This is Amendment 0001 to Solicitation 12444326Q0048 for gutter cleaning and repair services at Grey Tower National Historic Site in Milford, Pennsylvania. The amendment, issued by USDA-FS CSA EAST 5 on July 16, 2026, and effective July 23, 2026, provides clarification through a questions and answers document addressing contractor inquiries about the scope of work and site conditions.
The amendment clarifies that drones are prohibited on the property; gutter guards exist only on one small section of the Bait Box building with all other gutters at seven buildings unguarded. Electricity availability is very limited at all locations, requiring contractors to plan for extension cords or provide their own generators. The gutters were last cleaned in Spring 2025. Gutter repair work (Item 0009) is limited to gutter-only repairs without woodwork or fascia repair. The four annual cleanings and one annual tower cleaning will be scheduled in coordination with the Contracting Officer's Representative (COR). Work includes cleaning all gutter systems including those on the three mansion towers (Item 0002), to be performed once annually, with repairs limited to up to 50 feet annually with locations determined post-award as needs arise. Historic preservation restrictions prohibit anchoring into the historic structure. Access constraints exist for larger equipment on the east and north façade towers; contractors may propose their own access methods in their submissions. The government will not mark gutter sections, as all gutters including tower gutters are visible from the ground for contractor identification. The contract performance period is August 1, 2026, to July 31, 2027.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12444326Q0048 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ATLANTA GA 30309-2449
STE 876S
1720 PEACHTREE ST NW
USDA-FS CSA EAST 5
07/23/20260001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/16/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Gutter Cleaning and Repair, Grey Tower National Historic Site, Milford PA.
Amendment 0001 - The purpose of this amendment is to provide the attached questions and answers document.
Period of Performance: 08/01/2026 to 07/31/2027
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
KEITH D. REICHARD
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Questions and Answers
1. Drones allowed to measure?
No, drones are not allowed on Grey Towers Property
2. Are there gutter guards on the various gutters?
The Bait Box has one small section (approximately 3 feet of gutter guard installed by the side door). All other gutters at all 7 buildings have no guards.
3. Is electricity available outside each building?
There is very limited exterior access to electricity at all locations. If electric is needed plan to numerous extension cords to run equipment from remote location or use contractor provided generator.
4. When were the gutters last cleaned?
All gutters were cleaned last in Spring of 2025.
5. Does item 0009, Gutter Repair include woodwork, fascia repair?
No, it is gutter only repairs
6. When are the 4 cleanings scheduled?
The Contractor will work with the COR on the best times to perform the 4 annual cleaning, and 1 annual cleaning on the towers.
We need clarification regarding the gutters located on the elevated round tower/turret section.
Could you please confirm:
7. Whether the gutters on the round tower/turret are included in the required Statement of Work.
Yes, on the schedule of Item No. 0002 is the 3 Mansion Towers, to be done once annually
8. Whether cleaning or repairs are required on the entire tower or only on specifically identified gutter sections.
Cleaning is to happen on all gutter systems in the Statement of Work and the coinciding Scheule of Items, this includes the towers where the gutters are on the top of the edifice, to be done once annually. Repairs are planned to be up to 50’ annually, no location for the repair are selected for the repair, as that need can change throughout the course of the contract. The awarded contractor and the COR will select the location post award as the need arises. The awarded number of feet cannot be exceeded.
9. Whether the Government has an approved or recommended access method for this area, such as an aerial lift, scaffolding, or specialized rope-access equipment.
The government is not instructing the contractor how to do the job. There are constraints with access for larger equipment to access the east and north façade towers. The contractor can present their plan in their submission that they feel will best complete the job without impact to the resource, both the building and the surrounding landscape.
Questions and Answers
10. Whether there are any historic-preservation restrictions concerning ladders, lifts, scaffolding, anchoring, or equipment contact with the tower.
There is to be no anchoring into the historic structure.
11. Whether the Government can identify or mark all tower gutter sections that must be included in the contractor’s pricing.
Cleaning is to happen on all gutter systems in the Statement of Work and the coinciding Scheule of Items. All gutters, including the 3 towers, are visible for the contractor to locate from the ground, so the government will not be marking out the gutter systems.