This file is a photographic documentation of deferred maintenance and lead-based paint (LBP) abatement work required at the New Meadows Barn facility. The document contains five pages of annotated images showing the barn structure from multiple angles with labeled work items indicating scope requirements.
The primary work items identified include: removal and replacement of lead-based paint from siding, trim, rafter tails, and soffit throughout the structure; replacement of the wooden deck with metal decking and concrete piers; replacement of roofing materials including installation of plywood sheathing, ice/water shield, and corrugated metal roofing; replacement of siding and trim with new materials after lead abatement, including installation of sheathing, building wrap, and new siding in-kind; replacement of the existing hydrant and relocation 2 feet east; replacement of approximately 10 feet of SIDR9 1-inch waterline with tracer wire included; replacement of the galvanized barb fitting with brass barb fitting; and abatement of lead-based paint from window sills and frames. Window sashes are to remain in place. A concrete slab is to remain. The photographs serve as visual specifications for contractors bidding on or executing this deferred maintenance and environmental remediation project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C04b 1240LT27Q0027.pdf | ||
| C04f WD Adams County Idaho 1240LT27Q0027.pdf | ||
| C04c SOW 1240LT27Q0027.pdf | ||
| C04d Drawings 1240LT27Q0027.pdf | ||
| C04a SF-1442 1240LT27Q0027.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHOTOS-NEW MEADOWS BARN LBP & DEFERRED MAINTENANCE
samuelpthompson Callout Replace wooden deck with metal. Replace concrete piers.
samuelpthompson Callout Remove lead-based paint from rafter tails & soffit samuelpthompson Callout Remove lead-based paint from rafters tails & soffit samuelpthompson Callout Remove/replace lead-based paint siding/trim in-kind samuelpthompson Line samuelpthompson Line samuelpthompson Line samuelpthompson Callout Concrete slab to remain.
samuelpthompson
Remove/replace lead-based paint siding/trim in-kind
Callout Replace existing hydrant and move to east 2-feet.
samuelpthompson Line samuelpthompson Callout Replace galvanized barb fitting with brass barb fitting samuelpthompson
Replace ~10feet of SIDR9 1-inch waterline (ensure tracer wire is included).
Replace roofing (install plywood, sheathing, ice/water shield, new corrugated metal roofing samuelpthompson Callout Replace siding/trim (remove lead-based paint siding, install sheathing, building wrap and new siding/trim in-kind) samuelpthompson Line samuelpthompson Line samuelpthompson
Abate lead-based paint from rafter tails and soffit, repaint
Window sashes to remain samuelpthompson Callout Abate lead-based paint from window sills and frames.
samuelpthompson Line samuelpthompson Callout Replace lead-based paint trim in-kind
Line