This is a Request for Quotation (RFQ) for construction services to repair roads damaged by the White River and Irving Peak Wildfire on the Wenatchee River Ranger District of the Okanogan-Wenatchee National Forest in Chelan County, Washington.

The project involves road repair work including erosion control planning, traffic control, dewatering, culvert removal and installation, drainage construction, road grading, asphalt patching with biaxial geogrid reinforcement, underdrain system construction, and seeding/mulching of disturbed areas. The base requirement includes 21 pay items ranging from mobilization and soil erosion control to various drainage excavations, culvert installations, asphalt patching, and site restoration. Three optional items are available covering additional asphalt patching (Item 2), upper Ninemile Creek work including streambed reconstruction and rock weirs (Item 3), and additional clearing and road reconditioning (Item 4). The solicitation is set aside for small businesses under NAICS 237310. Quotations must be submitted via email to Eric Oldenkamp at eric.oldenkamp@usda.gov by 1300 (1 PM) Pacific Daylight Time on August 20, 2026. A 20% bid bond is required for quotes exceeding $150,000, with performance and payment bonds (100% each) required from the successful awardee. The contract award is anticipated for spring or summer 2026, with field work expected to begin in summer 2027 and completion required by October 31, 2029. Payment will be made via progress payments with 10% retainage until substantial completion, governed by AGAR clause 452.232-71. The evaluation basis is price, and award will be made to the responsible quoter with a reasonable price. Construction wage rates apply per Davis-Bacon requirements, and the work must comply with Federal Highway Administration Standard Specifications (FP-24), OSHA requirements, and environmental protections including in-water work windows and noxious weed prevention.

View the file

Other files for this federal contract opportunity

Other files attached to Irving Peak White River Road Repairs, newest first.
File Type Posted
C04_2_Attachment5-FireProtectionSuppression.rtf RTF text file
C04_3_Quote_Template.docx DOCX document
C04_2_Attachment1_WhiteRiverIrvingPeakRdRepairDrawings.pdf PDF
C04_2_Attachment6-FirePlan-FormR6-FS-6300-55.pdf PDF
C04_2_Attachment2_FSSS_WhiteRiverIrvingPeakRdRepair.docx DOCX document
C04_2_Attachment4_CampingPermit.docx DOCX document
C04_3_Bid_Bond_SF24.pdf PDF
C04_2_Attachment3_WageDetermination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION CALL

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

1171850

USDA-FS CSA NORTHWEST 7

1220 SW 3RD AVE

STE 310

PORTLAND OR 97204-2829

40BJ

All quote documents must be emailed to eric.oldenkamp@usda.gov.

An email copy of the Bid Bond is acceptable for quotes valued at $150,000 or greater.

ERIC OLDENKAMP 541-225-6321

107/22/2026

1240BJ26Q0022

INVITATION FOR BID

REQUEST FOR PROPOSAL

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Project Name: Irving Peak White River Road Repairs

Wenatchee River Ranger District, Okanogan-Wenatchee National Forest

See the Statement of Work (SOW) for a description of the project. Amended FAR provision 52.212-1 in this solicitation identifies what must be submitted in a quote.

Solicitation number 1240BJ26Q0022 is issued as a Request for Quotation (RFQ), and is prepared in accordance with the format in FAR Part 12. This requirements is set aside for small businesses under NAICS 237310.

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

1 1147 calendar days and complete it within ________________ ________________ calendar days after receiving

Period of Performance

08/20/2026

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 12/2022)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USDA-FS CSA NORTHWEST 7

1220 SW 3RD AVE

STE 310

PORTLAND OR 97204-2829

40BJ

28. NEGOTIATED AGREEMENT 29. AWARD

and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

10 U.S.C. 3204(a) 41 U.S.C. 3304(a)

STANDARD FORM 1442 (REV. 12/2022) BACK

Continued...

and return

(Contractor is not required to sign this document.) Your offer on this

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 37

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

1240BJ26Q0022

Delivery Location Code: 05GG

WENATCHEE NATIONAL FOREST

215 MELODY LANE

WENATCHEE WA 98801-5933 US

Period of Performance: 09/10/2026 to 10/31/2029

0001 BASE REQUIREMENT 1 LS

0002 OPTIONAL ITEM 1 LS

(Option Line Item)

0003 OPTIONAL ITEM 1 LS

(Option Line Item)

0004 OPTIONAL ITEM 1 LS

(Option Line Item)

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

SCHEDULE OF PAY ITEMS

Pay Item No.

