Bldg 82 Replace Overhead Coiling Grille and Security Grate
Solicitation number
N0025325Q0008
Issued by

About this file

The file C12_Att_08_Bid_Form.xlsx appears to be a bid form for a naval construction project at NUWC Keyport in Washington. The solicitation (N0025325Q0008) seeks quotes to replace an overhead coiling rollup door and security grille on the north side of Building 82, with a government estimate range of $25,000 to $100,000. The procurement is a 100% small business set-aside for a firm fixed-price construction contract, classified under NAICS code 238290 with a small business size standard of $22 million.

Key details include a target award date of July 16, 2025, and the requirement is being solicited as a non-commercial service under FAR Part 13. Offerors must be registered in the System for Award Management (SAM), and all inquiries should be directed to Michelle A. Farrales and James K. Wasson via their Navy email addresses. The solicitation will use Low Price Technically Acceptable evaluation factors, and an organized site visit is included as part of the procurement process.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form

Bid Form Solicitation Number:N0025325Q0008Contractor:
PID Description:Bldg 82 Replace Overhead Coiling Grille and Security GrateDate:
Project Location:Naval Base Kitsap, Keyport, WA
Note:Refer to Statement of Work
Instructions:Contractor to complete for all items required. Description should be sufficient to allow for technical and price evaluation in accordance with Section L instructions. Example rows are provided for guidance only to demonstrate the expected level of detail and should be deleted by contractor prior to completion.

Please leave all formulas utilized in calculating totals as formulas, rather than hard entering numbers in the "total" cells.

CLIN 0001 - Base BidQuantityUnitUnit RateMaterial TotalLabor TotalEquipment TotalLine Item Total
Bldg 82 Replace Overhead Coiling Grille and Security Grate
ITEMDESCRIPTION OF TASKS
A (example)Air Handler1Unit$1,000.00$1,000.00$1,000.00
A (example)Labor to Install Air Handler: HVAC Tech15Hrs$65.00$975.00$975.00
A (example)Labor to Install Air Handler: Electrician3Hrs$85.00$255.00$255.00
A (example)Misc. Materials to install Air Handler (piping, ducting, electrical supplies, etc)1Lot$250.00$250.00$250.00
A (example)Equipment (scissor lift)2day$100.00$200.00$200.00
B (example)Site mobilization/demobilization$0.00
B (example)Labor for site mob/demob: General Laborer15Hrs$45.00$675.00$675.00
B (example)Labor for site mob/demob: SSHO2Hrs$85.00$170.00$170.00
B (example)Equipment (Truck and Trailer to haul air handler and materials to job site)1day$450.00$450.00$450.00
B (example)Equipment (dump trailer for debris haul off)2day$250.00$500.00$500.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14<OFFEROR TO INSERT ROWS AS NECESSARY>
Subcontractor Performance Value
Prime Contractor & Project Management Costs
Subtotal
General Home Office Overhead (%)
General Field Overhead (%)
General and Administrative (%)
Profit (%)
Bond
CLIN 0001 Firm Fixed Price Proposal Amount