C5_Attach 2_SOI.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Jeffco Airtanker Base Flooring Replacement
- Solicitation number
- 1240LT26Q0144
- Issued by
-
Department of Agriculture Forest Service
About this file
This is an Independent Government Cost Estimate (IGCE) Schedule of Items (SOI) for the Jeffco Airtanker Base Flooring Replacement project located at Arapaho & Roosevelt National Forests and Pawnee National Grassland. The SOI outlines four base line items totaling 4,322 square feet of work: furniture moving and storage (lump sum), flooring removal and concrete slab preparation (1,997 SF), epoxy flooring installation with base cove and cleaning (1,501 SF), and vinyl flooring installation with base cove, transitions, and cleaning (824 SF). All unit prices are listed as $0.00, indicating this is a placeholder template requiring cost input from contractors.
The associated solicitation 1240LT26Q0144 is a combined synopsis/solicitation for commercial items issued by the Department of Agriculture Forest Service as a Total Small Business Set-Aside under NAICS code 238190 (Other Foundation, Structure, and Building Exterior Contractors) with a $19M small business size standard. A mandatory site visit is scheduled for July 29, 2026 at 10:00 AM MT, with questions due August 3, 2026 and quotations due August 21, 2026, both at 10:00 AM MT. The scope includes removal of existing flooring and installation of new epoxy and vinyl flooring systems with transitions and rubber cove base, with full project requirements detailed in the Statement of Work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IMG_0573.jpeg | JPEG file | |
| IMG_0484.jpeg | JPEG file | |
| IMG_0782.jpeg | JPEG file | |
| IMG_0781.jpeg | JPEG file | |
| IMG_0486.jpeg | JPEG file | |
| IMG_0581.jpeg | JPEG file | |
| IMG_0485.jpeg | JPEG file | |
| IMG_0487.jpeg | JPEG file | |
| IMG_0585.jpeg | JPEG file | |
| Attach 05_Q_A_Sign in sheet.pdf | ||
| 1240LT26Q0144_A0001_S.pdf | ||
| C5_Attach 3_Maps_Floor Plan.pdf | ||
| 1240LT26Q0144_Final.pdf | ||
| C5_Attach 1_SOW.pdf | ||
| C5_Attach 4_WD 20260018.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGCE
| Schedule of Items (SOI) |
| Jeffco ATB Flooring Replacement |
| ARAPAHO & ROOSEVELT NATIONAL FORESTS AND PAWNEE NATIONAL GRASSLAND | ||||||
| BASE ITEMS | ||||||
| Description | Serial/Product No. | Unit | Quantity | Unit Price | TOTAL | |
| 1 | Furnature moving & storage | Lump Sum | 1 | $0.00 | ||
| 2 | Flooring removal, disposal, and concrete slab preperation | SF | 1,997 | $0.00 | ||
| 3 | Flooring installation - expoxy flooring, base cove, and cleaning | SF | 1,501 | $0.00 | ||
| 4 | Flooring installation - vinyl flooring, base cove, transitions, and cleaning. | SF | 824 | $0.00 | ||
| TOTAL BASE ITEMS: | $0.00 |
File details come from the government source that posted it. Updated .