Description Measurement

Est.

Quantity

Cost

Method Unit Unit Price Total

ITEM 1 – BASE REQUIREMENT

15101A Mobilization LSQ LS ALL $_________ $_________

15701A Soil erosion control LSQ LS ALL $_________ $_________

20180A Clearing and grubbing, Disposal Method Chip

CQ MILE 8.35 $_________ $_________

20301A Removal culvert AQ EACH 17 $_________ $_________

20480A Drainage Excavation, Type I Class L Drain Dip

AQ EACH 19 $_________ $_________

20480C Drainage Excavation, Type IV Class L Armored Drain Dip

AQ EACH 7 $_________ $_________

20704 Geogrid, Biaxial CQ SY 12233 $_________ $_________

30103 Aggregate base grading 1-1/4" Minus

CSBC

CQ CY 205 $_________ $_________

30107 Subbase CQ CY 2286 $_________ $_________

30301A Ditch reconditioning CQ MILE 10.8 $_________ $_________

30301B Roadway reconditioning CQ MILE 8.41 $_________ $_________

41801 Asphalt concrete pavement patch, type 1 CQ SY 1072 $_________ $_________

60201A 24 inch pipe culvert CQ LF 510 $_________ $_________

60201B 36 inch pipe culvert CQ LF 280 $_________ $_________

60201C 48 inch pipe culvert CQ LF 60 $_________ $_________

60202 71x47 inch equivalent diameter arch or elliptical pipe culvert

CQ LF 160 $_________ $_________

60501 Standard underdrain system CQ LF 350 $_________ $_________

62511A Seeding, Dry Method CQ SY 433 $_________ $_________

62801 Temporary stream diversion LSQ LS ALL $_________ $_________

63501A Temporary traffic control LSQ LS ALL $_________ $_________

Base Subtotal = $_________

Description Measurement

Est.

Quantity

Cost

Method Unit Unit Price Total

ITEM 2 – OPTIONAL ITEM

41802 Asphalt concrete pavement patch, type 2 CQ TON 1300 $_________ $_________

Item 2 Option Subtotal = $_________

Description Measurement

Est.

Quantity

Cost

Method Unit Unit Price Total

ITEM 3 – OPTIONAL ITEM

15101B Mobilization LSQ LS ALL $_________ $_________

15701B Soil erosion control LSQ LS ALL $_________ $_________

20301B Removal culvert, Upper Ninemile AQ EACH 1 $_________ $_________

20445 Berms, earthen AQ EACH 2 $_________ $_________

20480D Drainage Excavation, Type I Class L Drain Dip

AQ EACH 6 $_________ $_________

20820 Dewatering LSQ LS ALL $_________ $_________

30201 Roadway aggregate, method 1, 1-1/4" Minus surface course

CQ CY 98 $_________ $_________

60525 Subdrainage blanket CQ SY 733 $_________ $_________

62511B Seeding, Dry Method CQ SY 1111 $_________ $_________

62516 Mulching, Dry Method CQ SY 1111 $_________ $_________

64702 Environmental design, streambed channel reconstruction

CQ LF 100 $_________ $_________

64703 Environmental design, rock weir AQ EACH 8 $_________ $_________

Item 3 Option Subtotal = $_________

Description Measurement

Est.

