C04_Attachment 4 Wage Determination IL20260014.pdf

PDF 51 KB Posted

Attached to
Demolition of Building 4 and Conversion to Asphalt Parking Lot
Solicitation number
1232SA26Q0791
Issued by

About this file

This is a General Decision wage determination document issued by the U.S. Department of Labor for Illinois heavy and highway construction projects. The determination applies to ten Illinois counties: Fulton, Hancock, Henderson, Knox, McDonough, Mercer, Peoria, Stark, Tazewell, and Warren. The document was initially published on January 2, 2026, with a modification dated May 18, 2026, establishing the prevailing wage rates and fringe benefits that contractors must pay workers on federally funded construction projects within this jurisdiction.

The wage determination specifies hourly rates and fringe benefit packages for numerous construction trade classifications including carpenters, electricians, ironworkers, laborers, equipment operators, painters, cement masons, and truck drivers. Rates vary by county and sometimes by geographic subdivisions within counties. For example, carpenter rates range from $35.05 to $40.28 per hour depending on location, with fringe benefits varying from $25.80 to $38.95. Electrician rates span from $36.51 to $58.58 per hour based on work type and location. Equipment operator rates are stratified into groups with hourly wages ranging from approximately $37.80 to $47.79. The document notes that Executive Order 13706 requires contractors to provide one hour of paid sick leave for every 30 hours worked (up to 56 hours annually), and Executive Order 13658 establishes a minimum wage requirement of $13.65 per hour for covered workers through December 31, 2026. The determination includes procedures for wage appeals and provides rate identifier explanations for union rates, weighted union averages, survey rates, and state-adopted rates.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"General Decision Number: IL20260014 05/18/2026

State: Illinois

Construction Types: Heavy and Highway

Counties: Illinois Counties of Fulton, Hancock, Henderson, Knox, McDonough, Mercer, Peoria, Stark, Tazewell and Warren

Heavy Construction

Highway Construction

Modification Number Publication Date 0 01/02/2026 1 05/18/2026

CARP0004-009 05/01/2025

Rates Fringes

CARPENTER (HENDERSON AND MERCER COUNTIES)...........$ 38.00 35.16

CARP0174-003 05/01/2025

Rates Fringes

CARPENTER (STARK COUNTY)............................$ 40.28 38.95

CARP0237-003 05/15/2020

Rates Fringes

CARPENTER (FULTON AND TAZEWELL (SOUTHERN 2/3)

COUNTIES)...........................................$ 36.16 30.07

CARP0237-013 05/15/2020

Rates Fringes

PILEDRIVERMAN (FULTON, KNOX, PEORIA, AND TAZEWELL

(NORTHERN 1/3) COUNTIES)............................$ 36.16 30.07

CARPENTER (FULTON, KNOX, PEORIA, AND TAZEWELL

(NORTHERN 1/3) COUNTIES)............................$ 36.16 30.07

CARP0270-010 05/15/2020

Rates Fringes

PILEDRIVERMAN (MCDONOUGH AND WARREN COUNTIES).......$ 37.66 28.57

CARPENTER (MCDONOUGH AND WARREN COUNTIES)...........$ 37.66 28.57

CARP0270-011 05/15/2020

Rates Fringes

PILEDRIVERMAN (HANCOCK COUNTY)......................$ 35.05 28.57

CARPENTER (HANCOCK COUNTY)..........................$ 35.05 28.57

ELEC0034-006 03/01/2018

Rates Fringes

ELECTRICIAN (FULTON (FAIRVIEW, FARMINGTON, JOSHUA,

CANTON, ORION, PUTNAM, BUCKHEART, BANNER, FARMERS,

BERNADOTTE, LEWISTOWN, LIVERPOOL, VERMONT,

PLEASANT, ISABEL, WATERFORD, ASTORIA, WOODLAND, AND

KERTON TWPS), PEORIA, STARK (WEST JERSEY, ESSEX,

AND VALLEY TWPS), & TAZEWELL COUNTIES)..............$ 36.51 21.19

ELEC0034-007 06/01/2022

Rates Fringes

ELECTRICIAN (FULTON (CASS, DEERFIELD, ELLISVILLE,

HARRIS, LEE, UNION, YOUNG, & HICKORY TWPS),

HENDERSON, KNOX, MCDONOUGH (BLANDINSVILLE, PRAIRIE

CITY, EMMET, TENNESEE, SCOTLAND, SCIOTA, BUSHNELL,

CHALMERS TWPS), MERCER (OHIO GROVE, NORTH

HENDERSON, AND SUEZ TWPS), AND WARREN COUNTIES).....$ 38.32 24.24

ELEC0051-002 01/01/2024

Rates Fringes

LINE CONSTRUCTION: LINEMAN AND SUBSTATION

TECHNICIAN (FULTON, HANCOCK, HENDERSON, KNOX,

MCDONOUGH, MERCER (N. HENDERSON & SUEZ TWPS),

PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES).......$ 58.58 26.29

LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER (FULTON,

HANCOCK, HENDERSON, KNOX, MCDONOUGH, MERCER (N.

