
This Bond (___ is) (___ is not) a SBA Guaranteed Bond.
Town of Dillon WTP Disinfection Contact (CT) Improvements Project – June 2024 Agreement: Page AG-10
LABOR AND MATERIAL PAYMENT BOND
a corporation organized and existing under the laws of the State of ____________________ and AUTHORIZED TO bound unto the TOWN OF DILLON, COLORADO as Obligee, hereinafter called the Obligee, for the use and benefit of claimants as hereinbelow defined, in the amount of
_______________________ Dollars ($ ____________), lawful money of the United States of America, together with interest as may be provided by law, for the payment whereof Principal and Surety bind themselves, their heirs, executors, successors and assigns, jointly and severally, firmly by these presents.
2. WHEREAS, Principal and the Obligee have entered into a contract dated the ______ day of ___________, 2002 for the following (project):
_____________________(Contract #___________), which contract is by reference made a part hereof, and is
3. NOW THEREFORE, THE CONDITION OF THIS OBLIGATION is such that, if the Principal shall promptly make payments of all amounts lawfully due to all persons supplying or furnishing the Principal or the
Principal's subcontractors with labor, materials, rental machinery, tools or equipment used or performed in the prosecution of the work provided for in the Contract; and if the Principal shall indemnify and save harmless the
Obligee to the extent of any payments in connection with the carrying out of the Contract which the Obligee may be required to pay under the law, all in accord with Colorado State Law, Section 38-26-105 C.R.S., then this obligation shall be null and void; otherwise this obligation shall remain in full force and effect.
Town of Dillon WTP Disinfection Contact (CT) Improvements Project – June 2024 Agreement: Page AG-11
AND FURTHER, should the Principal or the Principal's subcontractors fail to duly pay for any labor, materials, team hire, sustenance, provisions, provender, or other supplies used or consumed by the Principal or the
Principal's subcontractors in the performance of the work contracted to be done or fails to pay any person who supplies rental machinery, tools or equipment, all amounts due as the result of the use of such machinery, tools, or equipment, in the prosecution of the work under the Contract, the Surety shall pay the same in an amount not exceeding the sum specified in this Bond together with interest at the rate of eight percent per annum, in accord with
Colorado State Law, Section 38-26-106 C.R.S.
In accordance with Colorado State Law, Section 38-26-105 C.R.S., actions against the Principal and Surety under this Bond shall be brought within six months after the final completion of the Contract as defined by the ordinances, rules and regulations of the TOWN of __________, and not afterwards.
4. The Surety for value received agrees that no extension of time, change in, addition to, or other alteration or modification of the terms, conditions or obligations of the Contract or work to be performed thereunder, or any forbearance on the part of either the Obligee or the Principal to the other shall in any way release or affect the
Surety's liability or obligation on this Bond, and the Surety hereby waives notice of any such extension of time, Town of Dillon WTP Disinfection Contact (CT) Improvements Project – June 2024 Agreement: Page AG-12
WARRANTY BOND
a corporation organized and existing under the laws of the State of ____________________ and AUTHORIZED TO bound unto the TOWN OF DILLON, COLORADO as Obligee, hereinafter called the Obligee, in the amount of:
_______________________ Dollars ($ ____________), lawful money of the United States of America, together with interest as may be provided by law, for the maintenance and guarantee obligations of the Contract, for the payment whereof Principal and Surety bind themselves, their heirs, executors, successors and assigns, jointly and severally, firmly by these presents.
2. WHEREAS, Principal and the Obligee have entered into a contract dated the ______ day of ___________, 2002 for the following (project):
_____________________(Contract #___________), which contract is by reference made a part hereof, and is
3. NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the Principal shall promptly, properly and with out cost to Obligee perform all maintenance and other guarantee obligations under the terms of the Contract, including any modifications or extensions thereof granted by the Obligee, for a period of
_____ (____) year(s) from the date of final payment upon the Contract by the Obligee, and in the case of each correction or repair, during a period of one year after the date of said correction or repair or for the remaining period of years set forth herein, whichever is longer, then this obligation shall be null and void; otherwise this obligation shall remain in full force and effect.
