Statement of Work Summary

This is a Statement of Work (SOW) for the replacement of a greenhouse roof at the USDA Agricultural Research Service's Daniel K. Inouye U.S. Pacific Basin Agricultural Research Center in Hilo, Hawaii. The project number is 1240LT26Q0183, and the work location is 928 Stainback Highway, Hilo, HI 96720. The contract time is 90 calendar days from Notice to Proceed, with a document date of May 12, 2026.

The primary scope of work requires the contractor to remove broken and old paneling from both sides of the greenhouse roof (approximately 37 feet by 18 feet per side) and replace it with full sheets of 8mm opaque twin-wall polycarbonate greenhouse paneling, along with new stainless steel roof screws and hardware. The contractor must provide all labor, equipment, and materials to complete the work. Site access is restricted to 7:30 AM to 4:00 PM, Monday through Friday, excluding federal holidays. The government will furnish a reasonable amount of electricity and water. All work must comply with applicable federal, state, and local codes and industry standards (IBC, NEC, NSPC, NFPA, EPA, ASTM, GSA, AASHTO). The contractor is responsible for obtaining all permits and licenses, managing hazardous materials discovery, completing a Site Specific Safety Plan or Accident Prevention Plan within ten days of contract award, and providing a minimum one-year warranty on workmanship. Prior to final payment, the contractor must submit the warranty documentation, Operation and Maintenance Data, Release of Claims, and a Final Invoice.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Agriculture Agricultural Research Service

STATEMENT OF WORK

GREENHOUSE ROOF REPLACEMENT –

HILO REPOSITORY

USDA ARS DKI PBARC TPGRDRU-Hilo Repository

HILO, HI, 96720

Date: MAY 12, 2026

STATEMENT OF WORK

1.0 CONTRACT PROJECT:

a. Project Number: 1240LT26Q0183

b. Project Title: Greenhouse Roof Replacement

c. Project Location: USDA ARS DKI PBARC TPRGRDU – Hilo Repository

928 STAINBACK HWY. HILO, HI. 96720

2.0 PROJECT CONTACT PERSONS:

a. CONTRACTING SPEACILIST (CS):

Tony Taylor USDA-Forest Service Email: tony.taylor@usda.gov

b. RESEARCH LEADER (RL) Tracie Matsumoto USDA Agricultural Research Services Daniel K. Inouye U.S. Pacific Basin Agricultural Research Center Tropical Plant Genetic Resources and Disease Research Unit 64 Nowelo St. Hilo, HI, 96720 Email: tracie.matsumoto@usda.gov Tel. No.: 808-959-4358

c. ADMINITRATIVE OFFICER (AO)

Carlee Wehrsig USDA Agricultural Research Services Daniel K. Inouye U.S. Pacific Basin Agricultural Research Center

Email: Carlee.Wehrsig@usda.gov Tel. No.: 808-959-4312

d. LOCATION CONTRACTING OFFICER REPRESENTATIVE (COR) Dustin Galapir USDA Agricultural Research Service Daniel K. Inouye U.S. Pacific Basin Agricultural Research Center

Email: Dustin.Galapir@usda.gov Tel. No.: 808-333-0016

e. SAFETY OFFICER (CDSO)

Matthew Siderhurst or Charles Mason USDA Agricultural Research Services Daniel K. Inouye U.S. Pacific Basin Agricultural Research Center

Email: Matthew.Siderhurst@usda.gov or Charles.Mason@usda.gov mailto:tony.taylor@usda.gov mailto:tracie.matsumoto@usda.gov mailto:Carlee.Wehrsig@usda.gov mailto:Dustin.Galapir@usda.gov mailto:Matthew.Siderhurst@usda.gov mailto:Charles.Mason@usda.gov

3.0 PROJECT DESCRIPTION:

Replace entire greenhouse roof using 8mm full sheets of twin wall polycarbonate greenhouse panels.

4.0 PROJECT REQUIREMENTS:

a. Do not disturb hazardous materials and report condition immediately to the Location Monitor regarding potentially hazardous conditions that are uncovered. Stop work in the area of the questionable material or condition until identification and direction is provided.

b. The Contractor’s work shall adhere to the criteria stated within these project requirements, drawings, and specifications. All construction shall comply with applicable federal, state, and local code requirements as well as current industry standards, (i.e., IBC, NEC, NSPC, NFPA, EPA, ASTM, GSA, AASHTO, etc.) and health and safety codes, in effect at the time of contract award.

c. Access the site between 7:30 am and 4:00 pm Monday through Friday excluding federal holidays. Contractor staff must sign-in on the first day of arrival and then sign-out on the final day of the project, upon completion.

