About this file

This document is a pre-award survey checklist of a prospective contractor's accounting system submitted in response to solicitation N6449823R4011 for Advanced Power Systems issued by the Department of the Navy Naval Sea Systems Command. The prospective contractor provides responses to 22 questions regarding its accounting system and policies for tracking direct and indirect costs, allocating expenses, segregating allowable and unallowable costs, and accumulating costs under contracts. The checklist aims to determine if the contractor's accounting system is adequate for performance on potential cost-reimbursement contracts. The contractor indicates it has not previously been audited by DCAA but plans to submit proposals for cost-type contracts.

View the file

Other files for this federal contract opportunity

Other files attached to Advanced Power Systems, newest first.
File Type Posted
C11_N6449823R4011-0001 RFP Amendment.pdf PDF
C11_Exhibit_S_CDRL A017_Overhaul Repair Report.pdf PDF
C11_Exhibit_V_CDRL A020_Condition Found Report.pdf PDF
C11_Exhibit_P_CDRL A014_DMSMS.pdf PDF
C11_Exhibit_U_CDRL A019_Ship Check Report.pdf PDF
C11_Exhibit_E_CDRL A005_GP Inventory Report_Monthly.pdf PDF
C11_Exhibit_D_CDRL A004_Other Direct Costs Report (ODCs).pdf PDF
C11_Exhibit_X_CDRL A022_Small Business Utilization Report.pdf PDF
C11_Attachment 2-List of Key Personnel.docx DOCX document
C11_Exhibit_W_CDRL A021_Contractor Spend and Expenditure Plan.pdf PDF
C11_Exhibit_L_CDRL A011_FRACAS Report.pdf PDF
C11_Exhibit_M_CDRL A012_Service Engineering Report.pdf PDF
C11_Exhibit_N_CDRL A013_Engineering Change Proposals.pdf PDF
C11_Exhibit_G_CDRL A007_Technical Report Study.pdf PDF
C11_Exhibit_A_CDRL A001_Contract Status Report.pdf PDF
C11_Attachment 1-DD254 (Advanced Power) N6449823R4011.pdf PDF
C11_Attachment 3-NSWCPD SBPCD.xlsx XLSX spreadsheet
C11_Exhibit_T_CDRL A018_QA Workbook.pdf PDF
C11_Exhibit_R_CDRL A016_Training Materials.pdf PDF
C11_Exhibit_J_CDRL A009_Developmental Design Drawings.pdf PDF
C11_Exhibit_H_CDRL A008_Production Drawings.pdf PDF
C11_Exhibit_B_CDRL A002_Travel_Trip_Report.pdf PDF
C11_Exhibit_Z_CDRL A023_Notification of Test Trials.pdf PDF
C11_Attachment 4-Cost Summary Template.xlsx XLSX spreadsheet
C11_N6449823R4011 RFP FINAL.pdf PDF
C11_Exhibit_Q_CDRL A015_CSWF Baseline Certifications.pdf PDF
C11_Exhibit_K_CDRL A010_Technical Data Package Review.pdf PDF
C11_Exhibit_F_CDRL A006_GP Inventory Report_Final.pdf PDF
C11_Exhibit_C_CDRL A003_Contractor Personnel Roster.pdf PDF
C11_Attachment 5-Direct Labor Rate Substantiation.xls XLS spreadsheet
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-AWARD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM CHECKLIST

PRE-AWARD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM

Date:

Company Name, Contract Number, and Full Address:

Commercial and Government Agency (CAGE) Code Number: (Found at http://www.dlis.dla.mil/ cage_welcome.asp)

Cognizant Defense Contract Audit Agency (DCAA) office info (Address/phone number/E-mail) - (Found at http://dcaa.mil/office_locator.html)

Company Point of Contact:

(Name, Title, Phone Number, and E-mail address

If the accounting books and records are located at a physical address other than the address provided above, please indicate address here:

Name, Title, and signature of Company Principal (President/VP/Controller, etc) responsible for the design of the Accounting System.

