This document is a comprehensive set of technical specifications and design drawings for fire protection and plumbing systems at the USDA Agricultural Research Service Sugarcane Research Laboratory in Houma, Louisiana, dated May 20, 2026.
The fire alarm and mass notification system specifications require replacement of an existing EST-3 panel with a new EST-4 system for backward compatibility, including integration with existing equipment in the headhouse and greenhouse buildings. The system must incorporate a mass notification voice system per Presidential directive, with specific requirements for device locations, circuit configurations, voltage calculations, and conduit specifications. A Quality Control Fire Protection Engineer (QFPE) who is not an employee of the installing contractor must oversee design, inspection, and commissioning. The specifications mandate Class B signaling line circuits with no T-taps, hybrid Class A/B circuits with isolation modules, 70-volt speaker circuits, redundant fiber between buildings, and compliance with NFPA 72 standards. AC circuits must use red locking devices with surge protection, and all fire alarm conduits must be red-dipped or painted except in finished rooms where they match wall/ceiling finishes.
The fire protection sprinkler system includes wet-pipe protection for the existing headhouse (Zone 1) and new lab building (Zone 2), with provisions for an optional dry-pipe system for a covered canopy if utility water supply deficiencies are resolved. The plumbing systems encompass domestic water supply with booster pumps, hot water circulation, thermostatic mixing valves, laboratory utilities (compressed air, vacuum, natural gas, deionized water), and comprehensive drainage with floor drains and trench drains. The drawings detail fixture schedules, valve locations, piping materials (copper for potable water, black steel for gas, stainless steel for lab drains), and equipment specifications including water heaters, pumps, and water purification systems. All work must comply with NFPA 13 for sprinklers, NFPA 72 for fire alarms, and applicable plumbing codes, with specific attention to pipe sizing, support details, accessibility, and coordination between trades.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C05_Sol_1232SA26R0027_Amd_0002.pdf | ||
| C04_Attachment 11 - RFI Questions and Answers.xlsx | XLSX spreadsheet | |
| C05_Sol_1232SA26R0027_Amd_0001.pdf | ||
| C04_Attachment 10 -Geotechnical Engineering Report.pdf | ||
| C04_Site Visit Information 1232SA26R0027.pdf | ||
| C04_Attachment 9 - Schedule of Pricing (MS Excel Interactive Document).xlsx | XLSX spreadsheet | |
| C04_Solicitation_1232SA26R0027.pdf | ||
| C04_Attachment 4 - Drawings 01 - General-Civil-Structural.pdf | ||
| C04_Attachment 7 - Drawings 04 - Mechanical-Electrical.pdf | ||
| C04_Attachment 2 - Specifications Vol. 1.pdf | ||
| C04_Attachment 8 - Wage Determination LA20260046.pdf | ||
| C04_Attachment 1 - Scope of Work 1232SA26R0027.docx | DOCX document | |
| C04_Attachment 3 - Specifications Vol. 2.pdf | ||
| C04_Attachment 5 - Drawings 02 - Architectural.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INITIAL SPEAKER-WATTAGE
STROBE-CANDELA
DEVICE NUMBER FOR
RESPECTIVE CIRCUIT
INDICATES PANEL AND
CIRCUIT INFORMATION
DEVICE INFORMATION
FIRE ALARM NOTES:
1.SCOPE OF PROJECT:
1. PROVIDE EST-4 ADDRESSABLE VOICE FIRE ALARM AND MASS NOTIFICATION SYSTEM
AS OUTLINED FOR NEW LAB BUILDING.
2. SYSTEM MUST BE EST-4 FACU TO INTEGRATE WITH EXISTING EST EQUIPMENT IN
ADJACENT BUILDINGS.
3. A QUALIFIED QUALITY CONTROL FIRE PROTECTION ENGINEER (QFPE) MUST PROVIDE
OVERSIGHT OF FINAL PRODUCT SPECIFIC SHOP DRAWINGS AND FIELD INSTALLATION
WITH COMMISSIONING. CONTRACTORS FPE IS NOT REQUIRED TO SEAL THE
DRAWINGS BUT MUST PROVIDE QUALITY CONTROL REVIEWS AS OUTLINED.
FA UPGRADE NOTES:
1. ADJACENT HEADHOUSE HAS EXISTING EST-3 PANEL THAT IS REACHING END OF LIFE.
2. UNDER THIS SCOPE, REPLACE THE MOTHERBOARD / CARDS OF EXISTING EST-3 WITH
A NEW EST-4 PLATFORM. MAINTAIN EXISTING CAN.
3. REPROGRAM NEW SYSTEM FOR EXISTING DEVICES IN HEADHOUSE, GREENHOUSE,
ETC.
4. PROVIDE FIBER CONNECTION BETWEEN EST-4 IN HEADHOUSE AND EST-4 IN LAB
BUILDING TO NETWORK THE TWO PANELS WITH A SINGLE OFF-SITE REPORTING
POINT.
5. EXISTING HEADHOUSE AND GREENHOUSE SYSTEMS WILL REMAIN HORN/STROBE.
NEW LAB BUILDING WILL BE PROVIDED WITH MNS VOICE SYSTEM PER PRESIDENTIAL
DIRECTIVE FOR FEDERAL BUILDINGS.
6. MAINTAIN EXISTING ANNUNCIATOR(S) IN HEADHOUSE.
FIRE ALARM AND MNS GENERAL NOTES:
1. SYSTEM MUST COMPLY WITH THE FOLLOWING AT MINIMUM:
1.1. NFPA 70 & 72, LATEST EDITION AT TIME OF SOLICITATION
1.2. UPDATES FOR VISUAL NOTIFICATION FROM ECB 2018-17
1.3. FOLLOW ALL APPLICABLE SPECIFICATIONS INCLUDING FIRE ALARM 28 31 76, AND
GENERAL ELECTRICAL 26 20 00 WHEN ISSUED.
2. CLEAR STROBES WITH "ALERT" WILL BE USED FOR VISUAL NOTIFICATION.
3. DIRECTIONAL LOUDSPEAKERS SIMILAR TO WHEELOCK STH-15 MUST BE USED WHERE
INDICATED AND AIMED IN THE GENERAL DIRECTION INDICATED.
4. ADDRESSABLE NOTIFICATION APPLIANCES ARE NOT PERMITTED.
5. COMBINATION NOTIFICATION / SIGNALING CIRCUITS FOR SPEAKERS AND/OR STROBES
ARE NOT PERMITTED.
6. ALL STROBES MUST BE LISTED AND INTENDED FOR OPERATION AT 24 VOLTS WITH
NOMINAL 24 VOLT POWER SUPPLIES.
7. USER MUST BE PROVIDED WITH ALL TOOLS, HARDWARE, CABLES, MANUALS,
SOFTWARE, PASSWORDS, PASSWORD KEYS, ETC. TO FULLY SUPPORT AND MAINTAIN
THE SYSTEM.
8. CEILING GRID-MOUNT NOTIFICATION APPLIANCES MUST BE MOUNTED CENTER OF
TILE.
9. CEILING GRID-MOUNTED DEVICES MUST BE SUPPORTED BY BRIDGE SUPPORTS AND
NOT BY THE CEILING TILE.
10. ALL PANELS AND EQUIPMENT CABINETS, LOC, ETC. MUST BE KEYED THE SAME.
AS-BUILT MAY BE KEYED SEPARATE.
TEXT SIGN NOTES:
1. TEXT SIGNS ARE NOT PROVIDED FOR THIS BUILDING AS NOT REQUIRED BY FEDERAL
DIRECTIVE FOR VOICE SYSTEMS AND THIS PROJECT IS NOT REQUIRED TO COMPLY
WITH CORPS OF ENGINEERS ECD OR UFC CRITERIA.
INTELLIGIBILITY CONSIDERATIONS:
1. INTELLIGIBILITY MUST BE MEASURED AND SPEAKER TAPS FIELD ADJUSTED AS
NECESSARY TO ACHIEVE THE BEST SCORE.
2. INITIAL SPEAKER WATTAGE LEVELS ARE INDICATED ON DRAWINGS. CONTRACTOR
MUST ALLOW FOR FIELD ADJUSTMENTS TO ESTABLISH THE BEST INTELLIGIBILITY
WATTAGE / TAP SETTINGS FOR EACH RESPECTIVE SPACE BASED ON TESTING.
3. ALERT TONES MUST BE 15 DBA ABOVE AMBIENT AND MUST BE MEASURED TO SATISFY
AUDIBILITY LEVELS PER NFPA 72.
4. VOICE MESSAGES MUST BE RECORDED AND AMPLIFIED TO DELIVER THE BEST
INTELLIGIBILITY LEVELS PER NFPA 72.
5. PRE-RECORDED VOICE MESSAGES MUST BE OF A LOWER FREQUENCY/ PITCH
RATHER THAN A HIGHER FREQUENCY/ PITCH TO REDUCE THE NUMBER OF
REFLECTIONS IN REFLECTIVE SPACES.
6. THE NUMBER OF SPEAKERS HAS BEEN INTENTIONALLY LIMITED IN SOME AREAS DUE
TO REFLECTIVE PROPERTIES OF THE WORK SPACES. UNLIKE CARPETED OFFICE
SPACES, MORE SPEAKERS PRODUCE MORE REFLECTIONS IN REFLECTIVE SPACES.
AS SUCH, THE DESIGNER HAS TRIED TO OPTIMIZE INTELLIGIBILITY WHILE LIMITING
REFLECTIONS.
7. TARGET CIS SCORES IN WORK AREAS IS 0.80, AND 0.75 IN MECHANICAL AND CRAWL
SPACE AREAS.
8. DURING STIPA TESTING, THE INPUT SIGNAL MUST BE INJECTED INTO THE AMPLIFIER
VIA AUX AUDIO INPUT SO THAT THE RESULTING OUTPUT SIGNAL IS APPROXIMATELY
THE SAME VOLUME LEVEL AS PRE-RECORDED MESSAGES. THUS, THE VOICE
MESSAGE DBA LEVEL MUST BE MEASURED AT A PARTICULAR LOCATION AND THEN
THE STIPA INPUT ADJUSTED TO RESULT IN THE SAME SPEAKER OUTPUT LEVEL. THIS
CORRELATES THE STIPA INTELLIGIBILITY READINGS AS CLOSE AS FEASIBLE TO
ACTUAL PRE-RECORDED LEVELS.
9. INTELLIGIBILITY READINGS MUST BE TAKEN THROUGHOUT REPRESENTATIVE AREAS
AND DOCUMENTED ON DRAWINGS WITH BOTH THE AUDIBLE LEVELS AND CIS SCORES.
10. THREE READINGS ARE TO BE TAKEN AND AVERAGED FOR EACH LOCATION.
AC POWER FOR FIRE ALARM / MNS EQUIPMENT:
11. AC CIRCUITS MUST BE PROVIDED WITH RED LOCKING DEVICES AND CLEARLY
INDICATED AT FACU.
12. NO MORE THAN 3 FA/MNS PANELS ON ONE 20A CIRCUIT.
13. SURGE PROTECTION WITH ILLUMINATED STATUS LAMP IS TO BE PROVIDED FOR EACH
120VAC CIRCUIT.
13.1. SURGE PROTECTION MUST BE MOUNTED ADJACENT TO AND OUTSIDE OF ANY
FIRE ALARM CONTROL PANEL.
13.2. PROVIDE MINIMUM 3' LENGTH OF CIRCUIT BETWEEN SURGE PROTECTION AND
PROTECTED EQUIPMENT.
14. 120VAC CONDUIT MUST NOT BE RED.
CIRCUIT NOTES:
1. FIRE ALARM AND MNS NAC/SLC CIRCUITS MUST BE CLASS "B" WITH NO "T" TAPS
ALLOWED. SLC MUST BE CONTINUOUS PATH AND CAN BE DIVIDED BY ISOLATION
MODULES AS DETAILED.
2. SEE DETAIL FOR HYBRID CLASS A & B CIRCUIT AT MODULES IF UTILIZED, SUCH AS ONE
MODULE PER FLOOR / BUILDING.
3. PATHWAY SURVIVABILITY MUST BE LEVEL 1.
4. WHERE MORE THAN TWO (2) SLC, NAC, OR IDC CONDUITS WILL ENTER A SINGLE
PANEL OR WHERE THERE IS MORE THAN TWO (2) ADJACENT PANELS, A WIRE GUTTER
IS TO BE PROVIDED ABOVE THE PANEL FOR ADDITIONAL CONDUITS.
4.1. CONDUITS BETWEEN THE WIRE GUTTER AND PANELS TO BE INCREASED IN SIZE
TO MINIMIZE NUMBER OF CONDUITS.
4.2. TROUGHS SHOULD BE ABOVE CEILINGS IN FINISHED AREAS WITH MINIMUM
CONDUITS BETWEEN PANELS AND TROUGHS.
4.3. PANELS MUST NOT BE USED AS TERMINAL CABINETS OR PULL BOXES FOR
CIRCUITS PASSING THROUGH TO OTHER PANELS.
5. POWER LIMITED AND NON-POWER LIMITED CIRCUITS MUST NOT BE RUN IN SAME
RACEWAY OR WITHIN PANELS IN SPACES NOT APPROVED BY THE MANUFACTURER.
5.1. 120VAC CIRCUITS MUST NOT PASS THROUGH WIRE GUTTERS AND MUST ENTER
PANELS IN LOCATIONS DESIGNATED BY THE PANEL MANUFACTURER.
6. NO CONDUIT MAY ENTER THE BOTTOM SECTION OF A FIRE ALARM PANEL WHERE
BATTERIES ARE TO BE PLACED.
7. FIRE ALARM AND MNS CIRCUITS TO BE SOLID COPPER FPL/FPLR/FPLP UNLESS
OTHERWISE RECOMMENDED BY THE MFG.
8. PROVIDE FIBER BETWEEN MAIN PANELS IN ADJACENT BUILDINGS. PROVIDE
REDUNDANT / SPARE FIBERS IN EACH PULL.
9. ALL CIRCUITS RUNNING UNDERGROUND MUST BE LISTED FOR WET LOCATIONS.
10. EACH NOTIFICATION CIRCUITS IS TO BE LIMITED TO A SINGLE FLOOR AND NOT SERVE
MULTIPLE FLOORS.
11. EACH AMPLIFIER PANEL IS TO HAVE ONE SPARE SPEAKER CIRCUIT AVAILABLE FOR
TEMPORARY SWITCHING IF A CIRCUIT FAILS.
12. ALL FIELD-WIRING COLORS MUST BE THE SAME THROUGHOUT THE CIRCUIT TO WHICH
IT IS CONNECTED. DEVELOP A COLOR SCHEME AND SHOW ON SHOP DRAWINGS,
SUCH AS DIFFERENT COLORS FOR EACH CIRCUIT OR TYPE OF CIRCUIT.
13. WIRE PULLS ARE TO BE DEVICE TO DEVICE WITHOUT SPLICING. WIRING MUST EITHER
TERMINATE AT THE FIRE ALARM CONTROL PANEL, REMOTE POWER SUPPLY, OTHER
CABINETS OR A DEVICE.
13.1. ALL DEVICES MUST UTILIZE SCREW TERMINALS.
13.2. PULL ALL CONDUCTORS SPLICE FREE.
13.3. THE USE OF WIRE NUTS, CRIMPED CONNECTORS, OR TWISTING OF
CONDUCTORS IS PROHIBITED.
13.4. DO NOT USE TERMINAL STRIPS IN THE FIELD WIRING, SUCH AS IN-BETWEEN
DEVICES.
13.5. TERMINATION AT A DEVICE MUST BE A COMPLETE BREAK IN THE WIRE, DO NOT
LOOP THE WIRE AROUND THE SCREW.
14. UNLESS INDICATED OTHERWISE, THE FOLLOWING WIRE SIZE MUST BE USED:
14.1. SLC AND IDC: MINIMUM 18 AWG
14.2. NAC STROBE AND/OR TEXT SIGNS: MINIMUM 14 AWG
14.3. SPEAKER:MINIMUM 16 AWG
14.4. REMOTE ANNUNCIATOR, LOC DATA, TEXT SIGN CONTROL (RS485) PER MFG
RECOMMENDATIONS FOR DISTANCES OF PROJECT.
15. STROBE CIRCUITS AND SPEAKER CIRCUITS TO BE CALCULATED AS INDICATED.
15.1. AN ADDITIONAL 30'+ TO BE ADDED TO EACH DEVICE DISTANCE WHEN FLEX
DROPS ARE UTILIZED TO ACCOUNT FOR DROPS AND LOOPS IN JUNCTION BOXES
(DOWN/BACK). THIS DISTANCE MAY BE 15' WHEN CALCULATIONS DOUBLE
EITHER THE RESISTANCE OR THE DISTANCE. (EACH 6 FOOT FLEX ADDS 28' PER
DROP, DOWN & BACK WITH LOOPS).
15.2. VOLTAGE FOR STROBE CALCULATIONS MUST START AT 20.4 VOLTS AND MUST
NOT DROP BELOW 17 VOLTS (POINT-TO-POINT) ACCOUNTING FOR TOTAL
CIRCUIT PATH (OUT / BACK, AND DROPS / ELEVATION CHANGES).
15.3. VOLTAGE CALCS TO PROVIDE A SAFETY FACTOR OF AT LEAST 1 VOLT WHEN
POINT-TO-POINT CALCS ARE USED. NOT REQUIRED FOR LUMP-SUM
CALCULATIONS.
15.4. CONTRACTOR MUST PROVIDE VOLTAGE DROP CALCS FOR THEIR PARTICULAR
PRODUCTS.
15.5. BATTERY CALCULATIONS MUST ACCOUNT FOR 1.25% AGING FACTOR PER NFPA
72 10.6.7.2.14 (REVISED IN 2022 EDITION).
16. 70 VOLT SPEAKER CIRCUITS MUST BE USED TO MINIMIZE VOLTAGE DROP.
16.1. SPEAKER dB CALCULATIONS TO BE PERFORMED ACCOUNTING FOR DOUBLE THE
WATTAGE INDICATED ON FLOOR PLAN. THIS IS TO ACCOUNT FOR FIELD
ADJUSTMENTS AND SPARE CAPACITY.
16.2. IN NO CASE ARE SPEAKER CIRCUITS TO BE LOADED TO EXCEED A 5% DROP IN
VOLTAGE PER CALCULATIONS WITH DOUBLE ANTICIPATED WATTAGE USED IN
CALCS.
17. OTHER THAN SHORT DISTANCES SUCH AS AT PANEL AND TO WIRE GUTTERS,
SIGNALING LINE CIRCUITS ARE TO BE RUN IN SEPARATE RACEWAYS FROM
NOTIFICATION WIRING.
18. LOC CIRCUITS AND/OR CIRCUITS BETWEEN CONTROL PANELS (SUCH AS RS485,
VOICE, ETC.) MUST BE IN RACEWAYS SEPARATE FROM SLC AND NAC.
19. CONDUIT FILL CALCULATIONS MUST BE PROVIDED TO ENSURE THAT WIRE FILL DOES
NOT EXCEED 40% FILL OF THE CONDUIT. FP CABLES UP TO 14 AWG TO BE SIZED AS
#6 AWG FOR CONDUIT FILL UNLESS OTHERWISE INDICATED.
20. MINIMUM 3/4" EMT RED CONDUIT IS REQUIRED FOR ALL LOW-VOLTAGE CIRCUITS. 1"
RED CONDUIT MAY BE REQUIRED BASED ON CIRCUIT DESIGN. 120VAC CONDUIT WILL
NOT BE RED.
21. 3/4" FLEXIBLE METALLIC CONDUIT (FMC) MAY BE USED FOR DROPS TO DEVICES (SUCH
AS IN CEILINGS) TO A MAXIMUM OF 6' EACH.
21.1. A SINGLE DROP MUST BE PROVIDED DOWN/BACK TO DEVICE. DO NOT LOOP
DROPS TO DEVICES.
22. LIQUID TIGHT FLEXIBLE METALLIC CONDUIT (LTMC) AND FITTINGS MUST BE USED ON
THE EXTERIOR OR WET LOCATIONS (SUCH AS FOR SPEAKERS).
23. FLEXIBLE DROPS ARE NOT REQUIRED TO BE RED.
24. ALL CONDUIT MUST BE DEBURRED USING INTENDED CONDUIT REAMING TOOLS.
25. SCHEDULE 40 (MINIMUM) PVC IS TO BE USED WHEN RUNNING EXTERIOR CIRCUITS,
SUCH AS TO A PIV OR PUMP HOUSE.
26. SURGE PROTECTION IS REQUIRED FOR ALL FIRE ALARM CIRCUITS ENTERING /
LEAVING A BUILDING.
26.1. SURGE PROTECTION IS TO BE LOCATED JUST INSIDE THE BUILDING WHERE THE
CIRCUIT ENTERS THE BUILDING.
26.2. SURGE PROTECTION MUST HAVE PROPER GROUND CONDUCTOR PER THE MFG.
27. CONDUIT FITTINGS MUST BE OF THE COMPRESSION TYPE. SET SCREW NOT
PERMITTED.
28. UNLESS INDICATED, LOW-VOLTAGE FIRE ALARM AND MNS CONDUITS AND BACK
BOXES MUST BE RED DIPPED / PAINTED BY MFG.
28.1. WIRE TROUGHS AND LARGER JUNCTION BOXES MAY BE FIELD PAINTED RED.
28.2. COVERS MAY BE FIELD PAINTED RED.
28.3. EXPOSED CONDUITS IN A FINISHED ROOM MUST BE PAINTED TO MATCH WALL /
CEILING FINISH AND LABELED WITH A RED 3/4" BAND ON EACH SIDE OF A WALL.
THE INSIDE COVER OF PULL BOXES MUST BE LABELED AS "FIRE ALARM" WITH
THE INTERIOR OF THE BOX PAINTED RED.
