C1547026_Addenda__1.pdf
PDF 297 KB Posted
- Solicitation number
- 0000000847
- Issued by
- San Diego County, San Diego City, California
About this file
This is Addendum #1 issued by the California Department of Parks and Recreation for Contract #C1547026 "Goat Canyon Sediment Clean Out and Removal of Deposition Material" at Border Field State Park in San Diego, California. The addendum, dated April 14, 2016, revises the scope of work to specify removal of 74,000 cubic yards of sediment and adds requirements for third-party registered engineering surveyor services with submissions in PDF and AutoCAD formats. The document also clarifies that cobble removal is optional, and if exported, counts toward the contractor's export requirement.
The addendum adds two sediment analysis reports (2014 Goat Canyon Basin Sediment Analysis and Goat Canyon Grain Size Report from April 2007) as reference materials while noting that current year material testing is the contractor's responsibility if needed for disposal. It specifies that while the upper basin surface is typically dry at contract start, subsurface material retains moisture, and the lower basin retains more water. The contractor is responsible for pumping water if necessary to achieve required excavation volumes. No pricing terms or funding information are included in this addendum.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of California Natural Resources Agency Edmund G. Brown Jr., Governor
DEPARTMENT OF PARKS AND RECREATION Lisa Ann L. Mangat, Director
P.O. Box 942896 Sacramento, CA 94296-0001
ADDENDA #1
CONTRACT # C1547026
April 14, 2016
ADDENDA NUMBER 1
PROJECT: #C1547026 “Goat Canyon Sediment Clean Out and Removal of Deposition Material”
AT BORDER FIELD STATE PARK, SAN DIEGO, CALIFORNIA,
REVISE THE BID DOCUMENTS AS FOLLOWS
THIS ADDENDA #1 IS TO REVISE THE PROJECT as follows:
1) REMOVE: Scope of Work from the bid booklet.
2) REPLACE: With Revised Scope of Work dated 4/14/2016 (attached) Replace in the Bid Booklet.
3) ADD: 2014 Goat Canyon Basin Sediment Analysis (attached).
4) ADD: Goat Canyon Grain Size Fnl Rpt Apr07 (attached).
5) Added to the Scope of Work – revised 4/14/2016 (attached) the following wording “74,000 cy”
6) Added to the Scope of Work – revised 4/14/2016 (attached) the following wording “(See attached: “2014 Goat Canyon Sediment Analysis” and “Goat Canyon Grain Size Fnl Rpt
Apr07”). Previous years’ analyses should be used as guidelines, as the material may vary year to year.
This year’s material in the basins has not been tested. It is the responsibility of the Contractor to test this year’s material if that information is needed for disposal.”
7) Added to the Scope of Work, Detail #7 – revised 4/14/2016 (attached) the following wording “Surveys shall be performed by a third party registered engineering surveyor.
Survey files shall be submitted electronically to the CSP Representative in PDF and AutoCAD file formats.”
8) Added to the Scope of Work, Detail #9 – revised 4/14/2016 (attached) the following wording “Cobble is considered to be Deposition Material, until the Contractor chooses to sort, clean and leave it behind. Leaving cobble is OPTIONAL, and not a requirement. If cobble is exported that volume shall contribute towards the Contractor’s export requirement. If cobble is left behind, that volume shall not contribute towards the Contractor’s export requirement.”
9) Added to the Scope of Work, Detail #11 – revised 4/14/2016 (attached) the following wording “The upper basin surface is typically dry when the contract begins, although subsurface material typically retains moisture. The lower basin retains more water and may not dry significantly. If water is present and this precludes excavation of the required volume, it is the Contractor’s responsibility to pump the water in order to facilitate excavation.”
ALL OTHER REQUIREMENTS, TERMS, AND CONDITIONS REMAIN THE SAME. THERE
ARE NO OTHER CHANGES AT THIS TIME.
ADDENDUM #1 ACKNOWLEDGEMENT - PLEASE SIGN and Return with Bid Documents.
Name: _________________________________________
Name of Company:_______________________________
Date: _________________