NAME

TITLE

E-MAIL ADDRESS

SIGNATURE DATE

PLEASE ANSWER THE QUESTIONS BELOW:

HAVE YOU READ THE REQUIREMENTS IN THE SF1408? (YES/NO)

HAVE YOU READ THE DCAA PUBLICATION DCAAM 7641.90 - "Information for Contractors" ON

DCAA'S WEBSITE at http:www.dcaa.mil/? (YES/NO)

For each question, check only one box. ALL questions must have explanatory narrative text entered in the boxes. Please provide sufficient detail to describe the process (Including Account Numbers/Process Flow etc.) Each Question must be complete. Do NOT refer to previous answers, (i.e. "See Question 3 Above").

http://www.dlis.dla.mil/ http://dcaa.mil/office_locator.html) http://www.dcaa.mil/

Pre-award Survey of Prospective Contractor Accounting System Checklist

1. Has your organization's Accounting System ever been audited by DCAA?

YES (if Yes, the Offeror should attach a copy of their most recent DCAA audit report to this Modified Pre-Award Survey) or provide the DCAA Report number or DCAA POC info.

NO (if NO, answer N/A to Questions 1.A., 1.B., and 1.C. below)

1.A. If the answer is "Yes" to Question 1 above, when was the audit performed?

Within the past Year

Within the past 3 Years

Greater than 3 Years (PROVIDE THE YEAR THE AUDIT WAS PERFORMED HERE - ).

N/A (Answer to Question 1 is NO)

1.B. If the answer is "Yes" to Question 1 above, did DCAA determine the Accounting System acceptable for award of prospective contracts?

YES

NO (If NO provide an explanation in the box below)

1.C. If the answer is "Yes" to Question 1 above, have there been any changes to the Accounting System since the DCAA audit?

YES (If YES, describe the changes in the box below

NO

2. Is your organization subject to CAS (48 CFR Chapter 99)?

YES (If YES, is it FULL or MODIFIED CAS?) FULL MODIFIED

(If YES (FULL or MODIFIED), the Offeror MUST attach a copy of their most recent audit reports/documentation regarding all CAS compliance or non-compliance issues to this Modified Pre-Award Survey)

NO (If NO provide an explanation in the box below why your organization is exempt and answer N/A to Questions 2.A., 2.B., and 2.C. below)

2.A. Has your organization submitted a CASB disclosure statement (CASB DS-1) to DCAA and has it been determined adequate?

YES (If YES, provide an explanation that validates your answer in the box below)

N/A (Answer to Question 2 is NO)

2.B. Has your organization been notified by DCAA that it is (or may be in) non-compliance with its disclosure statement or CAS?

N/A (N/A, if the answer to Question 2 is NO)

2.c. Is any aspect of this proposal inconsistent with your organization’s disclosed practices or applicable CAS?

N/A (N/A, if the answer to Question 2 is NO or if you have no current, active proposal being considered)

Instruction: If the Contractor is planning on bidding on Cost Type Contracts, the contractor MUST provide explanatory narrative for all of the following questions:

3. Has your organization's Accounting System been audited by an outside Certified Public Accountant/Consultant or other Cognizant Federal Agency other than DCAA?

YES (If YES, the Offeror MUST attach a copy of their most recent audit report to this Modified Pre-Award Survey) NOTE: Do not submit your Annual Financial Audit.

4. Is your organization's Accounting System currently in full operation?

YES (If YES, provide an explanation that validates your answer in the box below).

NO (If NO, provide an explanation in the box below which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) non-existent)

N/A (If N/A, provide an explanation in the box below)

5. Is your organization's Accounting System in accord with Generally Accepted Accounting Principles (GAAP) Applicable in the Circumstances?

YES (If YES, provide an explanation that validates your answer in the box below)

N/A (N/A, provide an explanation in the box below)

6. Is your organization's Accounting System ready for a DCAA audit?

NO (If NO provide an explanation in the box below as to when you will be ready for an audit)

7. Are the loaded hourly labor rates proposed consistent with your established estimating and accounting principles and procedures and FAR Part 31, Cost Principles? (Answer this Questions "N/A" if you do not have an active proposal)

8. Does the Accounting System provide for the proper segregation of Direct Costs from Indirect Costs?

9. Does the Accounting System provide for the identification and accumulation of Direct Costs by contract?

10. Does the Accounting System provide for a logical and consistent method for the allocation of Indirect Costs to intermediate and final cost objectives? (A contract is a final cost objective.)

