C1a -70FB7020R00000002 Attachment 5 SF-364 Report of Discrepancy.pdf
PDF 1 MB Posted
- Attached to
- Resource and Capability Transportation Support during Disasters (RCTSD) VIPER Federal contract opportunity
- Solicitation number
- 70FB7020R00000002
- Issued by
- Federal Emergency Management Agency
About this file
This solicitation requests proposals for Resource and Capability Transportation Support during Disasters for the U.S. Virgin Islands and Puerto Rico. The Federal Emergency Management Agency Region II requires transportation services to move initial response resources and inter-agency support to survivors in secluded areas impacted by Hurricanes Irma and Maria. Services include delivery of life-sustaining goods such as water, meals, shelters and generators. Multiple Indefinite Delivery, Indefinite Quantity contracts will be awarded to responsible offerors deemed to provide the best value based on evaluation of technical factors and price. The deadline for phase I proposals is August 31, 2020, with questions due by August 19. Awards will be made considering experience, technical approach, quality control, and price on a best value tradeoff basis, with technical factors weighted more heavily than cost.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 70FB7020R00000002 Amendment 0002 Signed by FEMA.pdf | ||
| 70FB7020R00000002 Amendment 0003 Signed by FEMA.pdf | ||
| C1a -70FB7020R00000002 Attachment 1 CLIN Price Structure VIPR - REV 082020.xlsx | XLSX spreadsheet | |
| 70FB7020R00000002 Amendment 0001 Signed by FEMA.pdf | ||
| Government Answers to Contractor Questions REV 082020.xlsx | XLSX spreadsheet | |
| C1a -70FB7020R00000002 Attachment 3_FEMA Form 119-7-1-1 Report of Survey.pdf | ||
| C1a -70FB7020R00000002 Attachment 4 SF-91 Accident Report Form.pdf | ||
| Question and Answer Template.xlsx | XLSX spreadsheet | |
| C1a - 70FB7020R00000002 VIPER RFP.pdf | ||
| C1a -70FB7020R00000002 Attachment 1 CLIN Price Structure VIPR.xlsx | XLSX spreadsheet | |
| C1a -70FB7020R00000002 Attachment 6 ASN Upload_Spreadsheet v1.3.xlsx | XLSX spreadsheet | |
| C1a -70FB7020R00000002 Attachment 2 QASP RCTSD VIPR.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPORT OF DISCREPANCY (ROD)
SHIPPING PACKAGING
1. DATE OF PREPARATION 2. REPORT NUMBER
3. TO (Name and address, include ZIP Code) 4. FROM (Name and address, include ZIP Code)
5a. SHIPPER'S NAME 5b. NUMBER AND DATE OF
INVOICE
6. TRANSPORTATION DOCUMENT
NUMBER (GBL, Waybill; TCN, etc.)
7a. SHIPPER'S NUMBER (Purchase order/Shipment, Contract, etc.)
7b. OFFICE ADMINISTRATION CONTRACT 8. REQUISTIONER'S NUMBER (Requi-sition, Purchase Request, etc)
9. SHIPMENT, BILLING, AND RECEIPT DATA 10. DISCREPANCY DATA 11.
AC-2
TION
CODENSN/PART NUMBER AND
NOMENCLATURE
(a)
UNIT
OF ISSUE
(b)
QUANTITY
SHIPPED/
BILLED
(c)
QUANTITY
RECEIVED
(d)
QUAN-
TITY
(a)
UNIT
PRICE
(b)
TOTAL
COST
(c)
CODE1
(d)
12. REMARKS (Continue on separate sheet of paper if necessary)
1DISCREPANCY CODES 2 ACTION CODES
CONDITION OF MATERIAL
C1 — In condition other than that indicated on release/ receipt document C2 — Expired shelf life C3 — Damaged parcel post shipment
SUPPLY DOCUMENTATION
D1 — Not received D2 — Illegible or mutilated D3 — Incomplete improper or without authority (Only when receipt cannot be properly process)
MISDIRECTED MATERIAL
M1 — Addressed to wrong activity
OVERAGE/ DUPLICATE SHIPMENTS
O1 — Quantity in excess of that on receipt docu-ment O2 — Quantity in excess of that requested (Other than unit of issue pack) O3— Quantity duplicates shipment
PACKING DISCREPANCY
P1 — Improper preservation P2 — Improper packing P3 — Improper marking P4 — Improper unitization
PRODUCT QUALITY DEFICIENCIES
Q1 — Deficient material (Applicable to Grant Aid and FMS shipments only)
SHORTAGE OF MATERIAL
S1 — Quantity less than that on receipt document S2 — Quantity less than that requested (Other than unit of issue pack) S3 — Non-receipt of parcel post shipments ITEMS TECHNICAL DATA MARKINGS (i.e, Name Plates, Log Books, Opening Handbooks, Special Instructions, etc.)
