This document is a set of design and construction drawings for the Soap Creek Campground Streambank Rehabilitation project located within the Grand Mesa, Uncompahgre, and Gunnison National Forests under the Gunnison Ranger District, managed by the USDA Forest Service, Rocky Mountain Region (R02).

The project encompasses streambank stabilization and restoration work along approximately 140 linear feet of stream channel. Key construction activities include: bank regrading at a 2:1 horizontal-to-vertical slope with riprap placement (minimum 1-foot thickness, FP-24 Class 5 gradation with D₁₅ = 8 inches, D₅₀ = 10 inches, D_max = 15 inches); installation of one stream barb structure (43 feet total length, 8-foot embedded length, 35-foot weir length, constructed of FP-24 Class 2 stone with D_min = 12 inches, D₅₀ = 16 inches, D_max = 32 inches); placement of multiple rootwad structures (3-4 foot diameter, 8-10 foot footer logs, minimum 8 feet embedment depth); construction of three access points using large-diameter boulders as steps (3-4 feet wide, no greater than 8 feet in height); and willow revegetation using both plugs (planted above bankfull width) and cuttings (planted on slopes and sediment wedges). The contractor must hire a specialized subcontractor for native plant installation. All construction must occur outside the wetted channel except during stream barb construction, with tracking pads and mud mats required for equipment access. The project includes detailed cross-sectional survey data, longitudinal stream profile information, and specifications for all structural elements and materials.

View the file

Other files

File Type Posted
C05_Attach 2_SOW_Revised.pdf PDF
C05_Attach 1_SOI_Revised.xlsx XLSX spreadsheet
C05_Attach 2_SOW.pdf PDF
C05_Questions and Clarifications Revised 9-16-2026.pdf PDF
C05_1240LT26Q0171 Amendment.pdf PDF
C05_Attach 1_SOI.xlsx XLSX spreadsheet
1240LT26Q0171_Final Version.pdf PDF
C05_Attach 4 - Map location.pdf PDF
C05_Attach 6 - Wage Determination.pdf PDF
C05_Attach 2_SOW.pdf PDF
C05_Attach 3 - Map_Aerial.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I c:i w

0..

w i!i!

I Ill "'

I I i!i!

""I!!

C

>t.

w i!i!

z w

:IE

w i!i!

i i!i!

i C

I � ffl ""

0..

z e w

0..

C .,, C w z fJ1

:IE �::I

�::I w :c

I w .,,� w :c

:ll t:

Upstream

US Tie-in Point

Site #12 XFire Pit

Side Connel Thalweg

� Ir

Site #11 Fire Pit

X

Downstream

DS Tie-in Point ro L{)

United States Department of Agriculture

Forest Service

R02

ROCKY MOUNTAIN REGION

PROJECT NAME

Soap Creek CG Streambank Rehab

GRAND MESA,

UNCOMPAHGRE, AND

GUNNISON NATIONAL

FORESTS

GUNNISON RANGER DISTRICT

DRAWING TITLE

Existing Site Layout

DATE

ARCHIVE NO.

DESIGNER DWG SHEET NO.

R. WILLIAMS

DRAWN L1

R. WILLIAMS

CHECKED

SHEET OF

PROJECT NO.

1 11

Height as Stream

Sta Measured Bed Description

0 4.48 5.52 HOI

3 5.18 4.82 TOB

3.4 6.8 3.2 BF

5 7.54 2.46 EOW- Side channel

7 7.76 2.24

9 7.7 2.3 EOW- Side channel

11 7.54 2.46

13 7.26 2.74

15 7.28 2.72

17 7.38 2.62 EOW- Main channel

19 7.72 2.28

21 7.76 2.24

23 7.94 2.06

25 8.6 1.4

27 7.88 2.12

28 8.08 1.92

30 8.4 1.6

32 8.57 1.43

34 8.54 1.46

36 8.64 1.36

38 8.84 1.16 T.W.