HENDERSON & SUEZ TWPS), PEORIA, STARK, TAZEWELL,

AND WARREN COUNTIES)................................$ 39.92 20.22

LINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR

(ALL CRAWLER TYPE EQUIPMENT LARGER THAN D-4, 15 TON

CRANE OR LARGER) (FULTON, HANCOCK, HENDERSON, KNOX,

MCDONOUGH, MERCER (N. HENDERSON & SUEZ TWPS),

PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES).......$ 52.63 24.35

ELEC0145-006 06/02/2025

Rates Fringes

ELECTRICIAN (MERCER COUNTY (EXCEPT OHIO GROVE,

NORTH HENDERSON, AND SUEZ TWPS))....................$ 46.00 28.56

CABLE SPLICER (MERCER COUNTY (EXCEPT OHIO GROVE,

NORTH HENDERSON, AND SUEZ TWPS))....................$ 47.00 28.64

ELEC0145-007 12/04/2023

Rates Fringes

LINE CONSTRUCTION: LINEMAN, TECHNICIAN, HEAVY

EQUIPMENT OPERATOR (MERCER COUNTY (EXCEPT NORTH

HENDERSON AND SUEZ TWPS)) FOOTNOTE: A.

PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, AND THANKSGIVING DAY.....................$ 52.67 24.38

LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (MERCER

COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS))

FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY...$ 36.15 18.93

LINE CONSTRUCTION: GROUNDMAN (MERCER COUNTY (EXCEPT

NORTH HENDERSON AND SUEZ TWPS)) FOOTNOTE:

A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, AND THANKSGIVING DAY.....................$ 34.64 18.43

LINE CONSTRUCTION: DYNAMITER (MERCER COUNTY (EXCEPT

NORTH HENDERSON AND SUEZ TWPS)) FOOTNOTE:

A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, AND THANKSGIVING DAY.....................$ 43.92 21.49

LINE CONSTRUCTION: CABLE SPLICER (MERCER COUNTY

(EXCEPT NORTH HENDERSON AND SUEZ TWPS))

FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY...$ 53.12 24.53

LINE CONSTRUCTION, GROUNDMAN EQUIPMENT OPERATOR

(MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ

TWPS)) ............................................$ 41.61 20.73

ENGI0150-021 06/01/2025

Rates Fringes

OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR

(400 C.F.M. OR OVER); COMPACT LOADER (RUBBER TIRE,

TRACK & UTILITY); ENGINE DRIVEN WELDING MACHINE;

MECHANICAL HEATER (OTHER THAN STEAM BOILER); SMALL

OUTBOARD MOTOR BOAT (SAFETY BOAT & LIFE BOAT);

WATER PUMP (MORE THAN ONE WELL POINT PUMP).

(MERCER COUNTY).....................................$ 37.80 41.25

OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED

OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER

(ENGINEER OR FIREMAN); CONVEYOR OVER 20 H.P.;

DISTRIBUTOR; DRIVER ON TRUCK CRANE OR SIMILAR

MACHINES; ELEVATOR; FARM-TYPE TRACTOR (WITHOUT

POWER ATTACHMENT); FIREMAN & PUMP OPERATOR AT

ASPHALT PLANT; FORKLIFT (LESS THAN 6000 LB.

CAPACITY); GROUT PUMP; LIGHT PLANT; MECHANICAL

BROOM; MUD JACK; SELF-PROPELLED ROLLER (OTHER THAN

LISTED IN GROUP 2); STRADDLE CARRIER; TRENCH

MACHINE (UNDER 40 H.P.). (MERCER COUNTY)...........$ 38.85 41.25

OPERATOR: POWER EQUIPMENT, GROUP 2 ASPHALT

HEATER-PLANER UNIT; ASPHALT PAVER; ASPHALT PAVER

SCREED; ASPHALT PLANT; AUTOMATIC CURBING MACHINE;

BACKFILLER (THROW BUCKET); BLASTHOLER

SELF-PROPELLED ROTARY DRILL OR SIMILAR MACHINES;

BOOM TRACTOR OR SIDE BOOM; BORING MACHINE

(DIRECTIONAL, VERTICAL OR HORIZONTAL); BUILDING

HOIST (1,2 OR 3 DRUMS); CAISSON AUGURING MACHINES;

CENTRAL REDI-MIX PLANT; CHIP SPREADER; CLEANING &

PRIMING MACHINE; COMBINATION BACKHOE FRONT END

LOADER; COMBINATION CONCRETE FINISHING MACHINE AND

FLOAT; CONCRETE BREAKER OR HYDRO-HAMMER; CONCRETE

CONVEYOR OR PUMP; CONCRETE PAVER; CONCRETE

SPREADER; CONCRETE WHEEL SAW (LARGE

SELF-PROPELLED); CRUSHER (STONE, CONCRETE, ASPHALT,

ETC.); CURING-TINNING MACHINE; DIPPER DREDGE CRANE

MAN; DIPPER DREDGE OPERATOR; DUAL PURPOSE TRUCK

(BOOM, WINCH, ETC.); EXCAVATOR; FARM-TYPE TRACTOR

OPERATING SCOOP OR SCRAPER OR WITH POWER

ATTACHMENT; FORKLIFT (6000 LB. CAPACITY); GRADER,

MOTOR GRADER, MOTOR PATROL, AUTO GRADER, FORM

GRADER, PULL GRADER, SUB GRADER, ELEVATING GRADER;

GROUP EQUIPMENT GREASER; GUARD RAIL POST DRIVER;

HOISTS; HYDRAULIC DREDGE LEVERMAN OR ENGINEER;

HYDRO-VAC TRUCK MOUNTED OR PULL TYPE, AND SIMILAR

EQUIPMENT; LASER SCREED; LOADER (TRACK, RUBBER TIRE

OR ARTICULATED); LOCOMOTIVE ENGINEER;

MECHANIC-WELDER; MECHANICAL LOADED LOG CHIPPERS OR

SIMILAR MACHINES; MILLING MACHINE; MUCKING MACHINE;

PILE DRIVER; PIPE BENDING; PUG MILL; ROAD

WIDENER-SHOULDER SPREADER; SCRAPER

(SELF-PROPELLED); SELF-PROPELLED ROLLER OR TIRE

ROLLER (ON ASPHALT OR BLACKTOP), SHEEP FOOT OR PAD

FOOT COMPACTOR; SHOVEL; SLIP FORM PAVER; STEEL

TRACK-TYPE TRACTOR (DOZER, PUSH CAT, ETC.);

TRANSFER OR SHUTTLE BUGGY; TRENCHING MACHINE (40

H.P. & OVER); WORK BOAT. (MERCER COUNTY)..........$ 41.50 41.25

OPERATOR: POWER EQUIPMENT, GROUP 1 CRANE (FRICTION

OR HYDRAULIC, REGARDLESS OF SIZE OR ATTACHMENTS);

TOW OR PUSH BOAT (MERCER COUNTY)....................$ 43.50 41.25

ENGI0649-002 04/01/2025

Rates Fringes

OPERATOR: POWER EQUIPMENT, GROUP 3 STRAIGHT FRAMED

TRUCK AND TRUCK MOUNTED VAC UNIT, STARTING ENGINEER

(3 TO 5 PIECES); TRAC AIR MACHINE W/O ATTACHMENTS;

ROLLERS, 5 TONS & UNDER ON EARTH & GRAVEL; FORM

GRADER; BULK CEMENT PLANT; OILERS. (FULTON,

HANCOCK, HENDERSON, KNOX, MCDONOUGH, PEORIA, STARK,

TAZEWELL, AND WARREN COUNTIES) - ESCALATED RATE

ON CRANE, DERRICK BOOMS, AND TOWER CRANES:

ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN CRANE OR

DERRICK IS POSITIONED 50 FT. OR MORE ABOVE ADJACENT

GROUND LEVEL OR WATER LEVEL. $.05 PER HOUR, PER

FOOT, OVER 90 FEET INCLUDING JIB. $0.02 PER HOUR,

PER TON - OVER 50-TON CAPACITY. - OPERATING

ENGINEERS WHO OPERATE LATTICE BOOM CRAWLER CRANES,

LATTICE BOOM TRUCK CRANES, TELESCOPIC BOOM CRANES

LESS THAN 17.5 TONS, TOWER CRANES, OVERHEAD CRANES

AND HAVE BEEN CERTIFIED BY HTE NATIONAL COMMISSION

FOR THE CERTIFICATION OF CRANE OPERATORS ON THE

EQUIPMENT THEY OPERATE SHALL RECEIVE $1.60 PER HOUR

OVER SCALE. A. ON DESIGNATED HAZARDOUS WASTE

JOBS, OPERATORS SHALL RECEIVE: LEVEL A ADD $4.00

TO THE APPROPRIATE GROUP RATE; LEVELS B AND C ADD

$3.00 TO THE APPROPRIATE GROUP RATE; AND LEVEL D

ADD $2.00 TO THE APPROPRIATE GROUP RATE.............$ 38.03 43.42

OPERATOR: POWER EQUIPMENT, GROUP 2 BULKER & PUMP;

POWER LAUNCHES; BORING MACHINE & PIPE JACKING

MACHINE; DINKEYS; CARTS, POWERED HAUL UNIT FOR A

BORING MACHINE; P-H ONE PASS SOIL CEMENT MACHINES

AND SIMILAR TYPES: WHEEL TRACTOR; BACK FILLERS;

EUCLID LOADER; FORK LIFTS; JEEP WITH DITCHING

MACHINES OR OTHER ATTACHMENTS; TUNELUGER; AUTOMATIC

CEMENT & GRAVEL BATCHING PLANTS; MOBILE DRILLS SOIL

TESTING AND SIMILAR TYPES); PUGMILL WITH PUMP; ALL

1 AND 2 DRUM HOISTS; DE-WATERING SYSTEMS; STRAW

BLOWER; HYDRO SEEDER; BUMP GRINDERS, SELF

PROPELLED; ASSISTANT HEAVY EQUIPMENT GREASER; APSCO

SPREADER TRACTORS (TRACK-TYPE W/O POWER UNITS

PULLING ROLLERS); ROLLERS ON ASPHALT, BRICK, OR

MACADAM; CONCRETE BREAKERS; CONCRETE SPREADERS;