Quantity

Cost

Method Unit Unit Price Total

ITEM 4 – OPTIONAL ITEM

15101C Mobilization LSQ LS ALL $_________ $_________

15701C Soil erosion control LSQ LS ALL $_________ $_________

20180B Clearing and grubbing, Disposal Method Chip

CQ MILE 4.12 $_________ $_________

20480E Drainage Excavation, Type I Class L Drain Dip

AQ EACH 17 $_________ $_________

20480B Drainage Excavation, Type III Class L Drain Dip

AQ EACH 7 $_________ $_________

20480F Drainage Excavation, Type IV Class L Armored Drain Dip

AQ EACH 3 $_________ $_________

30301C Roadway reconditioning CQ MILE 4.12 $_________ $_________

63501B Temporary traffic control LSQ LS ALL $_________ $_________

Item 4 Option Subtotal = $_________

Sum of Base Item + Option Items = $_________

SCHEDULE NOTES

All offerors/quoters will be required to provide a Bid Bond (20%) with their proposal/quote submission.

Performance and Payment Bonds (100% each) will be required from the successful awardee.

Payment for bond premiums in accordance with Clause 452.232-71, Progress Payments for Commercial Construction Contracts (May 2026), shall not be in addition to the contract price. Include bond payments under 15101 Mobilization.

Abbreviations LS = Lump Sum LSQ = Lump Sum Quantity CY = Cubic Yard AQ = Actual Quantity SY = Square Yard CQ = Contract Quantity LF = Linear Feet

STATEMENT OF WORK

1. SCOPE OF CONTRACT

The Forest Service is seeking engineering services for construction work associated with repairing roads in and below the burn scar of the White River and Irving Peak Wildfire on the Wenatchee River Ranger District of the Okanogan-Wenatchee National Forest in Chelan County, Washington.

Work on this contract is anticipated to include, but is not limited to, developing and implementing an erosion control plan, a traffic control plan, dewatering plans, removing and disposing of existing culverts, installing new culverts, constructing armored rolling dips and drainage dips, road grading, roadside brushing, ditch cleaning, culvert and catch basin cleaning, shallow hot-mix asphalt patching and deep hot-mix asphalt patching with biaxial geogrid reinforcement and geo-composite edge drains, construction of an underdrain system, and seeding and mulching disturbed areas after construction is complete.

The contractor shall furnish all labor, materials, equipment, tools, transportation, and incidental supplies necessary to perform all work described in accordance with drawings and specifications of the contract.

The contractor shall assume all risk, loss, damage, or expense arising out of prosecution of the work, except as otherwise provided in the contract.

2. PROJECT LOCATION

The project sites are located on the Wenatchee River Ranger District of the Okanogan-Wenatchee National Forest.

To access the project area from Leavenworth, Washington, head west on US Highway 2 for approximately 15.1 miles then run north (right) on Washington State Highway 207. Follow State Highway 207 for approximately 4.4 miles then continue straight on to Lake Wenatchee Highway.

After approximately 5.3 miles, Lake Wenatchee Highway turns into White River Road. Follow White River Road for 0.8 miles then continue straight on Little Wenatchee Road. Follow Little Wenatchee Road for approximately 2.15 miles where it ends at the Forest Service Gate and then the road from the gate on becomes Little Wenatchee River Road (Forest Road 6500). The east end of the project starts at the gate where Forest Road 6500 begins at around 1,960 ft in elevation in Township 27 N Range 16 E Section 16 at 47°50'17.2"N 120°50'51.9"W (47.838103, -120.847754).

The 6500 road is seasonally closed during the winter months with the roads typically snow free in late May/early June. There are no known utilities within the areas, but utility line-locates are still required to verify none exist for geotechnical subsurface investigations and the final design.

3. TECHNICAL SPECIFICATIONS

The contract incorporates the USDOT, Federal Highway Administration’s Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-24). The standard specifications (FP-24) are available online at: http://flh.fhwa.dot.gov/resources/specs/

4. EXISTING CONDITIONS

The Contractor shall verify all existing dimensions and conditions before proceeding with all work.

All dimensions shall be verified and/or determined in the field. Protect all improvements including existing culverts and roadway from damage during construction.

5. PROJECT CONTROL

It is anticipated that this contract will be awarded during spring or summer of 2026. Onsite work can begin as soon as weather permits (sites typically accessible around June 1 through October 31) but the government anticipates that field work will not begin until summer of 2027 based on lead time for materials procurement. All work must be completed no later than October 31, 2029.

