This is a Schedule of Items attachment for a Request for Quotation (RFQ) issued by the U.S. Forest Service for septic system replacement at Big Pines Barracks within Angeles National Forest, California under solicitation number 127EAW26Q0034.
The project encompasses seven line items totaling an estimated 40 linear feet of distribution lines and includes: mobilization; removal of the existing septic tank and contents; purchasing and installation of a new 2,000-gallon concrete septic tank with two manhole extension collars and lids; removal and disposal of old distribution lines; installation of new distribution lines in approximately the same location; installation of two 4-inch cleanouts on the inlet and outlet sides of the septic tank; and coordination of pumping services for the existing tank. Offerors must provide pricing for all items and field-verify quantities to ensure compliance with drawings, statement of work, and specifications. This small business set-aside solicitation (NAICS code 238910 with a $19 million size standard) requires a bid bond or guarantee for proposals exceeding $150,000, with bond premiums to be included within the contract price rather than as an additional cost. A single award will be made, and payment will be rendered on actual work performed. Offerors must submit company information including UEI number, tax ID, and point of contact details with their quotes.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C05 - Amendment A00001 - 2026 Septic Replacement Big Pines Barracks - 127EAW26Q0034.pdf | ||
| C04 - 5 - Fire Plan.pdf | ||
| C04 - 6 - Photos.pdf | ||
| C04 - 10 - RFI Form.docx | DOCX document | |
| C04 - 1 - Solicitation Terms and Conditions - 127EAW26Q0034 - 2026 Septic Replacement Big Pines Barracks.pdf | ||
| C04 - 9 - Contract Administration Data.pdf | ||
| C04 - 4 - Davis-Bacon Act WD CA20260022.pdf | ||
| C04 - 2 - Statement of Work.pdf | ||
| C04 - 7 - Drawings.PDF | ||
| C04 - 8 - Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2026 Septic Replacement Big Pines Barracks Solicitation 127EAW26Q0034 Angeles National Forest
ATTACHMENT 3.
SCHEDULE OF ITEMS
ITEM
NUMBER
| DESCRIPTION |
| PAY |
UNIT
| EST QTY |
| UNIT COST |
| TOTAL |
| 001 |
| Mobilization |
| LS |
| 1 |
| 002 |
| Removal of Old Septic Tank- |
Remove the existing septic tank and all contents; tank capacity is estimated based on measured dimensions.
| LS |
| 1 |
Installation of New Septic Tank - Purchasing and installation of new 2,000-gallon concrete septic tank. Work is also to include the installation of (2) manhole extension collars with manhole lids
EA
| 004 |
| Old Distribution Lines - |
Requires contractor to remove and dispose of old distribution lines.
| LF |
| 40 |
New Distribution Lines - Contractor shall provide and install new distribution lines which should be placed in approximately the same location as the existing distribution lines that are to be removed.
LF
| 006 |
| Installation of Two-Way Cleanouts - |
Installation of two 4" cleanouts on the inlet and outlet side of the septic tank.
| EA |
| 2 |
Pumping Services - Contractor shall coordinate and schedule a pumping service for the existing approximately 2,000‑gallon septic tank, with capacity estimated based on field‑verified dimensions.
EA
TOTAL
COST
SCHEDULE NOTES
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
* Payment will be made on actual work performed unless otherwise noted.
* A single award will be made under this solicitation. To be considered for award, offerors shall provide pricing for all items.
* Bid Bond/Guarantee. REQUIRED for proposals exceeding $150,000.00 IAW FAR 52.228-1 Bid Guarantee.
NOTE: Payment for bond premiums shall not be in addition to the contract price.
The contractor shall complete the table below and include the information with their quote.
Company Name:
Company Address:
UEI Number:
POC Name and Title:
Phone Number:
Email:
Tax ID:
File details come from the government source that posted it. Updated .