CEMENT STRIPPERS; CEMENT FINISHING MACHINES & CMI

TEXTURE & REEL CURING MACHINES; VIBRO-TAMPERS &

SIMILAR TYPES SELF-PROPELLED; MECHANICAL

BULL-FLOATS; SELF-PROPELLED CONCRETE SAW; TRUCK

MOUNTED POWER SAWS; CURB CUTTERS; MIXERS OVER 3

BAGS TO 27E; WINCH & BOOM TRUCKS; TRACTOR PULLING

POWER BLADE OR ELEVATING GRADER; PORTER REX RAIL;

CLARY SCREED; MULE PULLING ROLLERS; PUGMILL W/O

PUMP; BARBER GREENE OR SIMILAR LOADERS; TRACK TYPE

TRACTOR WITH POWER UNIT ATTACHED; FIREMAN; SPRAY

MACHINE ON PAVING; CURB MACHINE; PAVED DITCH

MACHINE; POWER BROOM; SELF-PROPELLED SWEEPERS;

SELF- PROPELLED CONVEYORS; POWER SUBGRADER; OIL

DISTRIBUTOR; STRAIGHT TRACTOR; TRUCK CRANE OILER;

TRUCK TYPE OILERS; DIRECTIONAL BORING MACHINE;

HORIZONTAL DIRECTIONAL DRILL; ARTICULATING END DUMP

VEHICLES; STARTING ENGINEER (6 TO 10 PIECES).

(FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH,

PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) -

ESCALATED RATE ON CRANE, DERRICK BOOMS, AND TOWER

CRANES: ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN

CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE ABOVE

ADJACENT GROUND LEVEL OR WATER LEVEL. $.05 PER

HOUR, PER FOOT, OVER 90 FEET INCLUDING JIB. $0.02

PER HOUR, PER TON - OVER 50-TON CAPACITY. -

OPERATING ENGINEERS WHO OPERATE LATTICE BOOM

CRAWLER CRANES, LATTICE BOOM TRUCK CRANES,

TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER

CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY

HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF

CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL

RECEIVE $1.60 PER HOUR OVER SCALE. A. ON

DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL

RECEIVE: LEVEL A ADD $4.00 TO THE APPROPRIATE

GROUP RATE; LEVELS B AND C ADD $3.00 TO THE

APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO

THE APPROPRIATE GROUP RATE..........................$ 44.09 43.42

OPERATOR: POWER EQUIPMENT, GROUP 1 CRANES:

OVERHEAD CRANES; HYDRO CRANE; SHOVELS; CRANE TYPE

BACKFILLER; TOWER CRANES-MOBILE, CRAWLER,

STATIONARY; DERRICKS, HOIST (3 DRUM); DRAGLINES;

DROTT YUMBO & SIMILAR TYPES CONSIDERED AS CRANES;

360 DEGREES SWING EXCAVATOR, BACKHOE; DERRICK

BOATS; PILE DRIVER AND SKID RIGS; CLAM SHELL;

LOCOMOTIVE CRANES; ROAD PAVERS (SINGLE DRUM, DUAL

DRUM, TRI BATCHER); MOTOR PATROL & POWER BLADES

(DUNMORE, ELEVATING & SIMILAR TYPES); MECHANICS;

CENTRAL CONCRETE MIXING PLANT OPERATOR; ASPHALT

BATCH PLANT OPERATOR AND PLANT ENGINEER; GRADALL;

CAISSON RIGS; SKIMMER SCOOP, KOEHRING SCOOPER;

DREDGES (ALL TYPES); HOPTOE; ALL CHERRY PICKERS;

WORK BOAT; ROSS CARRIER; HELICOPTER; DOZER;

TOURNADOZER; TOURNAPULLS (ALL & SIMILAR TYPES);

CONCRETE AND ALL RECYCLE MACHINES, MULTIPLE UNIT

EARTH MOVERS; 75 CENTS PER HOUR FOR EACH SCOOP OVER

ONE; SCOOPS (ALL SIZES); PUSHCATS; ENDLOADERS (ALL

TYPES); ASPHALT SURFACING MACHINE; SLIP FORM PAVER;