4. The Surety for value received agrees that no extension of time, change in, addition to, or other alteration or
Town of Dillon WTP Disinfection Contact (CT) Improvements Project – June 2024 Agreement: Page AG-13 modification of the terms, conditions or obligations of the Contract or work to be performed thereunder, or any forbearance on the part of either the Obligee or the Principal to the other shall in any way release or affect the
Surety's liability or obligation on this Bond, and the surety hereby waives notice of any such extension of time, PLUMMER ASSOCIATES, INC. 40 05 06 - PAGE 1 OF 12 BID SET
4126-004-02 COUPLINGS, ADAPTERS, AND SPECIALS FOR PROCESS PIPING JUNE 2024
SECTION 40 05 06
COUPLINGS, ADAPTERS, AND SPECIALS FOR PROCESS PIPING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Wall and Floor Pipe Sleeves.
2. Flanged Coupling Adapters.
3. Restrained Flanged Coupling Adapters (RFCA).
4. Dismantling Joints.
5. Expansion Joints (Rubber and PTFE).
6. Service Saddles.
7. Dielectric Connections.
8. Dielectric Hardware Kits.
B. Related Sections:
1. Section 09 96 56 - Epoxy Coatings.
2. Section 33 01 10.58 - Disinfection of Water Utility Piping Systems.
3. Section 40 05 07 - Hangers and Supports for Process Piping.
4. Section 40 05 19 - Ductile Iron Process Pipe.
5. Section 40 05 23 - Stainless Steel Process Pipe and Tubing.
6. Section 40 05 24 - Steel Process Pipe.
7. Section 40 05 31 - Thermoplastic Process Pipe.
1.2 DEFINITIONS
A. Process Piping Systems: Includes all piping, fittings, valves, specials, hangers and supports, and related items required for a complete process piping system.
B. Ferrous Metal: Iron, steel, stainless steel, and alloys with iron as principal component.
C. Nonferrous Metals: Copper.
D. Nonmetallic: PVC, CPVC, PE, HDPE, and FRP.
E. Wetted or Submerged Piping Systems:
1. Submerged, or less than 1 foot above the maximum liquid surface of water holding structures.
2. Below top of channels, under cover of slabs of channels or tanks.
3. In other damp or covered locations (e.g., vaults, wetwells, utility corridors, etc.)
F. Exposed or Atmospherically Exposed Piping Systems: All piping systems exposed to the atmosphere (not buried, submerged, wetted, or embedded). This designation includes insulated piping inside chases or piping hidden from view.
1.3 REFERENCES
A. American National Standards Institute (ANSI):
jpaiz Rectangle jpaiz BLD Text Box
PLUMMER ASSOCIATES, INC. 40 05 06 - PAGE 2 OF 12 BID SET
1. ANSI B16.5 - Pipe Flanges and Flanged Fittings: NPS 1/2 through NPS 24, Metric/Inch
Standard.
2. ANSI B16.39 - Malleable Iron Threaded Pipe Unions.
3. ANSI B31 - Standards of Pressure Piping.
B. American Society of Testing and Materials (ASTM):
1. ASTM A53/A53M - Specification for Pipe, Steel, Black and Hot-dipped, Zinc-Coated, Welded and Seamless.
2. ASTM A105/A105M - Specification for Carbon Steel Forgings and Piping Applications.
3. ASTM B169/B169M - Specification for Aluminum Bronze Sheet, Strip, and Rolled Bar.
4. ASTM B650 - Specification for Electro-Deposited Engineering Chromium Coatings of
Ferrous Substrates.
5. ASTM C1173 - Standard Specification for Flexible Transition Couplings for
Underground Piping Systems.
6. ASTM D5926 - Standard Specifications for Poly (Vinyl Chloride) (PVC) Gaskets for
Drain, Waste, and Vent (DWV), Sewer, Sanitary, and Storm Plumbing Systems.
7. ASTM F593, Specification for Stainless Steel Bolts, Hex Cap Screws, and Studs.
C. National Sanitary Foundation (NSF):
1. NSF 61 - Drinking Water System Components, Health Effects.
1.4 COORDINATION
A. Coordinate Work of this Section with installation of process piping.
B. Coordinate installation of required supporting appurtenances including pipe sleeves in concrete penetration applications and other structural components as they are constructed.
C. Coordinate installation of piping systems with other trades including but not limited to
Plumbing, Fire Protection, HVAC, Electrical, and Controls.
D. Coordinate installation of identifying devices after completing covering and painting if devices are applied to surfaces.