4.1 Background & Site Description:

Government has a need to replace entire greenhouse roof with 8mm opaque (color) twin wall greenhouse paneling. Each side of roof is approximately 37’ x 18’.

4.2 Quote Schedule:

Provide all labor, equipment and materials to perform this Statement of Work and Schedule of Items.

4.3 Description of Work:

1. Remove broken and old paneling from both sides of greenhouse roof

a. approximately 37’ x 18’ per side.

2. Replace roof using full sheets of opaque (color) twin-wall polycarbonate greenhouse paneling.

3. Replace with new stainless steel roof screws and hardware.

4.4 Government Furnished Equipment\Services

a. Government will furnish a reasonable amount of electricity and water for the project.

5.0 GENERAL REQUIREMENTS:

5.1 Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor.

5.2 Existing Installations / Demolition: Contractor shall modify existing installations as needed to accommodate the new installation. Contractor shall coordinate modification of existing installations with Government. All disturbances of existing systems shall be thoroughly coordinated with the Government to prevent disturbances that might jeopardize on-going operations and research. Government reserves the right to retain any equipment / materials removed as part of the scope of work. Contractor shall coordinate any equipment / materials to be retained with Government prior to starting demolition operations.

Contractor shall legally dispose all any materials removed that will not be retained.

5.3 Installation: It shall be the responsibility of the Contractor to complete work in accordance with Federal, State, and Local Code Standards. Additional procedures and materials may be required than is indicated herein. If any item specified herein conflicts with the applicable codes and recommendations, the Contractor shall bring it to the attention of the Contracting Officer Representative for immediate resolution.

5.4 Submittals: Provide manufacturer’s descriptive literature/shop drawings for all materials to the Location Monitor for review. The descriptive literature shall be annotated/ highlighted to show its conformance with contract requirements. Submittals are required for new materials and will be stamped and/or signed by the general contractor prior to submission to the Government. Contractor is responsible for any costs incurred for equipment ordered without prior approval.

5.5 Quality Control: The work performed under this contract shall be subject to continuous audit by the Location Monitor. Quality control is the exclusive responsibility of the

Contractor. The Contractor shall retain and pay for the services of an independent inspector or testing laboratory to perform all tests expressly required by this contract.

5.6 Protection of Work and Property/Safety Requirements:

a. Contractor shall furnish a Site Specific Safety Plan (SSSP) or Accident Prevention Plan (APP) ten days after contract award. SSSP / APP shall be approved by the Government before construction work commences.

b. The Contractor shall protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired at the Contractor’s expense, to pre-damaged condition to the satisfaction of the Location Monitor.

c. Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities of the protection and security.

d. Contractor is responsible for verifying location of any underground utilities and is responsible for any damage caused to such utilities.

5.7 Temporary Facilities:

a. Temporary utilities (water and electricity) may be furnished to the Contractor by the Government, if requested. The Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through its own negligence.

b. Should the Contractor require any power or utility shutdowns during construction, the

Contractor shall obtain approval for such shutdown from the Location Monitor fourteen

(14) calendar days prior to the need.

5.8 Materials and Equipment:

a. The material and equipment to be furnished under these contract documents shall be the standard products of manufacturers regularly engaged in the production of such materials and equipment and shall be the manufacturer’s latest standard design.

b. All materials and equipment to be incorporated in the work shall be handled and stored by the manufacturer, fabricator, supplies and Contractor before during and after shipment in a manner to prevent any injury, theft or damage of any kind to the materials and equipment. All materials and equipment furnished by the Contractor shall be subject to inspection and approval by the CO/Location Monitor.

c. Government will not furnish any labor or equipment to unload or move materials or supplies.

5.9 Cleanup: The construction site shall be kept clean and free of debris at all times. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the Location Monitor.

5.10 Warranty:

a. Submit data concerning the standard one year warranty for workmanship, including the warranty periods (dates), and warranty contacts with names, addresses and telephone numbers.

5.11 Final Payment/Contract Closeout: The following documents are REQUIRED PRIOR TO

FINAL PAYMENT (other documents may also be required):

a. General contractor’s minimum one (1) year warranty on work.

b. Operation and Maintenance Data

c. Release of Claims

d. Final Invoice

6.0 Project Schedule:

The Contract time for this project is 90 calendar days from Notice to Proceed.

7.0 Figure

Figure 1

8.0 Photos

Photo 1

Photo 2

United States Department of Agriculture
Agricultural Research Service

File details come from the government source that posted it. Updated .