C04 A SCHEDULE OF ITEMS 12444626Q0084.pdf

PDF 317 KB Posted

Attached to
Purchase of a High Pressure Air Compressor
Solicitation number
12444626Q0084
Issued by

About this file

This is a Schedule of Items for an equipment acquisition requisition by the Forest Products Laboratory for an equipment replacement project. The solicitation seeks one PowerEX STD0503HP 460v 3-phase duplex oilless rotary scroll compressor or equivalent equipment meeting equal technical requirements, with shipping included. The item is listed as Item Number 0001 with an estimated quantity of one unit (EA). The pay unit is each (EA), and items 0002 through 0005 are blank, indicating potential for additional line items. Item 0006 is designated for the total price calculation.

The anticipated delivery date for this supply acquisition is October 30th, 2026. The award is anticipated to be a firm fixed price contract. The workplan acquisition plan/requisition number is to be provided, and the period of performance is listed as N/A since this is a supply item rather than a services or architectural and engineering procurement. No specific response date, set-aside information, federal contract vehicle, or federal agency is identified in this document, though it appears to be associated with federal procurement processes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM

NUMBER

DESCRIPTION PAY UNIT EST QTY

PowerEX STD0503HP 460v 3-phase duplex oilless rotary scroll compressor OR equal technical requirments including shipping.

EA 1 EA

0006 TOTAL PRICE $

EA - EACH

MO - MONTH

Award anticipated to be a firm fixed price contract.

SCHEDULE OF ITEMS

FOREST PRODUCTS LABORATORY

PROJECT TITLE: EQUIPMENT REPLACEMENT

WORKPLAN ACQUISITION PLAN/REQUISITION NO: (NUMBER)

SCHEDULE OF ITEMS

Period of Performance (Required for Services and A&E) N/A

Anticipated Delivery Date (Required for Supply and Construction) October 30th, 2026

File details come from the government source that posted it. Updated .