ROCK CRUSHER; MATERIAL CRUSHER (OUTSIDE PITS AND

QUARRIES); SCREENING PLANTS (OUTSIDE PITS AND

QUARRIES); TUNNEL BORING MACHINE; HEAVY EQUIPMENT

GREASER (TOP GREASER ON SPREAD); CMI, AUTO GRADE,

CMI BELT PLACER (3 TRACK & SIMILAR TYPES); SIDE

BOOMS; STARTING ENGINEER ON PIPELINE OR

CONSTRUCTION (ELEVEN 11 PIECES OR MORE); ASPHALT

HEATER & PLANER COMBINATION; WHEEL TRACTORS WITH

DOZER, HOE OR END LOADER ATTACHEMENTS; CAT

EARTHWORK COMPACTORS AND SIMILAR TYPES; BLAW KNOX

SPREADER & SIMILAR TYPES; TRENCH MACHINES; PUMP

CRETE, BELT CRETE, SQUEEZE CRETE, SCREW TYPE PUMPS

& GYPSUM; CRETER CRANE; CONCRETE PUMP TRUCK;

FORMLESS FINISHING MACHINES; FLAHERTY SPREADER OR

SIMILAR TYPES; SCREEDMAN ON LAYDOWN MACHINE;

VERMEER CONCRETE SAW; LASER SCREED; SPAN SAW;

DREDGE LEVERMAN; DREDGE ENGINEER; LULL OR SIMILAR

TYPE; HYDRO-BOOM TRUCK; GUARD RAIL MACHINE.

(FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH,

PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) -

ESCALATED RATE ON CRANE, DERRICK BOOMS, AND TOWER

CRANES: ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN

CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE ABOVE

ADJACENT GROUND LEVEL OR WATER LEVEL. $.05 PER

HOUR, PER FOOT, OVER 90 FEET INCLUDING JIB. $0.02

PER HOUR, PER TON - OVER 50-TON CAPACITY. -

OPERATING ENGINEERS WHO OPERATE LATTICE BOOM

CRAWLER CRANES, LATTICE BOOM TRUCK CRANES,

TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER

CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY

HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF

CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL

RECEIVE $1.60 PER HOUR OVER SCALE. A. ON

DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL

RECEIVE: LEVEL A ADD $4.00 TO THE APPROPRIATE

GROUP RATE; LEVELS B AND C ADD $3.00 TO THE

APPROPRIATE GROUP RATE; AND LEVEL D ADD $2.00 TO

THE APPROPRIATE GROUP RATE..........................$ 47.79 43.42

IRON0046-005 05/01/2024

Rates Fringes

IRONWORKER (FULTON COUNTY (SOUTHERN TIP INCLUDING

MARBLETOWN ASTORIA, & SUMMUM TWPS)).................$ 37.60 32.94

IRON0111-004 07/01/2025

Rates Fringes

IRONWORKER (KNOX (GALESBURG AND AREA NORTH

THEREOF), MERCER (EXCEPT SOUTHWEST PART), AND

WARREN (NORTHWEST PART) COUNTIES)...................$ 38.25 32.28

IRON0112-004 05/01/2025

Rates Fringes

IRONWORKER (FULTON (EASTERN 2/3), KNOX (SOUTH AND

EAST OF GALESBURG), PEORIA, STARK, AND TAZEWELL

COUNTIES)...........................................$ 45.48 34.13

IRON0577-006 06/01/2025

Rates Fringes

IRONWORKER (FULTON (NORTH OF SUMMUM & MARBLETOWN

TWPS, WEST 1/3), HANCOCK, HENDERSON, KNOX (WEST AND

SOUTHWEST OF GALESBURG), MCDONOUGH, MERCER, AND

WARREN (EXCEPT NORTHWEST PART) COUNTIES)............$ 36.30 25.80

LABO0165-002 05/01/2025

Rates Fringes

LABORER GROUP 3 ABESTOS ABATEMENT WORKER; HAZARDOUS

WASTE WORKER (INCLUDING MAINTAINING OF MANIFEST

SHEET); LEAD BASE PAINT ABATEMENT WORKER (PEORIA

AND TAZEWELL (NORTHWEST) COUNTIES)..................$ 38.07 38.14

LABORER GROUP 2 SKILLED LABORER - JACKHAMMER &

DRILL OPERATOR; GUNITE PUMP AND POT MAN; PUDDLERS,

VIBRATOR MEN; WIRE FABRIC PLACER; SANDBLAST PUMP

AND POT MAN; STRIKE OFF CONCRETE; UNLOADING,

HANDLING AND CARRYING OF ALL CREOSOTED PILES, TIES,

OR TIMER; CONCRETE BURNING BARS; POWER WHEELBARROWS

OR BUGGIES; ASPHALT RAKER; BRICKSETTERS; CUTTING

TORCHMEN (ELEC. AND ACETYLENE); MEN SETTING LINES

TO LEVEL FORMS; FORM SETTERS; GUNITE NOZZLE MAN AND

SANDBLASTING NOZZLE MAN; POWDER MAN; RIP-RAPPING

(BY HAND) (PEORIA AND TAZEWELL (NORTHWEST)

