This file is a Questions and Answers (Q&A) document for solicitation 12444526Q0082, a Request for Quotation (RFQ) issued by the U.S. Forest Service for the replacement of nineteen existing residential windows at the Eddyville Quarters facility located at 100 Marla Street, Eddyville, Illinois 62928. The contractor must provide all labor, equipment, and materials to remove and dispose of existing windows and install new energy-efficient white vinyl-clad, single-hung windows with Low-E glass and half screens. The project is classified as a commercial action under FAR Parts 12 and 13, subject to Service Contract Labor Standards (Service Contract Act Wage Determination 2015-5067, Revision 33). The quotation deadline is November 16, 2026, at 9:00 A.M. Eastern Standard Time, with quotations to be submitted by email to mikaela.laney@usda.gov with a signed SF-1449, completed pricing schedule, technical compliance confirmation, and optional experience questionnaire.

The completion date is March 31, 2027, to allow for field verification of dimensions, window ordering with manufacturing lead time, and installation. The building was constructed and altered in the 1930s–1950s and is presumed to contain lead-based paint; contractors must assume lead-safe work practices per EPA Renovation, Repair and Painting (RRP) Rule standards. Windows are approximate dimensions requiring field verification before ordering, with dimensions listed as width by height; Item 3 is 27-1/2" × 37", Item 4 is 81-3/4" × 53-1/2", and Item 7 (basement windows) is 31-1/2" × 17-1/2" and must be openable with an exterior screen. Submittals require written COR approval before ordering. As a service contract, no performance or payment bonds are required. Insurance requirements are satisfied by the installing subcontractor's general liability, workers' compensation, and auto insurance; the government will not be listed as additional insured. Maximum 50% of government-paid amounts may go to non-similarly situated subcontractors. A minimum 10-year manufacturer's warranty is required. Existing trim removal and reinstallation applies to all window trims; if trim cannot be reinstalled, replacement costs are addressed under FAR 52.243-5 (differing site conditions). Progress payments are normally allowed, with invoices submitted through the IPP system to the COR and CO for approval. All debris must be removed and disposed of off Forest Service property. The building is currently unoccupied with windows accessible from the exterior; no site visit is scheduled, though contact is available through Cynthia Morris at (618) 253-1029.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12444526Q0082, Eddyville Quarters Window Replacement questions:

Insurance: The Statement of Requirement (solicitation page 1) says the Contractor shall provide all labor, supervision, specialized tools, protective gear, transport vehicles, insurance, and construction materials. No insurance clause (such as FAR 52.228-5), coverage types, minimum limits or certificate requirement is included. Does this require the prime contractor itself to carry insurance or furnish its own certificate of insurance, or is it satisfied by the general liability, workers' compensation and auto insurance carried by the installing subcontractor that will perform all on-site work? If specific coverages or limits are required, please state them.

This is satisfied by the general liability, workers' compensation and auto insurance carried by the installing subcontractor that will perform all on-site work

1. Past performance: Factor 2 (solicitation page 15) evaluates the offeror's record through SAM.gov exclusions and federal performance databases, and the optional Experience Questionnaire (Attachment 5) asks about experience as a prime contractor and/or subcontractor. Will the experience and past performance of our proposed installing subcontractor be considered in the evaluation, for example if documented on the Experience Questionnaire?

All information submitted for Past Performance will be considered in the determination. The form included in the package is an optional format that includes the information requested..

2. Lead-based paint: The Statement of Work (Attachment 1) says the residence has been in service since the early years of the Shawnee National Forest, and the Project Specifications (Attachment 7) note that the quarters are occupied and that existing trim is to be removed and reinstalled. The solicitation addresses only asbestos. (a) Was the house built before 1978, and has it been inspected or tested for lead-based paint? If so, can the results be shared? (b) If lead-based paint is present or presumed and EPA's Renovation, Repair and Painting (RRP) rule applies, will the Forest Service accept the installing subcontractor's EPA RRP firm certification and its certified renovator, or must the prime contractor also hold its own EPA RRP firm certification? If the prime must hold it, by what date (quote submission or start of work)?

The building was constructed and altered in the 1930’s thru the 1950’s. While it has not been tested, it is assumed because of its age that lead based paint is present.

3. Quantity and sizes: The solicitation (page 1) and the Schedule of Items call for nineteen

(19) windows (7+3+1+1+1+1+5), but the SF1449 item description says twenty-one (21). Please confirm the quantity is 19. Please also confirm that Item 3 is 27-1/2" x 37" (the schedule shows 37') and Item 7 is 31-1/2" x 17-1/2" (the schedule shows 31/1/2").

Actual window count is 19. The dimensions are approximate and will need to be field verified by the successful bidder prior to ordering. Item 3 is 37 inches, not feet. Item 7 should 31-1/2”. Item 4: 81*3/4” is 81-3/4”. All windows listed are by Width

4. The SF1449 also shows an offer due date of 10/09/2026; please confirm that November 16, 2026 at 9:00 AM EST governs.

November 16, 2026 at 9:00 A.M. is the correct date and time.

5. Wage determination: Solicitation page 3 lists Attachment 4 as "General Wage Decision IL20260002", which is a Davis-Bacon decision number, but the attached document is Service Contract Act Wage Determination 2015-5067, Revision 33 (8/12/2026). FAR 52.222-41 is unchecked and FAR 52.222-6 is not listed. Which applies to this work: SCA WD 2015-5067 Rev 33, or Davis-Bacon (FAR 52.222-6) with certified payroll? If Davis-Bacon applies, please provide the applicable decision for Pope County.

This is being issued as a Service Contract. The correct wage determination is included with the documents on SAM.gov. Please disregard the Davis Bacon wage rate determination number.

6. Completion date: Solicitation page 14 requires the work to be complete by December 31, 2026 and also lists "Date of Award to 03/31/2027", while the SF1449 shows 10/12/2026 to 12/31/2026. Quotes close November 16, and the windows can only be ordered after field verification, so custom-size lead times leave little time before December 31. Which completion date governs? If it is December 31, 2026, will the Government allow completion

To allow for ordering and installation the completion date should be 03/31/2027

1. Lead-Based Paint: The solicitation states that asbestos was previously abated. The Eddyville Quarters is an occupied residence that appears to have been built before 1978, and the Project Specifications (Section 3.1.B) require existing trim to be removed and reinstalled. This work may be subject to the EPA Renovation, Repair and Painting (RRP) Rule (40 CFR Part 745). Has the residence been tested for lead-based paint? If not, should offerors presume lead-based paint is present and price lead-safe work practices by an EPA RRP-certified firm?

The building was constructed and altered in the 1930’s thru the 1950’s. While it has not been tested, it is assumed because of its age that lead based paint is present.

2. Applicable Wage Determination: Attachment 4 is Service Contract Act Wage Determination 2015-5067, Revision 33, while the solicitation text refers to General Wage Decision IL20260002. Please confirm that the Service Contract Act wage determination applies and that no Davis-Bacon wage decision will be incorporated.

This is being issued as a Service Contract. The correct wage determination is included with the documents on SAM.gov. Please disregard the Davis Bacon wage rate determination number

3. Period of Performance: The solicitation states that work must be complete and ready for use no later than December 31, 2026, and also lists the period of performance as Date of Award to 03/31/2027. Because the windows must be field-verified before ordering, and custom vinyl windows typically require several weeks of manufacturing lead time, please confirm the required completion date.

To allow for ordering and installation the completion date should be 03/31/2027

4. Basement Windows (Item 7): The window schedule identifies the five W7 basement windows as single hung at 31-1/2" x 17-1/2". Single-hung units of this height are uncommon. Will the Government accept a slider or hopper style of equal or better quality for these openings, or is single hung required?

The current window is an awning style. This window should be openable and fitted with a exterior screen. Dimensions on the windows are Width by Height.

5. Inspection and Acceptance: The invoicing section references sign-off by the Forest Products Laboratory end-user and final utility connection. Please confirm who will perform final inspection and acceptance for this project.

Per page 17 of C01_CSS_Commercial Products and Services Eddyville all invoices should be submitted thru the IPP system for approval. The designated COR and CO will be notified when a request is made. The statements referring to the Forest Products Lab is incorrect and not a part of this project.

