C12_Att_01-Material_Equipment_In_Place_List.xlsx
XLSX spreadsheet 26 KB Posted
- Solicitation number
- N0025325Q0015
About this file
The file is an Excel spreadsheet (C12_Att_01-Material_Equipment_In_Place_List.xlsx) designed to document the installation of emergency eyewash stations for a naval facility project. The template provides a comprehensive tracking mechanism for asset management, requiring detailed information for each installed equipment item, including asset description, building and room location, quantity, manufacturer details, warranty information, installation date, and replacement cost.
The associated federal contract opportunity (Solicitation N0025325Q0015) involves installing two emergency eyewash stations at Naval Base Kitsap - Keyport, WA, with specific requirements for tepid water compliance (60-100°F) per ANSI Z358.1-2014 standards. The project, valued between $30,000-$75,000, is a 100% small business set-aside for plumbing and industrial building renovation (NAICS 238220). The solicitation targets a contract award on August 15, 2025, with a site visit scheduled for July 17, 2025, and requires contractors to handle complete installation including water supply modifications, valve installations, and ensuring full operational readiness.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C24_N0025325Q0015-00002.pdf | ||
| C24_N0025325Q0015-00001.docx | DOCX document | |
| C11_Att_02_WD_WA20250109_20250718.pdf | ||
| C12_Att_03-Safety_Requirements_for_Contractors_and_Subcontractors.pdf | ||
| C12_Att_09-PPI_Form.docx | DOCX document | |
| C11B_Att_02_WD_WA20250109_20250627.pdf | ||
| C11_N0025325Q0015.pdf | ||
| C12_Att_10-Safety_Data_Sheet.docx | DOCX document | |
| C12_Att_06-Schedule_of_Values.xlsx | XLSX spreadsheet | |
| C12_Att_05-OPSEC_Guide_for_Defense_Contractors.pdf | ||
| C12_Att_04-Kpt_EV_Guide_for_Contractors_Jan_2025.pdf | ||
| C12_Att_11-OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf | ||
| C12_Att_08-Bid_Form.xlsx | XLSX spreadsheet | |
| C11d_Att_07-Past_Performance_References.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Installed Equipment
| Contract No: | N0025325Q0015 | ||||||||||||||
| Project Title: | Bldg. 38 & 233 Provide and install Emergency Eyewash Stations | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Notes: |
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. |
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. |
| 3. Enter equipment installed in column B and equipment removed in column O. |
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
Example
| Contract No: | N0025325Q0015 | ||||||||||||||
| Project Title: | Bldg. 38 & 233 Provide and install Emergency Eyewash Stations | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Notes: |
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. |
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. |
| 3. Enter equipment installed in column B and equipment removed in column O. |
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
File details come from the government source that posted it. Updated .