T1 — Missing T2 — Illegible or mutilated T3 — Precautionary operational markings missing T4 — Inspection data missing or incomplete T5 — Serviceability operating data missing or incomplete T6 — Warranty data missing WRONG ITEM (Identify requested item as a separate copy in item 9 above) W1 — Incorrect item received W2 — Unacceptable substitute
OTHER DISCREPANCIES
Z1 — See remarks
1A— Disposition instructions re-quested (Reply on reverse) 1B— Material being retained (See remarks) 1C— Supporting supply documenta-tion requested 1D— Material still required expedite shipment (Not applicable to
FMS)
1E— Local purchase material to be returned at supplier's expense unless disposition instructions to the contrary are received within 15 days (Reply on re-verse) (Not applicable to FMS) 1F— Replacement shipment requested (Not applicable to FMS) 1G— Reshipment not required. Item to be re-requisitioned.
1H— No action required. Information only 1Z— Other action requested (See remarks)
13. FUNDING AND ACCOUNTING DATA
14a. TYPED OR PRINTED NAME, TITLE, AND PHONE NUMBER OF PRE-
PARING OFFICAL
14b. SIGNATURE
15. DISTRIBUTION ADDRESSEES FOR COPIES
STANDARD FORM 364 (REV. 2-80)
16. FROM: 17. DISTRIBUTION ADDRESSEES FOR COPIES
18. TO:
Use window envelope to mail this document. Insert name, and address, including ZIP Code, starting one typing space below the left dot.
Each address line must NOT extent beyond right dot.
Address must not exceed four singles space typing lines.
19. IN ACCORDANCE WITH NOTICE OF DISCREPANCY ON FACE OF THIS FORM:
a. MATERIAL
HAS
BEEN
WILL
BE
SHIPPED
DOCUMENT NUMBER
NO RECORD OF SHIPMENT. RESUBMIT REPORT TO
b. PROPER OFFICE UNDER APPROPRIATE REGULATION.
AN ADJUSTMENT IN BILL-
ING HAS BEEN / WILL BE
c. PROCESSED AS A: CREDIT DEBIT
INVOICE/BILL
d. ATTACHED
PROOF OF DELIVERY (Parcel Post Shipments) OR EVIDENCE OF
e. SHIPMENTS ENCLOSED.
AN ADJUSTMENT IN BILLING FOR THE REPORTED DISCREPANCY WILL NOT BE PROCESSED FOR THE FOLLOWING REASON
f. WHICH IS CITED IN THE INDICATED REGULATION.
(1) REASON FOR NOT PROCESSING (2) PRESCRIBING REGULATION
(a) DISCREPANCY WAS NOT REPORTED WITHIN THE TIME
FRAMES ALLOWED AND/OR
(b) DOLLAR VALUE DOES NOT MEET THE CRITERIA PRE-
SCRIBED IN THE REGULATION OR AGREEMENT INDI-
CATED IN 19f(2)
(a) CHAPTER 5 OF THE GSA HANDBOOK. DISCREPANCIES OR
DEFICIENCIES IN GSA OR DOD SHIPMENTS, MATERIAL,
OR BILLINGS (FPMR 101-26.8)
(b) CHAP.2 AND/OR 7 OF DOD 4000.25-7-M, MILITARY STAND-
ARD BILLING SYSTEM (MILSBILLS) AND/OR DD 1513, U.S.
DOD OFFER AND ACCEPTANCE, AS APPLICABLE.
20. THE FOLLOWING DISPOSITION IS TO BE MADE OF THE REFERENCED MATERIAL:
PROCESS FOR DISPOSAL IN ACCORDANCE
a. WITH SERVICE/AGENCY DIRECTIVES.
c. RETAIN MATERIAL AT NO CHARGE.
