C04_Attachment 6 - Drawings 03 - Fire Protection-Plumbing.pdf

PDF 20 MB Posted

Attached to
Construct Sugarcane Research Laboratory Federal contract opportunity
Solicitation number
1232SA26R0027
Issued by
Department of Agriculture Agricultural Research Service

About this file

This document is a comprehensive set of technical specifications and design drawings for fire protection and plumbing systems at the USDA Agricultural Research Service Sugarcane Research Laboratory in Houma, Louisiana, dated May 20, 2026.

The fire alarm and mass notification system specifications require replacement of an existing EST-3 panel with a new EST-4 system for backward compatibility, including integration with existing equipment in the headhouse and greenhouse buildings. The system must incorporate a mass notification voice system per Presidential directive, with specific requirements for device locations, circuit configurations, voltage calculations, and conduit specifications. A Quality Control Fire Protection Engineer (QFPE) who is not an employee of the installing contractor must oversee design, inspection, and commissioning. The specifications mandate Class B signaling line circuits with no T-taps, hybrid Class A/B circuits with isolation modules, 70-volt speaker circuits, redundant fiber between buildings, and compliance with NFPA 72 standards. AC circuits must use red locking devices with surge protection, and all fire alarm conduits must be red-dipped or painted except in finished rooms where they match wall/ceiling finishes.

The fire protection sprinkler system includes wet-pipe protection for the existing headhouse (Zone 1) and new lab building (Zone 2), with provisions for an optional dry-pipe system for a covered canopy if utility water supply deficiencies are resolved. The plumbing systems encompass domestic water supply with booster pumps, hot water circulation, thermostatic mixing valves, laboratory utilities (compressed air, vacuum, natural gas, deionized water), and comprehensive drainage with floor drains and trench drains. The drawings detail fixture schedules, valve locations, piping materials (copper for potable water, black steel for gas, stainless steel for lab drains), and equipment specifications including water heaters, pumps, and water purification systems. All work must comply with NFPA 13 for sprinklers, NFPA 72 for fire alarms, and applicable plumbing codes, with specific attention to pipe sizing, support details, accessibility, and coordination between trades.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INITIAL SPEAKER-WATTAGE

STROBE-CANDELA

DEVICE NUMBER FOR

RESPECTIVE CIRCUIT

INDICATES PANEL AND

CIRCUIT INFORMATION

DEVICE INFORMATION

FIRE ALARM NOTES:

1.SCOPE OF PROJECT:

1. PROVIDE EST-4 ADDRESSABLE VOICE FIRE ALARM AND MASS NOTIFICATION SYSTEM

AS OUTLINED FOR NEW LAB BUILDING.

2. SYSTEM MUST BE EST-4 FACU TO INTEGRATE WITH EXISTING EST EQUIPMENT IN

ADJACENT BUILDINGS.

3. A QUALIFIED QUALITY CONTROL FIRE PROTECTION ENGINEER (QFPE) MUST PROVIDE

OVERSIGHT OF FINAL PRODUCT SPECIFIC SHOP DRAWINGS AND FIELD INSTALLATION

WITH COMMISSIONING. CONTRACTORS FPE IS NOT REQUIRED TO SEAL THE

DRAWINGS BUT MUST PROVIDE QUALITY CONTROL REVIEWS AS OUTLINED.

FA UPGRADE NOTES:

1. ADJACENT HEADHOUSE HAS EXISTING EST-3 PANEL THAT IS REACHING END OF LIFE.

2. UNDER THIS SCOPE, REPLACE THE MOTHERBOARD / CARDS OF EXISTING EST-3 WITH

A NEW EST-4 PLATFORM. MAINTAIN EXISTING CAN.

3. REPROGRAM NEW SYSTEM FOR EXISTING DEVICES IN HEADHOUSE, GREENHOUSE,

ETC.

4. PROVIDE FIBER CONNECTION BETWEEN EST-4 IN HEADHOUSE AND EST-4 IN LAB

BUILDING TO NETWORK THE TWO PANELS WITH A SINGLE OFF-SITE REPORTING

POINT.

5. EXISTING HEADHOUSE AND GREENHOUSE SYSTEMS WILL REMAIN HORN/STROBE.

NEW LAB BUILDING WILL BE PROVIDED WITH MNS VOICE SYSTEM PER PRESIDENTIAL

DIRECTIVE FOR FEDERAL BUILDINGS.

6. MAINTAIN EXISTING ANNUNCIATOR(S) IN HEADHOUSE.

FIRE ALARM AND MNS GENERAL NOTES:

1. SYSTEM MUST COMPLY WITH THE FOLLOWING AT MINIMUM:

1.1. NFPA 70 & 72, LATEST EDITION AT TIME OF SOLICITATION

1.2. UPDATES FOR VISUAL NOTIFICATION FROM ECB 2018-17

1.3. FOLLOW ALL APPLICABLE SPECIFICATIONS INCLUDING FIRE ALARM 28 31 76, AND

GENERAL ELECTRICAL 26 20 00 WHEN ISSUED.

2. CLEAR STROBES WITH "ALERT" WILL BE USED FOR VISUAL NOTIFICATION.

3. DIRECTIONAL LOUDSPEAKERS SIMILAR TO WHEELOCK STH-15 MUST BE USED WHERE

INDICATED AND AIMED IN THE GENERAL DIRECTION INDICATED.

4. ADDRESSABLE NOTIFICATION APPLIANCES ARE NOT PERMITTED.

5. COMBINATION NOTIFICATION / SIGNALING CIRCUITS FOR SPEAKERS AND/OR STROBES

ARE NOT PERMITTED.

6. ALL STROBES MUST BE LISTED AND INTENDED FOR OPERATION AT 24 VOLTS WITH

NOMINAL 24 VOLT POWER SUPPLIES.

7. USER MUST BE PROVIDED WITH ALL TOOLS, HARDWARE, CABLES, MANUALS,

SOFTWARE, PASSWORDS, PASSWORD KEYS, ETC. TO FULLY SUPPORT AND MAINTAIN

THE SYSTEM.

8. CEILING GRID-MOUNT NOTIFICATION APPLIANCES MUST BE MOUNTED CENTER OF

TILE.

9. CEILING GRID-MOUNTED DEVICES MUST BE SUPPORTED BY BRIDGE SUPPORTS AND

NOT BY THE CEILING TILE.

10. ALL PANELS AND EQUIPMENT CABINETS, LOC, ETC. MUST BE KEYED THE SAME.

AS-BUILT MAY BE KEYED SEPARATE.

TEXT SIGN NOTES:

1. TEXT SIGNS ARE NOT PROVIDED FOR THIS BUILDING AS NOT REQUIRED BY FEDERAL

DIRECTIVE FOR VOICE SYSTEMS AND THIS PROJECT IS NOT REQUIRED TO COMPLY

WITH CORPS OF ENGINEERS ECD OR UFC CRITERIA.

INTELLIGIBILITY CONSIDERATIONS:

1. INTELLIGIBILITY MUST BE MEASURED AND SPEAKER TAPS FIELD ADJUSTED AS

NECESSARY TO ACHIEVE THE BEST SCORE.

2. INITIAL SPEAKER WATTAGE LEVELS ARE INDICATED ON DRAWINGS. CONTRACTOR

MUST ALLOW FOR FIELD ADJUSTMENTS TO ESTABLISH THE BEST INTELLIGIBILITY

WATTAGE / TAP SETTINGS FOR EACH RESPECTIVE SPACE BASED ON TESTING.

3. ALERT TONES MUST BE 15 DBA ABOVE AMBIENT AND MUST BE MEASURED TO SATISFY

AUDIBILITY LEVELS PER NFPA 72.

4. VOICE MESSAGES MUST BE RECORDED AND AMPLIFIED TO DELIVER THE BEST

INTELLIGIBILITY LEVELS PER NFPA 72.

5. PRE-RECORDED VOICE MESSAGES MUST BE OF A LOWER FREQUENCY/ PITCH

RATHER THAN A HIGHER FREQUENCY/ PITCH TO REDUCE THE NUMBER OF

REFLECTIONS IN REFLECTIVE SPACES.

6. THE NUMBER OF SPEAKERS HAS BEEN INTENTIONALLY LIMITED IN SOME AREAS DUE

TO REFLECTIVE PROPERTIES OF THE WORK SPACES. UNLIKE CARPETED OFFICE

SPACES, MORE SPEAKERS PRODUCE MORE REFLECTIONS IN REFLECTIVE SPACES.

AS SUCH, THE DESIGNER HAS TRIED TO OPTIMIZE INTELLIGIBILITY WHILE LIMITING

REFLECTIONS.

7. TARGET CIS SCORES IN WORK AREAS IS 0.80, AND 0.75 IN MECHANICAL AND CRAWL

SPACE AREAS.

8. DURING STIPA TESTING, THE INPUT SIGNAL MUST BE INJECTED INTO THE AMPLIFIER

VIA AUX AUDIO INPUT SO THAT THE RESULTING OUTPUT SIGNAL IS APPROXIMATELY

THE SAME VOLUME LEVEL AS PRE-RECORDED MESSAGES. THUS, THE VOICE

MESSAGE DBA LEVEL MUST BE MEASURED AT A PARTICULAR LOCATION AND THEN

THE STIPA INPUT ADJUSTED TO RESULT IN THE SAME SPEAKER OUTPUT LEVEL. THIS

CORRELATES THE STIPA INTELLIGIBILITY READINGS AS CLOSE AS FEASIBLE TO

ACTUAL PRE-RECORDED LEVELS.

9. INTELLIGIBILITY READINGS MUST BE TAKEN THROUGHOUT REPRESENTATIVE AREAS

AND DOCUMENTED ON DRAWINGS WITH BOTH THE AUDIBLE LEVELS AND CIS SCORES.

10. THREE READINGS ARE TO BE TAKEN AND AVERAGED FOR EACH LOCATION.

AC POWER FOR FIRE ALARM / MNS EQUIPMENT:

11. AC CIRCUITS MUST BE PROVIDED WITH RED LOCKING DEVICES AND CLEARLY

INDICATED AT FACU.

12. NO MORE THAN 3 FA/MNS PANELS ON ONE 20A CIRCUIT.

13. SURGE PROTECTION WITH ILLUMINATED STATUS LAMP IS TO BE PROVIDED FOR EACH

120VAC CIRCUIT.

13.1. SURGE PROTECTION MUST BE MOUNTED ADJACENT TO AND OUTSIDE OF ANY

FIRE ALARM CONTROL PANEL.

13.2. PROVIDE MINIMUM 3' LENGTH OF CIRCUIT BETWEEN SURGE PROTECTION AND

PROTECTED EQUIPMENT.

14. 120VAC CONDUIT MUST NOT BE RED.

CIRCUIT NOTES:

1. FIRE ALARM AND MNS NAC/SLC CIRCUITS MUST BE CLASS "B" WITH NO "T" TAPS

ALLOWED. SLC MUST BE CONTINUOUS PATH AND CAN BE DIVIDED BY ISOLATION

MODULES AS DETAILED.

2. SEE DETAIL FOR HYBRID CLASS A & B CIRCUIT AT MODULES IF UTILIZED, SUCH AS ONE

MODULE PER FLOOR / BUILDING.

