C04_Attachment III - Akron CO Drawings_1232SA26Q1036.pdf
PDF 1 MB Posted
- Solicitation number
- 1232SA26Q1036
About this file
This document is a building layout map and floor plan collection for the Central Great Plains Research facility located at 40335 Co Rd GG, Akron, CO 80720.
The document contains a comprehensive site map showing 25 buildings and structures distributed across the research campus, including a main office, seed house, barn/garage, fuel house, runoff lab, shop, round top and square top storage structures, chemical shed, equipment buildings, modular NRCS building, storage building, rainout shelter, head house, and garden shed. Individual floor plans are provided for eight primary buildings: Building 01 (Office, 9,850 sq ft) featuring multiple offices, labs, conference rooms, storage areas, and support spaces with business occupancy classification; Building 03 (Barn, 3,660 sq ft) with two floors containing equipment space and radiation room; Building 04 (Garage, 3,150 sq ft) configured with eight individual garage bays; Building 06 (Runoff Lab, 6,100 sq ft) across two floors with plant/soil grinding rooms and sample bag storage; Building 07 (Shop, 3,000 sq ft) with two floors; Building 08 (Round Top, 4,000 sq ft); Building 09 (Square Top, 5,000 sq ft); Building 11 (Chemical Building, 759 sq ft) containing pesticide storage rooms and restroom; Building 13 (Small Equipment Storage, 3,000 sq ft); Building 16 (Bunk House, 1,440 sq ft) with offices, restrooms, HVAC, and conference room; Building 18 (Sample Storage, 3,000 sq ft); Building 20 (Field Day Building, 7,750 sq ft measuring 125' x 30'); and Building 23 (Head House, 3,000 sq ft) featuring growth chambers, spray chamber, greenhouse propagation, equipment room, soils prep, entomology lab, gamma room, storage, and specialized mechanical systems with detailed door and wall specifications.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CSU
CSU
Mach.
Lot
S15 S16 S17
1. Main Office
2. Seed House
3. Barn/Garage
4. Garage
5. Fuel House *S15-S17 Gas Disp.
6. Runoff Lab
7. Shop
8. Round Top
9. Square Top
11. Chem Shed
13. Equipment Bdlg
16. Modular NRCS Bdlg
18. Storage Bdlg
20. Equipment Bdlg
22. Rainout Shelter (not pictured)
23. Head House
24. Garden Shed 25?. Chem Mixing Bdlg
CENTRAL GREAT PLANS
RESEARCH
Building Layout Map 40335 Co Rd GG Akron, CO 80720
C o.
R d.
G G
N
25?
Storage Room
Pesticide RoomPesticide Room
Storage Room
Restroom
540700B011 Building 11
(Chemical Building) 759 Sq Ft
540700B013 Building 13
(Small Equipment Storage) 3,000 Sq Ft
540700B018 Building 18
( Sample Storage Building)
540700B020 Building 20
( Field Day Building) 7,750 Sq Ft
30'
30'
Radiation Room
540700B003 Building 03
(Barn) Floor 1
3,660 Sq Ft
540700B003 Building 03
(Barn) Floor 2
540700B004 Building 04
(Garage) 3,150 Sq Ft
Plant Grinding Rm Soil Grinding
Rm
540700B006 Building 6
( Run Off Lab) Floor 1
6,100 Sq Ft
540700B006 Building 6
( Run Off Lab) Floor 2
Sample Bag Storage
Sample Bag Storage
540700B007 Building 07
( Shop) Floor 1
3,000 Sq Ft
540700B007 Building 07
(Shop) Floor 2
540700B008 Building 08
(Round Top) 4,000 Sq Ft
540700B009 Building 09
(Square Top) 5,000 Sq Ft
Office 4 Office 5
Office 3
Office 2 Office 1
Restroom 2
Restroom 1
HVAC
Conference Rm
540700B016 Building 16
(Bunk House) 1,440 Sq Ft
100"
25' 7'-2" 14'-10" 8'-0" 11'-8" 5'-4"
2"X6" Stud Wall
'-8
'-0
25'-0" 8'-8" 13'-4"
GROWTH CHAMBER/
SPRAY CHAMBER
GREENHOUSE
PROPAGATION
EQUIPMENT ROOM
SOILS PREP
ENTOMOLOGY GAMMA
ROOM
BOILER
ROOM
FAN
ROOM
5' -0
4'
-1 0"
6' -3
4'-10"
STORAGE
ELE
PROBE
STORAGE
'-7
" 14'-3" +/-
2"X6" Stud Wall
2"X6" Stud Wall 2"X6" Stud Wall
WOOD STUD WALL TO CEILING
WOOD STUD WALL 8"
ROOMS WITH METAL WALL SHEETING
ROOMS WITH SHEETROCK WALL SHEETING & SUSPENDED CEILING
INTERIOR HOLLOW METAL DOUBLE DOOR (PAIR 3'-0" X 7'-0" / wire glass inserts minimum 24"x24" )
INTERIOR HOLLOW METAL SINGLE DOOR ( 3'-0" X 7'-0" / wire glass inserts minimum 24"x24")
INTERIOR HOLLOW METAL SINGLE DOOR ( 3'-0" X 7'-0" / no glass inserts) 103 x6 x1 x5
540700B023 Building 23
(Head House)
LAB
OFFICE bJ
A13P A136
OFFIC
Arr5 OR.4GE
A1:t6.2
LAB
OFFIC =
m'.l A132
OFFICE
Aij'1 LAB
OFFICE Uii] 'ii:1'30
CONFERENCE
9i:r.ls
11£3?.
LOBBY
CEPTION A118
OFFICE
Am Att6
OFFICE
/.ffi!;
Office STORAGE Iii
Am\2 ,AW, 2 OFFl:E I
CONST TE.MP oomrrTEMP a OF,!!j:E OFFICE
A109 Ate8
1 1 t , ,11111'.'.D!
DATA
MECHANICAL I 'ii:1'04
OCCUPANCY CLASSIFICATION
0 BUSINESS(B)
540700B001 Building 01 (Office) 9,850 Sq Ft
| C04_Attachment III - Akron 2013 Station Buildings Map.pdf |
| Page-1� |
| C04_Attachment III - Akon Building 011_ Chemical Bldg.pdf |
| Page-1� |
| C04_Attachment III - Akron Bldg 013_ Small Equip Stor.pdf |
| Page-1� |
| C04_Attachment III - Akron Bldg 0018_ Sample Stor Bldg.pdf |
| Page-1� |
| C04_Attachment III - Akron Bldg 20_Field Day Bldg.pdf |
| Page-1� |
| C04_Attachment III - Akron Building 03_Barn.pdf |
| Page-1� |
| C04_Attachment III - Akron Building 04_Garage.pdf |
| Page-1� |
| C04_Attachment III - Akron Building 006_ Run Off.pdf |
| Page-1� |
| C04_Attachment III - Akron Building 07_Shop.pdf |
| Page-1� |
| C04_Attachment III - Akron Building 08_RoundTop.pdf |
| Page-1� |
| C04_Attachment III - Akron Building 009_ Square Top.pdf |
| Page-1� |
| C04_Attachment III - Akron Building 16 Bunk house.pdf |
| Page-1� |
| C04_Attachment III - Akron Building 23_ Head House.pdf |
| Page-1� |
C04_Attachment III - Akron_Building 01_Office.pdf
File details come from the government source that posted it. Updated .