This is a Schedule of Items document for solicitation 127EAW26Q0058 outlining the scope of work and pricing structure for the Badger Hill Seed Orchard Well project at Eldorado National Forest in California.

The project consists of four lump-sum line items: mobilization, county permit acquisition, well drilling with casing installation, pump and solar system installation, water line installation, system testing and cleanup, and final acceptance. All costs necessary to complete the project are considered incidental and must be included in the contractor's lump-sum price. Quantities are estimated, and the contractor is responsible for field verification to ensure compliance with all drawing, statement of work, and specification requirements. This is a Total Small Business Set-Aside acquisition under the Water and Sewer Line and Related Structures Construction NAICS code (237110) with a small business size standard of $45 million. A Bid Bond/Guarantee is required for proposals exceeding $150,000, with bond premium payments to be included under the mobilization line item and not added to the contract price. Contractors must complete the company information section including company name, address, UEI number, point of contact, phone, email, and tax ID. One award will be made from this solicitation, and contractors must submit pricing for all items as specified.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF ITEMS

Badger Hill Seed Orchard Well Eldorado National Forest

Pay Item Number
Item Description
Unit
Quantity
Item Cost
0001
Mobilization
L.S.
1.0
0002
County permit
L.S.
1.0
0003
Well Drilling and Casing Installation

Pump, Solar System, and Water Line Installation System Testing, Cleanup, and Final Acceptance *

L.S.
1.0

Total Project Cost

SCHEDULE NOTES

* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.

* All other costs necessary to complete the project are considered incidental and shall be included in the Contractor’s lump‑sum price.

* One award will be made from this solicitation, contractors must submit pricing for all items.

* Bid Bond/Guarantee. REQUIRED for proposals exceeding $150,000.00 IAW FAR 52.228-1 Bid Guarantee. Payment for bond premiums shall not be in addition to the contract price. Include bond payments under Mobilization.

The contractor shall complete the table below and include the information with their quote.