This is a Statement of Work for bi-yearly roof inspection services at the Forest Products Laboratory (FPL) in Madison, Wisconsin. The contractor must provide semi-annual physical roof inspections (Fall: October-November and Spring: March-April) across eight FPL buildings totaling approximately 185,700 square feet of roof. Inspectors must hold IIBEC Registered Roof Observer (RRO) certification or equivalent. Inspections include exterior roofing system condition, flashing, sheet metal, wall panels, and parapets. The contractor is responsible for providing all accessing equipment, including ladders; facility ladders will not be provided. The contractor must deliver comprehensive annual reports in PDF format with photographs of all roof sections and identified issues, including roof age, roofing system type, deficiencies, recommended maintenance, and estimated remaining service life. A cost proposal to remedy any deficiencies discovered must accompany the annual report. The base year (October 1, 2026 – September 30, 2027) requires one annual inspection with full payment upon report delivery. Option years 1-4 (October 1, 2027 – September 30, 2031) each require two inspections per year with semi-annual reports and 50% payment per inspection.

Government-furnished items include facility access (6AM-6PM) with staff availability 7AM-4PM on non-federal holidays, and two access cards per inspection that must be returned before payment. All contractor personnel must complete mandatory contractor training and pass background checks before working on-site un-escorted. Travel time and expenses are the contractor's responsibility and must be included in the cost proposal. The Contracting Officer's Representative is Frank Morris (608-231-9338). A mandatory site visit was required on September 1, 2026 at 10AM CST; proposals without site visit attendance are not acceptable. Questions were due September 4, 2026, with bids due September 9, 2026 by 2:00 PM EST. All inspection reports become the exclusive property of FPL. The incumbent contract number is 12444824P0066.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Contents

Project3
General Information3
1.0 Scope of Work3
2.0 Background3
Contractor Requirements3
3.0Technical Requirements / Tasks3
4.0 Government Furnished4
5.0 Travel5
6.0 Security Requirements5
7.0 Data Rights5
Mandatory Contractor Training6

Project FPL Roof Inspections

General Information

1.0 Scope of Work

The goal of this project is to provide yearly roof inspection services at the Forest Products Laboratory, Madison, WI. The Forest Products Laboratory (FPL) maintains buildings/facilities that house various research & development activities. The work performed at FPL is vital to the health and productivity of our National Forests and Grasslands, and maintaining the facilities is of utmost importance. Recurring roof inspections will provide FPL facilities engineering staff necessary information to mitigate roof performance issues, address maintenance items, and plan for future roof replacements.

2.0 Background

FPL facilities were constructed between 1930 and 2010. Roof structures and types vary between concrete/metal/wood decks, and built-up & membrane roofing systems. Of the 10 buildings on FPL’s campus, 8 are included in this Scope of Work:

1. Building 1. Constructed 1932. Roof installed circa 2003. Built-up roof. One section of roof has been replaced with a TPO membrane system in 2023. Approximately 60,000 SF of roof.

2. Building 4. Constructed 1935. East section constructed 2004. Three separate roof sections. East & West sections are EPDM membrane system installed 2023. Middle section is EPDM system installed 2018. Approximately 3,500 SF of roof.

3. Building 15. Constructed 1951. Roof installed 2023. EPDM membrane system. Approximately 3,000 SF of roof.

4. Building 29. Constructed 1967. Roof installed approximately 2007. Built-up roof. Approximately 33,000 SF of roof.

5. Building 33. Constructed 1967. Roof installed approximately 2005. Built-up roof. Approximately 8,000 SF of roof.

6. Building 34. Constructed 1969. Roof installed approximately 2005. Built-up roof. Approximately 8,500 SF of roof.

7. Building 46. Constructed 1995. Roof installed approximately 2007. EPDM membrane system. Approximately 1,700 SF of roof.

8. Building 50. Constructed 2010. Roof is original – installed 2010. EPDM membrane system. Approximately 68,000 SF of roof.

Contractor Requirements

3.0 Technical Requirements / Tasks

A site visit will be required prior to submitting a proposal. Any proposals received from offerors not attending the site visit will not be considered. The site visit will be scheduled by the COR.

The scope of work includes:

3.1 Base Year. (10/1/2026 – 9/30/2027) Inspect roofs on FPL Buildings 1, 4, 15, 29, 33, 34, 46, & 50 & provide report to FPL.

3.1.1 Inspection includes physical walking tour of roofs. Roofs are accessed by various methods including direct access doors, ladders from ground or other roof elevations, permanent ladders fixed to building structure, etc.

3.1.1.1 Contractor to provide ladders and other accessing equipment as needed. Facility ladders will not be provided for use.

3.1.1.2 Access cards (2) to the facility will be issued for each inspection and must be returned to FPL prior to payment.

3.1.1.3 Facility restrooms will be available for use by the Contractor.

3.1.2 Inspections to take place in Fall (October – November) and Spring (March – April)

3.1.2.1 Inspectors must hold IIBEC – Registered Roof Observers (RRO) certification, or equivalent, and must be supplied with cost proposal to validate ability of Contractor to complete the services. Certifications of the inspectors of record must be supplied with each Semiannual Report.

3.1.3 Inspection to include exterior condition of roofing system and related flashing/sheet metal. Includes deterioration of or damage to adjacent wall panels, parapets, etc.

3.1.4 Annual Report. An annual report will be provided to FPL and include an outline of work performed, a condition report, and general overview.

3.1.4.1 Photographs of all roof sections must be included.

3.1.4.2 Photos showing identified issues must be included.

3.1.4.3 Report must utilize a consistent template throughout the Base + Option years to allow for easy referencing.

3.1.4.4 Report to include roof age (if known), roofing system type, any known or discovered deficiencies, needed/recommended maintenance, and estimated remaining service life.

3.1.4.5 Report to be delivered in electronic PDF format.

3.1.5 Deficiencies/maintenance issues found. Any conditions or issues found during the inspection must be included on the Annual Report. These can include blocked drains, weathered/missing caulking, deteriorated flashing, and other items that affect roof life/performance and any warranties.

3.1.5.1 A cost proposal to remedy the found deficiencies will be provided with the Annual Report. FPL may elect self-perform maintenance items or issue a Purchase Order for their completion.

3.1.6 Payment. Contractor to invoice for payment after inspection & report. Payment will be 100% of Base Year contract value.

3.2 Option Year 1 (10/1/2027 – 9/30/2028)

3.2.1 Provide inspection & reporting services as described in Base Year in addition to one additional inspection, for a total of 2 inspections per year. Approximately 6 months between inspections. A semiannual report will be provided to FPL after each inspection, as described in Base Year.

3.2.1.1 Contractor to invoice for payment after each inspection & report, twice per year. Payment will be 50% of yearly contract value per each inspection/report.

3.3 Option Year 2 (10/1/2028 – 9/30/2029)

3.3.1 Provide inspection & reporting services as described in Base Year in addition to one additional inspection, for a total of 2 inspections per year. Approximately 6 months between inspections. A semiannual report will be provided to FPL after each inspection, as described in Base Year.

3.3.1.1 Contractor to invoice for payment after each inspection & report, twice per year. Payment will be 50% of yearly contract value per each inspection/report.

3.4 Option Year 3 (10/1/2029 – 9/30/2030)

3.4.1 Provide inspection & reporting services as described in Base Year in addition to one additional inspection, for a total of 2 inspections per year. Approximately 6 months between inspections. A semiannual report will be provided to FPL after each inspection, as described in Base Year.

3.4.1.1 Contractor to invoice for payment after each inspection & report, twice per year. Payment will be 50% of yearly contract value per each inspection/report.

3.5 Option Year 4 (10/1/2030 – 9/30/2031)

3.5.1 Provide inspection & reporting services as described in Base Year in addition to one additional inspection, for a total of 2 inspections per year. Approximately 6 months between inspections. A semiannual report will be provided to FPL after each inspection, as described in Base Year.

3.5.1.1 Contractor to invoice for payment after each inspection & report, twice per year. Payment will be 50% of yearly contract value per each inspection/report.

4.0 Government Furnished

Facility access hours at 6AM-6PM. Facilities staff is available for questions 7AM-4PM. The facility is closed on Federal Holidays. A list of holidays is located at OPM.gov.

The Contracting Officer’s Representative (COR) is Frank Morris. 608-231-9338.

5.0 Travel

Travel time and/or expenses to FPL for performance of services listed above will not be reimbursed. These costs are to be estimated by the Contractor and included in the cost proposal.

6.0 Security Requirements

Contractor will be provided with one (1) access card upon arrival at the beginning of each inspection. Card will be provided to the Contractor by the COR. If the inspection is anticipated to require multiple days to complete, the Contractor is authorized to keep the card until the inspection is complete. Card must be returned to COR prior to payment. Additional cards may be requested by the Contractor for additional employees, subject to availability by FPL.

Contractor employees will not be escorted by FPL staff. All Contractor personnel on-site must complete the Mandatory Contractor Training before beginning work. Training requirements are located at the end of this document.

A background check will be completed by the government for all Contractor employees working on-site un-escorted. Employees that do not pass the background check will not be authorized to work on-site.

7.0 Data Rights

Inspection reports provided to FPL as part of this Scope of Work will become the property of the FPL for its exclusive use.