3. PATHWAY SURVIVABILITY MUST BE LEVEL 1.

4. WHERE MORE THAN TWO (2) SLC, NAC, OR IDC CONDUITS WILL ENTER A SINGLE

PANEL OR WHERE THERE IS MORE THAN TWO (2) ADJACENT PANELS, A WIRE GUTTER

IS TO BE PROVIDED ABOVE THE PANEL FOR ADDITIONAL CONDUITS.

4.1. CONDUITS BETWEEN THE WIRE GUTTER AND PANELS TO BE INCREASED IN SIZE

TO MINIMIZE NUMBER OF CONDUITS.

4.2. TROUGHS SHOULD BE ABOVE CEILINGS IN FINISHED AREAS WITH MINIMUM

CONDUITS BETWEEN PANELS AND TROUGHS.

4.3. PANELS MUST NOT BE USED AS TERMINAL CABINETS OR PULL BOXES FOR

CIRCUITS PASSING THROUGH TO OTHER PANELS.

5. POWER LIMITED AND NON-POWER LIMITED CIRCUITS MUST NOT BE RUN IN SAME

RACEWAY OR WITHIN PANELS IN SPACES NOT APPROVED BY THE MANUFACTURER.

5.1. 120VAC CIRCUITS MUST NOT PASS THROUGH WIRE GUTTERS AND MUST ENTER

PANELS IN LOCATIONS DESIGNATED BY THE PANEL MANUFACTURER.

6. NO CONDUIT MAY ENTER THE BOTTOM SECTION OF A FIRE ALARM PANEL WHERE

BATTERIES ARE TO BE PLACED.

7. FIRE ALARM AND MNS CIRCUITS TO BE SOLID COPPER FPL/FPLR/FPLP UNLESS

OTHERWISE RECOMMENDED BY THE MFG.

8. PROVIDE FIBER BETWEEN MAIN PANELS IN ADJACENT BUILDINGS. PROVIDE

REDUNDANT / SPARE FIBERS IN EACH PULL.

9. ALL CIRCUITS RUNNING UNDERGROUND MUST BE LISTED FOR WET LOCATIONS.

10. EACH NOTIFICATION CIRCUITS IS TO BE LIMITED TO A SINGLE FLOOR AND NOT SERVE

MULTIPLE FLOORS.

11. EACH AMPLIFIER PANEL IS TO HAVE ONE SPARE SPEAKER CIRCUIT AVAILABLE FOR

TEMPORARY SWITCHING IF A CIRCUIT FAILS.

12. ALL FIELD-WIRING COLORS MUST BE THE SAME THROUGHOUT THE CIRCUIT TO WHICH

IT IS CONNECTED. DEVELOP A COLOR SCHEME AND SHOW ON SHOP DRAWINGS,

SUCH AS DIFFERENT COLORS FOR EACH CIRCUIT OR TYPE OF CIRCUIT.

13. WIRE PULLS ARE TO BE DEVICE TO DEVICE WITHOUT SPLICING. WIRING MUST EITHER

TERMINATE AT THE FIRE ALARM CONTROL PANEL, REMOTE POWER SUPPLY, OTHER

CABINETS OR A DEVICE.

13.1. ALL DEVICES MUST UTILIZE SCREW TERMINALS.

13.2. PULL ALL CONDUCTORS SPLICE FREE.

13.3. THE USE OF WIRE NUTS, CRIMPED CONNECTORS, OR TWISTING OF

CONDUCTORS IS PROHIBITED.

13.4. DO NOT USE TERMINAL STRIPS IN THE FIELD WIRING, SUCH AS IN-BETWEEN

DEVICES.

13.5. TERMINATION AT A DEVICE MUST BE A COMPLETE BREAK IN THE WIRE, DO NOT

LOOP THE WIRE AROUND THE SCREW.

14. UNLESS INDICATED OTHERWISE, THE FOLLOWING WIRE SIZE MUST BE USED:

14.1. SLC AND IDC: MINIMUM 18 AWG

14.2. NAC STROBE AND/OR TEXT SIGNS: MINIMUM 14 AWG

14.3. SPEAKER:MINIMUM 16 AWG

14.4. REMOTE ANNUNCIATOR, LOC DATA, TEXT SIGN CONTROL (RS485) PER MFG

RECOMMENDATIONS FOR DISTANCES OF PROJECT.

15. STROBE CIRCUITS AND SPEAKER CIRCUITS TO BE CALCULATED AS INDICATED.

15.1. AN ADDITIONAL 30'+ TO BE ADDED TO EACH DEVICE DISTANCE WHEN FLEX

DROPS ARE UTILIZED TO ACCOUNT FOR DROPS AND LOOPS IN JUNCTION BOXES

(DOWN/BACK). THIS DISTANCE MAY BE 15' WHEN CALCULATIONS DOUBLE

EITHER THE RESISTANCE OR THE DISTANCE. (EACH 6 FOOT FLEX ADDS 28' PER

DROP, DOWN & BACK WITH LOOPS).

15.2. VOLTAGE FOR STROBE CALCULATIONS MUST START AT 20.4 VOLTS AND MUST

NOT DROP BELOW 17 VOLTS (POINT-TO-POINT) ACCOUNTING FOR TOTAL

CIRCUIT PATH (OUT / BACK, AND DROPS / ELEVATION CHANGES).

15.3. VOLTAGE CALCS TO PROVIDE A SAFETY FACTOR OF AT LEAST 1 VOLT WHEN

POINT-TO-POINT CALCS ARE USED. NOT REQUIRED FOR LUMP-SUM

CALCULATIONS.

15.4. CONTRACTOR MUST PROVIDE VOLTAGE DROP CALCS FOR THEIR PARTICULAR

PRODUCTS.

15.5. BATTERY CALCULATIONS MUST ACCOUNT FOR 1.25% AGING FACTOR PER NFPA

72 10.6.7.2.14 (REVISED IN 2022 EDITION).

16. 70 VOLT SPEAKER CIRCUITS MUST BE USED TO MINIMIZE VOLTAGE DROP.

16.1. SPEAKER dB CALCULATIONS TO BE PERFORMED ACCOUNTING FOR DOUBLE THE

WATTAGE INDICATED ON FLOOR PLAN. THIS IS TO ACCOUNT FOR FIELD

ADJUSTMENTS AND SPARE CAPACITY.

16.2. IN NO CASE ARE SPEAKER CIRCUITS TO BE LOADED TO EXCEED A 5% DROP IN

VOLTAGE PER CALCULATIONS WITH DOUBLE ANTICIPATED WATTAGE USED IN

CALCS.

17. OTHER THAN SHORT DISTANCES SUCH AS AT PANEL AND TO WIRE GUTTERS,

SIGNALING LINE CIRCUITS ARE TO BE RUN IN SEPARATE RACEWAYS FROM

NOTIFICATION WIRING.

18. LOC CIRCUITS AND/OR CIRCUITS BETWEEN CONTROL PANELS (SUCH AS RS485,

VOICE, ETC.) MUST BE IN RACEWAYS SEPARATE FROM SLC AND NAC.

19. CONDUIT FILL CALCULATIONS MUST BE PROVIDED TO ENSURE THAT WIRE FILL DOES

NOT EXCEED 40% FILL OF THE CONDUIT. FP CABLES UP TO 14 AWG TO BE SIZED AS

#6 AWG FOR CONDUIT FILL UNLESS OTHERWISE INDICATED.

20. MINIMUM 3/4" EMT RED CONDUIT IS REQUIRED FOR ALL LOW-VOLTAGE CIRCUITS. 1"

RED CONDUIT MAY BE REQUIRED BASED ON CIRCUIT DESIGN. 120VAC CONDUIT WILL

NOT BE RED.

21. 3/4" FLEXIBLE METALLIC CONDUIT (FMC) MAY BE USED FOR DROPS TO DEVICES (SUCH

AS IN CEILINGS) TO A MAXIMUM OF 6' EACH.

21.1. A SINGLE DROP MUST BE PROVIDED DOWN/BACK TO DEVICE. DO NOT LOOP

DROPS TO DEVICES.

22. LIQUID TIGHT FLEXIBLE METALLIC CONDUIT (LTMC) AND FITTINGS MUST BE USED ON

THE EXTERIOR OR WET LOCATIONS (SUCH AS FOR SPEAKERS).

23. FLEXIBLE DROPS ARE NOT REQUIRED TO BE RED.

24. ALL CONDUIT MUST BE DEBURRED USING INTENDED CONDUIT REAMING TOOLS.

25. SCHEDULE 40 (MINIMUM) PVC IS TO BE USED WHEN RUNNING EXTERIOR CIRCUITS,

SUCH AS TO A PIV OR PUMP HOUSE.

26. SURGE PROTECTION IS REQUIRED FOR ALL FIRE ALARM CIRCUITS ENTERING /

LEAVING A BUILDING.

26.1. SURGE PROTECTION IS TO BE LOCATED JUST INSIDE THE BUILDING WHERE THE

CIRCUIT ENTERS THE BUILDING.

26.2. SURGE PROTECTION MUST HAVE PROPER GROUND CONDUCTOR PER THE MFG.

27. CONDUIT FITTINGS MUST BE OF THE COMPRESSION TYPE. SET SCREW NOT

PERMITTED.

28. UNLESS INDICATED, LOW-VOLTAGE FIRE ALARM AND MNS CONDUITS AND BACK

BOXES MUST BE RED DIPPED / PAINTED BY MFG.

28.1. WIRE TROUGHS AND LARGER JUNCTION BOXES MAY BE FIELD PAINTED RED.

28.2. COVERS MAY BE FIELD PAINTED RED.

28.3. EXPOSED CONDUITS IN A FINISHED ROOM MUST BE PAINTED TO MATCH WALL /

CEILING FINISH AND LABELED WITH A RED 3/4" BAND ON EACH SIDE OF A WALL.

THE INSIDE COVER OF PULL BOXES MUST BE LABELED AS "FIRE ALARM" WITH

THE INTERIOR OF THE BOX PAINTED RED.

29. ALL CONDUIT MUST BE CONCEALED, UNLESS REQUIRED TO BE RUN IN OPEN

EXPOSED AREAS.

30. MINIMUM 25 PERCENT SPARE AMPERAGE MUST BE PROVIDED ON EACH CIRCUIT OF

POWER SUPPLIES.

31. RACEWAY FILL MUST BE IN ACCORDANCE WITH NFPA 70. FORTY (40) PERCENT FILL

MUST NOT BE EXCEEDED.

32. PROVIDE SPARE CIRCUITS AS INDICATED.

FIRE ALARM DESIGN:

1. THESE DRAWINGS PROVIDE GENERAL SPACING AND LOCATION OF DEVICES. FINAL

LOCATIONS TO BE COORDINATED WITH OTHER SYSTEMS AND FIELD CONDITIONS TO

ENSURE COMPLIANCE WITH NFPA 72 AND PROJECT REQUIREMENTS.

2. CONTRACTOR TO PROVIDE FULLY DETAILED SHOP DRAWINGS IN ACCORDANCE WITH

NFPA 72 AND SPECIFICATIONS.