1.5 SUBMITTALS
A. Per Section 01 33 00 - Submittal Procedures.
B. Product Data:
1. Submit manufacturer’s descriptive literature and product specifications for each product provided. At minimum product data to Indicate:
a. Pressure ratings, movements, spring rates, bolt patterns, flange types, and gasket material selection.
b. Provide manufacturer's catalog information with dimensions, material, and assembled weight.
C. Manufacturer’s Certificates:
1. Certify that products meet or exceed specified requirements.
2. Submit manufacturer’s certificate of NSF 61 compliance for all components in direct contact with potable water.
PLUMMER ASSOCIATES, INC. 40 05 06 - PAGE 3 OF 12 BID SET
D. Delegated Design Submittals:
1. Submit Shop Drawings and design calculations for Owner/Engineer approval.
2. Shop Drawings to Indicate general arrangement including dimensions, special fittings and bends, weights, and all other pertinent fabrication information.
E. Manufacturer’s Instructions: Submit product installation instructions including bolting torque specs assembly patterns.
F. Source Quality-Control Submittals: Indicate results of factory inspections and tests.
G. Field Quality-Control Submittals: Indicate results of Contractor furnished inspections and tests.
1.6 CLOSEOUT SUBMITTALS
A. Per Section 01 70 00 - Execution and Closeout Requirements.
B. Provide final executed warranty information including terms and conditions with warranty period and start date clearly indicated.
C. Project Record Documents:
1. Maintain accurate and up-to-date record documents showing Contract and Shop
Drawing modifications. Record documents shall show actual location of all piping and appurtenances on a copy of the Contract Drawings.
2. Record documents shall show piping with elevations referenced to the project datum and dimensions from permanent structures. For straight runs of pipe provide offset dimensions as required to document pipe location.
1.7 QUALITY ASSURANCE
A. Materials in Contact with Potable Water: Certified according to NSF 61.
B. Same Manufacturer to provide all like components including pipe, fittings, and flanges.
1.8 QUALIFICATIONS
A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.
1.9 DELIVERY, STORAGE, AND HANDLING
A. Per Section 01 60 00 - Product Requirements.
B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.
C. Store materials according to manufacturer instructions.
D. Protection:
1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.
2. Furnish temporary end caps and closures on piping and fittings and maintain in place until installation.
3. Provide additional protection according to manufacturer instructions.
PLUMMER ASSOCIATES, INC. 40 05 06 - PAGE 4 OF 12 BID SET
1.10 EXISTING CONDITIONS
A. Field Measurements:
1. Contractor shall verify actual dimensions of openings, adjacent facilities and equipment, utilities, and related items by field measurements before fabrication, as applicable.
2. Indicate field measurements on Shop Drawings.
1.11 WARRANTY
A. All products furnished and installed under this section shall be warranted in accordance with the requirements of Section 01 78 36 - Warranties.
PART 2 - PRODUCTS
2.1 PIPE PENETRATION SLEEVES:
A. Unless otherwise specified, provide wall penetration sleeves designed for use with modular mechanical seals to provide a corrosion-resistant sealing surface for pipes penetrating floors, walls, foundation, or any other concrete barrier as indicated on the Contract
Drawings.
B. Material:
1. Type 304L stainless steel.
2. Type 316L stainless steel.
3. Textured HDPE.
C. Seepage Ring: Provide a seepage ring in middle of pipe sleeve as follows:
1. Continuously fillet welded on each side all around or integrally molded.
2. Size Seepage Ring as follows:
a. Sleeve nominal diameter 12 inch and smaller:
1) Pipe outside diameter plus 4 inches.
2) Collar thickness: 1/2 inch.
b. Sleeve nominal diameter 14 inch through 18 inch:
1) Pipe outside diameter plus 4 inches.
2) Collar thickness: 3/4 inch.
c. Sleeve nominal diameter 20 inch and 24 inch:
1) Pipe outside diameter plus 6 inches.
2) Collar thickness: 3/4 inch.
d. Sleeve nominal diameter 26 inch through 42 inch:
1) Pipe outside diameter plus 8 inches.
2) Collar thickness: 1 inch.