1. The package lists both December 31, 2026, and March 31, 2027, as completion dates. Which date governs?

November 16, 2026 at 9:00 A.M. is the correct date and time.

2. Please confirm the intended width of the five W7 basement windows. For W2 and W4, do the dimensions represent individual single-hung windows or assemblies containing multiple units?

The current basement window, W7 is an awning style. This window should be openable and fitted with a exterior screen. Dimensions on the windows are Width by Height. W2 and W4

3. The specifications describe “vinyl-clad” windows, while the pricing schedule describes “white vinyl.” Are all-vinyl windows acceptable?

Provide the windows as described in the Specifications. The schedule of items is simply condensed to give the pricing.

4. May we arrange a site visit for a prospective installation subcontractor to verify measurements and existing conditions?

No site visit is scheduled. The building is currently unoccupied. All windows ae accessible from the exterior.

5. May we use a qualified local subcontractor to supply and install the windows? What minimum self-performance requirement, if any, applies?

This is a contractor decision and should in accordance with FAR 52.203-6 and 52.244-6. Maximum 50% of the amount paid by the government can go to non-similarly situated subcontractors.

1. The solicitation references both 19 and 21 windows. Please confirm the correct total quantity and which schedule should control pricing.

Actual window count is 19.

2. One window is listed as 27½" × 37'. Is the 37' dimension a typo, and if so, what is the correct dimension?

The dimensions are approximate and will need to be field verified by the successful bidder prior to ordering. Item 3 is 37 inches, not feet. Item 7 should 31-1/2". All windows listed are Width by Height.

3. We found conflicting completion dates of Dec. 31, 2026 and Mar. 31, 2027. Which completion date applies?

To allow for ordering and installation the completion date should be 03/31/2027

4. Please confirm the applicable wage determination for this project.

This is being issued as a Service Contract. The correct wage determination is included with the documents on SAM.gov. Please disregard the Davis Bacon wage rate determination number

1. Attachment 3 (Window Schedule Layout and Dimensional Diagram) is referenced but did not open or was not included for us. Could it be re-posted?

The drawings for the project are loaded on the SAM.gov webpage for this project. At the time of answering this question the website was working and the attachments were opening.

2. The SF1449 lists 21 windows and an earlier due date. The statement of work and schedule list 19 windows, due 11/16/2026. Please confirm the count is 19.

The statement of Work and the Scheule List are correct for due date 11/06/2026 and quantity of 19 windows to be replaced.

3. Attachment 4 is a Service Contract Act wage determination (2015-5067). The text also references IL20260002, and the 52.222-41 box is unchecked. Which wage determination applies: SCA or Davis-Bacon?

This is being issued as a Service Contract. The correct wage determination is included with the documents on SAM.gov. Please disregard the Davis Bacon wage rate determination number

4. The completion date is shown as 12/31/2026 in one place and as 03/31/2027 in another. Which date controls?

To allow for ordering and installation the completion date should be 03/31/2027

5. Has the quarters been tested for lead-based paint? If not, should quotes assume EPA RRP lead-safe work practices?

The building was constructed and altered in the 1930’s thru the 1950’s. While it has not been tested, it is assumed because of its age that lead based paint is present.

6. Several window sizes on the Schedule of Items appear to contain typos. Are the listed sizes nominal, with the contractor to field-verify every opening before ordering?

The dimensions are approximate and will need to be field verified by the successful bidder prior to ordering. Item 3 is 37 inches, not feet. Item 7 should 31-1/2". All windows listed are Width by Height.

7. Please advise, the statement of work and schedule states 19 windows but the SF1449 states 21. Does the Government have an estimated budget for this project?

Actual window count is 19. The government does have an estimated budget. This will not be shared with Vendors bidding.

1. Window count: The solicitation and Attachment 3 list 19 windows, but the SF-1449 lists 21. Please confirm the correct quantity.

2. Dates: The SF-1449 shows an offer due date of October 9th and performance starting October 12th. Please confirm the November 16th quote deadline governs.

November 16, 2026 at 9:00 A.M. is the correct date and time.

3. Completion date: The Period of Performance section requires completion by December 31st, 2026, but also lists "Date of Award to 03/31/2027." Which completion date governs? Custom vinyl windows typically carry several weeks of manufacturer lead time after field verification.