COUNTIES)...........................................$ 37.62 38.14

LABORER GROUP 1 GENERAL LABORER - LAYING OF

TEMPORARY GAS, OIL, AIR, AND WATER LINES; ALL

LABORER WORK PERTAINING TO ASPHALT AND ASPHALT

PLANTS IF NEEDED; WATERPROOFING MEMBRANE SYSTEMS

FOR BRIDGE DECKS AND WATERPROOFING FOR BOX CULVERTS

ON SITE; LAYING, PLACING, AND INSTALLATION OF ALL

STEEL CASING, CORRUGATED CASINGS, MULTIPLE PLATE

AND PRECAST CONCRETE AND ALL OTHER MATERIAL USED

FOR CASING, TUNNELS AND TUNNEL LINING; REMOVAL OF

SNAP TIES, THE PLACING AND REMOVING AND TENDING OF

BARRICADES, CONCRETE BARRICADE WALL, FLARES AND

SIGNAL LIGHTS; MAINTENANCE OF NELSON HEATERS; DIRT

FILL JOBS, SPOTTER AND GRADE EMPLOYEE AND SIGNAL

EMPLOYEE; SCAFFOLDING; TEMPORARY FENCING; PLACING

OF CONCRETE TO GRADE BY ANY MODE OR METHOD;

CARPENTER TENDERS, THE CONVEYING, HANDLING,

UNLOADING AND LOADING, HOISTING, ASSORTING OF ALL

LUMBER, ALL LABORER WORK REQUIRED AROUND CARPENTERS

INCLUDING THE CLEAN UP AFTER CARPENTERS; HORIZONTAL

DIRECTIONAL DRILL LOCATOR; WATERPROOFING WITH COLD

STUFF; BRICKLAYER TENDERS; CEMENT MASON TENDER;

CURING ALL CONCRETE BY HAND METHOD; DRIVE STAKES

AND STRING LINES FOR ALL MACHINERY; CONCRETE FORM

DISMANTLERS; HANDLING AND MAINTAINING ALL LIGHTS;

FLARES AND FLASHER FLARES; FLAGMAN; LANDSCAPING ON

ALL JOBS, THE LOADING, UNLOADING, DISTRIBUTION,

PLANTING, AND PLACING OF TREES, SHRUB, SOD, AND

SEEDING ON WORK COVERED BY THE AGREEMENT; COVERING

OF CONCRETE IN ANY MANNER; HIGH PRESSURE NOZZLE

(WATER BLAST); PILE DRIVER TENDERS; SURVEYOR

HELPER; TOOL CRIB MAN; WATER CARRIER; EXPANSION

JOINT ASSEMBLER; ALL OTHER EXCAVATING; DECK HAND,

DREDGE HAND, AND SHORE LABORER; UNLOADING AND

DISTRIBUTING OF REBARS; ALL POWER OPERATED TOOLS

AND CHAIN SAWS; CURB ASPHALT MACHING OPERATOR;

ASPHALT KETTLEMEN AND CARRIERS; WATERPROOFING WITH

HOT STUFF; CEMENT MEN AND SACK SHAKERS; CHIPPING

HAMMER MAN; KETTLEMEN AND CARRIERS OR MEN HANDLING

HOT STUFF; POWDER MAN HELPER; POWER CONCRETE SAW;

POWER FORM TAMPERS; RIG MEN; SIGNALING AND SPOTTING

OF RIGS AND EQUIPMENT; WALK BEHIND CONCRETE

BREAKER; STRIPPING CONCRETE FORMS WITH COMPOSITE

CREW OF LABORERS AND CARPENTERS; ALL OTHER WORK NOT

LISTED BELOW (PEORIA AND TAZEWELL (NORTHWEST)