2.2 MECHANICAL SLEEVE SEALS:
A. Provide modular, mechanical type seal for use with all pipe penetration sleeves. Seal to consist of interlocking synthetic rubber links shaped to continuously fill the annular space between pipe or conduit and sleeve. Once expanded, the mechanical seal shall provide a
PLUMMER ASSOCIATES, INC. 40 05 06 - PAGE 5 OF 12 BID SET
watertight seal.
B. Manufacturers:
1. Flexicraft Industries
2. GPT by EnPro Industries.
C. Sized: According to manufacturer’s recommendations for the size of pipe shown; to provide a watertight seal between pipe and wall sleeve opening.
D. Elastomeric element size and material shall be selected per manufacturer recommendations based on individual service conditions. Assemble with ASTM A276, Type 316 stainless steel bolts and nuts.
E. Pressure end plates shall be either Type 316 stainless steel or glass reinforced plastic, with a minimum tensile strength of 27,000 psi.
2.3 FLANGE COUPLING ADAPTER - SLEEVE TYPE:
A. Application: Connecting plain end ductile iron, carbon steel, or stainless-steel pipe to flanged pipe fitting, valve, instrument, or equipment item where misalignment, future maintenance, or constructability constraints exist, and restraint is not required.
B. Manufacturers:
1. Dresser Piping Specialties, Dresser Inc.
2. Romac.
3. Smith Blair, Inc.
C. Pressure and service: Equal to or greater than connected equipment and piping.
D. Material: Ductile Iron per A536.
E. Flange Drilling: Per ANSI B16.5, Class 150.
F. Gaskets: EPDM.
G. Bolts and Nuts:
1. ASME B18.2.1, carbon steel, unless otherwise indicated.
2. ASTM A307, Grade B, hex head bolts; ASTM A563, Grade A or B, hex head nut; and
ASTM F436 hardened steel washers. Corten is acceptable for mechanical joints.
3. Submerged applications: Type 316 stainless steel bolts; Type 316, hex head nuts and washers of the same material as bolts.
H. Harnessing:
1. Harness couplings to restrain pressure piping. For pipelines that will be under pressure, test pressures are specified in piping schedules in Section 40 06 00.
2. Tie adjacent flanges with bolts of corrosion-resistant alloy steel. Provide flange-mounted stretcher bolt plates to be designed by manufacturer, unless otherwise approved. For buried or submerged applications, provide external bolting and other hardware of Type 316 stainless steel, including tie bolts, bolt plates, lugs, nuts, and washers.
3. Conform to dimensions, size, spacing, and materials for lugs, bolts, washers, and nuts as recommended by manufacturer and approved by Engineer for pipe size, wall
PLUMMER ASSOCIATES, INC. 40 05 06 - PAGE 6 OF 12 BID SET
thickness, and test pressure required. Provide minimum 5/8-inch diameter bolts.
2.4 FLANGE COUPLING ADAPTER - SET SCREW TYPE:
A. Application: Connecting plain end ductile iron to flanged pipe fitting, valve, instrument, or equipment item where prefabricated pipe spool is not available or practical.
B. Obtain Engineer approval prior to use.
C. Manufacturers:
1. EBAA Iron Inc.
2. Or Engineer approved equal.
D. Pressure and service: Equal to or greater than connected equipment and piping.
E. Material: Ductile Iron per A536.
F. Flange: ANSI B16.1, Class 125.
G. Set Screws: Rockwell hardness of C40-45 converted from Brinnell.
2.5 RESTRAINED FLANGE COUPLING ADAPTER:
A. Application: Connecting plain end ductile iron, carbon steel, or stainless-steel pipe to flanged pipe fitting, valve, instrument, or equipment item where misalignment, future maintenance or constructability requires, and restraint is required.
B. Manufacturers:
1. Romac Industries, Inc.
2. Or Engineer approved equal.
C. Pressure and service: Equal to or greater than connected equipment and piping.
D. Material: Ductile Iron per A536.
E. Flange Drilling: Per ANSI B16.5, Class 150.
F. Gasket: EPDM.
G. Bolts and nuts:
1. ASME B18.2.1, carbon steel, unless otherwise indicated.
2. ASTM A307, Grade B, hex head bolts; ASTM A563, Grade A or B, hex head nut; and
ASTM F436 hardened steel washers. Corten is acceptable for mechanical joints.
3. Submerged applications: Type 316 stainless steel bolts; Type 316, hex head nuts and washers of the same material as bolts.