29. ALL CONDUIT MUST BE CONCEALED, UNLESS REQUIRED TO BE RUN IN OPEN
EXPOSED AREAS.
30. MINIMUM 25 PERCENT SPARE AMPERAGE MUST BE PROVIDED ON EACH CIRCUIT OF
POWER SUPPLIES.
31. RACEWAY FILL MUST BE IN ACCORDANCE WITH NFPA 70. FORTY (40) PERCENT FILL
MUST NOT BE EXCEEDED.
32. PROVIDE SPARE CIRCUITS AS INDICATED.
FIRE ALARM DESIGN:
1. THESE DRAWINGS PROVIDE GENERAL SPACING AND LOCATION OF DEVICES. FINAL
LOCATIONS TO BE COORDINATED WITH OTHER SYSTEMS AND FIELD CONDITIONS TO
ENSURE COMPLIANCE WITH NFPA 72 AND PROJECT REQUIREMENTS.
2. CONTRACTOR TO PROVIDE FULLY DETAILED SHOP DRAWINGS IN ACCORDANCE WITH
NFPA 72 AND SPECIFICATIONS.
3. IN ADDITION TO SPECIFICATIONS, SHOP DRAWINGS WILL AT MINIMUM INCLUDE THE
FOLLOWING:
3.1. DEVICE LOCATIONS WITH CONDUIT ROUTING.
3.2. IDENTIFICATION OF CIRCUITS IN RESPECTIVE CONDUIT PATH TO ACCOUNT FOR
CONDUIT FILL.
3.3. RISER DIAGRAM THAT REFLECTS ALL PANELS, CONTROLLERS, MODULES,
BATTERY CABINETS, ETC. THAT WILL BE INSTALLED AND HOW THEY INTERACT
WITH EACH OTHER.
3.4. ELEVATION DIAGRAM TO SCALE SHOWING ALL PANELS AND LOCATIONS.
3.5. MOUNTING HEIGHTS IN ACCORDANCE WITH CONTRACT DRAWINGS,
SPECIFICATIONS, AND NFPA 72.
3.6. DETAILS OF CONNECTIONS TO CIRCUIT BOARDS FOR INSTALLATION AND
FUTURE SERVICE. INCLUDING SLC, NAC, SPEAKER CIRCUITS, LOC,
ANNUNCIATOR, ETC. BETWEEN PANELS AND EQUIPMENT.
3.7. MOUNTING AND BACK BOX DETAILS / REQUIREMENTS.
3.8. VOLTAGE CALCULATIONS BY CIRCUIT.
3.9. BATTERY CALCULATIONS.
3.10. PRODUCT CUT SHEETS FOR ALL COMPONENTS WITH OPTIONS IDENTIFIED.
BASIS OF DESIGN FOR CIRCUITS AND PHASING:
1. CONTRACT DRAWINGS MAY SHOW CONCEPTUAL DEVICES PER CIRCUITS TO
ESTABLISH CIRCUITS AND PANELS ANTICIPATED.
2. UNLESS INDICATED OTHERWISE, CONTRACTOR MAY MODIFY THE CIRCUIT PATHS,
DEVICES PER CIRCUIT, ETC. TO BETTER FACILITATE FIELD CONDITIONS OR PHASING.
3. PANEL LOCATIONS INDICATED ARE APPROXIMATE AND MUST BE MAINTAINED UNLESS
OTHERWISE APPROVED PRIOR TO SUBMITTING SHOP DRAWINGS.
SMOKE DETECTOR VERIFICATION:
1. SPOT SMOKE DETECTORS ARE TO BE PROVIDED WITH ALARM VERIFICATION
FEATURE.
2. INITIALLY SET VERIFICATION AT 20 SECONDS.
LABELING BATTERIES:
1. EVERY CABINET THAT HAS BACKUP BATTERIES MUST HAVE A LABEL THAT IS
PROMINENTLY DISPLAYED JUST ABOVE BATTERIES INDICATING THE VOLTAGE AND
AMP-HOUR OF BATTERIES REQUIRED IN THAT CABINET BASED ON CALCULATIONS.
2. EXAMPLE: "TWO-12-VOLT 35-AMP HOUR BATTERIES".
3. BATTERIES MUST HAVE MFG DATE PER NFPA 72, NOT DATE OF INSTALLATION.
4. BATTERIES MUST HAVE BEEN MANUFACTURED WITHIN 6 MONTHS OF OCCUPANCY.
ADDITIONAL SITE / PROJECT SPECIFIC REQUIREMENTS:
1. EXISTING EQUIPMENT IS EST-3. PROVIDE NEW EST-4 FOR BACKWARD COMPATIBILITY
WITH EXISTING EQUIPMENT.
QUALITY CONTROL FIRE PROTECTION ENGINEER:
1. A QUALITY CONTROL FIRE PROTECTION ENGINEER (QFPE) IS REQUIRED FOR THIS
PROJECT.
2. THE QFPE MUST NOT BE AN EMPLOYEE OF THE INSTALLING CONTRACTOR.
3. THE QFPE IS TO BE A PART OF THE GENERAL CONTRACTORS QUALITY CONTROL
TEAM.
3.1. IT IS RECOMMENDED THAT THE QFPE BE HIRED BY THE GENERAL CONTRACTOR.
3.2. IF THE FIRE ALARM AND/OR MASS NOTIFICATION SYSTEM ALSO REQUIRES THE
SERVICES OF A QFPE, THERE SHOULD BE A SINGLE QFPE PROVIDING
OVERSIGHT OF ALL FIRE PROTECTION SYSTEMS UNDER THE CONTROL AND
DIRECTION OF THE GENERAL CONTRACTOR.
4. THE QFPE MUST HAVE SPECIFIC DESIGN, INSPECTION, AND COMMISSIONING
EXPERIENCE IN FIRE PROTECTION SYSTEMS IDENTIFIED FOR THIS PROJECT.
5. UNLESS SPELLED OUT OTHERWISE, THE QFPE IS TO PROVIDE THE FOLLOWING
MINIMUM SERVICES:
5.1. PROVIDE OVERSIGHT IN THE DESIGN AND PREPARATION OF THE SYSTEM
INSTALLATION DRAWINGS.
5.2. PROVIDE A LETTER AND/OR STAMP ON DOCUMENTS INDICATING THAT DESIGN
OVERSIGHT HAS BEEN PROVIDED AND THAT THE DESIGN IS IN COMPLIANCE
WITH ALL CONTRACT REQUIREMENTS.
5.3. QFPE IS NOT REQUIRED TO SEAL THE DESIGN DOCUMENTS AS A DESIGNER OF
RECORD (DOR), BUT MUST SEAL A LETTER TO VALIDATE THEIR PE
QUALIFICATIONS.
5.4. PROVIDE CONSTRUCTION SITE VISITS TO VERIFY THE INSTALLATION IS IN
ACCORDANCE WITH CONTRACT AND SHOP DRAWING REQUIREMENTS. AT
MINIMUM THIS INCLUDES INSPECTION PRIOR TO CEILINGS BEING INSTALLED.
5.5. PROVIDE DOCUMENTATION OF PRE-TESTING AND COMMISSIONING PLAN AND
STEPS TO BE TAKEN TO VERIFY SYSTEM COMPLIANCE AT LEAST 30 DAYS PRIOR
TO PERFORMING PRE-TESTING.
5.6. PROVIDE PRE-TESTING INSPECTION AND EVALUATION TO ENSURE SYSTEM
COMPLIANCE PRIOR TO SCHEDULING A FINAL COMMISSIONING TEST WITH
CONTRACTING OFFICER.
5.7. BE PRESENT FOR FINAL COMMISSION TESTING WITH THE CONTRACTING
OFFICER AND DESIGNATED REPRESENTATIVES.
5.8. PROVIDE DOCUMENTATION OF ALL FINDINGS, CORRECTIVE ACTIONS, AND
RESULTS OF PRE-TESTING AND FINAL COMMISSIONING.
BID OPTION NOTES:
1. BID OPTIONS MAY INCLUDE A COVERED CANOPY.
2. THIS BID OPTION CAN ONLY BE EXERCISED IF A UTILITY WATER SUPPLY DEFICIENCY
IS RESOLVED TO SUPPORT A DRY-PIPE SYSTEM WATER DEMAND.
3. IF EXERCISED, THE SYSTEM MUST INCORPORATE A NITROGEN GENERATOR
MONITORED BY THE FIRE ALARM SYSTEM.
4. THE DRY-PIPE VALVE AND NITROGEN GENERATOR WILL BE LOCATED ON THE
MEZZANINE OF THE NEW LAB BUILDING WHERE SPRINKLER EQUIPMENT IS IDENTIFIED.
5. PROVIDE FIRE ALARM MONITORING OF VALVES, HIGH PRESSURE, LOW PRESSURE,
TRIP, AND NITROGEN TROUBLE/OFF-LINE.
PANEL PROGRAMMING:
FIRE ALARM PANEL MUST BE
PROGRAMMED USING ACTUAL ROOM
NUMBERS. COORDINATE WITH FACILITY
ROOM SIGNAGE.
ACCESS CONTROL:
ACCESS CONTROL MUST NOT PREVENT
UNRESTRICTED EGRESS FROM ANY AREA.
ALL SYSTEMS MUST COMPLY WITH NFPA
101, IBC, AND NFPA 72.
S p
SLC
CD W
P-C-D c
P-C-D
SIGNALING LINE CIRCUIT #
CD W
c
S
W c
CD
S SB
F
WF
M
FIRE ALARM &
MASS NOTIFICATION LEGEND
CEILING MOUNT 4" SPEAKER WITH INITIAL WATTAGE TAP
INDICATED
CEILING MOUNTED CLEAR STROBE, WHITE TRIM, "ALERT"
TEXT. CANDELA INDICATED
4" CEILING MOUNTED SPEAKER/ STROBE WITH CLEAR LENS,
WHITE TRIM, AND "ALERT" TEXT. CANDELA AND INITIAL
WATTAGE INDICATED.
SMOKE DETECTOR (PHOTOELECTRIC). SB=SOUNDER BASE;
DH=DOOR HOLD; EL=ELEVATOR
DUCT SMOKE DETECTOR; S=SUPPLY, R=RETURN
INCLUDE RELAYS, TUBES, ETC.
MANUAL PULL STATION 48" AFF TO TOP OF BOX
FLOW SWITCH MODULE
TAMPER SWITCH MODULE
RELAY / CONTROL MODULES AS NEEDED
EST-4 AUTOMATIC INTELLIGENT, ADDRESSABLE FIRE ALARM
CONTROL UNIT. USER MAINTAINABLE.
WALL MOUNT SPEAKER/STROBE CLEAR LENS, WHITE TRIM,
"ALERT" TEXT. AT ~96" TO TOP. CANDELA AND CIRCUITS
INDICATED
WALL MOUNT MASS NOTIFICATION / FIRE ALARM SPEAKER
AT ~96" TO TOP TO MATCH SPEAKER/STROBES.