To allow for ordering and installation the completion date should be 03/31/2027

4. Window sizes: Please confirm W3 is 27-1/2" x 37" (listed as 37') and W7 is 31-1/2" x 17-1/2" (listed as 31/1/2").

Actual window count is 19. The dimensions are approximate and will need to be field verified by the successful bidder prior to ordering. Item 3 is 37 inches, not feet. Item 7 should 31-1/2”. Item 4: 81*3/4” is 81-3/4”. All windows listed are Width by

5. Wage determination: The solicitation references General Wage Decision IL20260002, but Attachment 4 is SCA Wage Determination 2015-5067. Please confirm which applies.

This is being issued as a Service Contract. The correct wage determination is included with the documents on SAM.gov. Please disregard the Davis Bacon wage rate determination number.

6. Acceptance: The invoicing section references sign-off by the Forest Products Laboratory end user and a final utility connection. Please confirm the COR will accept the work for invoicing.

Per page 17 of C01_CSS_Commercial Products and Services Eddyville all invoices should be submitted thru the IPP system for approval. The designated COR and CO will be notified when a request is made. The statements referring to the Forest Products Lab is incorrect and not a part of this project.

1. Window Quantity – The combined synopsis/solicitation and Schedule of Items state nineteen (19) windows. The SF-1449, Block 20, states twenty-one (21) windows. Please confirm the correct quantity. If 21, please provide the sizes and line items for the two additional units.

2. Window Sizes – Please confirm the following sizes on the Schedule of Items and Attachment 3:

· Item 3: 27-1/2" x 37' – confirm 37 inches.

· Item 4: 81*3/4" x 53-1/2" – confirm 81-3/4".

· Item 7: 31/1/2" x 17-1/2" – confirm 31-1/2".

3. The dimensions are approximate and will need to be field verified by the successful bidder prior to ordering. Item 3 is 37 inches, not feet. Item 7 should 31-1/2". Item 4 is 84-3/4”. All windows listed are Width by Height.

4. Window Product – Attachment 7, Section 2.2A specifies "vinyl clad" windows. The Schedule of Items specifies "White vinyl." Please confirm whether all-vinyl replacement windows are acceptable, or whether vinyl-clad wood units are required.

Provide the windows as described in the Specifications. The schedule of items is simply condensed to give the pricing.

5. Basement Units – Attachment 3 identifies five (5) Item 7 units (31-1/2" x 17-1/2") in the basement. Please confirm these units are to be single hung.

The current basement window, W7 is an awning style. This window should be openable and fitted with a exterior screen. Dimensions on the windows are Width by Height. W2 and W4

6. Completion Date – The solicitation requires the work be ready for use no later than December 31, 2026, and also lists a performance period of Date of Award to 03/31/2027. Field verification, submittals, and window manufacturing must occur before installation.

To allow for ordering and installation the completion date should be 03/31/2027

7. Submittals – Please confirm whether COR approval of submittals (Attachment 7, Section 2.1) is required before windows are ordered.

Yes the submittals should be approved prior to ordering the windows.

8. Trim – Attachment 7, Section 3.1B requires existing trim to be removed and reinstalled. Please confirm whether this applies to interior trim, exterior trim, or both. If existing trim is damaged or not reusable, please confirm whether replacement trim is to be included in the quoted price.

This applies to all window trims. If existing trim needs to be removed to install the window and cannot be reinstalled, then it will be handled in accordance with FAR 52.243-5.

9. Wage Determination – Attachment 4 is Service Contract Act Wage Determination 2015-5067, Rev. 33. The attachment list references "General Wage Decision IL20260002." Please confirm which wage determination applies.

This is being issued as a Service Contract. The correct wage determination is included with the documents on SAM.gov. Please disregard the Davis Bacon wage rate determination number.

10. Delivery Location – The Shipping Instructions list 50 Hwy. 145 S., Harrisburg, IL 62946. Please confirm whether windows are to be delivered to the Harrisburg office or directly to the Eddyville Quarters job site.