COUNTIES)...........................................$ 37.32 38.14

LABO0231-002 05/01/2024

Rates Fringes

LABORER (FULTON AND TAZEWELL (SOUTHEAST) COUNTIES)..$ 38.50 33.45

LABO0231-005 05/01/2024

Rates Fringes

LABORER (HANCOCK AND MCDONOUGH COUNTIES)............$ 33.50 30.13

LABO0309-003 01/01/2024

Rates Fringes

LABORER GROUP 3 CONCRETE SPECIALIST (MERCER

COUNTY).............................................$ 34.90 23.60

LABORER GROUP 2 ASPHALT RAKER OR LUTEMAN, HEAD FORM

SETTER, HEAD DYNAMITE MAN (POWDERMAN) HEAD STRING

OR WIRELINE MAN (ON PAVING), PIPE SETTER ON SEWER

OR WATER MAIN, GUNNITE NOZZIE MAN, ASPHALT OR

CONCRETE CURB MACHINE OPERATOR, HEAD GRADE MAN,

HEAD TUNNEL MINER, CONCRETE BURNING MACHINE

OPERATOR, CORING MACHINE OPERATOR, WELDER, ASBESTOS

ABATEMENT AND HAZARDOUS WASTE WORKERS (MERCER

COUNTY).............................................$ 34.27 23.60

LABORER GROUP 1 FLAGMAN, DUMPMAN, SPOTTER, BROOM

MAN, REMOVAL OF TREES, FENCING LABORERS, CLEANING

OF FORMS OR LUMBER (IN BONE YARD), MOVING AND/OR

MAINTENANCE OF FLARES AND BARRICADES, OPERATION OF

ALL HAND, ELECTRIC, AIR, HYDRAULIC, OR MECHANICALLY

POWERED TOOLS UNDER THE JURISDICTION OF THE

LABORERS; INCLUDING JACKHAMMERS, TAMPERS; AIR

SPADES, AUGERS, CONCRETE SAWS, CHAINS SAWS, UTILITY

SAWS, ROCK DRILLS, VIBRATORS, MORTAR MIXER, POWER

AND HAND SAW (WHEN CLEANING TIMBER), GENERAL

LABORERS (NOT ELSEWHERE COVERED), CRAFT-TENDER,

MATERIAL CHECKER, MATERIAL HANDLER, FORM HANDLER,

CONCRETE DUMPER, PUDDLER, EXPLOSIVES HANDLER,

CENTER STRIP, REINFORCING IN CONCRETE, WIRE MESH

HANDLER AND INSTALLER, PRIME MOVER OR ANY

MECHANICAL DEVICE TAKING THE PLACE OF CONCRETE

BUGGY OR WHEEL-BARROW, SANDPOINT SETTER, ASPHALT

KETTLEMAN, SHEETING HAMMER DRIVERS, LAYING AND

JOINING OF TELEPHONE CONDUIT, GAS DISTRIBUTION MEN,

PIPE SETTER ON LATERALS, DRAIN TILES, CULVERT PIPE,

AND STORM SEWER CATCH BASIN LEADS, CATCH BASINS,

MANHOLES, BATCH DUMPERS, TANK CLEANERS, COFFERDAM

WORKER, BANKMAN ON FLOATING PLANT, JOINTMAN WITH

PIPELAYERS. BACK-UP MAN (CORKER, JOINT MAKER) WITH

PIPE SETTER ON SEWER AND WATER MAINS, BATTERBOARD

MAN OR LASER OPERATOR ON SEWER AND WATER MAIN,

LABORER IN DITCH, OR TUNNEL, ON SEWER OR WATER

MAINS AND TELEPHONE CONDUIT, CUTTERS, BURNERS,

TORCHMAN, GRAVEL BOX MAN, ASPHALT PLANT LABORER,

CONCRETE PLANT LABORER, DECK HAND, UNLOADING OF

STEEL AND REBAR, LASER BEAM OPERATOR, WRECKING

LABORERS (MERCER COUNTY)..........................$ 33.77 23.60

LABO0538-001 05/01/2024

Rates Fringes

LABORERS: SKILLED LABORER: FLAGGERS; TRAFFIC

CONTROL AND ALL ASSOCIATED WORK; HANDLING OF

MATERIALS TREATED WITH OIL, CREOSOTE, ASPHALT

AND/OR FORIEGN MATERIAL HARMFUL TO SKIN OR

CLOTHING; TRACK LABORERS; CHLORIDE HANDLERS;

UNLOADING AND LABORERS WITH STEEL WORKERS AND

RE-BARS; CONCRETE WORKERS (WET); BATCH DUMPERS;

MASON TENDERS; KETTLE AND TAR MEN; PLASTIC

INSTALLERS; SCAFFOLD WORKERS; MOTORIZED BUGGIES OR

MOTORIZED UNIT USED FOR WET CONCRETE OR HANDLING OF

BUILDING MATERIALS; LABORERS WITH DE-WATERING

SYSTEMS; SEWER WORKERS PLUS DEPTH; VIBRATOR

OPERATORS; MOTOR MIXER OPERATORS; CEMENT SILICA,

CLAY, FLY ASH, LIME AND PLASTERS, HANDLERS (BULK OR

BAG); COFFERDAM WORKERS PLUS DEPTH; CONCRETE

PAVING, PLACING, CUTTING AND TYING OF REINFORCING;

DECKHAND, DREDGE HAND AND SHORE LABORERS; BACKMEN

ON FLOATING PLANT; ASPHALT WORKERS WITH MACHINE AND

LAYERS; GRADE CHECKER; POWER TOOLS; STRIPPING OF

ALL CONCRETE FORMS EXCEPT PAVING FORMS, DUMPMEN AND

SPOTTERS, WHEN NECESSARY; CAISSON WORKERS PLUS

DEPTH; GUNNITE NOZZLE MEN; TUNNEL HELPERS IN FREE

AIR; ROD AND CHAINMEN; WELDERS, CUTTERS, BURNERS,

AND TORCHMEN; CHAINSAW OPERATOR; PAVING BREAKER,

JACKHAMMER AND DRILL OPERATOR, LAYOUT MAN AND /OR

TILE LAYER; STEEL FORM SETTERS - STREET AND

HIGHWAY, AIR TAMPING HAMMERMAN; SIGNALMAN ON CRANE

CONCRETE SAW OPERATOR; SCREEDMAN ON ASPHALT PAVERS;