WP=WEATHER PROOF BACKBOX AND SPEAKER.
BOOSTER AMPLIFIER 100W CABINET WITH MINIMUM
4-CLASS "B" CIRCUITS.
DIRECTIONAL LOUD SPEAKER WITH VARIABLE OUTPUT
WATTAGES. LISTED FOR WET LOCATIONS. PROVIDE LIQUID
TIGHT FLEX WITH DRIP LEG. WATTAGE INDICATED
LOCAL OPERATOR CONTROL PANEL
NOTIFICATION APPLIANCE CIRCUIT STROBE/ TEXT PANEL
CAPABLE OF 4 CLASS "B" CIRCUITS
WALL MOUNT CLEAR STROBE, WHITE TRIM, "ALERT" TEXT,
AT ~96" TO TOP.
NAC
FACU
MNSA
DOOR HOLD-OPEN MODULE AND ASSEMBLY. PROVIDE 24
VOLT DC HOLD OPEN ASSEMBLY.
LOCKED AS-BUILT CABINET SIZED TO HOLD SHOP
DRAWINGS, DATA SHEETS, MANUALS FOR PANELS.
CD W
S
W
SS
TS
DH
RM
CO CARBON MONOXIDE DETECTOR - STAND ALONE
F
ELECTRIC WATER FLOW BELL, 24V, LOCATED ABOVE FDC AT
96" ABOVE GRADE. ON DEDICATED NAC CIRCUIT TO ALARM
DURING WATER FLOW.
NOTE: THE PANEL SYMBOLS BELOW ARE NOT IN COMPLIANCE WITH
NFPA 170 AS WE FEEL IT IS MORE IMPORTANT THAT THEY BE SIZED
TO SCALE OF TYPICAL PANELS OF THEIR TYPE TO ENSURE
ADEQUATE WALL SPACE IS PROVIDED FOR EQUIPMENT. NFPA
SYMBOLS WOULD NOT PROVIDE THIS NECESSARY SCALE.
HEAD-END VOICE PANEL WITH AMPLIFIERS IF NOT
INCORPORATED IN FACU.ACU
MONITOR / CONTROL MODULES AS NEEDEDMM
EXTERNAL SURGE PROTECTION WITH TROUBLE MONITORSS
ISOLATION MODULE FOR SIGNALING LINE CIRCUITISO
FIRE ALARM REMOTE ANNUNCIATOR, RECESSED IN WALL.
PROVIDE JUNCTION BOX WITH COVER PLATE WHICH
INCLUDES 6" LOOPED CIRCUITS AND LABELS ON CIRCUITS.
SIZE ACCORDING TO CIRCUITS PER NEC.
LOC
J
TXT
BASIC "ANNUNCIATE" AND "EVACUATE" LED TEXT SIGN FOR
MNS. MINIMAL SECONDARY POWER FOR POWER BLIPS
(7AH). NO VISIBLE TEXT WHEN NOT ILLUMINATED.
FIRE ALARM CONDUIT FILL - RECOMMENDED MAXIMUM CONDUCTORS PER CONDUIT
CONDUIT SIZEFPL 2-14 AWGFPL 2-16 AWGFPL 2-18 AWGTHHN 14 AWGTFFN 16 AWGTFFN 18 AWG
3/4" 5 6 7 17 21 28 1" 7 10 12 28 34 45
NO GUARANTEE IS PROVIDED WITH USING THIS TABLE. CONTRACTOR IS RESPONSIBLE TO ESTABLISH CONDUIT SIZE BASED ON WHAT THEY CAN SAFELY AND EFFECTIVELY PULL WITHOUT EXCEEDING NEC
LIMITS FOR FILL, DISTANCES, AND/OR DAMAGING CIRCUITS.
TWISTED FPL / FPLR / FPLP CABLES ARE CONSIDERABLY MORE DIFFICULT TO PULL THROUGH CONDUIT
THAN COMPARABLE SMOOTH THHN / TFFN SINGLE CONDUCTOR WIRE. AS A RESULT THE VALUES
PRESENTED IN THIS TABLE ARE RECOMMENDED MAXIMUMS. THESE VALUES ARE CONSERVATIVE FROM CALCULATING 40% FILL BASED ON GENERALLY PUBLISHED OUTSIDE CABLE DIMENSIONS. WIRE PULLING
LUBRICANT IS RECOMMENDED WHEN NEARING FILL QUANTITIES AND ON LONGER PULLS TO MINIMIZE
DAMAGE SUCH AS SHORTS & GROUND FAULTS ON CIRCUITS.
FPL / FPLR / FPLP CAN BE USED INTERCHANGEABLY PER THIS TABLE. VALUES INDICATE 2-CONDUCTOR CABLES (i.e. 2-14 AWG). SOME CABLES SUCH AS FPLP MAY PULL EASIER THAN FPL BASED ON OUTER
SHEATH.
CONTRACTOR TO ESTABLISH CONDUIT SIZE VS. RUNNING ADDITIONAL CONDUITS. ADDITIONAL
CONDUITS CAN REDUCE VOLTAGE DROP AND REDUCE CIRCUIT LENGTHS / NUMBER OF CIRCUITS.
JUNCTION BOX / PULL BOX CONDUCTOR FILL
CONTRACTOR TO ACCOUNT FOR THE NUMBER OF CIRCUITS PERMITTED WITHIN A JUNCTION BOX.
EXTENSION RINGS ARE NOT ALLOWED IN LIEU OF PROPERLY SIZING BOXES OR NUMBER OF
CONDUCTORS ENTERING THE BOX. THE FOLLOWING SUMMARIZES ALLOWABLE CIRCUITS PER BOX.
4" SQUARE 1-1/2" DEEP BOX 10- #14AWG 12- #16AWG 14- #18AWG
THESE VALUES DO NOT
ACCOUNT FOR BOXES WITH
MOUNTED DEVICES OR
MIXED CIRCUIT SIZES.
4" SQUARE 2-1/8" DEEP BOX 15- #14AWG 17- #16AWG 20- #18AWG
CIRCUITS TO BE PULLED SPLICE FREE AND WITHOUT "T" TAPS. THIS WILL
REQUIRE SOME CONDUITS TO HAVE TWO CIRCUITS (TO & BACK) FROM A
DEVICE TO CONTINUE TO NEXT DEVICE.
CELL BASED DACT OFF-SITE REPORTING TO CENTRAL
STATION MONITORING.TRC
RAP
TXT
STRANDED IS NOT
PERMITTED THIS PROJECT
FAULT ISOLATION
MODULE
ZONE - A
FROM ADJACENT
FACU TO NEXT MODULE OR
RETURN TO FACU
TO ISOLATED
SLC ZONE - A
FAULT ISOLATION
MODULE
ZONE - B
TO ISOLATED
SLC ZONE - B
THIS DETAIL UTILIZES A HYBRID CLASS A / B APPROACH
WITH LIMITED "T-TAPS" PERMITTED ON THE CLASS-A
CIRCUIT ADJACENT TO FACU. THIS APPROACH
PROVIDES FOR AN ENHANCED SYSTEM RELIABILITY
WITH VERY LITTLE ADDED COST VS. FULL-BUILDING
CLASS-A DESIGN.
THIS APPROACH ALLOWS CLASS-B SIGNALING LINE
CIRCUITS TO GO IN DIFFERENT DIRECTIONS ISOLATING
SMALLER ZONES RATHER THAN RUNNING ONE LONG
SLC THROUGHOUT ENTIRE BUILDING. ENHANCING
RELIABILITY AT LOWER CONDUIT AND CIRCUIT COSTS
OF OTHERWISE ZIG-ZAGING ACROSS BUILDING.
PROVIDE CLASS-A SIGNALING LINE CIRCUIT ADJACENT
TO FACU TO SERVE INDIVIDUAL ZONE ISOLATION
MODULES. THESE MODULES WILL PROVIDE CLASS-B
SIGNALING LINE CIRCUITS TO RESPECTIVE ZONES /
FLOOR AREAS AS IDENTIFIED ELSEWHERE.
FA-001
FIRE ALARM NOTES AND LEGEND
H S
P
UC
CF
L
KEY PLAN
BP
C
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATEc P.A.
FIRM
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
THE
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson M Adams
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
USDA AGRICULTURAL RESEARCH SERVICE
SUGARCANE RESEARCH LABORATORY
HOUMA, LOUISIANA
17605/20/2026
REH
SWL
BT/DW FACILITIES ENGINEERING BRANCH
5106 SUNNYSIDE AVENUE
BELTSVILLE, MD 20705-5100
XXX
WN
XXX
CM
JS
5/20/26
LAB/OFFICE
SCALE:
CONDUIT FILL CONCEPT
NTS
FA-001 SCALE:
HYBRID CLASS A / B ZONE ISOLATION MODULES
NTS
FA-001
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE 1038
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE 1008
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
ROOM LEGEND
ROOM NO ROOM NAME
STORAGE
STORAGE
MEETING ROOM
PREP
JANITORIAL
CORRIDOR
CORRIDOR
WOMEN
MEN
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
SMALL CONFERENCE
CORRIDOR
TECH OFFICE
TECH OFFICE
TECH OFFICE
CAT 3 OFFICE
CAT 3 OFFICE
TECHNICIAN OFFICE
TECHNICIAN OFFICE
CORRIDOR
STORAGE
PLANT PHYSIOLOGY / SOILS
SUPPORT
SUPPORT
HALL
SCOPE
SCOPE
SHARED EQUIPMENT ROOM
SUPPORT
STORAGE
SUPPORT
SERVICE / UTILITY CORRIDOR
HALL
BSL-2 LABORATORY
SUPPORT
PATHOLOGY / MOLECULAR GENETICS (CLEAN)
PATHOLOGY / MOLECULAR GENETICS (DIRTY)
FILES
BREAK ROOM
POST-DOC / TECHICAL OFFICE
MAIL / WORK ROOM
ENTRY LOBBY
CORRIDOR
TECH OFFICE
TECH OFFICE
TECH OFFICE
PROGRAM ASSISTANT
RESEARCH LEADER
OFFICE
OFFICE
OFFICE
CORRIDOR
SPACE
15 1/4 c
15 1/4 c
15 1/4 c
15 1/4 c
15 1/4 c
1/4 c
1/4 c
1/4 c
1/4 c
1/4 c
1/4 c
1/4 c
1/4 c
S 1/4 c S 1/4 c S 1/4 cS 1/4 c
S 1/4 c
S 1/4 c
S 1/4 c
S 1/4 c
S 1/4 c
S 1/4 c
S 1/4 c
S 1/4 c
S 1/4 c
S 1/4 cS 1/4 cS 1/4 cS 1/4 cS 1/4 cS 1/4 cS 1/4 c
15 1/4 c
S 1/4 c S 1/4 c S 1/4 c
1/4c
1/4c
1/4c
1/4c
1/4 c
1/4 c
15 1/4 c
75 1/4 c
15 1/4 c
1/4 c
1/4c
15 1/4 c
1/4c
1/4c
1 c
1/4c
1/4c
15 1/4 c
15 1/4 c
F
F F FF
F
LO
C1
LOC
S 1/4 c
S 1/4 c
NO SPEAKER TO AVOID
FEEDBACK OVER LOC
NO SPEAKER TO AVOID
FEEDBACK OVER LOC
RAP
S 1/4 c
F
15 1/4 c
S 1/4 c S 1/4 c S 1/4 c
15 1/4 c
WATER FLOW BELL (ACROSS FROM EXISTING FDC)
EXISTING
FDC
FA-101
FIRST FLOOR FIRE ALARM PLAN
H S
P
UC
CF
L
KEY PLAN
BP
C
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATEc P.A.