All work is at the work site in Eddyville, Illinois. There is no storage area or resident available at the site to receive the delivery or place it in storage. The contractor is responsible for all materials and products used on the project. The address is: 100 Marla Street, Eddyville, IL. 62928

11. Window Quantity: The main solicitation and Schedule of Items specify 19 windows, while the SF-1449 references 21 windows. Please confirm the correct quantity for pricing.

Actual window count is 19.

12. Solicitation Dates: The current solicitation identifies November 16, 2026, as the quotation deadline, while the SF-1449 lists October 2026, and a performance period beginning October 12, 2026. Please confirm the governing submission deadline and anticipated performance period.

November 16, 2026 at 9:00 A.M. is the correct date and time.

Could you please confirm the project location and advise where I can access the complete specifications, window schedule, drawings, and any site-visit requirements?

I would also appreciate confirmation of the required completion schedule and any specific contractor qualifications or submission requirements.

All documents applicable to this solicitation are available on the SAM.gov website.

1. Window dimensions: the schedule and diagram list sizes as shown, for example W4 at 81 3/4 inches by 53 1/2 inches, quantity 1, but do not label which number is width and which is height. Please confirm the order for the window sizes, in particular W4, and whether the dimensions are width by height or height by width.

Actual window count is 19. The dimensions are approximate and will need to be field verified by the successful bidder prior to ordering. Item 3 is 37 inches, not feet. Item 7 should 31-1/2”. Item 4: 81*3/4” is 81-3/4”. All windows listed are Width by

2. Site address: the package gives the location as Eddyville Quarters, Hidden Springs Ranger District, Shawnee National Forest, Pope County, Eddyville, Illinois, with a mapping sheet for the Eddyville Warehouse and Dwelling area, but no street address. Please provide the exact physical address and site access details for the quarters.

100 Marla Street, Eddyville, IL. 62928

3. Pictures: are there any photos of the property or existing windows available to help determine finish work needed for installation? If so, please share them, or confirm whether a site check is the intended way to judge finish work.

Site photos will be added to the SAM.gov website for this project.

We would like to know if this is a brand-new contract OR if there is (was) an incumbent performing these services.

If not brand new, could you please provide the current / previous contract number?

This is a new contract.

1. Window Quantity: The solicitation and Schedule of Items identify 19 windows, while SF-1449 identifies 21. Please confirm the correct quantity.

Actual window count is 19

2. Window Dimensions: Please confirm the dimensions for all window types, particularly W2, W3, and W4, and whether the larger openings require specific multi-unit configurations.

The dimensions are approximate and will need to be field verified by the successful bidder prior to ordering. Item 3 is 37 inches, not feet. Item 7 should 31-1/2". Item 4: 81*3/4" is 81-3/4". All windows listed are Width by Height.

3. Site Inspection: May we coordinate a site inspection with the COR to verify existing window conditions and installation requirements?

No site visit is scheduled. The building is currently unoccupied. All windows ae accessible from the exterior.

4. Structural Repairs: If concealed framing damage, rot, or deterioration is discovered during removal, will repairs be addressed through a contract modification?

If underlying differing site conditions are discovered during replacement, then they will handled in accordance with FAR 52.243-5.

5. Schedule: Please confirm the controlling period of performance, as the documents contain different completion dates.

To allow for ordering and installation the completion date should be 03/31/2027.

6. Labor Requirements: Please confirm whether the attached Service Contract Labor Standards wage determination governs the installation work or whether construction wage requirements apply.

This is being issued as a Service Contract. The correct wage determination is included with the documents on SAM.gov. Please disregard the Davis Bacon wage rate determination number.

7. Proposal Deadline: Please confirm that November 16, 2026, at 9:00 AM Eastern is the current quotation deadline, superseding the October 9 date on SF-1449.

November 16, 2026 at 9:00 A.M. is the correct date and time.

8. Bonding: Please confirm whether any performance or payment bond is required for this acquisition.

As this is a service contract we do not deal with Bonds.

As a Total Small Business prime contractor, may Vendors subcontract the complete physical removal, procurement, and installation of the replacement windows to a qualified window installation company while retaining overall contract management, quality oversight, and contractual responsibility?

Work may be subcontracted out.

1. FAR 52.219-14, Limitations on Subcontracting, appears unchecked. Please confirm whether statutory or regulatory limitations on subcontracting nevertheless apply, identify the applicable acquisition classification, and clarify whether a similarly situated small-business subcontractor may perform the installation work.

Maximum 50% of the amount paid by the government can go to non-similarly situated subcontractors.

2. Must proposed subcontractors possess any specific small-business classification, licensing, certifications, or Government approval before beginning work?

Will need to have proper certificates and licensing to do the work.

Bonding, Insurance, and Labor Compliance

3. Are bid guarantees, performance bonds, payment bonds, or alternative payment protection required? If so, please identify the applicable FAR provisions, required amounts or percentages, and submission deadlines.

This is a service contract. No bonds.

4. What minimum insurance coverage and policy limits apply, including commercial general liability, workers' compensation, employer's liability, and commercial automobile liability? Must subcontractors independently maintain these policies, and must the Government be listed as an additional insured?

This is satisfied by the general liability, workers' compensation and auto insurance carried by the installing subcontractor that will perform all on-site work. Government will not be listed as additional insured.

5. The solicitation references wage determination IL20260002, while Attachment 4 is labeled SCA2015-5067. Please confirm the governing wage determination, whether the Service Contract Labor Standards or Davis-Bacon construction labor requirements apply, and whether certified payroll submissions are required.

This is being issued as a Service Contract. The correct wage determination is included with the documents on SAM.gov. Please disregard the Davis Bacon wage rate determination number.

6. Are any Illinois or local contractor registrations, trade licenses, building permits, or inspections required? If so, which party must obtain and pay for them?

The project does not require specific registrations. Any and all permits needed are the responsibility of the contractor.

Window Quantities and Technical Specifications

7. The combined solicitation lists 19 windows, while the SF1449 identifies 21. Please confirm the correct total quantity and provide a revised controlling window schedule if necessary.

Actual window count is 19.

8. Please verify the dimensions for Item 3, which appears to show 27½ inches by 37 feet, and confirm the dimensions and acceptable configuration for the oversized Item 4 window.

Item 3 is 37 inches, not feet. Item 7 should 31-1/2". Item 4: 81*3/4" is 81-3/4". All windows listed are Width by Height.

9. Are the listed dimensions rough-opening dimensions, existing-window measurements, or finished replacement-unit dimensions? Which attachment controls if measurements differ?

The dimensions are approximate and will need to be field verified by the successful bidder prior to ordering.

10. Are specific manufacturers, minimum energy-efficiency ratings, glass specifications, or product certifications required beyond the listed white vinyl-clad, single-hung, Low-E windows with half screens?

Requirements for the windows are as indicated in the Specifications.

11. Must shop drawings and product data receive written COR approval before materials are ordered? What is the anticipated review period?

Written approval is required for the products being installed.

12. What manufacturer and workmanship warranty periods are required, including the requirements under FAR 52.246-21?

The original specification left out the warranty. The government is looking for a minimum manufacturer’s warranty of 10 years

Site Conditions and Performance

13. Although the solicitation indicates a site visit is not required, may prospective contractors arrange an optional site inspection and window measurement appointment before submitting quotations? If so, please provide scheduling instructions.

No site visit is scheduled. The building is currently unoccupied. All windows ae accessible from the exterior.

14. Please confirm the exact installation address, authorized work hours, occupant-access arrangements, and whether weekend work is permitted.

100 Marla Street, Eddyville, IL. 62928 Weekend work is at the contractor’s discretion, however the government may not have an inspector available for questions.

15. If hidden framing deterioration, rot, or other unforeseen structural damage is discovered during window removal, what is the required notification and change-authorization procedure?

The COR should be notified immediately differing conditions on site. If underlying differing site conditions are discovered during replacement, then they will handled in accordance with FAR 52.243-5.

16. Are special disposal methods, waste manifests, or disposal receipts required for removed windows and construction debris?

Per Project Specifications all debris shall be removed and disposed of off Forest Service property.

17. The solicitation requires commencement within 10 days after notice to proceed and completion by December 31, 2026, but also identifies March 31, 2027, as the performance end date. Please confirm the governing completion deadline and whether material procurement lead times are considered.