REPRESENTATIVE WILL CALL FOR DISCUS-
b. SION CONCERNING DISPOSITION IN:
d. MATERIAL WILL BE PICKED UP IN:
DAYS
DAYS
e. SHIP MATERIAL (Specify location):
(1) GBL APPROPRIATIONS CHARGEABLE:
(2) CHARGES COLLECT-VIA: FREIGHT EXPRESS PARCEL POST ($ postage advanced herewith.
NOTE: Please enclose postage. Material cannot to returned Parcel Post collect.)(3) PARCEL POST LABEL ATTACHED (4) FREIGHT PREPAID
f. OTHER (Specify)
IF MATERIAL IS STILL REQUIRED,
21. SUBMIT NEW REQUISITION
REPLACEMENT WITH SATISFACTORY
22. MATERIAL WILL BE MADE ON OR BEFORE:
DATE
23. REMARKS (Continue on separate sheet of paper if necessary)
24a. TYPED OR PRINTED NAME AND PHONE NUM-
BER OF PREPARING OFFICAL
24b. SIGNATURE 24c. DATE
STANDARD FORM 364 BACK (REV. 2-80)
REPORT OF DISCREPANCY (ROD)
SHIPPING
PACKAGING
1. DATE OF PREPARATION
2. REPORT NUMBER
3. TO (Name and address, include ZIP Code)
4. FROM (Name and address, include ZIP Code) 5a. SHIPPER'S NAME 5b. NUMBER AND DATE OF
INVOICE
6. TRANSPORTATION DOCUMENT
NUMBER (GBL, Waybill; TCN, etc.)
7a. SHIPPER'S NUMBER (Purchase order/Shipment, Contract, etc.)
7b. OFFICE ADMINISTRATION CONTRACT
8. REQUISTIONER'S NUMBER (Requi-sition, Purchase Request, etc)
| 9. | SHIPMENT, BILLING, AND RECEIPT DATA | |
| 10. | DISCREPANCY DATA |
11.
AC-2
TION
CODE
NSN/PART NUMBER AND
NOMENCLATURE
(a)
UNIT
OF ISSUE
(b)
QUANTITY
SHIPPED/
BILLED
(c)
QUANTITY
RECEIVED
(d)
QUAN-
TITY
(a)
UNIT
PRICE
(b)
TOTAL
COST
(c)
CODE1
(d)
12. REMARKS (Continue on separate sheet of paper if necessary)
1DISCREPANCY CODES
2 ACTION CODES
CONDITION OF MATERIAL
C1 — In condition other than that indicated on release/ receipt document C2 — Expired shelf life C3 — Damaged parcel post shipment
SUPPLY DOCUMENTATION
D1 — Not received D2 — Illegible or mutilated D3 — Incomplete improper or without authority (Only when receipt cannot be properly process)
MISDIRECTED MATERIAL
M1 — Addressed to wrong activity
OVERAGE/ DUPLICATE SHIPMENTS
O1 — Quantity in excess of that on receipt docu-ment O2 — Quantity in excess of that requested (Other than unit of issue pack) O3— Quantity duplicates shipment
PACKING DISCREPANCY
P1 — Improper preservation P2 — Improper packing P3 — Improper marking P4 — Improper unitization
PRODUCT QUALITY DEFICIENCIES
Q1 — Deficient material (Applicable to Grant Aid and FMS shipments only)
SHORTAGE OF MATERIAL
S1 — Quantity less than that on receipt document S2 — Quantity less than that requested (Other than unit of issue pack) S3 — Non-receipt of parcel post shipments ITEMS TECHNICAL DATA MARKINGS (i.e, Name Plates, Log Books, Opening Handbooks, Special Instructions, etc.)
T1 — Missing T2 — Illegible or mutilated T3 — Precautionary operational markings missing T4 — Inspection data missing or incomplete T5 — Serviceability operating data missing or incomplete T6 — Warranty data missing WRONG ITEM (Identify requested item as a separate copy in item 9 above) W1 — Incorrect item received W2 — Unacceptable substitute
OTHER DISCREPANCIES
Z1 — See remarks 1A— Disposition instructions re-quested (Reply on reverse) 1B— Material being retained (See remarks) 1C— Supporting supply documenta-tion requested 1D— Material still required expedite shipment (Not applicable to
FMS)
1E— Local purchase material to be returned at supplier's expense unless disposition instructions to the contrary are received within 15 days (Reply on re-verse) (Not applicable to FMS) 1F— Replacement shipment requested (Not applicable to FMS) 1G— Reshipment not required. Item to be re-requisitioned.