FIRM
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
THE
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson M Adams
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
USDA AGRICULTURAL RESEARCH SERVICE
SUGARCANE RESEARCH LABORATORY
HOUMA, LOUISIANA
17605/20/2026
REH
SWL
BT/DW FACILITIES ENGINEERING BRANCH
5106 SUNNYSIDE AVENUE
BELTSVILLE, MD 20705-5100
XXX
WN
XXX
CM
JS
5/20/26
LAB/OFFICE
SCALE:
FIRST FLOOR FIRE ALARM PLAN
1/8"=1'-0"
FA-101
PLAN
NORTH
TRUE
NORTH
08' 8'
1'-0"
4'
SCALE: 1/8" =
F F
1 c
1/4 c
0.8 M
M
1/4c
30 3030
S p
S p
FA
CU
NA
C
V1
AC
U
TE
XT
T1
SS
SS
SPRINKLER EQUIP.
WFTS WFTS
PROVIDE ADDITIONAL MONITORING
FOR DRY-PIPE SYSTEM AND
NITROGEN GENERATOR IF CANOPY
OPTION EXERCISED.
RUN FIBER / CIRCUIT PATH
BETWEEN BUILDINGS.
EXISTING HEADHOUSE BUILDING
SEE ARCHITECTURAL
DRAWINGS FOR THIS AREA AS
SOME AREAS ARE OPEN TO
BELOW AND WILL REQUIRE
HIGH LEVEL SPRINKLERS.
9'- 0"
'-0
ASSUMED PROPERTY LINE
BETWEEN BUILDINGS
ROOM LEGEND
ROOM NO ROOM NAME
SERVICE / UTILITY CORRIDOR
MECHANICAL PENTHOUSE
COMMUNICATIONS
ELECTRICAL ROOM
STORAGE
CORRIDOR
EXISTING HEADHOUSE BUILDING EXISTING HEADHOUSE BUILDING
NEW CONNECTION CORRIDOR
BETWEEN BUILDINGS
FA-102
SECOND FLOOR FIRE ALARM PLAN
H S
P
UC
CF
L
KEY PLAN
BP
C
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATEc P.A.
FIRM
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
THE
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson M Adams
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
USDA AGRICULTURAL RESEARCH SERVICE
SUGARCANE RESEARCH LABORATORY
HOUMA, LOUISIANA
17605/20/2026
REH
SWL
BT/DW FACILITIES ENGINEERING BRANCH
5106 SUNNYSIDE AVENUE
BELTSVILLE, MD 20705-5100
XXX
WN
XXX
CM
JS
5/20/26
LAB/OFFICE
SCALE:
SECOND FLOOR FIRE ALARM PLAN
1/8"=1'-0"
FA-102
PLAN
NORTH
TRUE
NORTH
08' 8'
1'-0"
BASIS FOR DESIGN
LOCATION
NO. OF SPRINKLERSNO. OF SPRINKLERS
1. DENSITY
SYSTEM DEMAND
3. STATIC PRESSURE
AT THE BASE OF
OF DISCHARGE
2. DESIGNED AREA
1. WATER FLOW RATE
THE RISER
2. RESIDUAL PRESSURE
AUTOMATIC SPRINKLER SYSTEM
BY A HYDRAULICALLY DESIGNED
THIS BUILDING IS PROTECTED
HYDRAULIC SYSTEM
ECCENTRIC REDUCER
FS
PUMP
PANEL
CONTROLPS PS
FIRE
BYPASS
LINE
MAIN DRAIN VALVE
TO FLOOR DRAIN
2" DRAIN THROUGH
EXTERIOR WALL
FS
1 1/2
DRIP CHECK
BACKFLOW PREVENTER
6" DOUBLE CHECK
6"
6"
CHECK VALVE, TYPICAL
TAMPER SWITCH, TYPICAL
OS&Y VALVE WITH
6"
DRAIN
TO FLOOR
CONTROL PANEL
TO PUMP
MAIN FIRE
PUMP
JOCKEY FIRE
PUMP
6"
ZONE 1 - EXISTING HEADHOUSE
WET PIPE SPRINKLER
ZONE 2 - NEW LAB BUILDING
SUPPLY ZONE (NEW VALVE)
HOSE VALVE MANIFOLD
WITH HOSE VALVES, SIZE &
NUMBER PER NFPA 20
4" TO FIRE
DEPARTMENT CONNECTION
SEE FLOOR PLANS
DRIP
CHECK
DRAIN CUP
PRESSURE GAGE WITH SHUT OFF COCK
FIRE PROTECTION PIPING
FS FLOW SWITCH
OS&Y VALVE WITH TAMPER SWITCH
DRIP CHECK VALVE
SWING GATE CHECK VALVE
FP
ZONE RISER
FIRE PROTECTION LEGEND FOR THIS SHEET
POST INDICATOR VALVE
OS & Y
OS & Y WITH TAMPER SWITCH
ANGLE VALVE WITH DRAIN
SECTIONAL VALVE WITH DRAIN
SCALE:
SYSTEM IDENTIFICATION
NOT TO SCALE
FP-001
SCALE:
EXISTING SERVICE ENTRANCE AND ZONE RISERS
NOT TO SCALE
FP-001
GENERAL SPRINKLER NOTES:
1. SYSTEM MUST COMPLY WITH NFPA 13, LATEST EDITION AT TIME OF SOLICITATION.
2. UNLESS INDICATED OTHERWISE, LIMITED SPRINKLER PIPING AND SPRINKLERS ARE
SHOWN TO ESTABLISH REMOTE AREA FIRE FLOW DEMAND CALCS AND / COST
ESTIMATING.
3. CONTRACTOR IS TO PERFORM HYDRAULIC CALCULATIONS AND ESTABLISH PIPE SIZING
FOR SYSTEM.
4. REPLACE EXISTING FIRE PUMP CONTROLLER AND TRANSFER SWITCH.
5. LOCAL BUILDING AND FIRE PERMITS ARE NOT REQUIRED. FIRE DEPARTMENT WOULD LIKE
TO BE NOTIFIED AND ALLOWED TO INSPECT THE PROJECT FOR PRE-PLANNING
FUNCTIONS.
QUALITY CONTROL FIRE PROTECTION ENGINEER:
1. A QUALITY CONTROL FIRE PROTECTION ENGINEER (QFPE) IS REQUIRED FOR THIS
PROJECT.
2. THE QFPE MUST NOT BE AN EMPLOYEE OF THE INSTALLING CONTRACTOR.
3. THE QFPE IS TO BE A PART OF THE GENERAL CONTRACTORS QUALITY CONTROL TEAM.
3.1. IT IS RECOMMENDED THAT THE QFPE BE HIRED BY THE GENERAL CONTRACTOR.
3.2. IF THE FIRE ALARM AND/OR MASS NOTIFICATION SYSTEM ALSO REQUIRES THE
SERVICES OF A QFPE, THERE SHOULD BE A SINGLE QFPE PROVIDING OVERSIGHT OF
ALL FIRE PROTECTION SYSTEMS UNDER THE CONTROL AND DIRECTION OF THE
GENERAL CONTRACTOR.
4. THE QFPE MUST HAVE SPECIFIC DESIGN, INSPECTION, AND COMMISSIONING EXPERIENCE
IN FIRE PROTECTION SYSTEMS IDENTIFIED FOR THIS PROJECT.
5. UNLESS SPELLED OUT OTHERWISE, THE QFPE IS TO PROVIDE THE FOLLOWING MINIMUM
SERVICES:
5.1. PROVIDE OVERSIGHT IN THE DESIGN AND PREPARATION OF THE SYSTEM
INSTALLATION DRAWINGS.
5.2. PROVIDE A LETTER AND/OR STAMP ON DOCUMENTS INDICATING THAT DESIGN
OVERSIGHT HAS BEEN PROVIDED AND THAT THE DESIGN IS IN COMPLIANCE WITH
ALL CONTRACT REQUIREMENTS.
5.3. QFPE IS NOT REQUIRED TO SEAL THE DESIGN DOCUMENTS AS A DESIGNER OF
RECORD (DOR), BUT MUST SEAL A LETTER TO VALIDATE THEIR PE QUALIFICATIONS.
5.4. PROVIDE CONSTRUCTION SITE VISITS TO VERIFY THE INSTALLATION IS IN
ACCORDANCE WITH CONTRACT AND SHOP DRAWING REQUIREMENTS. AT MINIMUM
THIS INCLUDES INSPECTION PRIOR TO CEILINGS BEING INSTALLED.
5.5. PROVIDE DOCUMENTATION OF PRE-TESTING AND COMMISSIONING PLAN AND STEPS
TO BE TAKEN TO VERIFY SYSTEM COMPLIANCE AT LEAST 30 DAYS PRIOR TO
PERFORMING PRE-TESTING.
5.6. PROVIDE PRE-TESTING INSPECTION AND EVALUATION TO ENSURE SYSTEM
COMPLIANCE PRIOR TO SCHEDULING A FINAL COMMISSIONING TEST WITH
CONTRACTING OFFICER.
5.7. BE PRESENT FOR FINAL COMMISSION TESTING WITH THE CONTRACTING OFFICER
AND DESIGNATED REPRESENTATIVES.
5.8. PROVIDE DOCUMENTATION OF ALL FINDINGS, CORRECTIVE ACTIONS, AND RESULTS
OF PRE-TESTING AND FINAL COMMISSIONING.
RISER NOTES:
1. HEADHOUSE HAS AN EXISTING FIRE PUMP THAT IS TO ALSO SERVE THE NEW LAB AND
OFFICE BUILDING.
2. PIPING BETWEEN THE BUILDING MUST BE INSTALLED TO PREVENT FREEZING AND
INCLUDE SOURCES OF HEAT.
3. PROVIDE ISOLATION VALVE IN PUMP ROOM FOR NEW LAB BUILDING, IN ADDITION TO ZONE
VALVES IN LAB BUILDING ON MEZZANINE.
4. RISER AND ALL ASSOCIATED VALVES / EQUIPMENT ARE TO BE LOCATED TO PROVIDE A
MINIMUM OF 36 INCHES CLEAR WORKING SPACE.
5. IN ACCORDANCE WITH NFPA 13, A HYDRAULIC PLACARD AND INFORMATION PLACARD IS
TO BE PROVIDED. INFORMATION MUST BE PRESENTED IN A MANNER THAT WILL NOT
FADE. NON PIGMENT MARKERS ARE NOT ALLOWED.