3. IN ADDITION TO SPECIFICATIONS, SHOP DRAWINGS WILL AT MINIMUM INCLUDE THE

FOLLOWING:

3.1. DEVICE LOCATIONS WITH CONDUIT ROUTING.

3.2. IDENTIFICATION OF CIRCUITS IN RESPECTIVE CONDUIT PATH TO ACCOUNT FOR

CONDUIT FILL.

3.3. RISER DIAGRAM THAT REFLECTS ALL PANELS, CONTROLLERS, MODULES,

BATTERY CABINETS, ETC. THAT WILL BE INSTALLED AND HOW THEY INTERACT

WITH EACH OTHER.

3.4. ELEVATION DIAGRAM TO SCALE SHOWING ALL PANELS AND LOCATIONS.

3.5. MOUNTING HEIGHTS IN ACCORDANCE WITH CONTRACT DRAWINGS,

SPECIFICATIONS, AND NFPA 72.

3.6. DETAILS OF CONNECTIONS TO CIRCUIT BOARDS FOR INSTALLATION AND

FUTURE SERVICE. INCLUDING SLC, NAC, SPEAKER CIRCUITS, LOC,

ANNUNCIATOR, ETC. BETWEEN PANELS AND EQUIPMENT.

3.7. MOUNTING AND BACK BOX DETAILS / REQUIREMENTS.

3.8. VOLTAGE CALCULATIONS BY CIRCUIT.

3.9. BATTERY CALCULATIONS.

3.10. PRODUCT CUT SHEETS FOR ALL COMPONENTS WITH OPTIONS IDENTIFIED.

BASIS OF DESIGN FOR CIRCUITS AND PHASING:

1. CONTRACT DRAWINGS MAY SHOW CONCEPTUAL DEVICES PER CIRCUITS TO

ESTABLISH CIRCUITS AND PANELS ANTICIPATED.

2. UNLESS INDICATED OTHERWISE, CONTRACTOR MAY MODIFY THE CIRCUIT PATHS,

DEVICES PER CIRCUIT, ETC. TO BETTER FACILITATE FIELD CONDITIONS OR PHASING.

3. PANEL LOCATIONS INDICATED ARE APPROXIMATE AND MUST BE MAINTAINED UNLESS

OTHERWISE APPROVED PRIOR TO SUBMITTING SHOP DRAWINGS.

SMOKE DETECTOR VERIFICATION:

1. SPOT SMOKE DETECTORS ARE TO BE PROVIDED WITH ALARM VERIFICATION

FEATURE.

2. INITIALLY SET VERIFICATION AT 20 SECONDS.

LABELING BATTERIES:

1. EVERY CABINET THAT HAS BACKUP BATTERIES MUST HAVE A LABEL THAT IS

PROMINENTLY DISPLAYED JUST ABOVE BATTERIES INDICATING THE VOLTAGE AND

AMP-HOUR OF BATTERIES REQUIRED IN THAT CABINET BASED ON CALCULATIONS.

2. EXAMPLE: "TWO-12-VOLT 35-AMP HOUR BATTERIES".

3. BATTERIES MUST HAVE MFG DATE PER NFPA 72, NOT DATE OF INSTALLATION.

4. BATTERIES MUST HAVE BEEN MANUFACTURED WITHIN 6 MONTHS OF OCCUPANCY.

ADDITIONAL SITE / PROJECT SPECIFIC REQUIREMENTS:

1. EXISTING EQUIPMENT IS EST-3. PROVIDE NEW EST-4 FOR BACKWARD COMPATIBILITY

WITH EXISTING EQUIPMENT.

QUALITY CONTROL FIRE PROTECTION ENGINEER:

1. A QUALITY CONTROL FIRE PROTECTION ENGINEER (QFPE) IS REQUIRED FOR THIS

PROJECT.

2. THE QFPE MUST NOT BE AN EMPLOYEE OF THE INSTALLING CONTRACTOR.

3. THE QFPE IS TO BE A PART OF THE GENERAL CONTRACTORS QUALITY CONTROL

TEAM.

3.1. IT IS RECOMMENDED THAT THE QFPE BE HIRED BY THE GENERAL CONTRACTOR.

3.2. IF THE FIRE ALARM AND/OR MASS NOTIFICATION SYSTEM ALSO REQUIRES THE

SERVICES OF A QFPE, THERE SHOULD BE A SINGLE QFPE PROVIDING

OVERSIGHT OF ALL FIRE PROTECTION SYSTEMS UNDER THE CONTROL AND

DIRECTION OF THE GENERAL CONTRACTOR.

4. THE QFPE MUST HAVE SPECIFIC DESIGN, INSPECTION, AND COMMISSIONING

EXPERIENCE IN FIRE PROTECTION SYSTEMS IDENTIFIED FOR THIS PROJECT.

5. UNLESS SPELLED OUT OTHERWISE, THE QFPE IS TO PROVIDE THE FOLLOWING

MINIMUM SERVICES:

5.1. PROVIDE OVERSIGHT IN THE DESIGN AND PREPARATION OF THE SYSTEM

INSTALLATION DRAWINGS.

5.2. PROVIDE A LETTER AND/OR STAMP ON DOCUMENTS INDICATING THAT DESIGN

OVERSIGHT HAS BEEN PROVIDED AND THAT THE DESIGN IS IN COMPLIANCE

WITH ALL CONTRACT REQUIREMENTS.

5.3. QFPE IS NOT REQUIRED TO SEAL THE DESIGN DOCUMENTS AS A DESIGNER OF

RECORD (DOR), BUT MUST SEAL A LETTER TO VALIDATE THEIR PE

QUALIFICATIONS.

5.4. PROVIDE CONSTRUCTION SITE VISITS TO VERIFY THE INSTALLATION IS IN

ACCORDANCE WITH CONTRACT AND SHOP DRAWING REQUIREMENTS. AT

MINIMUM THIS INCLUDES INSPECTION PRIOR TO CEILINGS BEING INSTALLED.

5.5. PROVIDE DOCUMENTATION OF PRE-TESTING AND COMMISSIONING PLAN AND

STEPS TO BE TAKEN TO VERIFY SYSTEM COMPLIANCE AT LEAST 30 DAYS PRIOR

TO PERFORMING PRE-TESTING.

5.6. PROVIDE PRE-TESTING INSPECTION AND EVALUATION TO ENSURE SYSTEM

COMPLIANCE PRIOR TO SCHEDULING A FINAL COMMISSIONING TEST WITH

CONTRACTING OFFICER.

5.7. BE PRESENT FOR FINAL COMMISSION TESTING WITH THE CONTRACTING

OFFICER AND DESIGNATED REPRESENTATIVES.

5.8. PROVIDE DOCUMENTATION OF ALL FINDINGS, CORRECTIVE ACTIONS, AND

RESULTS OF PRE-TESTING AND FINAL COMMISSIONING.

BID OPTION NOTES:

1. BID OPTIONS MAY INCLUDE A COVERED CANOPY.

2. THIS BID OPTION CAN ONLY BE EXERCISED IF A UTILITY WATER SUPPLY DEFICIENCY

IS RESOLVED TO SUPPORT A DRY-PIPE SYSTEM WATER DEMAND.

3. IF EXERCISED, THE SYSTEM MUST INCORPORATE A NITROGEN GENERATOR

MONITORED BY THE FIRE ALARM SYSTEM.

4. THE DRY-PIPE VALVE AND NITROGEN GENERATOR WILL BE LOCATED ON THE

MEZZANINE OF THE NEW LAB BUILDING WHERE SPRINKLER EQUIPMENT IS IDENTIFIED.

5. PROVIDE FIRE ALARM MONITORING OF VALVES, HIGH PRESSURE, LOW PRESSURE,

TRIP, AND NITROGEN TROUBLE/OFF-LINE.

PANEL PROGRAMMING:

FIRE ALARM PANEL MUST BE

PROGRAMMED USING ACTUAL ROOM

NUMBERS. COORDINATE WITH FACILITY

ROOM SIGNAGE.

ACCESS CONTROL:

ACCESS CONTROL MUST NOT PREVENT

UNRESTRICTED EGRESS FROM ANY AREA.

ALL SYSTEMS MUST COMPLY WITH NFPA

101, IBC, AND NFPA 72.

S p

SLC

CD W

P-C-D c

P-C-D

SIGNALING LINE CIRCUIT #

CD W

c

S

W c

CD

S SB

F

WF

M

FIRE ALARM &

MASS NOTIFICATION LEGEND

CEILING MOUNT 4" SPEAKER WITH INITIAL WATTAGE TAP

INDICATED

CEILING MOUNTED CLEAR STROBE, WHITE TRIM, "ALERT"

TEXT. CANDELA INDICATED

4" CEILING MOUNTED SPEAKER/ STROBE WITH CLEAR LENS,

WHITE TRIM, AND "ALERT" TEXT. CANDELA AND INITIAL

WATTAGE INDICATED.

SMOKE DETECTOR (PHOTOELECTRIC). SB=SOUNDER BASE;

DH=DOOR HOLD; EL=ELEVATOR

DUCT SMOKE DETECTOR; S=SUPPLY, R=RETURN

INCLUDE RELAYS, TUBES, ETC.

MANUAL PULL STATION 48" AFF TO TOP OF BOX

FLOW SWITCH MODULE

TAMPER SWITCH MODULE

RELAY / CONTROL MODULES AS NEEDED

EST-4 AUTOMATIC INTELLIGENT, ADDRESSABLE FIRE ALARM

CONTROL UNIT. USER MAINTAINABLE.

WALL MOUNT SPEAKER/STROBE CLEAR LENS, WHITE TRIM,

"ALERT" TEXT. AT ~96" TO TOP. CANDELA AND CIRCUITS

INDICATED

WALL MOUNT MASS NOTIFICATION / FIRE ALARM SPEAKER

AT ~96" TO TOP TO MATCH SPEAKER/STROBES.

WP=WEATHER PROOF BACKBOX AND SPEAKER.

BOOSTER AMPLIFIER 100W CABINET WITH MINIMUM

4-CLASS "B" CIRCUITS.

DIRECTIONAL LOUD SPEAKER WITH VARIABLE OUTPUT

WATTAGES. LISTED FOR WET LOCATIONS. PROVIDE LIQUID

TIGHT FLEX WITH DRIP LEG. WATTAGE INDICATED

LOCAL OPERATOR CONTROL PANEL

NOTIFICATION APPLIANCE CIRCUIT STROBE/ TEXT PANEL

CAPABLE OF 4 CLASS "B" CIRCUITS

WALL MOUNT CLEAR STROBE, WHITE TRIM, "ALERT" TEXT,

AT ~96" TO TOP.

NAC

FACU

MNSA

DOOR HOLD-OPEN MODULE AND ASSEMBLY. PROVIDE 24

VOLT DC HOLD OPEN ASSEMBLY.

LOCKED AS-BUILT CABINET SIZED TO HOLD SHOP

DRAWINGS, DATA SHEETS, MANUALS FOR PANELS.

CD W

S

W

SS

TS

DH

RM

CO CARBON MONOXIDE DETECTOR - STAND ALONE

F

ELECTRIC WATER FLOW BELL, 24V, LOCATED ABOVE FDC AT

96" ABOVE GRADE. ON DEDICATED NAC CIRCUIT TO ALARM

DURING WATER FLOW.