1H— No action required. Information only 1Z— Other action requested (See remarks)
13. FUNDING AND ACCOUNTING DATA
14a. TYPED OR PRINTED NAME, TITLE, AND PHONE NUMBER OF PRE-
PARING OFFICAL
14b. SIGNATURE
15. DISTRIBUTION ADDRESSEES FOR COPIES
STANDARD FORM 364 (REV. 2-80)
16. FROM:
17. DISTRIBUTION ADDRESSEES FOR COPIES
18. TO:
Use window envelope to mail this document. Insert name, and address, including ZIP Code, starting one typing space below the left dot. Each address line must NOT extent beyond right dot. Address must not exceed four singles space typing lines.
19. IN ACCORDANCE WITH NOTICE OF DISCREPANCY ON FACE OF THIS FORM:
a. MATERIAL
HAS
BEEN
WILL
BE
SHIPPED
DOCUMENT NUMBER
NO RECORD OF SHIPMENT. RESUBMIT REPORT TO
b. PROPER OFFICE UNDER APPROPRIATE REGULATION.
AN ADJUSTMENT IN BILL-
ING HAS BEEN / WILL BE
c. PROCESSED AS A:
CREDIT
DEBIT
INVOICE/BILL
d. ATTACHED PROOF OF DELIVERY (Parcel Post Shipments) OR EVIDENCE OF
e. SHIPMENTS ENCLOSED.
AN ADJUSTMENT IN BILLING FOR THE REPORTED DISCREPANCY WILL NOT BE PROCESSED FOR THE FOLLOWING REASON
f. WHICH IS CITED IN THE INDICATED REGULATION.
| (1) | REASON FOR NOT PROCESSING |
| (2) | PRESCRIBING REGULATION |
(a) DISCREPANCY WAS NOT REPORTED WITHIN THE TIME
FRAMES ALLOWED AND/OR
(b) DOLLAR VALUE DOES NOT MEET THE CRITERIA PRE-
SCRIBED IN THE REGULATION OR AGREEMENT INDI-
CATED IN 19f(2)
(a) CHAPTER 5 OF THE GSA HANDBOOK. DISCREPANCIES OR
DEFICIENCIES IN GSA OR DOD SHIPMENTS, MATERIAL,
OR BILLINGS (FPMR 101-26.8)
(b) CHAP.2 AND/OR 7 OF DOD 4000.25-7-M, MILITARY STAND-
ARD BILLING SYSTEM (MILSBILLS) AND/OR DD 1513, U.S.
DOD OFFER AND ACCEPTANCE, AS APPLICABLE.
20. THE FOLLOWING DISPOSITION IS TO BE MADE OF THE REFERENCED MATERIAL:
PROCESS FOR DISPOSAL IN ACCORDANCE
a. WITH SERVICE/AGENCY DIRECTIVES.
c. RETAIN MATERIAL AT NO CHARGE.
REPRESENTATIVE WILL CALL FOR DISCUS-
b. SION CONCERNING DISPOSITION IN:
d. MATERIAL WILL BE PICKED UP IN:
DAYS
DAYS
e. SHIP MATERIAL (Specify location):
(1) GBL APPROPRIATIONS CHARGEABLE:
(2) CHARGES COLLECT-VIA:
FREIGHT
EXPRESS
PARCEL POST
($ postage advanced herewith.
NOTE: Please enclose postage. Material cannot to returned Parcel Post collect.)