6. PROVIDE ELECTRONIC 24-VOLT DC BELL FOR WATER FLOW DEDICATED TO LAB BUILDING
ZONES.
6.1. BELL IS TO BE CONFIGURED TO CONTINUOUSLY RING WHILE SPRINKLER WATER IS
FLOWING.
6.2. UNLESS INDICATED OTHERWISE, THE BELL IS TO BE LOCATED ABOVE OR NEAR THE
FIRE DEPARTMENT CONNECTION TO HELP IDENTIFY FDC TO FIRE DEPARTMENT.
7. FIRE DEPARTMENT CONNECTION IS EXISTING. PROVIDE NEW SIGNAGE UNDER EXTERIOR
STAIRS TO IDENTIFY LOCATION OF FDC.
8. ALL DRAINS ARE TO BE PIPED TO THE EXTERIOR.
8.1. PROVIDE A SPLASH BLOCK TO PREVENT EROSION.
8.2. PROVIDE PROVISIONS SO THAT MAIN-DRAIN TESTING WILL NOT ERODE
LANDSCAPING.
8.3. DRAIN MUST NOT BE IN A LOCATION THAT STAINING WILL BE OBTRUSIVE, SUCH AS
NEAR A MAIN BUILDING ENTRANCE.
9. EVERY VALVE MUST HAVE A SIGN INDICATING FUNCTION AND NORMALLY OPEN OR
NORMALLY CLOSED POSITION.
9.1. THIS INCLUDES MAIN VALVES, MAIN DRAINS, ALARM TRIM VALVE, AIR MAINTENANCE
VALVES, AUXILIARY DRAIN VALVES, INSPECTOR TEST VALVES, PRIMING VALVES, ETC.
9.2. SIGNAGE MUST BE PRINTED IN A MANNER THAT WILL NOT FADE.
9.3. THE USE OF PERMANENT INK MARKER THAT DOES NOT CONTAIN A FADE-RESISTANT
PIGMENT IS NOT ALLOWED.
FIRE PUMP NOTES:
1. THE FIRE PUMP WITHIN HEADHOUSE IS EXISTING.
2. PUMP IS RATED AT 75 PSI @ 500 GPM.
3. CURRENT WATER SUPPLY AT TIME OF ISSUING DOCUMENTS CANNOT SUPPORT FLOW
OVER 520 GPM AT 20 PSI. AS SUCH, STREET PRESSURE MUST BE MONITORED DURING
PUMP TESTING. UTILITY COMPANY INDICATES THEY HAVE A VALVE CLOSED AND PUMPS
OFF-LINE. FIRE DEPARTMENT IS AWARE OF CONDITIONS.
4. CONTRACTOR IS TO FIELD VERIFY ALL CONDITIONS.
5. SEE KEY PLAN ON THIS DRAWING FOR APPROXIMATE SPRINKLER MAIN ROUTING, FIRE
PUMP LOCATION, AND FDC LOCATION.
6. REPLACE FIRE PUMP CONTROLLER AND TRANSFER SWITCH PER NOTES.
7. SEE PUMP CONTROLLER DATA ON SHEET FP-101.
SPRINKLER HEAD GENERAL NOTES:
1. UNLESS INDICATED OTHERWISE THE FOLLOWING SUB-SECTIONS APPLY:
1.1. ALL SPRINKLERS ARE TO BE QUICK RESPONSE
1.2. SPRINKLER TEMPERATURES ARE TO BE IN ACCORDANCE WITH NFPA 13 FOR THE
SPACE AND HEAT SOURCES IN THE AREA OF THE SPRINKLERS.
1.3. SPRINKLER HEADS FOR ORDINARY HAZARD SPACES ARE TO BE K=8 WITH 3/4"
THREADS.
1.4. PENDENT SPRINKLERS ARE TO BE SEMI-RECESSED WITH CHROME FINISH.
1.5. SPRINKLERS IN COMMUNICATION CLOSETS, JANITOR CLOSETS, ELECTRICAL ROOMS,
OR SERVER ROOMS ARE TO HAVE CONCEALED HEADS WITHIN A FINISHED CEILING,
OR UPRIGHT HEADS WITH APPROVED GUARDS IN OPEN EXPOSED ROOMS.
1.6. ANY LOCATION IN WHICH A DRY-BARREL SPRINKLER IS INSTALLED MUST BE
INSTALLED TO EASILY FACILITATE REMOVAL / REPLACEMENT EVERY 20 YEARS PER
NFPA 25. AS SUCH, PROVISIONS ARE TO BE PROVIDED AS NEEDED TO APPLY
WRENCHES ON THE BACK-SIDE OF THE FITTING / PIPPING THAT THE SPRINKLER IS
INSTALLED.
1.7. DRY-BARREL STYLE FLEXIBLE SPRINKLERS ARE PROHIBITED.
1.8. FLEXIBLE SPRINKLER DROPS FOR WET-PIPE SYSTEMS ARE PERMITTED AS FOLLOWS:
1.8.1. ONLY BRAIDED HOSES ARE ALLOWED.
1.8.2. FLEXIBLE SEGMENT IS LIMITED TO 48 INCHES.
1.8.3. CEILING GRID BRACKETS MUST BE SUBSTANTIAL TO PREVENT THE SPRINKLER
HEAD FROM ROTATING IN THE CEILING GRID PREVENTING A COMPLETELY
FLUSH ESCUTCHEON.
1.8.4. HYDRAULIC CALCS MUST VALIDATE THE FRICTION LOSS.
1.8.5. SHOP DRAWINGS MUST SPECIFICALLY IDENTIFY THE BRAND, SIZE, NUMBER OF
BENDS ALLOWED, AND LENGTH OF HEAD USED IN CALCULATIONS TO BE
VERIFIED IN THE INSTALLATION.
2. ALL SPRINKLER HEADS IN SUSPENDED CEILINGS ARE TO BE CENTER OF TILE.
3. SPRINKLER HEADS IN HARD-LID CEILINGS ARE TO BE COORDINATED WITH OTHER
SYSTEMS (LIGHTS, VENTS, FIRE ALARM, ETC.) AS MUCH AS POSSIBLE WHILE ACHIEVING
CODE CRITERIA.
SPRINKLER DENSITY / AREA / CALCS:
1. SEE SCHEDULES FOR DENSITY BY ROOM / AREA.
2. PROVIDE OUTSIDE HOSE DEMAND PER NFPA 13.
3. SEE FIRE FLOW DATA ON THIS SHEET FOR BIDDING.
4. CONTRACTOR TO PERFORM AN ADDITIONAL FLOW TEST WITHIN 6 MONTHS OF
SUBMITTING CALCULATIONS. CALCULATIONS TO BE BASED ON WORST CASE OF THE TWO
FLOW TESTS.
5. CONTRACTOR IS TO PROVIDE PIPE SIZES WHERE SPECIFICALLY INDICATED. IF NOT
INDICATED, THE CONTRACTOR IS TO SIZE PIPING BASED ON CALCULATIONS.
6. ABOVE GROUND VELOCITY NOT TO EXCEED 25 FPS WITH UNDERGROUND VELOCITY NOT
TO EXCEED 10 FPS.
7. PROVIDE 10 PSI SAFETY MARGIN. THIS AREA WILL HAVE CONTINUED GROWTH AND
DEMAND ON THE EXISTING WATER SYSTEM.
8. AREA REDUCTIONS FOR QUICK RESPONSE HEADS ARE NOT ALLOWED.
9. SMALL ROOM SPACING IS PERMITTED IN ACCORDANCE WITH NFPA 13.
10. SYSTEM MAINS ARE TO BE NOT LESS THAN 2.5", SUCH AS EXTENDING TO THE END OF A
CORRIDOR.
SPRINKLER MATERIALS NOTES:
1. PROVIDE INSPECTOR TEST AND DRAIN WHICH INCORPORATES PRESSURE RELIEF WITHIN
RISER ROOM OR READILY ACCESSIBLE AREAS.
1.1. ADDITIONAL PRESSURE RELIEF APPLIES TO SUB-ZONES.
2. PROVIDE AIR VENT PER NFPA 13 ON HIGH POINT OF SYSTEM WITH DRAIN PIPED TO AN
EXTERIOR LOCATION.
2.1. ADDITIONAL AIR VENT APPLIES TO SUB-ZONES.
3. ALL DRAINS, INCLUDING AUX. DRAINS FOR TRAPPED WATER MUST BE PIPED TO EXTERIOR
OF BUILDING WITH SPLASH BLOCKS.
4. FDC IS EXISTING TO PUMP MANIFOLD.
5. ABOVE GROUND PIPE 2.5" AND LARGER TO BE BLACK STEEL SCHEDULE 10 OR SCHEDULE
40.
6. PIPE 2" OR SMALLER TO BE BLACK STEEL SCHEDULE 40.
7. THIN-WALL ALTERNATE PIPES ARE NOT PERMITTED.
8. ALL GROOVED FITTINGS TO BE OF SAME BRAND.
9. ALL REDUCER FITTINGS TO BE CONCENTRIC.
10. NO WET PIPE IS TO BE INSTALLED WITHIN AN EXTERIOR WALL THAT COULD BE SUBJECT
TO FREEZING TEMPERATURES.
10.1. WHERE A SECTION OF PIPE MUST BE RUN DOWN AN EXTERIOR WALL TO DRAIN, THE
POINT OF ISOLATION (VALVE) MUST BE LOCATED ABOVE A CEILING OR OTHER SPACE
NOT SUBJECT TO FREEZING WITH ONLY DRY PIPE BEING WITHIN THE WALL
ENCLOSURE.
SHOP DRAWINGS AND SUBMITTALS:
1. DETAILED SHOP DRAWINGS ARE TO BE PROVIDED IN ACCORDANCE WITH NFPA 13 AND
SPECIFICATIONS.
2. IN ADDITION TO CRITERIA IN SPECIFICATIONS, ENSURE SUBMITTALS INCLUDE AT MINIMUM
THE CRITERIA IN THIS SECTION.
2.1. FLOOR PLANS INCLUDING SIZES, REMOTE AREA DEMANDS, HANGER CRITERIA,
ELEVATION CHANGES, PIPE ELEVATIONS, AND BRACING.
2.2. ELEVATION VIEW CROSS SECTION OF TYPICAL MAIN AND BRANCH LINE ELEVATIONS.
2.3. RISER DETAIL
2.4. LOCATION OF RELIEF VALVES AND AIR VENTS.
2.5. LOCATION OF AUXILIARY DRAINS TO APPROVED LOCATIONS ENSURING THAT NO
WET PIPE IS WITHIN AN EXTERIOR WALL.
2.6. REVIEW AND LETTER FROM QFPE WHEN INDICATED.
TESTING AND INSPECTIONS:
1. ALL TESTING TO BE IN ACCORDANCE WITH NFPA 13 AND NFPA 24.
2. PRESSURE TEST PIPING AT 200 LBS FOR MINIMUM 2-HR. PROVIDE THIRD-PARTY WITNESS
AND CONTACT INFORMATION.
