This is a Statement of Work (SOW) from the US Department of Agriculture for dam maintenance work at the Shawnee National Forest.
The project involves mowing and debris removal services on two Forest Service-owned dams located in Illinois: Dutchman Lake in Johnson County and Frank's Tract in Pope County. The contractor must complete mowing on the crest and downstream face of each dam to the toe, including emergency spillways. Work includes clearing and disposing of logs, brush, and rubbish from the primary spillway riser inlets, lake shoreline, and dam crest. At Frank's Tract specifically, the contractor must remove all tree and woody debris from the primary spillway and any roots or debris blocking the pipe, and must machine place a minimum of 15 tons of Illinois Riprap Class 3 around the primary spillway to reduce future vegetation growth. All cleared and grubbed materials become contractor property and must be disposed of off Forest Service lands in compliance with local rules and regulations. The contractor is responsible for all disposal fees.
Site access is permitted from 7:00 am to 6:00 pm Monday through Friday. The contractor must provide signs, barricades, and fencing to prevent public access to the work site and must remove all litter upon project completion. Work must be finished by the end date specified in the contract. The contractor must provide resumes and qualifications for all employees. No government property is furnished, travel is not required, and no security requirements, data rights obligations, or Section 508 electronic and information technology standards apply.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents Project
General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks........................................................................................................ Error! Bookmark not defined.
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards
Attachment ............................................................................................................................................. Error! Bookmark not defined.
Project Shawnee National Forest Dam Maintenance
General Information
1.0 Scope of Work
This project is for mowing the crest and downstream face of the dam, removal of debris from the top of spillway riser and tree removal along the upstream face and crest of the dams. Work to occur on Dutchman Lake in Johnson County Illinois and Frank’s Tract in Pope County Illinois
2.0 Background
Provide mowing and removing the logs and debris from the risers on two (2) Forest Service owned dams.
3.0 Contractor Requirements
Part 1 SUMMARY
1.1 ACCESS TO SITE
a. The contractor shall have full access to the site from 7:00 am until 6:00 pm, Monday through Friday.
1.2 CONTRACTORS OPERATIONS
a. Contractor shall provide signs, barricades, fencing, etc. to prevent publics access to the work site.
1.3 DEBRIS DISPOSAL
a. Debris and material removed shall be placed in a location off Forest Service lands.
b. At the end of the project the contractor shall remove all litter from the site.
Part 2 MOWING, CLEARING, GRUBBING
2.1 MOWING
a. Mowing shall occur on the crest and downstream face to the toe of the dam, as well as the emergency spillways.
2.2 TREE AND DEBRIS REMOVAL
a. The work shall consist of clearing and disposing of logs, brush, and rubbish from the designated areas on the primary spillway riser inlets, on the lake shoreline, and along the crest of the dam.
b. Wood debris on top of the spillway riser shall be removed and disposed of with no damage to structure and the dam area around it.
c. Frank’s Tract:
1) All tree and woody debris shall be removed from the primary spillway, as well as roots and debris blocking the pipe.
2) Machine place a minimum of 15 tons of Illinois Riprap Class 3 around the primary spillway to reduce future vegetation growth.
Part 3 DISPOSAL
3.1 All materials cleared and grubbed from the designated areas shall become the property of the contractor and be disposed of off Forest Service lands. Contractor is responsible for complying with all local rules and regulations and the payment of all fees that may result from disposal at locations away from the project site
4.0 Government Furnished
No government property is furnished
5.0 Deliverables / Schedule
Finish the work by the end date stated in the contract.
6.0 Travel
No Travel required
7.0 Contractor’s Key Personnel
Provide resumes and other qualifications for all employees working on this contract.
8.0 Security Requirements
None
9.0 Data Rights
None.