NOTE: THE PANEL SYMBOLS BELOW ARE NOT IN COMPLIANCE WITH

NFPA 170 AS WE FEEL IT IS MORE IMPORTANT THAT THEY BE SIZED

TO SCALE OF TYPICAL PANELS OF THEIR TYPE TO ENSURE

ADEQUATE WALL SPACE IS PROVIDED FOR EQUIPMENT. NFPA

SYMBOLS WOULD NOT PROVIDE THIS NECESSARY SCALE.

HEAD-END VOICE PANEL WITH AMPLIFIERS IF NOT

INCORPORATED IN FACU.ACU

MONITOR / CONTROL MODULES AS NEEDEDMM

EXTERNAL SURGE PROTECTION WITH TROUBLE MONITORSS

ISOLATION MODULE FOR SIGNALING LINE CIRCUITISO

FIRE ALARM REMOTE ANNUNCIATOR, RECESSED IN WALL.

PROVIDE JUNCTION BOX WITH COVER PLATE WHICH

INCLUDES 6" LOOPED CIRCUITS AND LABELS ON CIRCUITS.

SIZE ACCORDING TO CIRCUITS PER NEC.

LOC

J

TXT

BASIC "ANNUNCIATE" AND "EVACUATE" LED TEXT SIGN FOR

MNS. MINIMAL SECONDARY POWER FOR POWER BLIPS

(7AH). NO VISIBLE TEXT WHEN NOT ILLUMINATED.

FIRE ALARM CONDUIT FILL - RECOMMENDED MAXIMUM CONDUCTORS PER CONDUIT

CONDUIT SIZEFPL 2-14 AWGFPL 2-16 AWGFPL 2-18 AWGTHHN 14 AWGTFFN 16 AWGTFFN 18 AWG

3/4" 5 6 7 17 21 28 1" 7 10 12 28 34 45

NO GUARANTEE IS PROVIDED WITH USING THIS TABLE. CONTRACTOR IS RESPONSIBLE TO ESTABLISH CONDUIT SIZE BASED ON WHAT THEY CAN SAFELY AND EFFECTIVELY PULL WITHOUT EXCEEDING NEC

LIMITS FOR FILL, DISTANCES, AND/OR DAMAGING CIRCUITS.

TWISTED FPL / FPLR / FPLP CABLES ARE CONSIDERABLY MORE DIFFICULT TO PULL THROUGH CONDUIT

THAN COMPARABLE SMOOTH THHN / TFFN SINGLE CONDUCTOR WIRE. AS A RESULT THE VALUES

PRESENTED IN THIS TABLE ARE RECOMMENDED MAXIMUMS. THESE VALUES ARE CONSERVATIVE FROM CALCULATING 40% FILL BASED ON GENERALLY PUBLISHED OUTSIDE CABLE DIMENSIONS. WIRE PULLING

LUBRICANT IS RECOMMENDED WHEN NEARING FILL QUANTITIES AND ON LONGER PULLS TO MINIMIZE

DAMAGE SUCH AS SHORTS & GROUND FAULTS ON CIRCUITS.

FPL / FPLR / FPLP CAN BE USED INTERCHANGEABLY PER THIS TABLE. VALUES INDICATE 2-CONDUCTOR CABLES (i.e. 2-14 AWG). SOME CABLES SUCH AS FPLP MAY PULL EASIER THAN FPL BASED ON OUTER

SHEATH.

CONTRACTOR TO ESTABLISH CONDUIT SIZE VS. RUNNING ADDITIONAL CONDUITS. ADDITIONAL

CONDUITS CAN REDUCE VOLTAGE DROP AND REDUCE CIRCUIT LENGTHS / NUMBER OF CIRCUITS.

JUNCTION BOX / PULL BOX CONDUCTOR FILL

CONTRACTOR TO ACCOUNT FOR THE NUMBER OF CIRCUITS PERMITTED WITHIN A JUNCTION BOX.

EXTENSION RINGS ARE NOT ALLOWED IN LIEU OF PROPERLY SIZING BOXES OR NUMBER OF

CONDUCTORS ENTERING THE BOX. THE FOLLOWING SUMMARIZES ALLOWABLE CIRCUITS PER BOX.

4" SQUARE 1-1/2" DEEP BOX 10- #14AWG 12- #16AWG 14- #18AWG

THESE VALUES DO NOT

ACCOUNT FOR BOXES WITH

MOUNTED DEVICES OR

MIXED CIRCUIT SIZES.

4" SQUARE 2-1/8" DEEP BOX 15- #14AWG 17- #16AWG 20- #18AWG

CIRCUITS TO BE PULLED SPLICE FREE AND WITHOUT "T" TAPS. THIS WILL

REQUIRE SOME CONDUITS TO HAVE TWO CIRCUITS (TO & BACK) FROM A

DEVICE TO CONTINUE TO NEXT DEVICE.

CELL BASED DACT OFF-SITE REPORTING TO CENTRAL

STATION MONITORING.TRC

RAP

TXT

STRANDED IS NOT

PERMITTED THIS PROJECT

FAULT ISOLATION

MODULE

ZONE - A

FROM ADJACENT

FACU TO NEXT MODULE OR

RETURN TO FACU

TO ISOLATED

SLC ZONE - A

FAULT ISOLATION

MODULE

ZONE - B

TO ISOLATED

SLC ZONE - B

THIS DETAIL UTILIZES A HYBRID CLASS A / B APPROACH

WITH LIMITED "T-TAPS" PERMITTED ON THE CLASS-A

CIRCUIT ADJACENT TO FACU. THIS APPROACH

PROVIDES FOR AN ENHANCED SYSTEM RELIABILITY

WITH VERY LITTLE ADDED COST VS. FULL-BUILDING

CLASS-A DESIGN.

THIS APPROACH ALLOWS CLASS-B SIGNALING LINE

CIRCUITS TO GO IN DIFFERENT DIRECTIONS ISOLATING

SMALLER ZONES RATHER THAN RUNNING ONE LONG

SLC THROUGHOUT ENTIRE BUILDING. ENHANCING

RELIABILITY AT LOWER CONDUIT AND CIRCUIT COSTS

OF OTHERWISE ZIG-ZAGING ACROSS BUILDING.

PROVIDE CLASS-A SIGNALING LINE CIRCUIT ADJACENT

TO FACU TO SERVE INDIVIDUAL ZONE ISOLATION

MODULES. THESE MODULES WILL PROVIDE CLASS-B

SIGNALING LINE CIRCUITS TO RESPECTIVE ZONES /

FLOOR AREAS AS IDENTIFIED ELSEWHERE.

FA-001

FIRE ALARM NOTES AND LEGEND

H S

P

UC

CF

L

KEY PLAN

BP

C

PPM

REVISIONS

Agricultural

Service Research

DESCRIPTION

SHEET

DATEc P.A.

FIRM

U

NO.

DEPM

SAFETY & HEALTH

REAL PROPERTY

A

DATE

PROJECT NO.

SUSDA

BY

AGRICULTURAL RESEARCH SERVICE

OF

THE

DESIGNER

PROJECT MANAGER

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson M Adams

ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT

USDA AGRICULTURAL RESEARCH SERVICE

SUGARCANE RESEARCH LABORATORY

HOUMA, LOUISIANA

17605/20/2026

REH

SWL

BT/DW FACILITIES ENGINEERING BRANCH

5106 SUNNYSIDE AVENUE

BELTSVILLE, MD 20705-5100

XXX

WN

XXX

CM

JS

5/20/26

LAB/OFFICE

SCALE:

CONDUIT FILL CONCEPT

NTS

FA-001 SCALE:

HYBRID CLASS A / B ZONE ISOLATION MODULES

NTS

FA-001

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE 1038

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE 1008

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

ROOM LEGEND

ROOM NO ROOM NAME

STORAGE

STORAGE

MEETING ROOM

PREP

JANITORIAL

CORRIDOR

CORRIDOR

WOMEN

MEN

CORRIDOR

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

SMALL CONFERENCE

CORRIDOR

TECH OFFICE

TECH OFFICE

TECH OFFICE

CAT 3 OFFICE

CAT 3 OFFICE

TECHNICIAN OFFICE

TECHNICIAN OFFICE

CORRIDOR

STORAGE

PLANT PHYSIOLOGY / SOILS

SUPPORT

SUPPORT

HALL

SCOPE

SCOPE

SHARED EQUIPMENT ROOM

SUPPORT

STORAGE

SUPPORT

SERVICE / UTILITY CORRIDOR

HALL

BSL-2 LABORATORY

SUPPORT

PATHOLOGY / MOLECULAR GENETICS (CLEAN)

PATHOLOGY / MOLECULAR GENETICS (DIRTY)

FILES

BREAK ROOM

POST-DOC / TECHICAL OFFICE

MAIL / WORK ROOM

ENTRY LOBBY

CORRIDOR

TECH OFFICE

TECH OFFICE

TECH OFFICE

PROGRAM ASSISTANT

RESEARCH LEADER

OFFICE

OFFICE

OFFICE

CORRIDOR

SPACE

15 1/4 c

15 1/4 c

15 1/4 c

15 1/4 c

15 1/4 c

1/4 c

1/4 c

1/4 c

1/4 c

1/4 c

1/4 c

1/4 c

1/4 c

S 1/4 c S 1/4 c S 1/4 cS 1/4 c

S 1/4 c

S 1/4 c

S 1/4 c

S 1/4 c

S 1/4 c

S 1/4 c

S 1/4 c

S 1/4 c

S 1/4 c

S 1/4 cS 1/4 cS 1/4 cS 1/4 cS 1/4 cS 1/4 cS 1/4 c

15 1/4 c

S 1/4 c S 1/4 c S 1/4 c

1/4c

1/4c

1/4c

1/4c

1/4 c

1/4 c

15 1/4 c

75 1/4 c

15 1/4 c

1/4 c

1/4c

15 1/4 c

1/4c

1/4c

1 c

1/4c

1/4c

15 1/4 c

15 1/4 c

F

F F FF

F

LO

C1

LOC

S 1/4 c

S 1/4 c

NO SPEAKER TO AVOID

FEEDBACK OVER LOC

NO SPEAKER TO AVOID

FEEDBACK OVER LOC

RAP

S 1/4 c

F

15 1/4 c

S 1/4 c S 1/4 c S 1/4 c

15 1/4 c

WATER FLOW BELL (ACROSS FROM EXISTING FDC)

EXISTING

FDC

FA-101

FIRST FLOOR FIRE ALARM PLAN

H S

P

UC

CF

L

KEY PLAN

BP

C

PPM

REVISIONS

Agricultural

Service Research

DESCRIPTION

SHEET

DATEc P.A.

FIRM

U

NO.

DEPM

SAFETY & HEALTH

REAL PROPERTY

A

DATE

PROJECT NO.

SUSDA

BY

AGRICULTURAL RESEARCH SERVICE

OF

THE

DESIGNER

PROJECT MANAGER

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson M Adams

ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT

USDA AGRICULTURAL RESEARCH SERVICE

SUGARCANE RESEARCH LABORATORY

HOUMA, LOUISIANA

17605/20/2026

REH

SWL

BT/DW FACILITIES ENGINEERING BRANCH

5106 SUNNYSIDE AVENUE

BELTSVILLE, MD 20705-5100

XXX

WN

XXX

CM

JS

5/20/26

LAB/OFFICE

SCALE:

FIRST FLOOR FIRE ALARM PLAN

1/8"=1'-0"

FA-101

PLAN

NORTH

TRUE

NORTH

08' 8'

1'-0"

4'

SCALE: 1/8" =

F F

1 c

1/4 c

0.8 M

M

1/4c

30 3030

S p

S p

FA

CU

NA

C

V1

AC

U

TE

XT

T1

SS

SS

SPRINKLER EQUIP.

