C04a - Schedule of Items - 1240LT26Q0179.pdf
PDF 233 KB Posted
- Attached to
- Big Springs Horse Corral Replacement
- Solicitation number
- 1240LT26Q0179
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items for a USDA Forest Service fixed-price construction contract for the Big Springs Horse Corral Replacement project, dated August 13, 2026.
The contract includes two base line items: Mobilization (Item 011900) and a 60' X 20' four-rail divided steel corral with concrete footings (Item 055000-1). The steel corral specification includes 174 linear feet of post, 800 linear feet of rail, and 1 cubic yard of concrete. Two optional items are available for potential award: an additional identical corral with steel pipe and concrete (Item 055000-2) and an optional hitching rail (Item 055000-3). All items are priced on a lump sum basis. The contract performance period for base and option line items is 61 calendar days, with options potentially awarded at the time of base line items or up to 30 days thereafter. Bond premiums are required in accordance with FAR 52.228-15 and must be included within the Mobilization line item price rather than as an addition to the contract price, per FAR 52.232-5.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA Forest Service
SCHEDULE OF ITEMS
0415 INC NEW Big Springs Horse Corral Replacement
Date: 8/13/2026
ITEM
NUMBER DESCRIPTION
METHOD
OF MEAS UNIT QUANTITY PRICE TOTAL
011900 Mobilization LSQ Lump Sum 1
055000-1 60' X 20' FOUR-RAIL DIVIDED STEEL CORRAL W/CONCRETE FOOTINGS* LSQ Lump Sum 1
Subtotal $
OPTION ITEMS:
055000-2 OPTIONAL 1 ADDITIONAL CORRAL (STEEL PIPE AND CONCRETE INCLUDED) LSQ Lump Sum 1
055000-3 OPTIONAL HITCHING RAIL LSQ Lump Sum 1
Total with both Option Items
* 60' X 20' FOUR-RAIL DIVIDED STEEL CORRAL W/CONCRETE FOOTINGS INCLUDES 174 LF OF POST, 800 LF OF RAIL, AND 1 CY CONCRETE.
1. Base and Option Line Items = 61 Calendar Days Options may be awarded at time of base line items, or may be awarded up to 30 days.