Contractor is responsible for protecting workers from injury (refer to FAR 52.236-13, Accident Prevention, for full text).

The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Government is not responsible for loss of or damage to materials or supplies stored on-site during performance of this contract.

The Forest Service is administering and is intending to award a construction contract for the upgrade of two culvert crossings to bridges along the Little Wenatchee Road/FS 6500 at Ninemile Creek (~MP 6.674) and Lodgepole Creek (~MP 8.63). Both crossings are within the project area. Work utilizing either crossing must be coordinated with the other contractor through the COR. The 6500 Road and several spur roads that originate from the 6500 road beyond the Ninemile Crossing have no alternate egress options. Utilization of the 6500 road at the lodgepole crossing is currently not safe and should not be considered for use during the contract until the Lodgepole Bridge Construction is complete. There is a detour around the Lodgepole Crossing on the 6500 Road via the 6504 road. Schedule activities to assure no delays or interference with the operations of the Ninemile Creek Bridge and Lodgepole Creek Bridge contract. Contractor may need to adjust work accordingly so road repairs and maintenance are done with the least amount of impact to the bridge crossing sites (ideally work on these segments of roads while the bridge contractor is either not working at all or while the bridge contractor are working on the Lodgepole Crossing site. Contractor should anticipate some level of minor delays for importing materials while the bridges construction contract is in progress or plan on some level of mitigation, such as onsite stockpiling of material.

6. LANDSCAPE PRESERVATION

All heavy equipment shall be cleaned and thoroughly inspected prior to mobilization to the work site. Once on site all equipment shall be inspected daily and all visible oil, grease, and hydraulic fluid will be removed. Needed repairs will be implemented immediately before resuming work.

All machinery shall be refueled outside of riparian reserve areas or within 150 feet of the Fish Bearing Streams or any of their tributaries. If refueling does occur within riparian reserve areas, spill control measures shall be installed around the machinery prior to refueling operations.

Unless otherwise agreed, to prevent the introduction of seeds of noxious weeds onto National Forest land, Contractor shall ensure all equipment moved onto National Forest land is free of soil, seeds, vegetative matter or other debris that could contain or hold seeds. Contractor shall employ whatever cleaning methods necessary to ensure compliance with this provision and shall notify the Forest Service prior to moving each piece of equipment onto National Forest land. Upon request of Forest Service, arrangements will be made for Forest Service to inspect each piece of equipment prior to being moved onto National Forest land.

7. TERMINOLOGY

The term “Engineer,” when used in the contract documents, shall refer to the contracting officer’s representative (COR).

The term “Owner,” when used in the contract documents, shall refer to the federal government (USDA Forest Service).

8. PACKING AND MARKING

All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.

9. POST AWARD CONFERENCE

A post award conference with the successful offeror is required. It will be scheduled and held within 10 days after the date of contract award. The conference will be held at a mutually agreed upon location and/or will utilize telephone/videoconferencing as deemed appropriate by the Contracting Officer.

10. INVOICE PROCESSING PLATFORM (IPP)

All invoices are to be submitted via the electronic Invoice Processing Platform (IPP). Contractors shall submit all invoices electronically via IPP. Paper copies of invoices are no longer accepted. The Contractor must also attach a detailed invoice in IPP.

Invoice & Schedule of Values:

The Contractor shall prepare and submit for approval a cost breakdown of the Contract price, to be referred to as the “schedule of values”, assigning values to each major activity necessary to complete the work. Values must include all direct and indirect costs, although a separate value for bond costs may be established. The schedule of values must contain sufficient detail to enable the Contracting Officer and/or Contracting Officer Representative to evaluate payment application(s).

11. GOVERNMENT-FURNISHED PROPERTY

There is no government furnished property for this contract

12. NOTIFICATION OF SUBCONTRACTING

The Contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement. The subcontractor shall have the experience and be equipped for such work. The Contractor and subcontractor shall fill out the SF 1413, Statement and Acknowledgement and submit to the Contracting Officer. Other written notification shall include as a minimum:

A. The name, address and telephone number of the subcontractor.

B. The date upon which the subcontract was entered into and its duration.

C. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.