To allow for ordering and installation the completion date should be 03/31/2027

Pricing, Submission, and Payment

18. Please confirm that November 16, 2026, at 9:00 AM Eastern Standard Time is the current Government quotation deadline and that submissions must be emailed directly to your address. The solicitation also refers to a submission portal.

November 16, 2026 at 9:00 A.M. is the correct date and time. The email address that submissions need to be sent to is mikaela.laney@usda.gov

19. Is payment authorized only after final Government acceptance, or are progress payments available for completed work or materials?

Normally progress payments are allowed

20. The invoicing instructions refer to final utility connections and Forest Products Laboratory acceptance, which appear unrelated to this project. Please confirm the applicable acceptance authority, required closeout documentation, and correct IPP invoicing procedure.

Per page 17 of C01_CSS_Commercial Products and Services Eddyville all invoices should be submitted thru the IPP system for approval. The designated COR and CO will be notified when a request is made. The statements referring to the Forest Products Lab is incorrect and not a part of this project.

21. Please confirm whether the required quotation package consists of the completed pricing schedule, technical compliance confirmation, applicable representations, and optional experience questionnaire, or whether any additional mandatory forms or supporting documentation must be submitted.

The final bid package must consist of a signed SF1449, completed pricing schedule, technical compliance and the optional experience questionnaire.

1. The SF-1449 shows an offer due date of "10/09/2026 0900 ET", "twenty-one (21) existing residential windows" and "Period of Performance: 10/12/2026 to 12/31/2026", while the Commercial Products and Services document gives November 16, 2026 at 09:00 A.M. EST, and the Schedule of Items lists 19 windows. Please confirm that the November 16 date and the 19 windows on the Schedule of Items govern, and what period of performance applies.

Actual window count is 19. November 16, 2026 at 9:00 A.M. is the correct date and time.

2. Should the SF-1449 be completed, signed and returned with the quotation?

Yes the SF-1449 should be filled out, signed and returned with the prospective offer.

3. The solicitation lists "General Wage Decision IL20260002", but the attached wage determination is SCA WD 2015-5067. Which wage determination applies to this work?

This is being issued as a Service Contract. The correct wage determination is included with the documents on SAM.gov. Please disregard the Davis Bacon wage rate determination number.

1. Window Quantity SF 1449 identifies twenty-one (21) windows, whereas the main solicitation and Schedule of Items identify nineteen (19). Please confirm the correct quantity and whether revised pricing documents will be issued.

Actual window count is 19.

2. Quotation Deadline SF 1449 identifies October 9, 2026, while the main solicitation identifies November 16, 2026, at 9:00 a.m. Eastern time. Please confirm the controlling quotation deadline.

November 16, 2026 at 9:00 A.M. is the correct date and time.

3. Period of Performance The solicitation references December 31, 2026, and March 31, 2027, as performance-related dates. Please clarify the required completion date and applicable contractual performance period.

To allow for ordering and installation the completion date should be 03/31/2027

4. Wage Determination and Labor Standards The main solicitation references Wage Determination IL20260002, while the attached wage determination is SCA2015-5067. Please confirm the applicable wage determination, labor classifications, and whether Service Contract Labor Standards or construction wage requirements govern the window replacement work.

This is being issued as a Service Contract. The correct wage determination is included with the documents on SAM.gov. Please disregard the Davis Bacon wage rate determination number.

5. Limitations on Subcontracting FAR 52.219-14 appears unchecked in the solicitation. Please clarify whether limitations on subcontracting apply to this acquisition and identify the applicable performance requirements.

Maximum 50% of the amount paid by the government can go to non-similarly situated subcontractors.

6. Window Specifications Please confirm the intended dimensions for line items containing inconsistent dimension notation and whether the final quantities and sizes will be confirmed through a corrected schedule.

The dimensions are approximate and will need to be field verified by the successful bidder prior to ordering. Item 3 is 37 inches, not feet. Item 7 should 31-1/2". Item 4: 81*3/4" is 81-3/4". All windows listed are Width by Height.

7. Submission and Acceptance Please confirm whether quotations are to be submitted exclusively by email, whether a signed SF 1449 is required, and which Government representative will conduct final acceptance.

Quotes are to be submitted exclusively by email with a signed SF1449. Please send to mikaela.laney@usda.gov

1. Is 17 Mustang Lane, Simpson, IL 62985 the correct project address?

No, this is not correct.