WFTS WFTS

PROVIDE ADDITIONAL MONITORING

FOR DRY-PIPE SYSTEM AND

NITROGEN GENERATOR IF CANOPY

OPTION EXERCISED.

RUN FIBER / CIRCUIT PATH

BETWEEN BUILDINGS.

EXISTING HEADHOUSE BUILDING

SEE ARCHITECTURAL

DRAWINGS FOR THIS AREA AS

SOME AREAS ARE OPEN TO

BELOW AND WILL REQUIRE

HIGH LEVEL SPRINKLERS.

9'- 0"

'-0

ASSUMED PROPERTY LINE

BETWEEN BUILDINGS

ROOM LEGEND

ROOM NO ROOM NAME

SERVICE / UTILITY CORRIDOR

MECHANICAL PENTHOUSE

COMMUNICATIONS

ELECTRICAL ROOM

STORAGE

CORRIDOR

EXISTING HEADHOUSE BUILDING EXISTING HEADHOUSE BUILDING

NEW CONNECTION CORRIDOR

BETWEEN BUILDINGS

FA-102

SECOND FLOOR FIRE ALARM PLAN

H S

P

UC

CF

L

KEY PLAN

BP

C

PPM

REVISIONS

Agricultural

Service Research

DESCRIPTION

SHEET

DATEc P.A.

FIRM

U

NO.

DEPM

SAFETY & HEALTH

REAL PROPERTY

A

DATE

PROJECT NO.

SUSDA

BY

AGRICULTURAL RESEARCH SERVICE

OF

THE

DESIGNER

PROJECT MANAGER

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson M Adams

ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT

USDA AGRICULTURAL RESEARCH SERVICE

SUGARCANE RESEARCH LABORATORY

HOUMA, LOUISIANA

17605/20/2026

REH

SWL

BT/DW FACILITIES ENGINEERING BRANCH

5106 SUNNYSIDE AVENUE

BELTSVILLE, MD 20705-5100

XXX

WN

XXX

CM

JS

5/20/26

LAB/OFFICE

SCALE:

SECOND FLOOR FIRE ALARM PLAN

1/8"=1'-0"

FA-102

PLAN

NORTH

TRUE

NORTH

08' 8'

1'-0"

BASIS FOR DESIGN

LOCATION

NO. OF SPRINKLERSNO. OF SPRINKLERS

1. DENSITY

SYSTEM DEMAND

3. STATIC PRESSURE

AT THE BASE OF

OF DISCHARGE

2. DESIGNED AREA

1. WATER FLOW RATE

THE RISER

2. RESIDUAL PRESSURE

AUTOMATIC SPRINKLER SYSTEM

BY A HYDRAULICALLY DESIGNED

THIS BUILDING IS PROTECTED

HYDRAULIC SYSTEM

ECCENTRIC REDUCER

FS

PUMP

PANEL

CONTROLPS PS

FIRE

BYPASS

LINE

MAIN DRAIN VALVE

TO FLOOR DRAIN

2" DRAIN THROUGH

EXTERIOR WALL

FS

1 1/2

DRIP CHECK

BACKFLOW PREVENTER

6" DOUBLE CHECK

6"

6"

CHECK VALVE, TYPICAL

TAMPER SWITCH, TYPICAL

OS&Y VALVE WITH

6"

DRAIN

TO FLOOR

CONTROL PANEL

TO PUMP

MAIN FIRE

PUMP

JOCKEY FIRE

PUMP

6"

ZONE 1 - EXISTING HEADHOUSE

WET PIPE SPRINKLER

ZONE 2 - NEW LAB BUILDING

SUPPLY ZONE (NEW VALVE)

HOSE VALVE MANIFOLD

WITH HOSE VALVES, SIZE &

NUMBER PER NFPA 20

4" TO FIRE

DEPARTMENT CONNECTION

SEE FLOOR PLANS

DRIP

CHECK

DRAIN CUP

PRESSURE GAGE WITH SHUT OFF COCK

FIRE PROTECTION PIPING

FS FLOW SWITCH

OS&Y VALVE WITH TAMPER SWITCH

DRIP CHECK VALVE

SWING GATE CHECK VALVE

FP

ZONE RISER

FIRE PROTECTION LEGEND FOR THIS SHEET

POST INDICATOR VALVE

OS & Y

OS & Y WITH TAMPER SWITCH

ANGLE VALVE WITH DRAIN

SECTIONAL VALVE WITH DRAIN

SCALE:

SYSTEM IDENTIFICATION

NOT TO SCALE

FP-001

SCALE:

EXISTING SERVICE ENTRANCE AND ZONE RISERS

NOT TO SCALE

FP-001

GENERAL SPRINKLER NOTES:

1. SYSTEM MUST COMPLY WITH NFPA 13, LATEST EDITION AT TIME OF SOLICITATION.

2. UNLESS INDICATED OTHERWISE, LIMITED SPRINKLER PIPING AND SPRINKLERS ARE

SHOWN TO ESTABLISH REMOTE AREA FIRE FLOW DEMAND CALCS AND / COST

ESTIMATING.

3. CONTRACTOR IS TO PERFORM HYDRAULIC CALCULATIONS AND ESTABLISH PIPE SIZING

FOR SYSTEM.

4. REPLACE EXISTING FIRE PUMP CONTROLLER AND TRANSFER SWITCH.

5. LOCAL BUILDING AND FIRE PERMITS ARE NOT REQUIRED. FIRE DEPARTMENT WOULD LIKE

TO BE NOTIFIED AND ALLOWED TO INSPECT THE PROJECT FOR PRE-PLANNING

FUNCTIONS.

QUALITY CONTROL FIRE PROTECTION ENGINEER:

1. A QUALITY CONTROL FIRE PROTECTION ENGINEER (QFPE) IS REQUIRED FOR THIS

PROJECT.

2. THE QFPE MUST NOT BE AN EMPLOYEE OF THE INSTALLING CONTRACTOR.

3. THE QFPE IS TO BE A PART OF THE GENERAL CONTRACTORS QUALITY CONTROL TEAM.

3.1. IT IS RECOMMENDED THAT THE QFPE BE HIRED BY THE GENERAL CONTRACTOR.

3.2. IF THE FIRE ALARM AND/OR MASS NOTIFICATION SYSTEM ALSO REQUIRES THE

SERVICES OF A QFPE, THERE SHOULD BE A SINGLE QFPE PROVIDING OVERSIGHT OF

ALL FIRE PROTECTION SYSTEMS UNDER THE CONTROL AND DIRECTION OF THE

GENERAL CONTRACTOR.

4. THE QFPE MUST HAVE SPECIFIC DESIGN, INSPECTION, AND COMMISSIONING EXPERIENCE

IN FIRE PROTECTION SYSTEMS IDENTIFIED FOR THIS PROJECT.

5. UNLESS SPELLED OUT OTHERWISE, THE QFPE IS TO PROVIDE THE FOLLOWING MINIMUM

SERVICES:

5.1. PROVIDE OVERSIGHT IN THE DESIGN AND PREPARATION OF THE SYSTEM

INSTALLATION DRAWINGS.

5.2. PROVIDE A LETTER AND/OR STAMP ON DOCUMENTS INDICATING THAT DESIGN

OVERSIGHT HAS BEEN PROVIDED AND THAT THE DESIGN IS IN COMPLIANCE WITH

ALL CONTRACT REQUIREMENTS.

5.3. QFPE IS NOT REQUIRED TO SEAL THE DESIGN DOCUMENTS AS A DESIGNER OF

RECORD (DOR), BUT MUST SEAL A LETTER TO VALIDATE THEIR PE QUALIFICATIONS.

5.4. PROVIDE CONSTRUCTION SITE VISITS TO VERIFY THE INSTALLATION IS IN

ACCORDANCE WITH CONTRACT AND SHOP DRAWING REQUIREMENTS. AT MINIMUM

THIS INCLUDES INSPECTION PRIOR TO CEILINGS BEING INSTALLED.

5.5. PROVIDE DOCUMENTATION OF PRE-TESTING AND COMMISSIONING PLAN AND STEPS

TO BE TAKEN TO VERIFY SYSTEM COMPLIANCE AT LEAST 30 DAYS PRIOR TO

PERFORMING PRE-TESTING.

5.6. PROVIDE PRE-TESTING INSPECTION AND EVALUATION TO ENSURE SYSTEM

COMPLIANCE PRIOR TO SCHEDULING A FINAL COMMISSIONING TEST WITH

CONTRACTING OFFICER.

5.7. BE PRESENT FOR FINAL COMMISSION TESTING WITH THE CONTRACTING OFFICER

AND DESIGNATED REPRESENTATIVES.

5.8. PROVIDE DOCUMENTATION OF ALL FINDINGS, CORRECTIVE ACTIONS, AND RESULTS

OF PRE-TESTING AND FINAL COMMISSIONING.

RISER NOTES:

1. HEADHOUSE HAS AN EXISTING FIRE PUMP THAT IS TO ALSO SERVE THE NEW LAB AND

OFFICE BUILDING.

2. PIPING BETWEEN THE BUILDING MUST BE INSTALLED TO PREVENT FREEZING AND

INCLUDE SOURCES OF HEAT.

3. PROVIDE ISOLATION VALVE IN PUMP ROOM FOR NEW LAB BUILDING, IN ADDITION TO ZONE

VALVES IN LAB BUILDING ON MEZZANINE.

4. RISER AND ALL ASSOCIATED VALVES / EQUIPMENT ARE TO BE LOCATED TO PROVIDE A

MINIMUM OF 36 INCHES CLEAR WORKING SPACE.

5. IN ACCORDANCE WITH NFPA 13, A HYDRAULIC PLACARD AND INFORMATION PLACARD IS

TO BE PROVIDED. INFORMATION MUST BE PRESENTED IN A MANNER THAT WILL NOT

FADE. NON PIGMENT MARKERS ARE NOT ALLOWED.

6. PROVIDE ELECTRONIC 24-VOLT DC BELL FOR WATER FLOW DEDICATED TO LAB BUILDING

ZONES.

6.1. BELL IS TO BE CONFIGURED TO CONTINUOUSLY RING WHILE SPRINKLER WATER IS

FLOWING.

6.2. UNLESS INDICATED OTHERWISE, THE BELL IS TO BE LOCATED ABOVE OR NEAR THE

FIRE DEPARTMENT CONNECTION TO HELP IDENTIFY FDC TO FIRE DEPARTMENT.

7. FIRE DEPARTMENT CONNECTION IS EXISTING. PROVIDE NEW SIGNAGE UNDER EXTERIOR

STAIRS TO IDENTIFY LOCATION OF FDC.

8. ALL DRAINS ARE TO BE PIPED TO THE EXTERIOR.

8.1. PROVIDE A SPLASH BLOCK TO PREVENT EROSION.

8.2. PROVIDE PROVISIONS SO THAT MAIN-DRAIN TESTING WILL NOT ERODE

LANDSCAPING.

