C04a Attachment 1 SOI 1240BH26Q0050.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 1240BH26Q0050
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Objectives and pricing template for federal construction work at a USDA Forest Service facility. Solicitation 1240BH26Q0050 covers mechanical, electrical, and plumbing (MEP) repairs and utility installations at GAOA Star Meadows, requiring complete operational assembly of hydronic heating systems, air heating and distribution, propane service, propane fireplaces, water supply, and sewer drain systems.
The pricing template is structured in two schedules. Schedule A (Base Bid) includes ten line items covering mobilization, selective demolition, concrete, wood/plastics/composites, thermal and moisture protection, plumbing, HVAC, electrical, earthwork, and utilities, each priced as a lump sum. Schedule B (Option) includes four line items for optional work consisting of wall insulation (160 square feet), floor insulation (600 square feet), plumbing for hydronic heat (600 square feet), and radiant floor heat zoning tubing, with pricing specified by line item. Offerors must complete the template with unit prices and costs for each line item, provide their UEI number, date, and point of contact information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C05a RFI QA Final 1240BH26Q0050.docx | DOCX document | |
| C05 SF30 1240BH26Q0050-0002.pdf | ||
| C05 SF30 1240BH26Q0050-0001.pdf | ||
| C05a Attachment 5 RFI Form 1240BH26Q0050.docx | DOCX document | |
| C04c Attachment 3 Specifications 1240BH26Q0050.doc | DOC document | |
| C04 SF1442 RFQ1240BH26Q0050.pdf | ||
| C04f Attachment 6 General Decision MT20260032 07282026.pdf | ||
| C04b Attachment 2 SOW 1240BH26Q0050.docx | DOCX document | |
| C04e Attachment 5 RFI Form 1240BH26Q0050.docx | DOCX document | |
| C04d Attachment 4 Drawings 1240BH26Q0050.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI
| BASE SCHEDULE A | GAOA STAR MEADOWS MEP, REPAIRS & UTILITY INSTALLATIONS - 1240BH26Q0050 | |||||
| BASE BID | Method | Estimated | Pay | Unit | Item | |
| Pay Item | Item Description | of Meas. | Quantity | Unit | Price | Cost |
| 1 | Mobilization | LSQ | 1 | LS | $ | $ |
| 2 | Selective Demolition | LSQ | 1 | LS | $ | $ |
| 3 | Concrete | LSQ | 1 | LS | $ | $ |
| 4 | Wood, Plastics, & Composites | LSQ | 1 | LS | $ | $ |
| 5 | Thermal & Moisture Protection | LSQ | 1 | LS | $ | $ |
| 6 | Plumbing | LSQ | 1 | LS | $ | $ |
| 7 | Heating, Ventilating, & Air Conditioning | LSQ | 1 | LS | $ | $ |
| 8 | Electrical | LSQ | 1 | LS | $ | $ |
| 9 | Earthwork | LSQ | 1 | LS | $ | $ |
| 10 | Utilities | LSQ | 1 | LS | $ | $ |
| SCHEDULE A TOTAL: | $ | |||||
| OPTION SCHEDULE B | GAOA STAR MEADOWS MEP, REPAIRS & UTILITY INSTALLATIONS - 1240BH26Q0050 | |||||
| OPTION | Method | Estimated | Pay | Unit | Item | |
| Pay Item | Item Description | of Meas. | Quantity | Unit | Price | Cost |
| 11 | Thermal & Moisture Protection Wall Insulation | SqFT | 160 | LS | $ | $ |
| 12 | Thermal & Moisture Protection Floor Insulation | SqFT | 600 | LS | $ | $ |
| 13 | Plumbing for Hydronic Heat | SqFT | 600 | LS | $ | $ |
| ½” Tubing Radiant Floor Heat Zone | $ | |||||
| SCHEDULE B TOTAL: | $ | |||||
| SCHEDULE A + B TOTAL: | $ | |||||