(3) PARCEL POST LABEL ATTACHED
(4) FREIGHT PREPAID
f. OTHER (Specify)
IF MATERIAL IS STILL REQUIRED,
21. SUBMIT NEW REQUISITION
REPLACEMENT WITH SATISFACTORY
22. MATERIAL WILL BE MADE ON OR BEFORE:
DATE
23. REMARKS (Continue on separate sheet of paper if necessary) 24a. TYPED OR PRINTED NAME AND PHONE NUM-
BER OF PREPARING OFFICAL
24b. SIGNATURE 24c. DATE
STANDARD FORM 364 BACK (REV. 2-80)
8.2.1.4029.1.523496.503679
| REPORT OF DISCREPANCY (ROD). SHIPPING: 0 |
| REPORT OF DISCREPANCY (ROD). PACKAGING: 0 |
| 1. DATE OF PREPARATION. Enter 2 digit month, 2 digit day and 4 digit year.: |
| 2. REPORT NUMBER.: |
| 3. TO (Name and address, include ZIP Code).: |
| 4. FROM (Name and address, include ZIP Code).: |
| 5a. SHIPPER'S NAME.: |
| 5b. NUMBER OF INVOICE.: |
| 24c. DATE. Enter 2 digit month, 2 digit day and 4 digit year.: |
| 6. TRANSPORTATION DOCUMENT NUMBER (GBL, Waybill; TCN, etc.).: |
| 7a. SHIPPER'S NUMBER (Purchase order/Shipment, Contract, etc.).: |
| 7b. OFFICE ADMINISTRATION CONTRACT.: |
| 8. REQUISTIONER'S NUMBER (Requisition, Purchase Request, etc).: |
| 9a. SHIPMENT, BILLING, AND RECEIPT DATA. NSN/PART NUMBER AND NOMENCLATURE. 1 of 7.: |
| 11. ACTION CODE. (See 2 below).: |
| 10d. DISCREPANCY DATA. CODE. (See 1 below).: |
| 10b. DISCREPANCY DATA. UNIT PRICE.: |
| 10a. DISCREPANCY DATA. QUANTITY.: |
| 9d. SHIPMENT, BILLING, AND RECEIPT DATA. QUANTITY RECEIVED.: |
| 9c. SHIPMENT, BILLING, AND RECEIPT DATA. QUANTITY SHIPPED/ BILLED.: |
| 9b. SHIPMENT, BILLING, AND RECEIPT DATA. UNIT OF ISSUE.: |
| 9a. SHIPMENT, BILLING, AND RECEIPT DATA. NSN/PART NUMBER AND NOMENCLATURE. 7 of 7.: |
| 11. ACTION CODE. (See 2 below).: |
| 10d. DISCREPANCY DATA. CODE. (See 1 below).: |
| 10b. DISCREPANCY DATA. UNIT PRICE.: |
| 10a. DISCREPANCY DATA. QUANTITY.: |
| 9d. SHIPMENT, BILLING, AND RECEIPT DATA. QUANTITY RECEIVED.: |
| 9c. SHIPMENT, BILLING, AND RECEIPT DATA. QUANTITY SHIPPED/ BILLED.: |
| 9b. SHIPMENT, BILLING, AND RECEIPT DATA. UNIT OF ISSUE.: |
| 9a. SHIPMENT, BILLING, AND RECEIPT DATA. NSN/PART NUMBER AND NOMENCLATURE. 6 of 7.: |
| 11. ACTION CODE. (See 2 below).: |
| 10d. DISCREPANCY DATA. CODE. (See 1 below).: |
| 10b. DISCREPANCY DATA. UNIT PRICE.: |
| 10a. DISCREPANCY DATA. QUANTITY.: |
| 9d. SHIPMENT, BILLING, AND RECEIPT DATA. QUANTITY RECEIVED.: |
| 9c. SHIPMENT, BILLING, AND RECEIPT DATA. QUANTITY SHIPPED/ BILLED.: |
| 9b. SHIPMENT, BILLING, AND RECEIPT DATA. UNIT OF ISSUE.: |
| 9a. SHIPMENT, BILLING, AND RECEIPT DATA. NSN/PART NUMBER AND NOMENCLATURE. 5 of 7.: |
| 11. ACTION CODE. (See 2 below).: |
| 10d. DISCREPANCY DATA. CODE. (See 1 below).: |
| 10b. DISCREPANCY DATA. UNIT PRICE.: |
| 10a. DISCREPANCY DATA. QUANTITY.: |
| 9d. SHIPMENT, BILLING, AND RECEIPT DATA. QUANTITY RECEIVED.: |
