The file is a Bid Form for Solicitation Number N0025325Q0007, detailing a construction project to replace lower float pier access panels at Naval Base Kitsap in Keyport, WA. The bid form provides a template for contractors to itemize their pricing, breaking down costs into material, labor, and equipment categories, with example rows demonstrating the expected level of detail for submissions.

The associated federal contract opportunity is a small business set-aside solicitation issued by the Department of the Navy Naval Sea Systems Command, with a government estimate ranging from $25,000 to $100,000. The project will be awarded as a firm fixed-price construction contract, with a target award date of June 18, 2025. Contractors must be registered in the System for Award Management (SAM), and all inquiries are to be directed to specific Navy contract points of contact. The solicitation will be evaluated using Low Price Technically Acceptable criteria under FAR Parts 13 and 36, with NAICS code 237990 and a small business size standard of $45.0 Million.

View the file

Other files for this federal contract opportunity

Other files attached to Bldg. 221 - Replace lower float pier access panels, newest first.
File Type Posted
C12_Att_13_-_Lower_float_Picture.jpg JPG image
C12_Att_12_-_Distro_A_lower_float_Drawing.pdf PDF
C24_N0025325Q00070001.pdf PDF
C12_Att_10_-_Safety_Data_Sheet.docx DOCX document
C12_Att_06_-_Schedule_of_Values.xlsx XLSX spreadsheet
C12_Att_11_-_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf PDF
C11b_Att_02_-_WA20250126_20250207_Mod1_Heavy.pdf PDF
C11_N0025325Q0007.pdf PDF
C12_Att_03_-_Safety_Requirements_for_Contractors_and_Subcontractors.pdf PDF
C12_Att_05_-_OPSEC_Guide_for_Defense_Contractors.pdf PDF
C12_Att_09_-_PPI_Form.docx DOCX document
C12_Att_04_-_Kpt_EV_Guide_for_Contractors_Jan_2025.pdf PDF
C11d_Att_07_-_Past_Performance_References.docx DOCX document
C12_Att_01_-_Material_Equipment_In_Place_List.xlsx XLSX spreadsheet
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form

Bid Form Solicitation Number:N0025325Q0007Contractor:
PID Description:Bldg. 221 - Replace lower float pier access panelsDate:
Project Location:Naval Base Kitsap, Keyport, WA
Note:Refer to Statement of Work
Instructions:Contractor to complete for all items required. Description should be sufficient to allow for technical and price evaluation in accordance with Section L instructions. Example rows are provided for guidance only to demonstrate the expected level of detail and should be deleted by contractor prior to completion.

Please leave all formulas utilized in calculating totals as formulas, rather than hard entering numbers in the "total" cells.

CLIN 0001 - Base BidQuantityUnitUnit RateMaterial TotalLabor TotalEquipment TotalLine Item Total
Bldg. 221 - Replace lower float pier access panels
ITEMDESCRIPTION OF TASKS
A (example)Air Handler1Unit$1,000.00$1,000.00$1,000.00
A (example)Labor to Install Air Handler: HVAC Tech15Hrs$65.00$975.00$975.00
A (example)Labor to Install Air Handler: Electrician3Hrs$85.00$255.00$255.00
A (example)Misc. Materials to install Air Handler (piping, ducting, electrical supplies, etc)1Lot$250.00$250.00$250.00
A (example)Equipment (scissor lift)2day$100.00$200.00$200.00
B (example)Site mobilization/demobilization$0.00
B (example)Labor for site mob/demob: General Laborer15Hrs$45.00$675.00$675.00
B (example)Labor for site mob/demob: SSHO2Hrs$85.00$170.00$170.00
B (example)Equipment (Truck and Trailer to haul air handler and materials to job site)1day$450.00$450.00$450.00
B (example)Equipment (dump trailer for debris haul off)2day$250.00$500.00$500.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14<OFFEROR TO INSERT ROWS AS NECESSARY>
Subcontractor Performance Value
Prime Contractor & Project Management Costs
Subtotal
General Home Office Overhead (%)
General Field Overhead (%)
General and Administrative (%)
Profit (%)
Bond
CLIN 0001 Firm Fixed Price Proposal Amount