8.3. DRAIN MUST NOT BE IN A LOCATION THAT STAINING WILL BE OBTRUSIVE, SUCH AS

NEAR A MAIN BUILDING ENTRANCE.

9. EVERY VALVE MUST HAVE A SIGN INDICATING FUNCTION AND NORMALLY OPEN OR

NORMALLY CLOSED POSITION.

9.1. THIS INCLUDES MAIN VALVES, MAIN DRAINS, ALARM TRIM VALVE, AIR MAINTENANCE

VALVES, AUXILIARY DRAIN VALVES, INSPECTOR TEST VALVES, PRIMING VALVES, ETC.

9.2. SIGNAGE MUST BE PRINTED IN A MANNER THAT WILL NOT FADE.

9.3. THE USE OF PERMANENT INK MARKER THAT DOES NOT CONTAIN A FADE-RESISTANT

PIGMENT IS NOT ALLOWED.

FIRE PUMP NOTES:

1. THE FIRE PUMP WITHIN HEADHOUSE IS EXISTING.

2. PUMP IS RATED AT 75 PSI @ 500 GPM.

3. CURRENT WATER SUPPLY AT TIME OF ISSUING DOCUMENTS CANNOT SUPPORT FLOW

OVER 520 GPM AT 20 PSI. AS SUCH, STREET PRESSURE MUST BE MONITORED DURING

PUMP TESTING. UTILITY COMPANY INDICATES THEY HAVE A VALVE CLOSED AND PUMPS

OFF-LINE. FIRE DEPARTMENT IS AWARE OF CONDITIONS.

4. CONTRACTOR IS TO FIELD VERIFY ALL CONDITIONS.

5. SEE KEY PLAN ON THIS DRAWING FOR APPROXIMATE SPRINKLER MAIN ROUTING, FIRE

PUMP LOCATION, AND FDC LOCATION.

6. REPLACE FIRE PUMP CONTROLLER AND TRANSFER SWITCH PER NOTES.

7. SEE PUMP CONTROLLER DATA ON SHEET FP-101.

SPRINKLER HEAD GENERAL NOTES:

1. UNLESS INDICATED OTHERWISE THE FOLLOWING SUB-SECTIONS APPLY:

1.1. ALL SPRINKLERS ARE TO BE QUICK RESPONSE

1.2. SPRINKLER TEMPERATURES ARE TO BE IN ACCORDANCE WITH NFPA 13 FOR THE

SPACE AND HEAT SOURCES IN THE AREA OF THE SPRINKLERS.

1.3. SPRINKLER HEADS FOR ORDINARY HAZARD SPACES ARE TO BE K=8 WITH 3/4"

THREADS.

1.4. PENDENT SPRINKLERS ARE TO BE SEMI-RECESSED WITH CHROME FINISH.

1.5. SPRINKLERS IN COMMUNICATION CLOSETS, JANITOR CLOSETS, ELECTRICAL ROOMS,

OR SERVER ROOMS ARE TO HAVE CONCEALED HEADS WITHIN A FINISHED CEILING,

OR UPRIGHT HEADS WITH APPROVED GUARDS IN OPEN EXPOSED ROOMS.

1.6. ANY LOCATION IN WHICH A DRY-BARREL SPRINKLER IS INSTALLED MUST BE

INSTALLED TO EASILY FACILITATE REMOVAL / REPLACEMENT EVERY 20 YEARS PER

NFPA 25. AS SUCH, PROVISIONS ARE TO BE PROVIDED AS NEEDED TO APPLY

WRENCHES ON THE BACK-SIDE OF THE FITTING / PIPPING THAT THE SPRINKLER IS

INSTALLED.

1.7. DRY-BARREL STYLE FLEXIBLE SPRINKLERS ARE PROHIBITED.

1.8. FLEXIBLE SPRINKLER DROPS FOR WET-PIPE SYSTEMS ARE PERMITTED AS FOLLOWS:

1.8.1. ONLY BRAIDED HOSES ARE ALLOWED.

1.8.2. FLEXIBLE SEGMENT IS LIMITED TO 48 INCHES.

1.8.3. CEILING GRID BRACKETS MUST BE SUBSTANTIAL TO PREVENT THE SPRINKLER

HEAD FROM ROTATING IN THE CEILING GRID PREVENTING A COMPLETELY

FLUSH ESCUTCHEON.

1.8.4. HYDRAULIC CALCS MUST VALIDATE THE FRICTION LOSS.

1.8.5. SHOP DRAWINGS MUST SPECIFICALLY IDENTIFY THE BRAND, SIZE, NUMBER OF

BENDS ALLOWED, AND LENGTH OF HEAD USED IN CALCULATIONS TO BE

VERIFIED IN THE INSTALLATION.

2. ALL SPRINKLER HEADS IN SUSPENDED CEILINGS ARE TO BE CENTER OF TILE.

3. SPRINKLER HEADS IN HARD-LID CEILINGS ARE TO BE COORDINATED WITH OTHER

SYSTEMS (LIGHTS, VENTS, FIRE ALARM, ETC.) AS MUCH AS POSSIBLE WHILE ACHIEVING

CODE CRITERIA.

SPRINKLER DENSITY / AREA / CALCS:

1. SEE SCHEDULES FOR DENSITY BY ROOM / AREA.

2. PROVIDE OUTSIDE HOSE DEMAND PER NFPA 13.

3. SEE FIRE FLOW DATA ON THIS SHEET FOR BIDDING.

4. CONTRACTOR TO PERFORM AN ADDITIONAL FLOW TEST WITHIN 6 MONTHS OF

SUBMITTING CALCULATIONS. CALCULATIONS TO BE BASED ON WORST CASE OF THE TWO

FLOW TESTS.

5. CONTRACTOR IS TO PROVIDE PIPE SIZES WHERE SPECIFICALLY INDICATED. IF NOT

INDICATED, THE CONTRACTOR IS TO SIZE PIPING BASED ON CALCULATIONS.

6. ABOVE GROUND VELOCITY NOT TO EXCEED 25 FPS WITH UNDERGROUND VELOCITY NOT

TO EXCEED 10 FPS.

7. PROVIDE 10 PSI SAFETY MARGIN. THIS AREA WILL HAVE CONTINUED GROWTH AND

DEMAND ON THE EXISTING WATER SYSTEM.

8. AREA REDUCTIONS FOR QUICK RESPONSE HEADS ARE NOT ALLOWED.

9. SMALL ROOM SPACING IS PERMITTED IN ACCORDANCE WITH NFPA 13.

10. SYSTEM MAINS ARE TO BE NOT LESS THAN 2.5", SUCH AS EXTENDING TO THE END OF A

CORRIDOR.

SPRINKLER MATERIALS NOTES:

1. PROVIDE INSPECTOR TEST AND DRAIN WHICH INCORPORATES PRESSURE RELIEF WITHIN

RISER ROOM OR READILY ACCESSIBLE AREAS.

1.1. ADDITIONAL PRESSURE RELIEF APPLIES TO SUB-ZONES.

2. PROVIDE AIR VENT PER NFPA 13 ON HIGH POINT OF SYSTEM WITH DRAIN PIPED TO AN

EXTERIOR LOCATION.

2.1. ADDITIONAL AIR VENT APPLIES TO SUB-ZONES.

3. ALL DRAINS, INCLUDING AUX. DRAINS FOR TRAPPED WATER MUST BE PIPED TO EXTERIOR

OF BUILDING WITH SPLASH BLOCKS.

4. FDC IS EXISTING TO PUMP MANIFOLD.

5. ABOVE GROUND PIPE 2.5" AND LARGER TO BE BLACK STEEL SCHEDULE 10 OR SCHEDULE

40.

6. PIPE 2" OR SMALLER TO BE BLACK STEEL SCHEDULE 40.

7. THIN-WALL ALTERNATE PIPES ARE NOT PERMITTED.

8. ALL GROOVED FITTINGS TO BE OF SAME BRAND.

9. ALL REDUCER FITTINGS TO BE CONCENTRIC.

10. NO WET PIPE IS TO BE INSTALLED WITHIN AN EXTERIOR WALL THAT COULD BE SUBJECT

TO FREEZING TEMPERATURES.

10.1. WHERE A SECTION OF PIPE MUST BE RUN DOWN AN EXTERIOR WALL TO DRAIN, THE

POINT OF ISOLATION (VALVE) MUST BE LOCATED ABOVE A CEILING OR OTHER SPACE

NOT SUBJECT TO FREEZING WITH ONLY DRY PIPE BEING WITHIN THE WALL

ENCLOSURE.

SHOP DRAWINGS AND SUBMITTALS:

1. DETAILED SHOP DRAWINGS ARE TO BE PROVIDED IN ACCORDANCE WITH NFPA 13 AND

SPECIFICATIONS.

2. IN ADDITION TO CRITERIA IN SPECIFICATIONS, ENSURE SUBMITTALS INCLUDE AT MINIMUM

THE CRITERIA IN THIS SECTION.

2.1. FLOOR PLANS INCLUDING SIZES, REMOTE AREA DEMANDS, HANGER CRITERIA,

ELEVATION CHANGES, PIPE ELEVATIONS, AND BRACING.

2.2. ELEVATION VIEW CROSS SECTION OF TYPICAL MAIN AND BRANCH LINE ELEVATIONS.

2.3. RISER DETAIL

2.4. LOCATION OF RELIEF VALVES AND AIR VENTS.

2.5. LOCATION OF AUXILIARY DRAINS TO APPROVED LOCATIONS ENSURING THAT NO

WET PIPE IS WITHIN AN EXTERIOR WALL.

2.6. REVIEW AND LETTER FROM QFPE WHEN INDICATED.

TESTING AND INSPECTIONS:

1. ALL TESTING TO BE IN ACCORDANCE WITH NFPA 13 AND NFPA 24.

2. PRESSURE TEST PIPING AT 200 LBS FOR MINIMUM 2-HR. PROVIDE THIRD-PARTY WITNESS

AND CONTACT INFORMATION.

SPECIFIC SITE CONDITIONS:

1. CONTRACTOR TO COMPLY WITH LOCAL JURISDICTION REQUIREMENTS.

2. CONTRACTOR TO INCLUDE FEES AND SUBMIT FOR ALL LOCAL PERMITS AND INSPECTIONS

AS MAY BE APPLICABLE.

BID OPTION NOTES:

1. BID OPTION #1 MAY INCLUDE A COVERED CANOPY.

2. THIS BID OPTION CAN ONLY BE EXECUTED IF A UTILITY WATER SUPPLY DEFICIENCY IS

RESOLVED TO SUPPORT A DRY-PIPE SYSTEM OF OH1 / 1,950 FT2. THE CURRENT WATER

SUPPLY CANNOT SUPPORT THE INCREASED AREA OF DRY SYSTEM.

3. IF EXERCISED, THE SYSTEM MUST INCORPORATE A NITROGEN GENERATOR ON THE

MEZZANINE WITH LAB BUILDING SPRINKLER ZONE VALVES AND MONITORED BY THE FIRE

ALARM SYSTEM.

4. C-FACTOR OF DRY-PIPE MAY BE 120 IN ACCORDANCE WITH NFPA 13 UTILIZING NITROGEN.

5. WATER SUPPLY IS A CONCERN. SYSTEM MUST BE CAREFULLY BALANCED BETWEEN

PRESSURES AND FLOWS FOR THE AVAILABLE SUPPLY.

6. THE DRY-PIPE VALVE AND NITROGEN GENERATOR WILL BE LOCATED ON THE MEZZANINE

OF THE NEW LAB BUILDING WHERE SPRINKLER EQUIPMENT IS IDENTIFIED.

7. COORDINATE WITH ELECTRICAL FOR LARGER CIRCUITS IF NITROGEN GENERATOR

REQUIRES > 20AMP 120VAC CIRCUIT.

8. GALVANIZED PIPE CANNOT BE USED.

9. ALL PIPING MUST BE CLEANED, PRIMED, AND PAINTED RED ENAMEL WITH UV PROTECTED

PIGMENTS FOR EXTERIOR USE.

10. PIPE MUST BE SLOPED PER NFPA 13 WITH DRUM DRIP DRAINS PROVIDED.

11. PROVIDE SPRINKLER PROTECTION OVER AND UNDER THE CONNECTING WALKWAY IF BID

OPTION #1 IS EXECUTED.

12. PROVIDE FIRE ALARM MONITORING OF VALVES, HIGH PRESSURE, LOW PRESSURE, TRIP,

AND NITROGEN TROUBLE/OFF-LINE.

THE INFORMATION IN THIS DETAIL IS FROM ORIGINAL

HEADHOUSE DESIGN DOCUMENTS. CONTRACTOR IS

RESPONSIBLE TO FIELD VERIFY ALL EXISTING

CONDITIONS.

SCALE:

PRELIMINARY WATER SUPPLY AND DEMAND

NOT TO SCALE

FP-001

SECURE HYDRAULIC CALC DATA TO RISER PIPE AT

FIRE PUMP MANIFOLD AND ALSO AT SECOND FLOOR

ZONE VALVES IN NEW LAB BUILDING. ALSO PROVIDE

INFORMATION SHEET AS REQUIRED BY NFPA 13 AT

PUMP ROOM RISER.

6" SUPPLY RUNS OVERHEAD TO OTHER SIDE OF BUILDING WHERE IT TURNS DOWN AND OUT

BETWEEN HEADHOUSE AND GREEN HOUSE BUILDINGS. SEE ORIGINAL SPRINKLER CONTRACTOR

DRAWINGS FOR CONCEPT ROUTING.

FIRE FLOW TEST WAS PERFORMED ON 4/16/2026. NOTE THAT THE AVAILABLE WATER ONLY ALLOWS FOR A FLOW OF 520 GPM AT 20 PSI. AS SUCH, THE FIRE PUMP CANNOT BE TESTED AT RATED FLOW. SUCTION PRESSURES MUST BE MONITORED AT THE STREET TO MAINTAIN 20 PSI IN SYSTEM. WHEN PERFORMING A FIRE FLOW TEST THE TEST PRESSURE MUST BE MONITORED TO MAINTAIN ABOVE 20 PSI. THIS MAY CAUSE A CHALLENGE WITH FULL OPERATION OF THE FLOW HYDRANT TO PROPERLY SEAT DRAIN VALVE. UTILITY PROVIDER WAS PRESENT AND AWARE OF WATER SUPPLY ISSUE AS THEY HAD VALVES AND PUMPS OFF-LINE AT TIME OF TESTING. ESTIMATED TIME OF SYSTEM RETURNING TO SERVICE

COULD NOT BE PROVIDED.

4"4"

FIRST FLOOR ZONE

ASSEMBLY

MEZZANINE FLOOR ZONE

ASSEMBLY

CANOPY DRY-PIPE RISER

(IF PROVIDED UNDER OPTIONS)

FROM EXISTING FIRE PUMP

IN ADJACENT BUILDING

DOWN TO

FIRST FLOOR

SPRINKLER MANIFOLD ON

MEZZANINE

SCALE:

SPRINKLER MANIFOLD IN LAB BUILDING

NOT TO SCALE

FP-001

NITROGEN

GENERATOR

(IF PROVIDED

UNDER OPTION)

FDC

SCALE:

FIRE DEPARTMENT CONNECTION SIGN

NOT TO SCALE

FP-001

CURRENT FDC IS NOT IDENTIFIED PER CODE.

PROVIDE SIGNAGE WITH MINIMUM 5" HIGH

LETTERS, REFLECTIVE RED ON REFLECTIVE

WHITE BACKGROUND, ALUMINUM GRADE

TRAFFIC GRADE ALUMINUM.

PROVIDE BRACING AND ATTACH TO METAL

STAIR STRUCTURE, JUST OUT FROM WALL

WHERE INDICATED. SIGN TO IDENTIFY

LOCATION OF EXISTING FDC.

SEE KEY PLAN THIS SHEET FOR GENERAL SIGN

LOCATION.

FS

FS

INSPECTOR TEST / DRAIN / PRESSURE RELIEF

TDR

TDR

TDR

FP-001

FIRE PROTECTION SPRINKLER NOTES

H S

P

UC

CF

L

KEY PLAN

BP

C

PPM

REVISIONS

Agricultural

Service Research

DESCRIPTION

SHEET

DATEc P.A.

FIRM

U

NO.

DEPM

SAFETY & HEALTH

REAL PROPERTY

A

DATE

PROJECT NO.

SUSDA

BY

AGRICULTURAL RESEARCH SERVICE

OF

THE

DESIGNER

PROJECT MANAGER

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson M Adams

ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT

USDA AGRICULTURAL RESEARCH SERVICE

SUGARCANE RESEARCH LABORATORY

HOUMA, LOUISIANA

17605/20/2026

REH

SWL

BT/DW FACILITIES ENGINEERING BRANCH

5106 SUNNYSIDE AVENUE

BELTSVILLE, MD 20705-5100

XXX

WN

XXX

CM

JS

5/20/26

LAB/OFFICE

FIRE PUMP

APPROXIMATE FIRE WATER ROUTING FROM

TAP, ON-SITE HYDRANT, AND TO FIRE PUMP

FROM SPRINKLER DRAWINGS. FIELD VERIFY.

TAP

HYD

FDC

SIGN

AREA "C" BID OPTION 1.

SEE 2ND FLOOR AND

ARCHITECTURAL DRAWINGS FOR

HIGH CEILING THESE ROOMS.

ORDINARY HAZARD GROUP 1

LIGHT HAZARD

LEGEND

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE 1038

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE 1008

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

SPACE

ROOM LEGEND

ROOM NO ROOM NAME

STORAGE

STORAGE

MEETING ROOM

PREP

JANITORIAL

CORRIDOR

CORRIDOR

WOMEN

MEN

CORRIDOR

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

SMALL CONFERENCE

CORRIDOR

TECH OFFICE

TECH OFFICE

TECH OFFICE

CAT 3 OFFICE

CAT 3 OFFICE

TECHNICIAN OFFICE

TECHNICIAN OFFICE

CORRIDOR

STORAGE

PLANT PHYSIOLOGY / SOILS

SUPPORT

SUPPORT

HALL

SCOPE

SCOPE

SHARED EQUIPMENT ROOM

SUPPORT

STORAGE

SUPPORT

SERVICE / UTILITY CORRIDOR

HALL

BSL-2 LABORATORY

SUPPORT

PATHOLOGY / MOLECULAR GENETICS (CLEAN)

PATHOLOGY / MOLECULAR GENETICS (DIRTY)

FILES

BREAK ROOM

POST-DOC / TECHICAL OFFICE

MAIL / WORK ROOM

ENTRY LOBBY

CORRIDOR

TECH OFFICE

TECH OFFICE

TECH OFFICE

PROGRAM ASSISTANT

RESEARCH LEADER

OFFICE

OFFICE

OFFICE

CORRIDOR

SPACE

FP-101

FIRST FLOOR SPRINKLER PLAN

H S

P

UC

CF

L

KEY PLAN

BP

C

PPM

REVISIONS

Agricultural

Service Research

DESCRIPTION

SHEET

DATEc P.A.

FIRM

U

NO.

DEPM

SAFETY & HEALTH

REAL PROPERTY

A

DATE

PROJECT NO.

SUSDA

BY

AGRICULTURAL RESEARCH SERVICE

OF

THE

DESIGNER

PROJECT MANAGER

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson M Adams

ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT

USDA AGRICULTURAL RESEARCH SERVICE

SUGARCANE RESEARCH LABORATORY

HOUMA, LOUISIANA

17605/20/2026

REH

SWL

BT/DW FACILITIES ENGINEERING BRANCH

5106 SUNNYSIDE AVENUE

BELTSVILLE, MD 20705-5100

XXX

WN

XXX

CM

JS

5/20/26

LAB/OFFICE

SCALE:

FIRST FLOOR SPRINKLER PLAN

1/8"=1'-0"

FP-101

PLAN

NORTH

TRUE

NORTH

08' 8'

1'-0"

4'

SCALE: 1/8" =

SCALE:

FIRE PUMP CONTROLLER AND TRANSFER SWITCH DATA

NTS

FP-101

FIRE PUMP CONTROLLER NOTES:

1. THE EXISTING FIRE PUMP CONTROLLER HAS EXPERIENCED A LOW VOLTAGE DETECTION FAULT. CONTROLLER

SETTINGS HAVE BEEN ADJUSTED TO NOT ALARM. THE CONTROLLER IS NO LONGER SUPPORTED BY MFG.

2. CONTRACTOR IS TO VERIFY THAT THE PUMP CONTROLLER HAS NOT BEEN PREVIOUSLY REPLACED PRIOR TO

ORDERING. A CREDIT IS TO BE ISSUED IF PREVIOUSLY REPLACED DUE TO CONTRACTING DELAYS.

3. CONTROLLER SHOULD BE COORDINATED TO BE REPLACED AS SOON AS POSSIBLE FOLLOWING AWARD OF

CONTRACT AND NOT TO EXCEED 90 DAYS.

4. REPLACE THE CONTROLLER AND TRANSFER SWITCH WITH MANUFACTURER COMPATIBLE EQUIVALENT SUCH AS:

4.1. FIRETROL FTA1930-AM30B-TSA-JKP

4.2. REPLACEMENT INFORMATION PROVIDED BY FIRETROL / METRON REPRESENTATIVE CRAIG FINK OF AMPAIR, INC. OF HOUSTON, TX.

4.3. CONTRACTOR TO VERIFY EQUAL REPLACEMENT.

5. CONTROLLER TO BE IN ACCORDANCE WITH NFPA 20 & 70, LATEST EDITION AT TIME OF SOLICITATION.

6. PROVIDE R QUALIFIED ELECTRICAL PERSONNEL TO ISOLATE AND REPLACE EQUIPMENT ENSURING

LOCK-OUT-TAG-OUT PROCEDURES ARE FOLLOWED, INCLUDING POWER FROM GENERATOR.

4. PROVIDE FACTORY AUTHORIZED CONTROLLER MANUFACTURER REPRESENTATIVE TO INSPECT AND PERFORM

FIRE PUMP TESTING TO VERIFY PERFORMANCE.