40 8.72 1.28 Tree

42 8.7 1.3

44 8.5 1.5

46 8 2 EOW- Main channel

48 7.5 2.5

50 7.34 2.66

52 6.98 3.02 BF

54 6.72 3.28 Edge of Veg, TOB

56 6.72 3.28

61 6.78 3.22

Cross-Section 1 Surveyed at Tie-in Point of Stream Barb and Bank (Marked by Survey Stake on Site)

'- • Top of Bank, West

0 10

Cross-Section 1

( at Approx. Tie-in Pt. of Stream Barb to Bank)

20 30

Stations (ft.)

Thalweg

�Stream Bed � Water Level in Side Channel, 6-11-26 � Water Level in Main Channel, 6-11-26

Top of Bank, East

50 60

- - - Bankfull Condition

United States Department of Agriculture

Forest Service

R02

ROCKY MOUNTAIN REGION

PROJECT NAME

Soap Creek CG

Streambank Rehab

GRAND MESA,

UNCOMPAHGRE, AND

GUNNISON NATIONAL

FORESTS

GUNNISON RANGER DISTRICT

DRAWING TITLE

DATE

Surveyed Stream

Profile

Cross-Section 1

ARCHIVE NO.

DESIGNER DWG SHEET NO.

R. WILLIAMS

DRAWN P1

R. WILLIAMS

CHECKED

SHEET OF

2 11

Cross-Section 2 Surveyed at Approx. Widest Point in Channel w/in Project Area, Located at Approx. Apex of Outside Edge of Channel Curve (Marked by Survey Stake on Site)

Height as Stream

Sta Measured Bed Description

0 4.94 7.06

Cross-Section 2 (at Approx. Widest Point in Channel, Apex of Curve)

2.6 5.1 6.9 TOB 8

r 3.8 6.68 5.32 BF

6.8 7.7 4.3 EOW- Side Channel 7

10 8.1 3.9

15 7.66 4.34 6 ',_ Top of Bank, West

20 7.68 4.32 Top of Bank, East

25 7.12 4.88 5

30 6.94 5.06 .t:!

35 6.94 5.06 -5 4

40 7.32 4.68 0

44 8.36 3.64 EOW- Main Channel 3

45 8.54 3.46 so 9.66 2.34

55 10.18 1.82

59.5 10.5 1.STW Thalweg

63 8.4 3.6 EOW- Main Channel

65 7.92 4.08 0 10 20 30 40 50 60 70

70 7.34 4.66 BF Stations (ft.)

75 7.82 4.18

81 7.44 4.56 � Stream Bed � Edge of Water, Side Channel, 6-11-26 � Edge of Water, Main Channel, 6-11-26 - - - Bankfull 86 7.5 4.5 Edge of Veg i

United States Department of Agriculture Forest Service

R02

ROCKY MOUNTAIN REGION

PROJECT NAME

Soap Creek CG

Streambank Rehab

GRAND MESA,

UNCOMPAHGRE, AND

GUNNISON NATIONAL

FORESTS

GUNNISON RANGER DISTRICT

DRAWING TITLE

DATE

Surveyed Stream

Profile

Cross-Section 2

ARCHIVE NO.

DESIGNER DWG SHEET NO.

R.Williams

DRAWN P2

R.Williams

CHECKED

SHEET OF

3 11

Height as Stream

Sta Measured Bed Description

0 8.7 5.3 CPl

10 8.34 5.66

20 8.54 5.46

30 9.04 4.96 5

40 9.24 4.76

50 9.7 4.3 -5 4

60 9.86 4.14

70 10.38 3.62 3

80 10.66 3.34

90 10.32 3.68 2

100 10.08 3.92

110 9.9 4.1

120 10.2 3.8

130 10.48 3.52 0

140 11.38 2.62 CP2

Longitudinal Stream Profile From US Tie-in Point to DS Tie-in Point

Longitudinal Profile

(Between Tie-in Points for Streamwork) y = -0.0171x + 5.4095 : Approx. Slope = -1. 7%

MaxVAP, Opt. 2 = 0.6ft.

20 40

Max VAP, Opt. 1 = 0.6 ft.

60 80

Stations (ft.)

� Stream Bed •········ Linear (Stream Bed)

100 120 140

United States Department of Agriculture Forest Service

R02

ROCKY MOUNTAIN REGION

PROJECT NAME

Soap Creek CG

Streambank Rehab

GRAND MESA,

UNCOMPAHGRE, AND

GUNNISON NATIONAL

FORESTS

GUNNISON RANGER DISTRICT

DRAWING TITLE

Surveyed Longitudinal

Stream Profile

DATE

ARCHIVE NO.