2. If not, could you provide the exact physical address or GPS coordinates of the residence?

The address is 100 Marla Street, Eddyville, IL 62928

3. Is there an onsite point of contact and phone number available to assist with locating the correct building and arranging access?

Cynthia Morris is the contact at (618) 253-1029. No site visit is scheduled. The building is currently unoccupied. All windows ae accessible from the exterior.

1. Completion date: The Period of Performance section states that all work must be complete no later than December 31, 2026, while the period of performance is also shown as Date of Award to 03/31/2027. Could you please confirm which completion date applies?

To allow for ordering and installation the completion date should be 03/31/2027

2. Window lead time: Since the windows must be field-verified before ordering and are made to the verified dimensions, manufacturing lead times may run close to the holiday season. If the award is made in late November, would the Government accept completion after December 31, 2026, provided the work is finished by March 31, 2027?

To allow for ordering and installation the completion date should be 03/31/2027

3. Insurance: Are there minimum insurance limits required for this project (e.g., general liability, workers' compensation, automobile)? We did not find specific amounts in the solicitation.

This is satisfied by the general liability, workers' compensation and auto insurance carried by the installing subcontractor that will perform all on-site work.

4. Wage determination: Please confirm that Wage Determination IL20260002 (Attachment 4) is the one that applies to work performed in Pope County, Illinois.

This is being issued as a Service Contract. The correct wage determination is included with the documents on SAM.gov. Please disregard the Davis Bacon wage rate determination number.

5. Payment: Will payment be made in a single invoice upon completion and acceptance of all work, through the Invoice Processing Platform (IPP)?

Normally progress payments are allowed

1. Site address: Could you please provide the physical street address of the Eddyville Quarters? The solicitation references Mustang Lane, while the location map shows the site near Main Street and IL-145 in Eddyville.

The address is 100 Marla Street, Eddyville, IL. 62928

2. Site visit / photos: May prospective offerors schedule an exterior or interior site visit before the quote due date? If not, could exterior photos of the residence be provided?

No site visit is scheduled. The building is currently unoccupied. All windows ae accessible from the exterior. A few interior and exterior photos will be added to the end of the questions for reference.

3. Window types W2 and W4: W2 (65-3/4" x 45") and W4 (81-3/4" x 53-1/2") exceed typical single-hung widths. Are these intended as mulled (twin/triple) single-hung units?

These appear to be multiple single windows. Please photos attached for reference.

4. Window type W3: The Schedule of Items lists 27-1/2" x 37'. Please confirm the height is 37 inches.

Actual window count is 19. The dimensions are approximate and will need to be field verified by the successful bidder prior to ordering. Item 3 is 37 inches, not feet. Item 7 should 31-1/2". Item 4: 81*3/4" is 81-3/4". All windows listed are Width by Height.

5. Basement windows W7: W7 (31-1/2" x 17-1/2") is very short for a single-hung unit. Would a slider or another operable type be acceptable for these basement windows?

Actual window count is 19. The dimensions are approximate and will need to be field verified by the successful bidder prior to ordering. Item 3 is 37 inches, not feet. Item 7 should 31-1/2". Item 4: 81*3/4" is 81-3/4". All windows listed are Width by Height.

6. Labor standards: The notice references Service Contract Wage Determination 2015-5067, while the solicitation text references General Wage Decision IL20260002 (Davis-Bacon). Please confirm which wage determination applies.

This is being issued as a Service Contract. The correct wage determination is included with the documents on SAM.gov. Please disregard the Davis Bacon wage rate determination number.

7. Applicable clauses: The solicitation mentions the Forest Products Laboratory, final utility connection, and option clauses (52.217-8/9). Please confirm whether these apply to this project.

Per page 17 of C01_CSS_Commercial Products and Services Eddyville all invoices should be submitted thru the IPP system for approval. The designated COR and CO will be notified when a request is made. The statements referring to the Forest Products Lab is incorrect and not a part of this project.

This contract does not have any options for extension, so these do not apply.

8. Bonds: Are payment or performance bonds required for this acquisition?

As this is a service contract we do not deal with Bonds.