YES (If YES, provide an explanation that validates your answer in the box below)

11. Does the Accounting System Provide for the accumulation of costs under general ledger control?

12. Does the Accounting System provide for a timekeeping system that identifies employees' labor by intermediate or final cost objectives?

13. Does the Accounting System provide for a labor distribution system that charges Direct and Indirect labor to the appropriate cost objectives?

YES (If YES, provide an explanation that validates your answer in the box below)

14. Does the Accounting System provide for an interim (at least monthly) determination of costs charged to a contract through routine posting of books of account?

YES (If YES, provide an explanation that validates your answer in the box below)

15. Does the Accounting System provide for an exclusion of costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions?

YES (If YES, provide an explanation that validates your answer in the box below)

16. Does the Accounting System provide for the identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract?

YES (If YES, provide an explanation that validates your answer in the box below)

17. Does the Accounting System provide for the segregation of preproduction costs from production costs?

18. Does the Accounting System provide financial information required by contract clauses concerning limitation of cost (FAR 52.232.20) or limitation on payments (FAR 52.216-16)?

YES (If YES, provide an explanation that validates your answer in the box below)

19. Does the Accounting System provide financial information required to support requests for Progress Payments?

20. Is the Accounting System designed, and are the records maintained, in such manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?

21. Is your organization planning on submitting proposals on Cost-Type (FAR 16.3) contracts/task orders?

22. Is your organization currently performing on Cost-Type (FAR 16.3) contracts/task orders?

N/A

PRE-AWARD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM CHECKLIST
1. Has your organization's Accounting System ever been audited by DCAA?
1.A. If the answer is "Yes" to Question 1 above, when was the audit performed?
1.B. If the answer is "Yes" to Question 1 above, did DCAA determine the Accounting System acceptable for award of prospective contracts?
1.C. If the answer is "Yes" to Question 1 above, have there been any changes to the Accounting System since the DCAA audit?
2. Is your organization subject to CAS (48 CFR Chapter 99)?
2.A. Has your organization submitted a CASB disclosure statement (CASB DS-1) to DCAA and has it been determined adequate?
2.B. Has your organization been notified by DCAA that it is (or may be in) non-compliance with its disclosure statement or CAS?
2.c. Is any aspect of this proposal inconsistent with your organization’s disclosed practices or applicable CAS?
3. Has your organization's Accounting System been audited by an outside Certified Public Accountant/Consultant or other Cognizant Federal Agency other than DCAA?
4. Is your organization's Accounting System currently in full operation?
5. Is your organization's Accounting System in accord with Generally Accepted Accounting Principles (GAAP) Applicable in the Circumstances?
7. Are the loaded hourly labor rates proposed consistent with your established estimating and accounting principles and procedures and FAR Part 31, Cost Principles? (Answer this Questions "N/A" if you do not have an active proposal)
8. Does the Accounting System provide for the proper segregation of Direct Costs from Indirect Costs?
9. Does the Accounting System provide for the identification and accumulation of Direct Costs by contract?
10. Does the Accounting System provide for a logical and consistent method for the allocation of Indirect Costs to intermediate and final cost objectives? (A contract is a final cost objective.)
11. Does the Accounting System Provide for the accumulation of costs under general ledger control?
12. Does the Accounting System provide for a timekeeping system that identifies employees' labor by intermediate or final cost objectives?
13. Does the Accounting System provide for a labor distribution system that charges Direct and Indirect labor to the appropriate cost objectives?
14. Does the Accounting System provide for an interim (at least monthly) determination of costs charged to a contract through routine posting of books of account?
15. Does the Accounting System provide for an exclusion of costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions?
Pre-award Survey of Prospective Contractor Accounting System Checklist
16. Does the Accounting System provide for the identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract?
17. Does the Accounting System provide for the segregation of preproduction costs from production costs?
19. Does the Accounting System provide financial information required to support requests for Progress Payments?
pricing follow-on acquisitions?
21. Is your organization planning on submitting proposals on Cost-Type (FAR 16.3) contracts/task orders?
22. Is your organization currently performing on Cost-Type (FAR 16.3) contracts/task orders?