5. PROVIDE ALL EQUIPMENT AND TESTING NECESSARY TO PERFORM REPLACEMENT IN ACCORDANCE WTIH NFPA 70

AND NFPA 20.

6. INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURER RECOMMENDATIONS FOR THE EQUAL

REPLACEMENT AND CODE COMPLIANCE.

7. WATER SUPPLY PRESSURE MUST BE MONITORED AT STREET HYDRANT DURING ALL PUMP FLOW TESTING TO

ENSURE WATER MAIN DOES NOT DROP BELOW 20 PSI.

8. ENSURE ALL EQUIPMENT IS ON-SITE PRIOR TO STARTING REPLACEMENT.

9. COORDINATE ALL TRADES AND REPLACEMENT SO THAT FIRE PUMP IS NOT OUT OF SERVICE FOR MORE THAN A

72-HOUR PERIOD.

10. IMPAIRMENT PROCEDURES PER NFPA 25 ARE TO BE FOLLOWED.

ROOM LEGEND

ROOM NO ROOM NAME

SERVICE / UTILITY CORRIDOR

MECHANICAL PENTHOUSE

COMMUNICATIONS

ELECTRICAL ROOM

STORAGE

CORRIDOR

SPRINKLER EQUIP.

MINIMUM 4"SPRINKLER LINE FROM EXISTING FIRE PUMP AND RISER

MANIFOLD. RUN ACROSS CONNECTING BRIDGE WITH OTHER UTILITY

LINES. MUST BE RUN IN CONDITIONED / HEATED SPACE. HEAT

TRACING IS NOT PERMITTED.

EXTEND SPRINKLER PROTECTION FOR CONNECTOR

CORRIDOR FROM HEADHOUSE SYSTEM.

PROVIDE OFFSETS (ELEVATION &

HORIZONTAL) WITH FLEXIBLE FITTINGS FOR

EXPANSION JOINTS (~1" MOVEMENT).

PROVIDE OFFSETS (ELEVATION &

HORIZONTAL) WITH FLEXIBLE FITTINGS

FOR EXPANSION JOINTS.

OVER-SIZE HOLE FOR EXPANSION

MOVEMENT WITH 2-HR FIRE STOP.

EXISTING HEADHOUSE BUILDING

SEE ARCHITECTURAL

DRAWINGS FOR THIS AREA AS

SOME AREAS ARE OPEN TO

BELOW AND WILL REQUIRE

HIGH LEVEL SPRINKLERS.

ORDINARY HAZARD GROUP 1

LIGHT HAZARD

LEGEND

FP-102

SECOND FLOOR SPRINKLER PLAN

H S

P

UC

CF

L

KEY PLAN

BP

C

PPM

REVISIONS

Agricultural

Service Research

DESCRIPTION

SHEET

DATEc P.A.

FIRM

U

NO.

DEPM

SAFETY & HEALTH

REAL PROPERTY

A

DATE

PROJECT NO.

SUSDA

BY

AGRICULTURAL RESEARCH SERVICE

OF

THE

DESIGNER

PROJECT MANAGER

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson M Adams

ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT

USDA AGRICULTURAL RESEARCH SERVICE

SUGARCANE RESEARCH LABORATORY

HOUMA, LOUISIANA

17605/20/2026

REH

SWL

BT/DW FACILITIES ENGINEERING BRANCH

5106 SUNNYSIDE AVENUE

BELTSVILLE, MD 20705-5100

XXX

WN

XXX

CM

JS

5/20/26

LAB/OFFICE

SCALE:

SECOND FLOOR SPRINKLER PLAN

1/8"=1'-0"

FP-102

PLAN

NORTH

TRUE

NORTH

08' 8'

1'-0"

COURTYARD

COURTYARD

CSFP101

BID OPTION #1 SPRINKLER DRY-PIPE

H S

P

UC

CF

L

KEY PLAN

BP

C

PPM

REVISIONS

Agricultural

Service Research

DESCRIPTION

SHEET

DATEc P.A.

FIRM

U

NO.

DEPM

SAFETY & HEALTH

REAL PROPERTY

A

DATE

PROJECT NO.

SUSDA

BY

AGRICULTURAL RESEARCH SERVICE

OF

THE

DESIGNER

PROJECT MANAGER

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson M Adams

ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT

USDA AGRICULTURAL RESEARCH SERVICE

SUGARCANE RESEARCH LABORATORY

HOUMA, LOUISIANA

17605/20/2026

REH

SWL

BT/DW FACILITIES ENGINEERING BRANCH

5106 SUNNYSIDE AVENUE

BELTSVILLE, MD 20705-5100

XXX

WN

XXX

CM

JS

5/20/26

LAB/OFFICE

08' 8'

1'-0"

4'

SCALE: 1/8" =

LEGEND

NOTE:

DRY PIPE SYSTEM VALVES AND AIR NITROGEN GENERATOR TO

BE LOCATED ON MEZZANINE OF LAB BUILDING.

SCALE:

WALKWAY - CANOPY PLAN - BID OPTION #1

1/8"=1'-0"

CSFP101

PLAN

NORTH

TRUE

NORTH

SCALE:

WALKWAY - GROUND LEVEL - PLAN BID OPTION #1

1/8"=1'-0"

CSFP101

PLAN

NORTH

TRUE

NORTH

BID OPTION 1 CANOPY NOTES:

1. AT TIME OF DESIGN THE WATER SUPPLY CANNOT SUPPORT DRY-PIPE PROTECTION

OF THE PROPOSED EXTERIOR CANOPY WITH THE 30% INCREASED SPRINKLER

DESIGN AREA. BEFORE THIS OPTION CAN BE EXERCISED THE UTILITY WATER

SUPPLY WILL NEED TO BE CORRECTED. (AS OF DESIGN THERE ARE UTILITY

COMPANY PUMPS OFF-LINE AND A VALVE CLOSED SERVING THE STREET MAIN.)

2. IF THE WATER SUPPLY ISSUE IS RESOLVED AND THE CANOPY OPTION IS EXERCISED,

THE FOLLOWING NOTES APPLY.

3. A NEW FIRE FLOW TEST WOULD NEED TO BE PERFORMED TO VERIFY. THE UTILITY

COMPANY WOULD NEED TO VERIFY IN WRITING THAT THE HIGHER FLOW CONDITIONS

WILL BE MAINTAINED AS THE NORMAL CONDITION.

4. SEE BID OPTION NOTES ON FP001.

5. COORDINATE ADDITIONAL FIRE ALARM MONITORING BETWEEN TRADES.

6. COORDINATE NITROGEN GENERATOR WIRE / CIRCUIT SIZE WITH ELECTRICAL.

LOCATE THE NITROGEN GENERATOR ON MEZZANINE OF LAB BUILDING WHERE

SPRINKLER EQUIPMENT IS INDICATED.

7. DRY-PIPE SPRINKLERS MUST BE PROVIDED OVER AND UNDER THE CONNECTING

WALKWAY BETWEEN BUILDINGS.

8. SLOPE PIPE AND PROVIDE LOW POINT DRAINS PER NFPA 13.

9. SEE ARCHITECTURAL ELEVATION VIEWS FOR CHANGES IN CANOPY ELEVATION.

BID OPTION COVERED CANOPY / WALKWAY. OHG1 0.1 / 1,950 FT2 (1,500 FT2 + 30%)

DRY-PIPE SYSTEM SERVED FROM NEW LAB BUILDING. PROVIDE DRY-PIPE PROTECTION

OVER AND UNDER THE CONNECTING WALKWAY. INSIDE THE WALKWAY IS TO BE

PROTECTED FROM WET-PIPE SYSTEM IN HEADHOUSE.

EXTEND WET PIPE SPRINKLER LINE FROM HEADHOUSE

TO SPRINKLERS IN WALKWAY.

CORRIDOR 2102 (BRIDGE)

BRIDGE OVERHEAD

PPM

REVISIONS

Agricultural

Service Research

DESCRIPTION

SHEET

DATEc P.A.

FIRM

U

NO.

DEPM

SAFETY & HEALTH

REAL PROPERTY

A

DATE

PROJECT NO.

SUSDA

BY

AGRICULTURAL RESEARCH SERVICE

OF

THE

DESIGNER

PROJECT MANAGER

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson M Adams

ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT

USDA AGRICULTURAL RESEARCH SERVICE

SUGARCANE RESEARCH LABORATORY

HOUMA, LOUISIANA

PLUMBING GENERAL NOTES,

ABBREVIATIONS, AND LEGEND

P-001 97 17605/20/2026

REH

SME

DRL FACILITIES ENGINEERING BRANCH

5106 SUNNYSIDE AVENUE

BELTSVILLE, MD 20705-5100

XXX

WN

XXX

CM

JS

PLUMBING ABBREVIATIONS: GENERAL PLUMBING NOTES:

1. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS (DO NOT SCALE FOR

LOCATIONS). THE CONTRACTOR MUST PROVIDE A COMPLETE AND FUNCTIONAL PLUMBING SYSTEM AS INDICATED WITH ALL NECESSARY

EQUIPMENT, APPURTENANCES AND CONTROLS AS INDICATED.

2. THE PLUMBING CONTRACTOR MUST REVIEW THE DRAWINGS OF OTHER TRADES AS PART OF THIS CONTRACT FOR ADDITIONAL WORK REQUIRED AND FOR COORDINATION OF PLUMBING WORK FOR OPERATIONS OF OR CONNECTIONS TO OTHER TRADES.

3. REMOVE AND CAP CONNECTING UTILITIES (WATER, DRAINAGE, POWER, GAS, ETCETERA) AS INDICATED OR NECESSARY FOR FUTURE

RECONNECTION.

4. CONTRACTOR MUST EMPLOY WORKMEN WHO ARE TRAINED AND EXPERIENCED IN NECESSARY SKILLS TO PERFORM PLUMBING AND

PLUMBING DEMOLITION WORK.

5. CONTRACTOR MUST USE APPROPRIATE TOOLS AND MUST NOT IMPART EXCESSIVE VIBRATIONS TO THE EXISTING STRUCTURE OR OTHER

BUILDING COMPONENTS.

6. MAKE OFFSETS AND TRANSITIONS TO COORDINATE WITH OTHER TRADES WITHOUT ANY ADDITIONAL EXPENSE TO THE OWNER.

CONTRACTOR MUST PROVIDE COORDINATION DRAWINGS OF TRADES.

7. ALL NEW & DEMOLISHED PIPING PENETRATIONS TO THE BUILDING ENVELOPE MUST BE FULLY SEALED WATER TIGHT.

8. CONTRACTOR MUST FIELD VERIFY EXACT LOCATIONS AND POINTS OF CONNECTIONS TO THE EXISTING UTILITIES (DOMESTIC WATER &

SANITARY SEWER, NATURAL GAS, ETCETERA).

9. REFER TO SPECIFICATIONS, SHEET NOTES, DETAILS AND SCHEDULES FOR ADDITIONAL REQUIREMENTS PERTAINING TO THE PLUMBING

WORK.

10. ALL WORK (MATERIALS, EQUIPMENT, DEVICES, COMPONENTS, SYSTEMS, SUPPORTS, ETCETERA) MUST COMPLY WITH THE

REQUIREMENTS OF ALL CODES, CODE AMENDMENTS, AND ORDINANCES AS USED, ADOPTED AND/OR ENFORCED…