This is a Request for Information (RFI) Questions and Answers document for solicitation 1240BH26Q0050, a federal contract opportunity issued by the Department of Agriculture Forest Service for the GAOA Star Meadows MEP, Repairs, & Utility Installations project at Flathead National Forest. The document clarifies eight key requirements and project specifications for contractors submitting proposals.
The project requires complete operational assembly of hydronic heating, air heating and distribution, propane service, propane fireplaces, water supply, and sewer drain systems. Specifically, contractors must install two propane fireplaces (Model GDS28 or equal) and three propane gas-distribution connections, including a government-supplied 500-gallon propane tank in new condition available on-site. Contractors must provide LPG yardline assemblies with standpipe risers, shut-off valves, service regulators, underground yellow HDPE piping, and associated safety components. The Period of Performance is 120 calendar days from the Notice to Proceed, with work accessible year-round via Star Meadows Road, a maintained county road. Site visits are available weekdays between 11 a.m. and 2 p.m. local time by contacting Patrick Siers at 406-758-5347 or patrick.siers@usda.gov. The contract requires a full-time on-site superintendent present during all active construction per FAR 52.236-6. Award evaluation will use Lowest-Price-Technically-Acceptable (LPTA) methodology based on combined totals from both Base Schedule A and Option Schedule B. This RFI clarification document must be acknowledged and submitted with all proposals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C05 SF30 1240BH26Q0050-0002.pdf | ||
| C05a Attachment 5 RFI Form 1240BH26Q0050.docx | DOCX document | |
| C05 SF30 1240BH26Q0050-0001.pdf | ||
| C04 SF1442 RFQ1240BH26Q0050.pdf | ||
| C04d Attachment 4 Drawings 1240BH26Q0050.pdf | ||
| C04c Attachment 3 Specifications 1240BH26Q0050.doc | DOC document | |
| C04e Attachment 5 RFI Form 1240BH26Q0050.docx | DOCX document | |
| C04a Attachment 1 SOI 1240BH26Q0050.xlsx | XLSX spreadsheet | |
| C04b Attachment 2 SOW 1240BH26Q0050.docx | DOCX document | |
| C04f Attachment 6 General Decision MT20260032 07282026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
REQUEST FOR INFORMATION (RFI) FORM
1240BH26Q0050
GAOA Star Meadows MEP, Repairs, & utility Installations Flathead National Forest RFI #1 – Is there a prebid or walkthrough for this project?
There is no site visit planned but you can visit between 11am and 2 pm local time during the weekdays. Please email and/or call Patrick Siers at 406-758-5347 or patrick.siers@usda.gov to inform him of your visit and get a key for access.
RFI #2 – The SOW and Section 235513 of the specifications require two propane fireplaces. However, the drawings state that gas-distribution piping must be provided to three propane fireplaces and one boiler. Please confirm the required number of fireplaces and gas connections.
General Note 5.1.4 describes an erroneous number of interior mechanical appliances when the author intended to describe (3) three Gas-Distribution connections and the LPG yardlines.
The Star Meadows project requires:
· (2) two Propane Fireplaces
· Model GDS28 or equal, Direct Vent Cast Iron Gas Stoves and
· (3) three propane Gas-Distribution Connections
· The contractor is required to safely connect a government supplied propane tank to the Cabin and the Bunkhouse by supplying & testing new LPG yardline assemblies with the following features:
· (3) standpipe risers w/ shut-off valves, (1) one first-stage service regulator at the tank, (2) two second stage service regulators at the buildings, runs of underground yellow HDPE pipe, transition fittings, adapters, and safety components of tracer wire and warning tape included w/ excavation trenches.
RFI #3 – The SOW identifies an estimated performance period of September 1 through November 29, 2026, but quotations are due September 2, 2026. The SF1442 requires completion within 120 calendar days after Notice to Proceed (NTP). Please confirm the controlling performance period.
The Period of Performance (PoP) is 120 calendar days after the notice to proceed is issued. The calendar dates will be adjusted to correspond to award and NTP.
RFI #4 – The SOW requires the contractor to notify the Contracting Officer two weeks before entering the worksite, while the SF1442 requires work to begin within 10 calendar days after Notice to Proceed (NTP). Please clarify how these requirements should be reconciled.
Please see Quality Control Plan of section 014100.
A Contractor’s decision as to how required scheduling will be reconciled is wholly their own. While its true work item performance cannot occur prior to the Notice to Proceed, messages and announcements intending to notify the government of the contractor’s plan to start work or date(s) of worksite entry can begin as soon as the contract is awarded. A pre-construction conference is often held prior to issuance of the NTP. Also, immediately after NTP, work under the contract may be performed including those which may be accomplished prior to onsite occupancy such as, submittals, utility locates, permits, and purchasing equipment.
RFI #5 - The SOW states that the propane tank is Government-supplied. Please confirm the tank’s capacity, condition, anticipated availability and delivery responsibility, and whether the contractor is responsible only for the pad, installation and connections.
The tank is 500 gallons, in new condition and available on site. The contractor is responsible for coordinating with the Forest Service’s local supply vendor at the time the tank is moved onto the new concrete pad.
No, the limitation of responsibility is not confirmed, the contract requires assembly of a utility propane service described in the Statement of Work (section C), the Drawing sheets (No.’s 3, 4, 8, 9, 10, 12, 13), and the Specifications (Sections 01010, 312200, 03300, 23030, 23131, 231126, 235513) which depict specific and miscellaneous items of propane work to be completed in every detail for proper use and operation.
RFI #6 - Please confirm whether the evaluated price for the lowest-price-technically-acceptable determination will include the combined total of Base Schedule A and Option Schedule B.
All items under Base Schedule A and Option Schedule B will be included in the LPTA determination.
RFI #7 - Please confirm whether Star Meadow Road and the project site will remain accessible to construction vehicles and material-delivery trucks throughout the entire performance period, including during winter-weather conditions.
Yes, access to Star Meadows Cabin is available year-round. Star Meadows Road is managed under Flathead County MT jurisdiction. The Road and Bridge Department maintains Star Meadows Road as a public county road which is paved from State Highway 424 to locations beyond Star Meadow Cabin. The cabin is located in a rural area and conditions will vary from the lower sections near MT-424 (Farm to Market Rd) at higher elevation mountain areas.
During winter weather snow removal snow removal by the County begins in the early morning hours (around 5:30 a.m. to 7:30 a.m.).
RFI #8 - Please confirm whether the contractor must supply a full-time on-site superintendent or whether the superintendent may serve in another project role while remaining available and present during active construction.
The standard government provision FAR 52.236-6 ("Superintendence by the Contractor"), is incorporated in the Star Meadows project. The Federal Acquisition Regulation requires the contractor to directly supervise the work or assign a competent superintendent to be on the worksite at all times during performance until the work is completed and accepted.