C08_Attachment 7_Project Specifications_12444526Q0082.pdf
PDF 109 KB Posted
- Attached to
- Eddyville Quarters Window Replacement
- Solicitation number
- 12444526Q0082
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Work for a window replacement project at the Eddyville Quarters, a federally occupied residence within the Hidden Springs Ranger District of Shawnee National Forest in Pope County, Eddyville, Illinois.
The contractor shall remove existing windows and install new vinyl clad, single-hung windows with half screens in white color and Low E glazing. All windows must be sized according to field-verified dimensions before ordering. The contractor is responsible for providing all materials, equipment, and labor necessary for removal and installation, including caulk, insulation, shims, and sealants. Removed windows must be replaced within the same day of removal, and all trims shall be carefully removed for reinstallation. Installation requirements include setting units level, plumb, and true to line with weathertight construction; adjusting operating panels and hardware for smooth operation; and cleaning all window units and glass of grease, sealant, dirt, debris, fingerprints, and smudges. The contractor must remove and dispose of all debris offsite and maintain clean work areas both interior and exterior. The contractor shall coordinate entry with the Contracting Officer's Representative, maintain least inconvenience to the building occupant (currently occupied), coordinate a staging area location, and ensure access is maintained to the residence and other facilities. Construction activities that create noise, lights, or other disturbances to neighboring residents are prohibited between 6:00 pm and 7:00 am. Submittals of shop drawings, product data, and samples must be marked with contract number, date, quantity, and size of each window, submitted as three copies or one electronic PDF copy.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EDDYVILLE QUARTERS WINDOW REPLACEMENT
Shawnee National Forest
Hidden Springs Ranger District
Pope County, Eddyville, Illinois
PART 1 GENERAL
1.1 Statement of Work:
A This project is for the removal and installation of vinyl clad windows at the Eddyville Quarters.
Contractor shall provide all materials, equipment and labor necessary to remove and dispose of the existing windows and provide and install new windows.
1.2 Contractor Use of Premises
A General: The contractor should coordinate entry into the quarters with the COR. At the time of advertisement, the quarters are occupied.
B Contractor shall conduct his operations to ensure the least inconvenience to the building occupant.
C Power, water and sanitary facilities are available on site.
D Confine storage of materials to areas as approved by the CO.
1.3 Field verification
A Contractor shall field verify all new and existing dimensions affecting the work of this contract before ordering products.
1.4 Cleaning and Disposal of Material
A Contractor shall remove and dispose of all debris offsite, including materials removed from building.
B The Contractor shall ensure all work areas are clean and free of dust, debris and construction waste generated by the project. This includes interior and exterior of building
1.5 Security - The Contractor shall be responsible for protecting all equipment and supplies for use on the project and stored on the site. The Contractor shall be responsible for all costs required to provide such protection. The construction area shall be secured and placed in a safe condition at the end of each working day.
1.6 Disturbances - Noise, lights, or other activities that disturb neighboring residents shall not be permitted between the hours of 6:00 pm and 7:00 am.
1.7 Stage Area - The Contractor shall coordinate with the COR on a staging area location. Access must be maintained to residence and other facilities on the site. The Contractor shall operate all equipment and store, transport, and handle materials in a manner that will not damage the existing facilities, roads, parking lots, and landscaping.
PART 2 PRODUCTS
2.1 Submittals:
A Submit all shop drawings, product data and samples for the Contractor, subcontractor(s) and supplier(s).
B Mark each submittal, with the contract number, date of submittal and the quantity and size of each window.
C Submit three copies for COR’s use or one electronic copy in PDF format.
2.2 Windows:
A Shall be Vinyl clad
B Single hung
C Half screen
EDDYVILLE QUARTERS WINDOW REPLACEMENT
Shawnee National Forest
Hidden Springs Ranger District
Pope County, Eddyville, Illinois
D Color White
E Low E
F Sized as shown on the drawings and verified in the field prior to ordering.
2.3 Other Materials”
A Items are to include all material and supplies to properly install the new windows shall include, but not be limited to:
1 Caulk
2 Insulation
3 Shims
4 Sealants
PART 3 EXECUTION
3.1 REMOVAL
A Windows removed shall be replaced within the same day.
B Contractor shall remove any trims with care for reinstallation after installing the windows.
3.2 INSTALLATION
A Set units level, plumb, and true to line, without warp or rack of frames and panels and anchor securely in place.
B Set sill members in bed of sealant or with gaskets, as indicated, to provide weathertight construction.
C Adjust operating panels, screens, and hardware for smooth operation and weathertight closure.
Lubricate hardware and moving parts.
D All window units shall be cleaned of grease, sealant, dirt and debris.
E All window glass shall be cleaned of fingerprints, dirt and smudges.
File details come from the government source that posted it. Updated .