| 9c. SHIPMENT, BILLING, AND RECEIPT DATA. QUANTITY SHIPPED/ BILLED.: |
| 9b. SHIPMENT, BILLING, AND RECEIPT DATA. UNIT OF ISSUE.: |
| 9a. SHIPMENT, BILLING, AND RECEIPT DATA. NSN/PART NUMBER AND NOMENCLATURE. 4 of 7.: |
| 11. ACTION CODE. (See 2 below).: |
| 10d. DISCREPANCY DATA. CODE. (See 1 below).: |
| 10b. DISCREPANCY DATA. UNIT PRICE.: |
| 10a. DISCREPANCY DATA. QUANTITY.: |
| 9d. SHIPMENT, BILLING, AND RECEIPT DATA. QUANTITY RECEIVED.: |
| 9c. SHIPMENT, BILLING, AND RECEIPT DATA. QUANTITY SHIPPED/ BILLED.: |
| 9b. SHIPMENT, BILLING, AND RECEIPT DATA. UNIT OF ISSUE.: |
| 9a. SHIPMENT, BILLING, AND RECEIPT DATA. NSN/PART NUMBER AND NOMENCLATURE. 3 of 7.: |
| 11. ACTION CODE. (See 2 below).: |
| 10d. DISCREPANCY DATA. CODE. (See 1 below).: |
| 10b. DISCREPANCY DATA. UNIT PRICE.: |
| 10a. DISCREPANCY DATA. QUANTITY.: |
| 9d. SHIPMENT, BILLING, AND RECEIPT DATA. QUANTITY RECEIVED.: |
| 9c. SHIPMENT, BILLING, AND RECEIPT DATA. QUANTITY SHIPPED/ BILLED.: |
| 9b. SHIPMENT, BILLING, AND RECEIPT DATA. UNIT OF ISSUE.: |
| 9a. SHIPMENT, BILLING, AND RECEIPT DATA. NSN/PART NUMBER AND NOMENCLATURE. 2 of 7.: |
| 9b. SHIPMENT, BILLING, AND RECEIPT DATA. UNIT OF ISSUE.: |
| 9c. SHIPMENT, BILLING, AND RECEIPT DATA. QUANTITY SHIPPED/ BILLED.: |
| 9d. SHIPMENT, BILLING, AND RECEIPT DATA. QUANTITY RECEIVED.: |
| 10a. DISCREPANCY DATA. QUANTITY.: |
| TOTAL COST.: |
| TOTAL COST.: |
| TOTAL COST.: |
| TOTAL COST.: |
| TOTAL COST.: |
| TOTAL COST.: |
| TOTAL COST.: |
| 10b. DISCREPANCY DATA. UNIT PRICE.: |
| 10d. DISCREPANCY DATA. CODE. (See 1 below).: |
| 11. ACTION CODE. (See 2 below).: |
| 12. REMARKS (Continue on separate sheet of paper if necessary): |
| 13. FUNDING AND ACCOUNTING DATA: |
| 14a. TYPED OR PRINTED NAME, TITLE, AND PHONE NUMBER OF PREPARING OFFICAL.: |
| 14b. SIGNATURE.: |
| 24b. SIGNATURE.: |
| 15. DISTRIBUTION ADDRESSEES FOR COPIES.: |
| 16. FROM:: |
| 17. DISTRIBUTION ADDRESSEES FOR COPIES.: |
| 18. TO:: |
| a. MATERIAL. HAS BEEN SHIPPED.: 0 |
| a. MATERIAL. WILL BE SHIPPED.: 0 |
| DOCUMENT NUMBER.: |
| b. NO RECORD OF SHIPMENT. RESUBMIT REPORT TO ROPER OFFICE UNDER APPROPRIATE REGULATION.: 0 |
| c. AN ADJUSTMENT IN BILLING HAS BEEN / WILL BE PROCESSED AS A:: 0 |
| c. AN ADJUSTMENT IN BILLING HAS BEEN / WILL BE PROCESSED AS A: CREDIT.: 0 |
| c. AN ADJUSTMENT IN BILLING HAS BEEN / WILL BE PROCESSED AS A: DEBIT.: 0 |
| d. INVOICE/BILL ATTACHED.: 0 |
| e. PROOF OF DELIVERY (Parcel Post Shipments) OR EVIDENCE OF SHIPMENTS ENCLOSED.: 0 |
| f. AN ADJUSTMENT IN BILLING FOR THE REPORTED DISCREPANCY WILL NOT BE PROCESSED FOR THE FOLLOWING REASON WHICH IS CITED IN THE INDICATED REGULATION.: 0 |
| (1) REASON FOR NOT PROCESSING. (a) DISCREPANCY WAS NOT REPORTED WITHIN THE TIME FRAMES ALLOWED AND/OR.: 0 |
| (b) DOLLAR VALUE DOES NOT MEET THE CRITERIA PRESCRIBED IN THE REGULATION OR AGREEMENT INDICATED IN 19f(2).: 0 |
| (b) CHAPTER 2 AND/OR 7 OF DOD 4000.25-7-M, MILITARY STANDARD BILLING SYSTEM (MILSBILLS) AND/OR DD 1513, U.S. DOD OFFER AND ACCEPTANCE, AS APPLICABLE.: 0 |
| (a) CHAPTER 5 OF THE GSA HANDBOOK. DISCREPANCIES OR DEFICIENCIES IN GSA OR DOD SHIPMENTS, MATERIAL, OR BILLINGS (FPMR 101-26.8).: 0 |
| 20a. THE FOLLOWING DISPOSITION IS TO BE MADE OF THE REFERENCED MATERIAL. PROCESS FOR DISPOSAL IN ACCORDANCE WITH SERVICE/AGENCY DIRECTIVES.: 0 |
| 20c. THE FOLLOWING DISPOSITION IS TO BE MADE OF THE REFERENCED MATERIAL. RETAIN MATERIAL AT NO CHARGE.: 0 |
| 20e. THE FOLLOWING DISPOSITION IS TO BE MADE OF THE REDERENCED MATERIAL. SHIP MATERIAL (Specify location):: 0 |
| 20e. THE FOLLOWING DISPOSITION IS TO BE MADE OF THE REDERENCED MATERIAL. OTHER.: 0 |
| 20b. THE FOLLOWING DISPOSITION IS TO BE MADE OF THE REFERENCED MATERIAL. REPRESENTATIVE WILL CALL FOR DISCUSSION CONCERNING DISPOSITION IN:: 0 |
| 20d. THE FOLLOWING DISPOSITION IS TO BE MADE OF THE REFERENCED MATERIAL. MATERIAL WILL BE PICKED UP IN:: 0 |
| 20. THE FOLLOWING DISPOSITION IS TO BE MADE OF THE REFERENCED MATERIAL. DAYS.: |
| 20. THE FOLLOWING DISPOSITION IS TO BE MADE OF THE REFERENCED MATERIAL. DAYS.: |
| 20e. THE FOLLOWING DISPOSITION IS TO BE MADE OF THE REFERENCED MATERIAL. SHIP MATERIAL (Specify location): (1) GBL APPROPRIATIONS CHARGEABLE.: 0 |
| 20e. THE FOLLOWING DISPOSITION IS TO BE MADE OF THE REFERENCED MATERIAL. SHIP MATERIAL (Specify location): (2) CHARGES COLLECT-VIA:: 0 |
| 20e. THE FOLLOWING DISPOSITION IS TO BE MADE OF THE REFERENCED MATERIAL. SHIP MATERIAL (Specify location): (3) PARCEL POST LABEL ATTACHED.: 0 |
| (2) CHARGES COLLECT-VIA: FREIGHT.: 0 |
| (2) CHARGES COLLECT-VIA: EXPRESS.: 0 |
| (2) CHARGES COLLECT-VIA: PARCEL POST.: 0 |
| (Dollar amount) for postage advanced herewith. NOTE: Please enclose postage. Material cannot to returned Parcel Post collect.: |
| 20f. THE FOLLOWING DISPOSITION IS TO BE MADE OF THE REFERENCE MATERIAL. OTHER (Specify).: |
| 21. IF MATERIAL IS STILL REQUIRED, SUBMIT NEW REQUISITION.: 0 |
| 22. REPLACEMENT WITH SATISFACTORY MATERIAL WILL BE MADE ON OR BEFORE:: 0 |
| 22. DATE. Enter 2 digit month, 2 digit day and 4 digit year.: |
| 23. REMARKS (Continue on separate sheet of paper if necessary).: |
| 24a. TYPED OR PRINTED NAME OF PREPARING OFFICAL.: |
| 24a. TYPED OR PRINTED PHONE NUMBER OF PREPARING OFFICAL.: |
| 24b. SIGNATURE. THIS IS A PROTECTED FIELD.: |
| 20e. THE FOLLOWING DISPOSITION IS TO BE MADE OF THE REFERENCED MATERIAL. SHIP MATERIAL (Specify location): (4) FREIGHT PREPAID: 0 |
File details come from the government source that posted it. Updated .