SPECIFIC SITE CONDITIONS:
1. CONTRACTOR TO COMPLY WITH LOCAL JURISDICTION REQUIREMENTS.
2. CONTRACTOR TO INCLUDE FEES AND SUBMIT FOR ALL LOCAL PERMITS AND INSPECTIONS
AS MAY BE APPLICABLE.
BID OPTION NOTES:
1. BID OPTION #1 MAY INCLUDE A COVERED CANOPY.
2. THIS BID OPTION CAN ONLY BE EXECUTED IF A UTILITY WATER SUPPLY DEFICIENCY IS
RESOLVED TO SUPPORT A DRY-PIPE SYSTEM OF OH1 / 1,950 FT2. THE CURRENT WATER
SUPPLY CANNOT SUPPORT THE INCREASED AREA OF DRY SYSTEM.
3. IF EXERCISED, THE SYSTEM MUST INCORPORATE A NITROGEN GENERATOR ON THE
MEZZANINE WITH LAB BUILDING SPRINKLER ZONE VALVES AND MONITORED BY THE FIRE
ALARM SYSTEM.
4. C-FACTOR OF DRY-PIPE MAY BE 120 IN ACCORDANCE WITH NFPA 13 UTILIZING NITROGEN.
5. WATER SUPPLY IS A CONCERN. SYSTEM MUST BE CAREFULLY BALANCED BETWEEN
PRESSURES AND FLOWS FOR THE AVAILABLE SUPPLY.
6. THE DRY-PIPE VALVE AND NITROGEN GENERATOR WILL BE LOCATED ON THE MEZZANINE
OF THE NEW LAB BUILDING WHERE SPRINKLER EQUIPMENT IS IDENTIFIED.
7. COORDINATE WITH ELECTRICAL FOR LARGER CIRCUITS IF NITROGEN GENERATOR
REQUIRES > 20AMP 120VAC CIRCUIT.
8. GALVANIZED PIPE CANNOT BE USED.
9. ALL PIPING MUST BE CLEANED, PRIMED, AND PAINTED RED ENAMEL WITH UV PROTECTED
PIGMENTS FOR EXTERIOR USE.
10. PIPE MUST BE SLOPED PER NFPA 13 WITH DRUM DRIP DRAINS PROVIDED.
11. PROVIDE SPRINKLER PROTECTION OVER AND UNDER THE CONNECTING WALKWAY IF BID
OPTION #1 IS EXECUTED.
12. PROVIDE FIRE ALARM MONITORING OF VALVES, HIGH PRESSURE, LOW PRESSURE, TRIP,
AND NITROGEN TROUBLE/OFF-LINE.
THE INFORMATION IN THIS DETAIL IS FROM ORIGINAL
HEADHOUSE DESIGN DOCUMENTS. CONTRACTOR IS
RESPONSIBLE TO FIELD VERIFY ALL EXISTING
CONDITIONS.
SCALE:
PRELIMINARY WATER SUPPLY AND DEMAND
NOT TO SCALE
FP-001
SECURE HYDRAULIC CALC DATA TO RISER PIPE AT
FIRE PUMP MANIFOLD AND ALSO AT SECOND FLOOR
ZONE VALVES IN NEW LAB BUILDING. ALSO PROVIDE
INFORMATION SHEET AS REQUIRED BY NFPA 13 AT
PUMP ROOM RISER.
6" SUPPLY RUNS OVERHEAD TO OTHER SIDE OF BUILDING WHERE IT TURNS DOWN AND OUT
BETWEEN HEADHOUSE AND GREEN HOUSE BUILDINGS. SEE ORIGINAL SPRINKLER CONTRACTOR
DRAWINGS FOR CONCEPT ROUTING.
FIRE FLOW TEST WAS PERFORMED ON 4/16/2026. NOTE THAT THE AVAILABLE WATER ONLY ALLOWS FOR A FLOW OF 520 GPM AT 20 PSI. AS SUCH, THE FIRE PUMP CANNOT BE TESTED AT RATED FLOW. SUCTION PRESSURES MUST BE MONITORED AT THE STREET TO MAINTAIN 20 PSI IN SYSTEM. WHEN PERFORMING A FIRE FLOW TEST THE TEST PRESSURE MUST BE MONITORED TO MAINTAIN ABOVE 20 PSI. THIS MAY CAUSE A CHALLENGE WITH FULL OPERATION OF THE FLOW HYDRANT TO PROPERLY SEAT DRAIN VALVE. UTILITY PROVIDER WAS PRESENT AND AWARE OF WATER SUPPLY ISSUE AS THEY HAD VALVES AND PUMPS OFF-LINE AT TIME OF TESTING. ESTIMATED TIME OF SYSTEM RETURNING TO SERVICE
COULD NOT BE PROVIDED.
4"4"
FIRST FLOOR ZONE
ASSEMBLY
MEZZANINE FLOOR ZONE
ASSEMBLY
CANOPY DRY-PIPE RISER
(IF PROVIDED UNDER OPTIONS)
FROM EXISTING FIRE PUMP
IN ADJACENT BUILDING
DOWN TO
FIRST FLOOR
SPRINKLER MANIFOLD ON
MEZZANINE
SCALE:
SPRINKLER MANIFOLD IN LAB BUILDING
NOT TO SCALE
FP-001
NITROGEN
GENERATOR
(IF PROVIDED
UNDER OPTION)
FDC
SCALE:
FIRE DEPARTMENT CONNECTION SIGN
NOT TO SCALE
FP-001
CURRENT FDC IS NOT IDENTIFIED PER CODE.
PROVIDE SIGNAGE WITH MINIMUM 5" HIGH
LETTERS, REFLECTIVE RED ON REFLECTIVE
WHITE BACKGROUND, ALUMINUM GRADE
TRAFFIC GRADE ALUMINUM.
PROVIDE BRACING AND ATTACH TO METAL
STAIR STRUCTURE, JUST OUT FROM WALL
WHERE INDICATED. SIGN TO IDENTIFY
LOCATION OF EXISTING FDC.
SEE KEY PLAN THIS SHEET FOR GENERAL SIGN
LOCATION.
FS
FS
INSPECTOR TEST / DRAIN / PRESSURE RELIEF
TDR
TDR
TDR
FP-001
FIRE PROTECTION SPRINKLER NOTES
H S
P
UC
CF
L
KEY PLAN
BP
C
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATEc P.A.
FIRM
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
THE
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson M Adams
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
USDA AGRICULTURAL RESEARCH SERVICE
SUGARCANE RESEARCH LABORATORY
HOUMA, LOUISIANA
17605/20/2026
REH
SWL
BT/DW FACILITIES ENGINEERING BRANCH
5106 SUNNYSIDE AVENUE
BELTSVILLE, MD 20705-5100
XXX
WN
XXX
CM
JS
5/20/26
LAB/OFFICE
FIRE PUMP
APPROXIMATE FIRE WATER ROUTING FROM
TAP, ON-SITE HYDRANT, AND TO FIRE PUMP
FROM SPRINKLER DRAWINGS. FIELD VERIFY.
TAP
HYD
FDC
SIGN
AREA "C" BID OPTION 1.
SEE 2ND FLOOR AND
ARCHITECTURAL DRAWINGS FOR
HIGH CEILING THESE ROOMS.
ORDINARY HAZARD GROUP 1
LIGHT HAZARD
LEGEND
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE 1038
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE 1008
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
ROOM LEGEND
ROOM NO ROOM NAME
STORAGE
STORAGE
MEETING ROOM
PREP
JANITORIAL
CORRIDOR
CORRIDOR
WOMEN
MEN
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
SMALL CONFERENCE
CORRIDOR
TECH OFFICE
TECH OFFICE
TECH OFFICE
CAT 3 OFFICE
CAT 3 OFFICE
TECHNICIAN OFFICE
TECHNICIAN OFFICE
CORRIDOR
STORAGE
PLANT PHYSIOLOGY / SOILS
SUPPORT
SUPPORT
HALL
SCOPE
SCOPE
SHARED EQUIPMENT ROOM
SUPPORT
STORAGE
SUPPORT
SERVICE / UTILITY CORRIDOR
HALL
BSL-2 LABORATORY
SUPPORT
PATHOLOGY / MOLECULAR GENETICS (CLEAN)
PATHOLOGY / MOLECULAR GENETICS (DIRTY)
FILES
BREAK ROOM
POST-DOC / TECHICAL OFFICE
MAIL / WORK ROOM
ENTRY LOBBY
CORRIDOR
TECH OFFICE
TECH OFFICE
TECH OFFICE
PROGRAM ASSISTANT
RESEARCH LEADER
OFFICE
OFFICE
OFFICE
CORRIDOR
SPACE
FP-101
FIRST FLOOR SPRINKLER PLAN
H S
P
UC
CF
L
KEY PLAN
BP
C
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATEc P.A.
FIRM
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
THE
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson M Adams
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
USDA AGRICULTURAL RESEARCH SERVICE
SUGARCANE RESEARCH LABORATORY
HOUMA, LOUISIANA
17605/20/2026
REH
SWL
BT/DW FACILITIES ENGINEERING BRANCH
5106 SUNNYSIDE AVENUE
BELTSVILLE, MD 20705-5100
XXX
WN
XXX
CM
JS
5/20/26
LAB/OFFICE
SCALE:
FIRST FLOOR SPRINKLER PLAN
1/8"=1'-0"
FP-101
PLAN
NORTH
TRUE
NORTH
08' 8'
1'-0"
4'
SCALE: 1/8" =
SCALE:
FIRE PUMP CONTROLLER AND TRANSFER SWITCH DATA
NTS
FP-101
FIRE PUMP CONTROLLER NOTES:
1. THE EXISTING FIRE PUMP CONTROLLER HAS EXPERIENCED A LOW VOLTAGE DETECTION FAULT. CONTROLLER
SETTINGS HAVE BEEN ADJUSTED TO NOT ALARM. THE CONTROLLER IS NO LONGER SUPPORTED BY MFG.
2. CONTRACTOR IS TO VERIFY THAT THE PUMP CONTROLLER HAS NOT BEEN PREVIOUSLY REPLACED PRIOR TO
ORDERING. A CREDIT IS TO BE ISSUED IF PREVIOUSLY REPLACED DUE TO CONTRACTING DELAYS.
3. CONTROLLER SHOULD BE COORDINATED TO BE REPLACED AS SOON AS POSSIBLE FOLLOWING AWARD OF
CONTRACT AND NOT TO EXCEED 90 DAYS.
4. REPLACE THE CONTROLLER AND TRANSFER SWITCH WITH MANUFACTURER COMPATIBLE EQUIVALENT SUCH AS:
4.1. FIRETROL FTA1930-AM30B-TSA-JKP
4.2. REPLACEMENT INFORMATION PROVIDED BY FIRETROL / METRON REPRESENTATIVE CRAIG FINK OF AMPAIR, INC. OF HOUSTON, TX.
4.3. CONTRACTOR TO VERIFY EQUAL REPLACEMENT.
5. CONTROLLER TO BE IN ACCORDANCE WITH NFPA 20 & 70, LATEST EDITION AT TIME OF SOLICITATION.
6. PROVIDE R QUALIFIED ELECTRICAL PERSONNEL TO ISOLATE AND REPLACE EQUIPMENT ENSURING
LOCK-OUT-TAG-OUT PROCEDURES ARE FOLLOWED, INCLUDING POWER FROM GENERATOR.
4. PROVIDE FACTORY AUTHORIZED CONTROLLER MANUFACTURER REPRESENTATIVE TO INSPECT AND PERFORM
FIRE PUMP TESTING TO VERIFY PERFORMANCE.
5. PROVIDE ALL EQUIPMENT AND TESTING NECESSARY TO PERFORM REPLACEMENT IN ACCORDANCE WTIH NFPA 70
AND NFPA 20.
6. INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURER RECOMMENDATIONS FOR THE EQUAL
REPLACEMENT AND CODE COMPLIANCE.
7. WATER SUPPLY PRESSURE MUST BE MONITORED AT STREET HYDRANT DURING ALL PUMP FLOW TESTING TO
ENSURE WATER MAIN DOES NOT DROP BELOW 20 PSI.
8. ENSURE ALL EQUIPMENT IS ON-SITE PRIOR TO STARTING REPLACEMENT.
9. COORDINATE ALL TRADES AND REPLACEMENT SO THAT FIRE PUMP IS NOT OUT OF SERVICE FOR MORE THAN A
72-HOUR PERIOD.
10. IMPAIRMENT PROCEDURES PER NFPA 25 ARE TO BE FOLLOWED.
ROOM LEGEND
ROOM NO ROOM NAME
SERVICE / UTILITY CORRIDOR
MECHANICAL PENTHOUSE
COMMUNICATIONS
ELECTRICAL ROOM
STORAGE
CORRIDOR
SPRINKLER EQUIP.
MINIMUM 4"SPRINKLER LINE FROM EXISTING FIRE PUMP AND RISER
MANIFOLD. RUN ACROSS CONNECTING BRIDGE WITH OTHER UTILITY
LINES. MUST BE RUN IN CONDITIONED / HEATED SPACE. HEAT
TRACING IS NOT PERMITTED.
EXTEND SPRINKLER PROTECTION FOR CONNECTOR
CORRIDOR FROM HEADHOUSE SYSTEM.
PROVIDE OFFSETS (ELEVATION &
HORIZONTAL) WITH FLEXIBLE FITTINGS FOR
EXPANSION JOINTS (~1" MOVEMENT).
PROVIDE OFFSETS (ELEVATION &
HORIZONTAL) WITH FLEXIBLE FITTINGS
FOR EXPANSION JOINTS.
OVER-SIZE HOLE FOR EXPANSION
MOVEMENT WITH 2-HR FIRE STOP.
EXISTING HEADHOUSE BUILDING
SEE ARCHITECTURAL
DRAWINGS FOR THIS AREA AS
SOME AREAS ARE OPEN TO
BELOW AND WILL REQUIRE
HIGH LEVEL SPRINKLERS.
ORDINARY HAZARD GROUP 1
LIGHT HAZARD
LEGEND
FP-102
SECOND FLOOR SPRINKLER PLAN
H S
P
UC
CF
L
KEY PLAN
BP
C
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATEc P.A.
FIRM
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
THE
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson M Adams
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
USDA AGRICULTURAL RESEARCH SERVICE
SUGARCANE RESEARCH LABORATORY
HOUMA, LOUISIANA
17605/20/2026
REH
SWL
BT/DW FACILITIES ENGINEERING BRANCH
5106 SUNNYSIDE AVENUE
BELTSVILLE, MD 20705-5100
XXX
WN
XXX
CM
JS
5/20/26
LAB/OFFICE
SCALE:
SECOND FLOOR SPRINKLER PLAN
1/8"=1'-0"
FP-102
PLAN
NORTH
TRUE
NORTH
08' 8'
1'-0"
COURTYARD
COURTYARD
CSFP101
BID OPTION #1 SPRINKLER DRY-PIPE
H S
P
UC
CF
L
KEY PLAN
BP
C
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATEc P.A.
FIRM
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
THE
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson M Adams
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
USDA AGRICULTURAL RESEARCH SERVICE
SUGARCANE RESEARCH LABORATORY
HOUMA, LOUISIANA
17605/20/2026
REH
SWL
BT/DW FACILITIES ENGINEERING BRANCH
5106 SUNNYSIDE AVENUE
BELTSVILLE, MD 20705-5100
XXX
WN
XXX
CM
JS
5/20/26
LAB/OFFICE
08' 8'
1'-0"
4'
SCALE: 1/8" =
LEGEND
NOTE:
DRY PIPE SYSTEM VALVES AND AIR NITROGEN GENERATOR TO
BE LOCATED ON MEZZANINE OF LAB BUILDING.
SCALE:
WALKWAY - CANOPY PLAN - BID OPTION #1
1/8"=1'-0"
CSFP101
PLAN
NORTH
TRUE
NORTH
SCALE:
WALKWAY - GROUND LEVEL - PLAN BID OPTION #1
1/8"=1'-0"
CSFP101
PLAN
NORTH
TRUE
NORTH
BID OPTION 1 CANOPY NOTES:
1. AT TIME OF DESIGN THE WATER SUPPLY CANNOT SUPPORT DRY-PIPE PROTECTION
OF THE PROPOSED EXTERIOR CANOPY WITH THE 30% INCREASED SPRINKLER
DESIGN AREA. BEFORE THIS OPTION CAN BE EXERCISED THE UTILITY WATER
SUPPLY WILL NEED TO BE CORRECTED. (AS OF DESIGN THERE ARE UTILITY
COMPANY PUMPS OFF-LINE AND A VALVE CLOSED SERVING THE STREET MAIN.)
2. IF THE WATER SUPPLY ISSUE IS RESOLVED AND THE CANOPY OPTION IS EXERCISED,
THE FOLLOWING NOTES APPLY.
3. A NEW FIRE FLOW TEST WOULD NEED TO BE PERFORMED TO VERIFY. THE UTILITY
COMPANY WOULD NEED TO VERIFY IN WRITING THAT THE HIGHER FLOW CONDITIONS
WILL BE MAINTAINED AS THE NORMAL CONDITION.
4. SEE BID OPTION NOTES ON FP001.
5. COORDINATE ADDITIONAL FIRE ALARM MONITORING BETWEEN TRADES.
6. COORDINATE NITROGEN GENERATOR WIRE / CIRCUIT SIZE WITH ELECTRICAL.
LOCATE THE NITROGEN GENERATOR ON MEZZANINE OF LAB BUILDING WHERE
SPRINKLER EQUIPMENT IS INDICATED.
7. DRY-PIPE SPRINKLERS MUST BE PROVIDED OVER AND UNDER THE CONNECTING
WALKWAY BETWEEN BUILDINGS.
8. SLOPE PIPE AND PROVIDE LOW POINT DRAINS PER NFPA 13.
9. SEE ARCHITECTURAL ELEVATION VIEWS FOR CHANGES IN CANOPY ELEVATION.
BID OPTION COVERED CANOPY / WALKWAY. OHG1 0.1 / 1,950 FT2 (1,500 FT2 + 30%)
DRY-PIPE SYSTEM SERVED FROM NEW LAB BUILDING. PROVIDE DRY-PIPE PROTECTION
OVER AND UNDER THE CONNECTING WALKWAY. INSIDE THE WALKWAY IS TO BE
PROTECTED FROM WET-PIPE SYSTEM IN HEADHOUSE.
EXTEND WET PIPE SPRINKLER LINE FROM HEADHOUSE
TO SPRINKLERS IN WALKWAY.
CORRIDOR 2102 (BRIDGE)
BRIDGE OVERHEAD
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATEc P.A.
FIRM
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
THE
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson M Adams
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
USDA AGRICULTURAL RESEARCH SERVICE
SUGARCANE RESEARCH LABORATORY
HOUMA, LOUISIANA
PLUMBING GENERAL NOTES,
ABBREVIATIONS, AND LEGEND
P-001 97 17605/20/2026
REH
SME
DRL FACILITIES ENGINEERING BRANCH
5106 SUNNYSIDE AVENUE
BELTSVILLE, MD 20705-5100
XXX
WN
XXX
CM
JS
PLUMBING ABBREVIATIONS: GENERAL PLUMBING NOTES:
1. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS (DO NOT SCALE FOR
LOCATIONS). THE CONTRACTOR MUST PROVIDE A COMPLETE AND FUNCTIONAL PLUMBING SYSTEM AS INDICATED WITH ALL NECESSARY
EQUIPMENT, APPURTENANCES AND CONTROLS AS INDICATED.
2. THE PLUMBING CONTRACTOR MUST REVIEW THE DRAWINGS OF OTHER TRADES AS PART OF THIS CONTRACT FOR ADDITIONAL WORK REQUIRED AND FOR COORDINATION OF PLUMBING WORK FOR OPERATIONS OF OR CONNECTIONS TO OTHER TRADES.
3. REMOVE AND CAP CONNECTING UTILITIES (WATER, DRAINAGE, POWER, GAS, ETCETERA) AS INDICATED OR NECESSARY FOR FUTURE
RECONNECTION.
4. CONTRACTOR MUST EMPLOY WORKMEN WHO ARE TRAINED AND EXPERIENCED IN NECESSARY SKILLS TO PERFORM PLUMBING AND
PLUMBING DEMOLITION WORK.
5. CONTRACTOR MUST USE APPROPRIATE TOOLS AND MUST NOT IMPART EXCESSIVE VIBRATIONS TO THE EXISTING STRUCTURE OR OTHER
BUILDING COMPONENTS.
6. MAKE OFFSETS AND TRANSITIONS TO COORDINATE WITH OTHER TRADES WITHOUT ANY ADDITIONAL EXPENSE TO THE OWNER.
CONTRACTOR MUST PROVIDE COORDINATION DRAWINGS OF TRADES.
7. ALL NEW & DEMOLISHED PIPING PENETRATIONS TO THE BUILDING ENVELOPE MUST BE FULLY SEALED WATER TIGHT.
8. CONTRACTOR MUST FIELD VERIFY EXACT LOCATIONS AND POINTS OF CONNECTIONS TO THE EXISTING UTILITIES (DOMESTIC WATER &
SANITARY SEWER, NATURAL GAS, ETCETERA).
9. REFER TO SPECIFICATIONS, SHEET NOTES, DETAILS AND SCHEDULES FOR ADDITIONAL REQUIREMENTS PERTAINING TO THE PLUMBING
WORK.
10. ALL WORK (MATERIALS, EQUIPMENT, DEVICES, COMPONENTS, SYSTEMS, SUPPORTS, ETCETERA) MUST COMPLY WITH THE
REQUIREMENTS OF ALL CODES, CODE AMENDMENTS, AND ORDINANCES AS USED, ADOPTED AND/OR ENFORCED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .