C04f - WD ID20260013 dtd 5-18-2026 1240LT262Q0179.pdf
PDF 2 MB Posted
- Attached to
- Big Springs Horse Corral Replacement
- Solicitation number
- 1240LT26Q0179
- Issued by
-
Department of Agriculture Forest Service
About this file
Wage Determination Summary
This is a General Decision Wage Determination (ID20260013) issued by the U.S. Department of Labor under the Davis-Bacon Act, effective May 18, 2026, applicable to building construction projects in Idaho Counties of Caribou. The determination establishes prevailing wage rates and fringe benefits for various construction classifications required on federally-funded or federally-assisted construction contracts in the specified geographic area.
The wage determination lists prevailing hourly rates and fringe benefit percentages for multiple construction classifications, including: Bricklayer ($30.00/hour, 17.78% fringes), Carpenter ($35.68/hour, 18.24% fringes), Electrician ($40.00/hour, 18.74% fringes), Power Equipment Operators ranging from $36.33-$37.35/hour (16.10% fringes), Ironworker Structural ($33.37/hour, 22.98% fringes), Laborers ($32.62-$33.93/hour, 16.50% fringes), Plumber ($36.75/hour, 18.93% fringes), Roofer ($29.02/hour, 19.90% fringes), Sheet Metal Worker ($35.50/hour, 22.25% fringes), various Sprinkler Fitter and related trades ($14.76-$26.80/hour, 0.00-2.80% fringes), and Truck Drivers ($35.60-$37.19/hour, 17.00% fringes). Zone-based pay differentials apply for certain classifications based on distance from specified post offices in Boise, Twin Falls, Pocatello, and Idaho Falls. The determination also incorporates requirements under Executive Orders 13706 and 13658 regarding paid sick leave and minimum wage provisions for covered workers on Davis-Bacon Act contracts.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .