This is a Schedule of Items for a construction solicitation addressing mechanical room renovation at the USDA Forest Service Duchesne District Office in Duchesne, Utah. The project, identified as solicitation number 1240LT26Q0080, requires five primary line items: mobilization, select demolition, laminate sheet flooring and subflooring installation (110 square feet), subfloor repair and replacement (50 square feet), and new plumbing installation including a mop sink. The schedule indicates measurement methods and units for each item, with quantities specified where applicable. The total contract value is set at $2,745,000, which represents 90 percent of the baseline estimate of $3.05 million.
The scope of work encompasses repair of damaged flooring and subfloor materials, installation of new laminate flooring, installation and plumbing of a new mop sink, and replumbing of existing mechanical systems including the water heater TPR valve water line and furnace condensate water line to connect to the existing grey water drain line within the crawl space. The project is under the Department of Agriculture Forest Service and was prepared by Cathleen Christensen, Engineering Staff Officer, on May 13, 2026.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI
| USDA Forest Service |
| SCHEDULE OF ITEMS |
DUCHESNE OFFICE MECHANICAL ROOM RENOVATION
| Prepared by: Cathleen Christensen, Engineering Staff Officer, 05/13/2026 | ||||||
| ITEM NUMBER | DESCRIPTION | METHOD OF MEAS | UNIT | QUANTITY | PRICE | TOTAL |
| 000001 | Mobilization | LSQ | LS | 1 |
| 017320 | Select Demolition | LSQ | LS | 1 |
| 096516 | Laminate sheet flooring and subflooring | AQ | SF | 110 |
| 061000 | Repair and Replace subfloor | AQ | SF | 50 |
| 220500 | New Plumbing and Mop Sink | LSQ | LS | 1 |
TOTAL
Total, Keep at 90% of 3.05M $ 2,745,000