This is a Statement of Work (SOW) for gutter cleaning and repair services at Grey Towers National Historic Site in Milford, Pennsylvania.

The contractor shall provide comprehensive gutter and downspout cleaning, inspection, repair, and heat tape services across eight buildings: the Mansion main building, Mansion 3 Towers, Bait Box, Letterbox, Icehouse, Visitor Pavilion, Gatehouse, and Farmhouse. Gutters will be cleaned four times annually at dates coordinated by the Contracting Officer Representative (COR), except the Mansion 3 Towers which require cleaning only once per year. Estimated quantities total approximately 1,882 linear feet of gutters and 695 linear feet of downspouts across all structures. Cleaning consists of inspection, debris removal, cleaning and replacement of downspout screens and scuppers, and collection of all debris from the site including walkways and roads. The contractor is responsible for identifying actual sizes, distances, and materials required and must coordinate all site visits with the COR. Work shall be performed in accordance with manufacturer specifications, International Building Codes (current edition), Forest Service Specifications FP-14, and OSHA regulations, with the more protective requirement applied in cases of conflict. Additional services include gutter repairs up to 50 linear feet annually on copper or aluminum systems and heat tape removal and installation up to 50 linear feet, both requiring COR notification and approval before commencement. All work areas must be cleaned at the end of each workday. Safety is emphasized due to Grey Towers' status as a tourist attraction with frequent events and activities; the contractor must coordinate with the COR to implement sufficient safety precautions to protect employees and the public. Payment shall be made as lump sum quantities or by other methods of measure as listed in the Schedule of Items, constituting full compensation for the complete project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GUTTER CLEANING AND REPAIR

GREY TOWER NATIONAL HISTORIC SITE

MILFORD PA.

SPECIFICATIONS

SECTION 01010 - SUMMARY OF WORK

PART 1 GENERAL

1.01 SUMMARY

A. Description of Work:

1. Work Covered by Contract Documents:

a. Provide for and furnish all labor, superintendence, materials, tools, equipment, transportation, certificates, insurance, temporary protection, and other items designated under provisions of this contract necessary to provide Gutter cleaning services on the Mansion and Outbuildings at Grey Towers National Historic Site.

b. The project shall consist of work to include but not limited to:

Cleaning Gutters and downspouts on the Mansion, Bait Box, Letterbox, Icehouse, Visitor Pavilion, Gatehouse and Farmhouse. Cleaning consists of inspecting all gutter and downspout systems on the buildings described above and if debris is found it will be removed. All downspout screens and scuppers are to be cleaned and put back in place unless otherwise directed. The purpose of this work is to ensure the Gutters and downspouts operate as designed and intended. The Mansion will be broken out into two sections the Mansion main building as one and the 3 Towers as a sperate bid the reason is the Towers only need to be cleaned once a year. All other buildings described will be bid as entire building gutter systems.

If during inspection/cleaning, there is any damage identified to the gutter systems the damage is to be reported to the COR. All debris will be collected and removed from site including any debris on walkways, roads and other areas that was a result of the gutter cleaning.

Gutter repair, 50’ is listed in schedule of items, this can include but not limited to repairing seams or installing a section to repair operation of gutters on copper gutter system or typical aluminum gutter system up to 50 feet a year. This will be coordinated and approved by the COR before repair is started.

Heat tape removal and installation of new in section deemed to not be functioning will be notified to COR and an install up to 50 feet and connected to electrical boxes already in the mansion & outbuildings. This will be coordinated and approved by the COR before repair is started.

Actual sizes, distances and materials required are the responsibility of the contractor.

The contractor shall inspect with the COR (Contracting Officer Representative) all existing conditions.

Work shall be performed in accordance with manufacturer’s application instructions, industry standards and best practices, applicable construction codes, this statement of work, and federal, state, and local laws and regulations to include OSHA regulations.

Grey Towers Historical Site is a tourist attraction with many events and activities. Safety is the upmost of importance for the protection of employees and the public. The Contractor shall coordinate work with the COR and ensure sufficient safety notices and precautions are in place around the work area to protect Grey Towers’ employees and the public from all hazards.

See below for a more detailed explanation for the Description of Work and the Estimated Quantities, see Schedule of Items

*Gutters will be cleaned 4 times annually exact dates and times will be coordinated by the COR

*Mansion 3 Towers to be cleaned 1 times a year

*No building permits are needed for this contract.

*Site visits shall be coordinated with the COR

*All work shall meet Manufacturers Specifications, International Building Codes Current edition, and Forest Service Specifications FP-14. In the case of conflict use the requirement which is more protective.

* All work shall be performed in compliance with OSHA Regulations.

*Work area shall be cleaned up at the end of each work day.

The quantities shall be paid for as lump sum quantities or by other methods of measure as listed in the SCHEDULE OF ITEMS. Such payment shall be considered full compensation for constructing the complete project in accordance with the plans and specifications.

ESTIMATED QUANTITIES

1) Mansion:

Gutters 600lf

Downspouts 260 lf

2) Mansion 3 Towers:

Gutters 360 lf Downspouts 65lf

3) Baitbox:

Gutters 200 lf Downspouts 50lft

4) Letterbox :

Gutters 200lf Downspouts 80lf

5) Icehouse:

Gutters 100lf Downspouts 20lf

6) Vistor Pavillion:

Gutters 100lf Downspouts 40lf

7) Gatehouse:

Gutters 142lf Downspouts 80lf

8) Farmhouse:

Gutters 180lf Downspouts 60lf

NOTE:

These ESTIMATED quantities were compiled to give the Contractor an idea of the scope of the work requested. The Contractor shall be responsible for the generation of their own quantities upon which to base their quote to provide a complete drainage system.