DESIGNER

R. WILLIAMS

DRAWN

R.WILLIAMS

CHECKED

PROJECT NO.

DWG SHEET NO.

P3

SHEET OF 4 11

us Tie-in Point

Grass Pattern � Indicates Extent of Willow �

Planting � �

Wetted Area of Channel at Low-Water Conditions

Stream Barb

NOTES:

Stream Access Paths

Site #12 _,, X Fire Pit _,, Rock Pattern Indicates Extent of Bank

Regrading and Riprap Placement

1. ALL CONSTRUCTION ACTIVITIES SHALL OCCUR OUTSIDE OF WETTED AREA OF CHANNEL AT LOW CONDITIONAL, EXCEPT DURING THE CONSTRUCTION OF THE STREAM BARB. EVEN THEN CARE SHALL BE TAKEN TO MINIMIZE DISTURBANCE AS MUCH AS POSSIBLE.

2. LOCATION OF STREAM ACCESS PATHS IS APPROXIMATE. ACCESS PATHS ARE NOTTO BE CONSTRUCTED.

3. THERE SHALL BE A TOTAL OF THREE (3) CONSTRUCTED ACCESS POINTS TO STREAM. ACCESS POINTS SHALL BE CONSTRUCTED OF LARGE-DIAMETER ROCK FORMING STEPS EMBEDDED INTO THE STREAMBANK AT DESIGNATED POINTS. EACH INDMDUALSTEPS SHALL BE NO GREATER THAN 8' IN HEIGHT. STEPS SHALL BE NO LESS THAN THREE FEET (3') WIDE AND NO GREATER THAN FOUR FEET (4') WIDE.

4. WILLOWS PLANTED OUTSIDE OF BANKFULL WIDTH (TOP OF BANK) SHALL BE PLUGS.

5. WILLOWS PLANTED WITHIN BANKFULL WIDTH (ON SLOPES OF BANK AND SEDIMENT WEDGE) SHALL BE CUTTINGS.

6. WILLOW CUTTINGS SHALL NOT BE PLANTED WITHIN TEN FEET BOTH US AND DS OF CENTERLINE OF ACCESS STEPS.

7. CONTRACTOR SHALL HIRE A SUBCONTRACTOR THAT SPECIALIZES IN PLANTING NATIVE PLANT PLUGS AND CUTTINGS TO PERFORM REVEGETATION TASKS.

8. LOCATION OF ROOT WADS IS APPROXIMATE AND SHALL BE STAKED IN FIELD BY PROJECT ENGINEER.

9. THE CENTER ACCESS PATH SHALL SERVE AS EQUIPMENT ACCESS TO THE RIVER.

10. TRACKING PADS AND/OR MUD MATS SHALL BE LAID DOWN ON TOP OF CENTER ACCESS POINT EXTENDED FROM THE STREAM BANK TO THE CAMPGROUND ROAD TO REDUCE IMPACTS OF HEAVY MACHINERY ACCESSING CHANNEL.

11. EXISTING TOP OF BANK SHALL BE LAID BACK APPROXIMATELY THREE FEET (31 OR AS INDICATED BY CONSTRUCTION STAKING. BANK SHALL BE RECONSTRUCTED AT A 2:1 (HORIZONTAL: VERTICAL) SLOPE. SLOPE SHALL BE CARRIED FROM DELINEATED TOP OF BANK TO EXISTING STREAMBED.

HEIGHT AND NEWLY DELINEATED BANK, THEREFORE, SHALL VARY.

12. RECONSTRUCTED BANK SHALL BE TAPERED BACK INTO EXISTING BANK AT US AND DS TIE-IN POINTS AS SHOWN. LENGTH OF TRANSITION ZONE SHALL BE NO LESS THAN TEN FEET (101 AND NO GREATER THAN TWENTY FEET (20').

13. CONTRACTOR SHALL TAKE CARE NOT TO DISTURB OR REGRADE EXISTING STREAMBED WITHIN BANKFULL ZONES, EXCEPT WHERE NEEDED TO ACHIEVE SPECIFIED EMBEDMENT DEPTHS OF STREAMBANK REINFORCEMENT AND STREAM BARB. IF STREAMBED ELEVATION IS DISTURBED DURING CONSTRUCTION ACTIVITIES, IT SHALL BE RETURNED, AS CLOSELY AS POSSIBLE, TO ITS ORIGINAL CONDITION.

Site #11 Fire Pit

X

Access Steps- To be constructed of large-diameter boulders

Placed Embedded Root Wads

DS Tie-in Point

United States Department of Agriculture

Forest Service

R02

ROCKY MOUNTAIN REGION

PROJECT NAME

Soap Creek CG

Streambank Rehab

GRAND MESA,

UNCOMPAHGRE, AND

GUNNISON NATIONAL

FORESTS

GUNNISON RANGER DISTRICT

DRAWING TITLE

Scope of Work

DATE

ARCHIVE NO.

DESIGNER DWG SHEET NO.

R. WILLIAMS

DRAWN SOW1

R. WILLIAMS

CHECKED

SHEET

PROJECT NO.

NOT TO SCALE

Typical Cross-Section

Lay existing ------- bank back ~3', or as staked

Cut

Minimum Riprap Bank Coverage Thickness

Tie Ri ra Into Top of Bank

Depth of Embedment .1\ I

I 1.5'-2' :

�11 1

1-=I 11--:-

1' (from original top of bank to streambed)

Minimum Width of Toe 3' Wide

Riprap Fill Feather streambed material over riprap apron to maintain original streambed profile.

'V 'V

, �I �lll'i,�;�1

II

1I 111 1nf I\ I 1

1 I I _ 'TTP==I__

Riprap Apron ~3' Wide

I I Il l I l l l lll ll ll ll l i'II

III

1 1 1 u_-- == ,-nor-.

mJrnillmill-rnill,, 1==111-111-111-111--:-l�I I I I I I I I I 1=• -Til 111-111 - _,.-,11-11 . -

Water Surface at Low Condition

United States Department of Agriculture

Forest Service

R02

ROCKY MOUNTAIN REGION

PROJECT NAME

Soap Creek CG

Streambank Rehab

GRAND MESA,

UNCOMPAHGRE, AND

GUNNISON NATIONAL

FORESTS

GUNNISON RANGER DISTRICT

DRAWING TITLE

DATE

ARCHIVE NO.

DESIGNER

R. Williams

DRAWN

R. Williams

CHECKED

PROJECT NO.

Bankwork

Detail

DWG SHEET NO.

D1

SHEET OF 6 11

NOT TO SCALE

w z

....I ....I

....I w :c w w

Toe of Bank

B-B

Plan View

\_ Tangent Line to Stream Bank

Slope = � :1

Geotextile Fabric

Slope = Greater than 1 :1

Slope = 1 :1

L

B-B

I �

Slope = 1 :1

Profile View

Geotextile Fabric

Cross-Section A-A

BW2

-j TW2j-

Geotextile Fabric

WB2 ---.

Cross-Section B-B

United States Department of Agriculture Forest Service

R02

ROCKY MOUNTAIN REGION

PROJECT NAME

Soap Creek CG

Streambank Rehab

GRAND MESA,

UNCOMPAHGRE, AND

GUNNISON NATIONAL

FORESTS

GUNNISON RANGER DISTRICT

DRAWING TITLE

Stream Barbs Detail

DATE

ARCHIVE NO.

DESIGNER DWG SHEET NO.

R. WILLIAMS

DRAWN D2

R. WILLIAMS

CHECKED

SHEET OF

7 11

....I ....I

....I w :c w w

;ii

I

I

LB LW

8.0 35

Definition of Dimensions

Abbreviation Description

LB Embedded length of barb

LW Weir length of barb

L Total length of barb (LB +LW)

H Minimum height of barb above streambed = i average bankfull height

HB Height of bank= max height of barb above stream bed

D Depth of embedment of barb

A Angle between centerline of barb and tangent line to existing stream bank

TW1 Minimum top width

TW2 Maximum top width

BW1 Minimum bottom width

BW2 Maximum bottom width

WB1 Minimum width of bed key

WB2 Maximum width of bed key

Specified Dimensions

Profile View Plan View Cross-section A-A Cross-section B-B

L H HB D A TW1 TW2 BW1 BW2 WB1 WB2

Feet Degrees Feet

43 1 2 2.0 20 3 3 7 13 7 7

Gradation- Stream Barb Gradation- Bank Riprap

D_min D_50 D_max FP-24 D_15 D_50 D_max FP-24

Gradation Gradation

Inches Class

Inches Class

12 16 32 2 8 10 15 5

USDA.�-;;,}_,;,,

-1�,,,��I

United States Department of Agriculture Forest Service

R02

ROCKY MOUNTAIN REGION

PROJECT NAME

Soap Creek CG

Streambank Rehab

GRAND MESA,

UNCOMPAHGRE, AND

GUNNISON NATIONAL

FORESTS

GUNNISON RANGER DISTRICT

DRAWING TITLE

BBK Stream Barb

Specifications

Not less than TW1

DATE

ARCHIVE NO.

DESIGNER DWG SHEET NO.

R. WILLIAMS

DRAWN D3

R. WILLIAMS

CHECKED

SHEET OF

8 11

Large-diameter

Boulder fill w

Large-<liameter �/�--- Boulder Fill w

Rootwads- Plan View

All portions of root wad structures behind delineated channel bank are embedded and covered. See Profile view detail.

United States Department of Agriculture

Forest Service

R02

ROCKY MOUNTAIN REGION

PROJECT NAME

Soap Creek CG

Streambank Rehab

GRAND MESA,

UNCOMPAHGRE, AND

GUNNISON NATIONAL

FORESTS

GUNNISON RANGER DISTRICT

DRAWING TITLE

ROOTWADS DETAIL

PLAN VIEW

DATE

ARCHIVE NO.

DESIGNER DWG SHEET NO.

R. WILLIAMS

DRAWN D4

R. WILLIAMS

CHECKED

SHEET OF

9 11 t

I I z

I C i z

I C z ti z w iii!

D.

iii w

D.

C

C w z

::I

::I w :c

I w

,;! u

I w i

Base Flow

Footer L

,...... ________ E --------i

Willow Plantings

Boulder diameter 1 � times diameter of log

Rootwads- Profile View

TT=

-I

,----:111

1 Ill I� I

Il l rr-

-11· cp1

Regraded or existing stream bank

Riprap armoring minimum 1' thick, extending from top of boulders/ root wad to top of bank, tapered to ground surface

Protruding

Log

I

I

United States Department of Agriculture Forest Service

R02

ROCKY MOUNTAIN REGION

PROJECT NAME

Soap Creek CG Streambank Rehab

GRAND MESA,

UNCOMPAHGRE, AND

GUNNISON NATIONAL

FORESTS

GUNNISON RANGER DISTRICT

DRAWING TITLE

ROOTWADS DETAIL

PROFILE VIEW

DATE

ARCHIVE NO.

DESIGNER DWG SHEET NO.

R. WILLIAMS

DRAWN D5

R. WILLIAMS

CHECKED

SHEET OF

10 11

....I ....I

....I w :c w w

Rootwads Specfications, Notes

Symbol

D w

L cp1 cp2 s

NOTES:

1. LOGS SHALL BE GOVERNMENT FURNISHED.

Specified Dimensions

(in feet)

Description Minimum Maximum

Depth of embedment 8 -

Diameter of rootwad 3 4

Length of footer log 8 10

Projecting log diameter 1.30 -

Footer log diameter 2 See notes below

As specified in layout

Spacing between barbs drawings and construction staking

2. SELECT CROOKED LOGS WITH AN IRREGULAR SURFACE AND FULLY INTACT ROOT WADS. ROOT WADS SHALL HAVE NUMEROUS PROTRUSIONS.

3. DIAMETER OF PROTRUDING LOG AND FOOTER LOG SHALL BE SIXTEEN INCHES (16") MINIMUM, OR AS OTHERWISE SPECIFIED.

4. DIAMETER OF FOOTER LOG SHALL BE SUFFICIENTLY LARGE SUCH THAT FOOTER LOG CAN BE EMBEDDED TO THE EXPECTED SCOUR DEPTH.

5. FOOTER LOG SHALL BE INSTALLED ALONG TOE OF BANK AND AT A SLIGHT ANGLE AGAINST THE DIRECTION OF STREAMFLOW SUCH THAT UPSTREAM END OF FOOTER LOG CAN

BE EMBEDDED INTO EXISTING BANK FOR NOT LESS THAN FOUR FEET (4') OF ITS LENGTH, OR AS OTHERWISE SPECIFIED. IT SHALL BE INSTALLED SUCH THAT IT PROVIDES A

STABLE FOUNDATION FOR ROOT WAD.

6. FOOTER LOG MUST BE ANCHORED USING BOULDERS OR ¾-IN. REBAR 54 INCHES OR LONGER IN COMBINATION WITH CABLES.

7. ROOT WAD DIAMETER SHALL BE A MINIMUM OF ONE HALF (1/2) BANK HEIGHT BUT NO GREATER THAN FULL BANK HEIGHT, OR AS OTHERWISE SPECIFIED. ROOT WAD DIAMETER

SHALL BE GREATER THAN 2-YEAR FLOW DEPTHS .

8. PLACE ROOT WADS SUCH THAT THE PRIMARY BRACE ROOTS ARE FLUSH WITH STREAMBANK AT A SLIGHT ANGLE IN THE DIRECTION OF STREAM FLOW.

9. PROTRUDING LOG SHALL BE EMBEDDED INTO BANK FOR NO LESS THAN EIGHT FEET (8'), OR AS OTHERWISE SPECIFIED.

10. LARGE BOULDERS OF A DIAMETER NO LESS THAN 1 ½ TIMES THE DIAMETER OF THE PROTRUDING LOG SHALL BE KEYED INTO VOIDS BETWEEN ROOT WAD, FOOTER LOG, AND

EXISTING BANK, AS SHOWN.

11. REMAINING BANK ABOVE ROOT WAD AND KEYED BOULDERS SHALL BE BACKFILLED WITH SPECIFIED BANK MATERIAL TO A SPECIFIED DEPTH AND COVERED WITH A LAYER NO

LESS THAN 1' THICK OR TWO TIMES 050 (WHICHEVER IS GREATER) OF RIPRAP OF A SPECIFIED GRADATION. WILLOW CUTTINGS SHALL BE PLANTED IN RIPRAP AT A SPECIFIED

DENSITY, WITH ENDS EXTENDING BEYOND RIPRAP INTO BANK SOIL.

United States Department of Agriculture Forest Service

R02

ROCKY MOUNTAIN REGION

PROJECT NAME

Soap Creek CG

Streambank Rehab

GRAND MESA,

UNCOMPAHGRE, AND

GUNNISON NATIONAL

FORESTS

GUNNISON RANGER DISTRICT

DRAWING TITLE

Rootwad Specifications

DATE

ARCHIVE NO.

DESIGNER DWG SHEET NO.

R. WILLIAMS

DRAWN D6

R. WILLIAMS

CHECKED

f---------, SHEET OF

11 11

DETAIL_STREAM_BARBS_D2.pdf
DETAIL_STREAM_BARBS_SPECS_D3.pdf
SoapCreekCG_StreamRehab_ConstDrawings.pdf
STREAM_PROFILE_LONGITUDINAL.pdf
SoapCreekCG_StreamRehab_Drawings.pdf
DETAIL_ROOT_WADS_PROFILE_D5_final.pdf
SoapCreekCG_StreamRehab_Drawings.pdf
DETAIL_ROOT_WADS_SPECS_D6.pdf
SoapCreekCG_StreamRehab_Drawings.pdf
EXISTING_LAYOUT.pdf
SCOPE_OF_WORK.pdf
DETAIL_BANKWORK_D1.pdf
DETAIL_STREAM_BARBS_D2.pdf
DETAIL_STREAM_BARBS_SPECS_D3.pdf
DETAIL_ROOT_WADS_PLAN_D4.pdf
STREAM_PROFILE_XC1.pdf
STREAM_PROFILE_XC2.pdf

File details come from the government source that posted it. Updated .