The file C12_Att_08_Bid_Form.xlsx appears to be a bid form for a naval construction project at NUWC Keyport in Washington. The solicitation (N0025325Q0008) seeks quotes to replace an overhead coiling rollup door and security grille on the north side of Building 82, with a government estimate range of $25,000 to $100,000. The procurement is a 100% small business set-aside for a firm fixed-price construction contract, classified under NAICS code 238290 with a small business size standard of $22 million.
Key details include a target award date of July 16, 2025, and the requirement is being solicited as a non-commercial service under FAR Part 13. Offerors must be registered in the System for Award Management (SAM), and all inquiries should be directed to Michelle A. Farrales and James K. Wasson via their Navy email addresses. The solicitation will use Low Price Technically Acceptable evaluation factors, and an organized site visit is included as part of the procurement process.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C11b_Att_02_-_WA20250109_20250307_Mod2_Building.pdf | ||
| C11d_Att_07_Past_Performance_References.docx | DOCX document | |
| C12_Att_01_Material_Equipment_In_Place_List.xlsx | XLSX spreadsheet | |
| C12_Att_03_Safety_Requirements_for_Contractors_and_Subcontractors.pdf | ||
| C12_Att_04_Kpt_EV_Guide_for_Contractors_Jan_2025.pdf | ||
| C12_Att_06_Schedule_of_Values.xlsx | XLSX spreadsheet | |
| C12_Att_11_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf | ||
| C12_Att_10_Safety_Data_Sheet.docx | DOCX document | |
| C11_N0025325Q0008.pdf | ||
| C12_Att_05_OPSEC_Guide_for_Defense_Contractors.pdf | ||
| C12_Att_09_PPI_Form.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form
| Bid Form Solicitation Number: | N0025325Q0008 | Contractor: | |
| PID Description: | Bldg 82 Replace Overhead Coiling Grille and Security Grate | Date: | |
| Project Location: | Naval Base Kitsap, Keyport, WA | ||
| Note: | Refer to Statement of Work | ||
| Instructions: | Contractor to complete for all items required. Description should be sufficient to allow for technical and price evaluation in accordance with Section L instructions. Example rows are provided for guidance only to demonstrate the expected level of detail and should be deleted by contractor prior to completion. |
Please leave all formulas utilized in calculating totals as formulas, rather than hard entering numbers in the "total" cells.
| CLIN 0001 - Base Bid | Quantity | Unit | Unit Rate | Material Total | Labor Total | Equipment Total | Line Item Total | |
| Bldg 82 Replace Overhead Coiling Grille and Security Grate | ||||||||
| ITEM | DESCRIPTION OF TASKS | |||||||
| A (example) | Air Handler | 1 | Unit | $1,000.00 | $1,000.00 | $1,000.00 | ||
| A (example) | Labor to Install Air Handler: HVAC Tech | 15 | Hrs | $65.00 | $975.00 | $975.00 | ||
| A (example) | Labor to Install Air Handler: Electrician | 3 | Hrs | $85.00 | $255.00 | $255.00 | ||
| A (example) | Misc. Materials to install Air Handler (piping, ducting, electrical supplies, etc) | 1 | Lot | $250.00 | $250.00 | $250.00 | ||
| A (example) | Equipment (scissor lift) | 2 | day | $100.00 | $200.00 | $200.00 | ||
| B (example) | Site mobilization/demobilization | $0.00 | ||||||
| B (example) | Labor for site mob/demob: General Laborer | 15 | Hrs | $45.00 | $675.00 | $675.00 | ||
| B (example) | Labor for site mob/demob: SSHO | 2 | Hrs | $85.00 | $170.00 | $170.00 | ||
| B (example) | Equipment (Truck and Trailer to haul air handler and materials to job site) | 1 | day | $450.00 | $450.00 | $450.00 | ||
| B (example) | Equipment (dump trailer for debris haul off) | 2 | day | $250.00 | $500.00 | $500.00 | ||
| 1 | ||||||||
| 2 | ||||||||
| 3 | ||||||||
| 4 | ||||||||
| 5 | ||||||||
| 6 | ||||||||
| 7 | ||||||||
| 8 | ||||||||
| 9 | ||||||||
| 10 | ||||||||
| 11 | ||||||||
| 12 | ||||||||
| 13 | ||||||||
| 14 | <OFFEROR TO INSERT ROWS AS NECESSARY> | |||||||
| Subcontractor Performance Value | ||||||||
| Prime Contractor & Project Management Costs | ||||||||
| Subtotal | ||||||||
| General Home Office Overhead (%) | ||||||||
| General Field Overhead (%) | ||||||||
| General and Administrative (%) | ||||||||
| Profit (%) | ||||||||
| Bond | ||||||||
| CLIN 0001 Firm Fixed Price Proposal Amount |