FRONT END MAN ON CHIP SPREADER; MULTIPLE CONCRETE

DUCT; LUTEMAN, ASPHALT RAKER; CURB ASPHALT MACHINE

OPERATOR. (HENDERSON, KNOX, WARREN, AND STARK

(WEST) COUNTIES)....................................$ 36.23 28.10

LABORERS: GENERAL LABORER: ALL CLASSIFICATIONS NOT

LISTED BELOW. (HENDERSON, KNOX, WARREN, AND STARK

(WEST) COUNTIES)....................................$ 35.23 28.10

LABO0996-003 05/01/2024

Rates Fringes

LABORER GROUP 2 DYNAMITE MAN; ASBESTOS ABATEMENT

WORKER AND HAZARDOUS WASTE WORKER; AND LEAD BASE

PAINT WORKER (STARK COUNTY (EAST))..................$ 40.17 28.01

LABORER GROUP 1 ALL CLASSIFICATIONS NOT LISTED

BELOW (STARK COUNTY (EAST)).........................$ 39.17 28.01

PAIN0030-010 06/01/2023

Rates Fringes

PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY,

AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL

TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES

(BUREAU, FORD, HANCOCK, LA SALLE, LIVINGSTON,

MCDONOUGH, MCLEAN, PUTNAM AND STARK COUNTIES).......$ 40.00 26.90

PAIN0157-001 06/01/2023

Rates Fringes

PAINTER: BRUSH, SPRAY, PRESSURE ROLLER,

SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK

(FULTON, MARSHALL, MASON, PEORIA, SCHUYLER,

TAZEWELL AND WOODFORD COUNTIES).....................$ 40.00 26.90

PAIN1178-003 06/01/2022

Rates Fringes

PAINTER: SPRAY, STRUCTURAL STEEL, & SANDBLASTING

(HENDERSON, KNOX, MERCER, AND WARREN COUNTIES)......$ 30.50 17.37

PAINTER: BRUSH AND ROLLER (HENDERSON, KNOX, MERCER,

AND WARREN COUNTIES)................................$ 30.00 17.37

PAINTER: BRIDGES (HENDERSON, KNOX, MERCER, AND

WARREN COUNTIES)....................................$ 32.00 17.37

PLAS0018-011 05/01/2025

Rates Fringes

CEMENT MASON/CONCRETE FINISHER (FULTON

(NORTHWESTERN PART), KNOX, MERCER (SOUTHEASTERN

CORNER), AND WARREN COUNTIES).......................$ 35.38 27.31

PLAS0018-012 06/01/2015

Rates Fringes

CEMENT MASON/CONCRETE FINISHER (STARK COUNTY).......$ 36.70 22.08

PLAS0018-013 05/01/2021

Rates Fringes

CEMENT MASON/CONCRETE FINISHER (FULTON (EXCEPT

NORTHWEST PART), PEORIA, AND TAZEWELL COUNTIES).....$ 32.98 30.70

PLAS0018-028 05/01/2016

Rates Fringes

CEMENT MASON/CONCRETE FINISHER (HANCOCK, HENDERSON

(SOUTHERN HALF), AND MCDONOUGH COUNTIES)............$ 28.64 24.57

PLAS0018-037 01/01/2020

Rates Fringes

CEMENT MASON/CONCRETE FINISHER (HENDERSON (NORTHERN

HALF) AND MERCER (EXCEPT SOUTHEASTERN CORNER)

COUNTIES)...........................................$ 28.52 24.04

TEAM0371-003 05/01/2025

Rates Fringes

TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL

PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS

WASTE WORK. (MERCER COUNTY).........................$ 47.71 25.72

TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS.

(MERCER COUNTY).....................................$ 46.60 25.72

TRUCK DRIVER, GROUP 3 (MERCER COUNTY)...............$ 46.25 25.72

TRUCK DRIVER, GROUP 2 (MERCER COUNTY)...............$ 45.93 25.72

TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING

LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES

AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE

UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES;

MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP

TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO

AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO

6,000 LB CAPACITY. (MERCER COUNTY).................$ 45.35 25.72

TEAM0627-002 05/01/2024

Rates Fringes

TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL

PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS

WASTE WORK. (FULTON, HANCOCK, HENDERSON, KNOX,

MCDONOUGH, PEORIA, STARK, TAZEWELL, AND WARREN

COUNTIES)...........................................$ 45.59 24.27

TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS.

(FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH,

PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES).......$ 44.49 24.27

TRUCK DRIVER, GROUP 3 (FULTON, HANCOCK, HENDERSON,

KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND

WARREN COUNTIES)....................................$ 44.10 24.27

TRUCK DRIVER, GROUP 2 (FULTON, HANCOCK, HENDERSON,

KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND

WARREN COUNTIES)....................................$ 43.83 24.27

TRUCK DRIVER, GROUP 1 DRIVERS ON 2 AXLES HAULING

LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES

AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE

UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES;

MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP

TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO

AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO

6,000 LB CAPACITY. (FULTON, HANCOCK, HENDERSON,

KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND

WARREN COUNTIES)....................................$ 43.24 24.27

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than """"SU"""", """"UAVG"""", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The """"SU"""" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The """"SA"""" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210.

END OF GENERAL DECISION"

File details come from the government source that posted it. Updated .