D. Documentation of the subcontractor's representative authority.

E. A copy of the Statement of Acknowledgement form (SF-1413) must be provided to the Contracting Officer prior to any subcontractor work beginning.

Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract.

13. PHYSICAL DATA

Data and information furnished or referred to below is for the contractor's information. The government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surface observations.

(b) Weather conditions typical for this area indicate the following normal work season and fire season:

Normal work season: June 1 – November 15

Restricted work season: August 1st-October 31st. Wildlife restrictions prohibits onsite work prior to August 1st due to Northern Spotted Owl (NSO). The aquatic fisheries in-water window is from July 1-September 30 but cannot begin until August 1st due to the NSO restriction.

Normal fire season: July 1 – October 15

(c) Transportation facilities providing access to the site are identified elsewhere herein.

14. PAYMENT FOR MATERIALS DELIVERED OFF THE SITE

As provided in AGAR clause 452.232-71, Progress Payments for Commercial Construction Contracts, material acquired for incorporation into the project, and stored off site by the Contractor, may, at the option of the Contracting Officer, be included in progress payments.

Prior to payment, such material will be subject to Government inspection and must be stored separately from other materials, and be identified as, "PROPERTY OF THE UNITED STATES, Project Name and Contract Number." In addition, the Contractor shall furnish the Government with a right of ingress and egress from the property together with right of removal.

15. PROSECUTION OF WORK – WORK HOUR LIMITS – WORK ITEM LIMITS

The contractor shall conduct activities so that interference with the public shall be kept at a minimum. Construction activity may be performed Monday through Friday and shall be limited to the hours between 7:00 a.m. and 6:00 p.m., unless other hours are approved in writing by the COR.

No work will be allowed on Federal Holidays unless approved by CO in writing. Any contractor activities requiring closure to the public shall be scheduled with the COR at least: 30 calendar days prior to the closure.

16. SUBMITTALS

Submittals shall include the following unless otherwise required in the specification:

1. Date and revision dates.

2. Project name and contract number.

3. Names of contractor, subcontractor, supplier and manufacturer.

4. Specifications section number.

5. Field dimensions and relation to adjacent structures.

6. Applicable standards such as ASTM or Federal Specifications.

7. Contractor’s stamp, initial or signature, certifying the review of submittal, verification of field measurements and compliance with contract documents.

Provide all submittals within 14 calendar days of contract award unless otherwise required by the specification.

Submittal Log for Disaster Relief White River Irving Peak Road Repairs

Log No.

Incidental to Pay Item(s)

Description of Submittal Type of

Submittal

Requirement found in

Specification No./Drawing

Additional Specification References

1 151 Weed Free Material Source Certification

Material Certification

FSSS 105.02(c)

2 151 Spill Prevention, Control, and Countermeasure (SPCC) Plan

Plan 107.1

3 151 Contractor Quality

Control Plan Plan 153.02

4 151 Fire Plan R6-FS-6300-

Plan

R6-FS-6300-52

part 2

5 151 Proposed Progress

Schedule R6-FS-6300-7 Construction

Schedule

Schedules for Construction

Contracts [FAR 52.236-15]

6 151 Designation of

Representative R6-FS- 6300-6

Completed Form

Superintendence by the Contractor

[FAR 52.236-6]

7 151 Drug Free Workplace

Policy

Establish a program, take actions, notifications and reporting as required by policy

Drug-Free Workplace

[FAR 52.223-6]

8 151

SF1413 - Statement and Acknowledgement for each Subcontractor including

Owner/Operators and other Sole Proprietorship

Subcontractors [not required for material suppliers]

Completed Form

Subcontracts (Labor

Standards) [FAR 52.236-11]

9 151 Payroll Record WH347

Certified Payrolls submitted weekly

Copy of Certification

Payrolls and Basic Records

[FAR 52.222-8]

