This is a Schedule of Items for a USDA Forest Service construction contract titled "0415 CONST INC NEW Teton Basin Wyoming RTP Grant-Darby TH Improvements," dated 2/2/2026. The document outlines four line items required for trailhead improvements in Teton Basin, Wyoming, funded through an RTP (Recreation Trails Program) grant.

The contract requirements include: (1) Mobilization/Transportation to Site, measured as a lump sum; (2) Precast Concrete Vault Restroom Building, measured per each (EA); (3) Owl Guard, measured per each (EA); and (4) Earthwork, measured as a lump sum. Each item has a quantity of one unit specified. The document provides columns for unit pricing and total cost calculations, though specific pricing amounts are not filled in on this schedule. This is a pricing template requiring bidders to populate the price and total columns for each line item.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA Forest Service

ITEM

NUMBER DESCRIPTION

METHOD

OF MEAS UNIT QUANTITY PRICE TOTAL

011900 MOBILIZATION/TRANSPORTATION TO SITE LSQ Lump Sum 1

133402-1 PRECAST CONCRETE VAULT RESTROOM BUILDING AQ EA 1

133402-2 OWL GUARD AQ EA 1

312000 EARTHWORK LSQ Lump Sum 1

Total

SCHEDULEOF ITEMS

0415 CONST INC NEW Teton Basin Wyoming RTP Grant-Darby TH Improvements

2/2/2026

SOI