C04 Attachment 2 - SCHEDULE OF ITEMS - 1240LT26Q0080.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 1240LT26Q0080
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items for a federal construction solicitation issued by the USDA Forest Service for mechanical room renovation work at the Duchesne District Office in Duchesne, Utah. The project involves five line items totaling approximately $2,745,000 (maintained at 90% of the $3.05 million baseline): Mobilization (lump sum); Select Demolition (lump sum); Laminate sheet flooring and subflooring installation (110 square feet); Repair and replacement of subfloor (50 square feet); and New Plumbing and Mop Sink installation (lump sum). The work scope includes repairing damaged flooring and subfloor, installing new laminate flooring, installing and plumbing a new mop sink, and replumbing existing water heater TPR valve water line and furnace condensate water line to the existing grey water drain line within the crawl space.
The solicitation number is 1240LT26Q0080 and the original submission deadline of June 9, 2026 was extended to June 15, 2026 via amendment SF30 P0001. A second amendment (SF30 P0002) was issued with no change to the submission deadline. The schedule of items was prepared by Cathleen Christensen, Engineering Staff Officer, on May 13, 2026, and references attached photos and drawings (C04 Attachment 4) as part of the solicitation documentation.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI
| USDA Forest Service |
| SCHEDULE OF ITEMS |
DUCHESNE OFFICE MECHANICAL ROOM RENOVATION
| Prepared by: Cathleen Christensen, Engineering Staff Officer, 05/13/2026 | ||||||
| ITEM NUMBER | DESCRIPTION | METHOD OF MEAS | UNIT | QUANTITY | PRICE | TOTAL |
| 000001 | Mobilization | LSQ | LS | 1 |
| 017320 | Select Demolition | LSQ | LS | 1 |
| 096516 | Laminate sheet flooring and subflooring | AQ | SF | 110 |
| 061000 | Repair and Replace subfloor | AQ | SF | 50 |
| 220500 | New Plumbing and Mop Sink | LSQ | LS | 1 |
TOTAL
Total, Keep at 90% of 3.05M $ 2,745,000
File details come from the government source that posted it. Updated .