H. Harnessing:
1. Harness adapters to restrain pressure piping.
2. For flanged adapters 12-inch diameter and smaller, provide 1/2-inch diameter
(minimum) Type 316 stainless steel anchor studs installed in pressure-tight anchor boss. For buried or submerged applications, provide external bolting and other hardware of Type 316 stainless steel, including tie bolts, bolt plates, lugs, nuts, and washers. Provide number of studs required to restrain test pressure and service conditions. Harness shall be as designed and recommended by flanged adapter manufacturer. Provide the following minimum anchor studs unless otherwise
PLUMMER ASSOCIATES, INC. 40 05 06 - PAGE 7 OF 12 BID SET
approved by Engineer.
a. Six-inch Diameter and Smaller: 2.
b. Eight-inch Diameter and Smaller: 4.
c. Ten-inch Diameter and Smaller: 6.
d. Twelve-inch Diameter and Smaller: 8.
3. For adapters larger than 12-inch diameter, provide split-ring harness clamps with minimum of four corrosion-resistant alloy steel bolts. For buried or submerged applications, provide external bolting and other hardware of Type 316 stainless steel, including tie bolts, bolt plates, lugs, nuts, and washers. Harness assembly shall be as designed and recommended by flanged adapter manufacturer. Dimensions, sizes, spacing and materials shall be suitable for service and conditions encountered and shall be approved by Engineer.
4. Harness couplings to restrain pressure piping. For pressure pipelines, test pressures are included in piping schedules in Section 40 06 00.
2.6 DISMANTLING JOINTS:
A. Application: Connecting flanged ductile iron, carbon steel, or stainless-steel pipe to flanged pipe fitting, valve, instrument, or equipment item where misalignment, future maintenance, or constructability constraints exist.
B. Manufacturers:
1. Romac Industries, Inc.
2. Or Engineer approved equal.
C. Pressure and service: Equal to or greater than as connected equipment and piping.
D. Material: Ductile Iron per A536.
E. Flange Drilling: Per ANSI B16.5, Class 150.
F. Gaskets: EPDM.
G. Bolts and Nuts:
1. ASME B18.2.1, carbon steel, unless otherwise indicated.
2. ASTM A307, Grade B, hex head bolts; ASTM A563, Grade A or B, hex head nut; and
ASTM F436 hardened steel washers. Corten is acceptable for mechanical joints.
3. Submerged applications: Type 316 stainless steel bolts; Type 316, hex head nuts and washers of the same material as bolts.
H. Harnessing:
1. Harness couplings to restrain pressure piping. For pipelines that will be under pressure, test pressures are specified in piping schedules in Section 40 06 00.
2. Tie adjacent flanges with bolts of corrosion-resistant alloy steel. Provide flange-mounted stretcher bolt plates to be designed by manufacturer, unless otherwise approved. For buried or submerged applications, provide external bolting and other hardware of Type 316 stainless steel, including tie bolts, bolt plates, lugs, nuts, and washers.
3. Conform to dimensions, size, spacing, and materials for lugs, bolts, washers, and nuts
PLUMMER ASSOCIATES, INC. 40 05 06 - PAGE 8 OF 12 BID SET
as recommended by manufacturer and approved by Engineer for pipe size, wall thickness, and test pressure required. Provide minimum 5/8-inch diameter bolts.
2.7 EXPANSIONS JOINTS
A. Manufacturers:
1. Flexicraft Industries.
2. Garlock.
3. Mercer.
4. Proco.
B. All expansion joints shall be provided with stainless steel limit/control rods in the quantity recommend by the manufacturer for the joint size and application.
C. Type I Expansion Joints:
1. Unless otherwise indicated Type I expansion joints shall be provided for lower 1/3 sidewall connections to polyethylene storage tanks.
2. Pressure and service: Equal to or greater than connected equipment and piping.
3. All wetted parts shall be PTFE.
4. Expansion joint to have a minimum of 3 convolutions and stainless-steel flanges.
Galvanized parts will not be accepted.
5. Joint flanges shall be van-stone type with a drilling pattern per ASME B16.5 for Class
150 flat faced flanges.
D. Type II Expansion Joints:
1. Unless otherwise indicated Type II expansion joints shall be provided for all connections to centrifugal pumps.
2. Pressure and service: Equal to or greater than connected…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .