C8 N4523A26Q5706 Attachment 2. QASP.pdf
PDF 472 KB Posted
- Attached to
- N4523A26Q5706 ELPAR Cylinder Lift Rebuild
- Solicitation number
- N4523A26Q5706
About this file
This is a Quality Assurance Surveillance Plan (QASP) for the refurbishment of Elwell Parker Main Lift Cylinders at Puget Sound Naval Shipyard (PSNS) Code 700 Lifting and Handling Department. The QASP establishes procedures and methodologies for the government to monitor contractor performance against standards outlined in the associated Performance Work Statement (PWS). The Contracting Officer holds overall responsibility for contract compliance and administration, while the Contracting Officer's Representative (COR) monitors all technical aspects of contract performance, including inspections, maintenance of communications with the contractor, and issuance of written technical interpretations. The COR is explicitly prohibited from modifying contract terms and conditions, a power reserved solely for the warranted Contracting Officer. Performance standards are documented in Attachment 1 (Performance Requirements Summary Table) and include three primary requirements: equipment repair functionality per PWS Section 5.22 paragraph F with zero deviation from standard, contractor communication and liaison with 24-hour response time to problems with zero deviation from standard, and complete final condition report assessment with 100 percent compliance and zero deviation from standard.
The QASP employs simplified surveillance methodologies including 100 percent review of monthly documentation entered into a Surveillance Activity Checklist, random sampling for periodic inspections, and customer feedback mechanisms. Acceptable Quality Levels (AQLs) are structured to allow contractor discretion in work performance while providing negative incentives for performance shortfalls, with critical activities such as inspection and rebuild established at 100 percent performance. The COR prepares written monthly reports summarizing quality assurance surveillance results, which become part of the COR file and inform determinations regarding contractor performance ratings (Satisfactory, Excellent, or Unsatisfactory) for the annual Contractor Performance Assessment Report (CPAR). Contractor performance meeting required service levels receives a Satisfactory rating; exceeding requirements receives Excellent; failure to meet requirements results in Unsatisfactory ratings. If minimum requirements are not met, the Contracting Officer may require the contractor to develop a corrective action plan, with failure to achieve required performance outcomes potentially resulting in an unsatisfactory Past Performance Rating. Attachment 2 provides the Quality Assurance Monitoring Form used to document surveillance activities, sampling percentages, performance measurement rates, and narrative assessments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
Refurbishment of Elwell Parker Main Lift Cylinders
INTRODUCTION:
This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the Performance Work Statement (PWS) entitled Refurbishment of Elwell Parker Main Lift Cylinders. This plan sets forth the procedures and guidelines the government will use in ensuring the required performance standards or services levels are achieved by the contractor.
PURPOSE:
The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS.
This QASP defines the role and responsibilities of the government representative(s) identified to monitor contractor performance. This QASP shall prescribe the methodologies used to monitor and evaluate the contractor’s performance and the contractor’s performance objectives and thresholds
PERFORMANCE MANAGEMENT:
The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own Quality Control Plan (QCP), whether formal or informally.
QCP is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspection of the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QCP.
The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
ROLES AND RESPONSIBILITIES:
The Contracting Officer:
The Contracting Officer is responsible for monitoring contract compliance, contract administration, and for resolving any differences between the observations documented by the Contracting Officer's Representative (COR) and the Contractor. The Contracting Officer will designate in writing the COR as required. The COR’s along with TA serve as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance.
The Contracting Officer’s Representative (COR):
The COR monitors all technical aspects of the contract and assists in contract administration.
The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel.
The COR is NOT authorized to change any of the terms and conditions of this contract. Only the warranted Contracting Officer is authorized to make modifications/changes to the terms and conditions of this contract. If the COR believes any Government personnel has effectively issued a change resulting in a change in effort and price/cost of the contract, the COR shall immediately notify the Contracting Officer in writing.
IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS:
The required performance standards and/or quality levels are included in the PWS and in Attachment 1, “Performance Requirements Summary Table.” Refurbishment of Elwell Parker Main Lift Cylinders Section 5 Specific Task. If the contractor meets the required service or performance level, it will be rated as SATISFACTORY on the annual Contractor Performance Assessment (CPAR) report. If the contractor exceeds the service or performance level, it is eligible to receive an EXCELLENT on the annual CPAR report. Failure to meet the required level of quality, will result in an UNSATISFACTORY rating in the annual CPARS.
METHODOLOGIES TO MONITOR PERFORMANCE
Surveillance Techniques In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the COR(s) to evaluate contractor performance when appropriate. The primary methods of surveillance are: 100% review of field evaluation reports and submittals, random Sampling and Onsite Visits.
-Random monitoring, which shall be performed by the COR.
-100% Inspection – Each month, the COR, shall review the generated documentation and enter summary results into the Surveillance Activity Checklist (Attachment 2 contained herein). The COR if assigned shall include the results in their COR Reports.
-Periodic Inspection – COR typically performs the periodic inspection on a Random Sampling basis.
-Customer Feedback: The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints. Customer complaints, to be considered valid, must be detailed enough in nature to allow the COR to investigate and notify the Contracting Officer of the validity/resolution. Customer feedback may also be obtained from the results of formal customer satisfaction surveys.
-Acceptable Quality Levels: The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities such as those involving inspection and rebuild the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance at Puget Sound Naval Shipyard (PSNS) Code 700 Lifting and Handling Department.
QUALITY ASSURANCE DOCUMENTATION:
Performance Management Feedback Performance management feedback occurs begins with communication. The COR shall complete monitoring requirements within the Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1 Performance Requirements Summary (PRS). The COR shall communicate with the Contracting Officer any issues, successes or failures of the Contractor to accomplish PWS or PRS requirements.
Monitoring Forms The government’s Quality Assurance (QA) and surveillance, accomplished by the COR, will be reported to the Contracting Officer using the monitoring forms in Attachments 2. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required performance outcomes are being achieved.
The COR will retain a copy of all completed QA surveillance forms.
ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
Determining Performance
Government shall use the monitoring methods cited to determine whether the required performance outcomes have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan (by the Contracting Officer ONLY) to show how and by what date it intends to bring performance up to the required levels. Failure to meet the required performance outcomes may result in an unsatisfactory Past Performance Rating.
Reporting At the end of each month, the COR will prepare a written report summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted reports and the completed quality assurance monitoring forms (Attachment 2), will become part of the COR file. It will enable the government to demonstrate whether the contractor is meeting the required performance outcomes.
Reviews and Resolution The Contracting Officer may require the contractor to meet with the Government team as deemed necessary to discuss performance evaluation. The Contracting Officer will define a frequency of in-depth reviews with the contractor if the need arises, or per the contractor’s request.
The Contracting Officer and COR will coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
ATTACHMENT 2:
Solicitation # QUALITY ASSURANCE
MONITORING FORM
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint
LEVEL OF SURVEILLANCE (Check):
Monthly Quarterly As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
Service Provider’s Performance (Check): Meets Standards
Does Not Meet Standards
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________ DATE: _________________