10 154 Material Moisture/Density

Testing Test Results Table 208-1 106

11 157 Dewatering and Soil

Erosion and Pollution Control Plan

Plan FSSS 157.04

12 157 Rolled Erosion Control

Product Copy of

Certification

157.16 106, 629, 713

13 207 Geosynthetics:

Certifications

Material Certification

FSSS 207.08 106, 714

14 302 Subbase, Base & Surface

Course Material

Certification 703.05(b), Table

703.03

15 403 Asphalt Concrete Mix Design 403.02

16 602 Culverts Material

Certification

602.08 106, 707

17 625 Seed Mix Mix Design

FSSS 625,

713.04 106, 713

18 635 Traffic Control Plan Plan FSSS 156.03 635

17. PROTECTION OF HABITAT OF ENDANGERED, THREATENED AND SENSITIVE

SPECIES

Location of areas needing special measures for protection of plants or animals listed as threatened or endangered under the Endangered Species Act of 1973, as amended, or as sensitive by the Regional Forester under authority of FSM 2670, are shown on the Plans and identified on the ground.

Measures need to protect such areas have been included elsewhere in this contract or are as follows:

In-water work is prohibited outside the in-water work window.

If protection measures prove inadequate, if other such areas are discovered, or if new species are listed as federally threatened or endangered, or as sensitive by the Regional Forester, Forest Service may either cancel or unilaterally modify this contract to provide additional protection regardless of when such facts become known. Discovery of such areas by either party shall be promptly reported to the other party.

18. FINAL CLEANUP

Contractor shall remove and dispose of all of its own trash and refuse from the contract area.

Material to be removed includes, but is not limited to, camp refuse such as tin cans, aluminum foil, glass, paper, garbage, used engine oil, oil filters, oil cans, grease cartridges, etc. The Contractor shall also remove and dispose of upon completion of the road construction, all stakes, old culverts, flagging and similar debris within the project area. This cleanup is a subsidiary item for which no special payment will be made. All debris shall be disposed of off National Forest Land and in accordance with State and Local disposal requirements.

19. TRAFFIC CONTROL, BARRICADES, WARNING SIGNS, AND OTHER DEVICES

The contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, flaggers, pilot cars and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Barricades and other obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.

All operations shall conform to the current requirements and guidelines of the Occupational Safety and Health Administration (OSHA) and the Manual of Uniform Traffic Control Devices (MUTCD).

The contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points, where the new work crosses or coincides with an existing road or trail.

20. HAZARDOUS CONDITIONS SAFETY PLAN

The following conditions have been identified as inherently hazardous to a degree that failure to take the proper precautions could lead to serious injury or loss of life. This listing shall not be construed as all inclusive. The contractor shall provide a written job-specific hazard analysis and safety plan that addresses and conforms to the requirements of 29 CFR 1910 and 1926 and the clause entitled Accident Prevention (FAR 52.236-13) included herein. Appropriate actions shall be taken by the contractor to implement this plan during performance and to take any and all other necessary steps to mitigate the dangers from hazards.

Tree felling Temporary excavation / deep trenching / slope stability Fall hazard from work heights exceeding six feet Traffic control on high-volume and/or high-speed and/or limited visibility roads Heavy equipment operation Tree climbing and/or tower climbing Fire hazards Hazardous materials handling Electrical hazard Hydraulic and/or pneumatic and/or other high pressure hazards Mechanical hazards such as pulleys, springs etc.

Flooding Debris Flows

21. ROAD MAINTENANCE REQUIREMENTS

In order to fulfill the obligation to protect existing facilities, material source, and disposal site access roads from seasonal weather damage, to safeguard soil and water quality, and to repair damage commensurate with its use, the contractor shall perform road maintenance work on these roads in accordance with the following:

1. While performing ordinary road maintenance work, the contractor shall avoid permanent fouling of gravel or bituminous surfaces through covering them with earth or debris from side ditches, slides, or other sources. The contractor shall avoid blading surface material off the surface of roads.

2. While performing all phases of construction, the contractor shall minimize damage to ditches, slopes and road surfaces. Where damage does occur, the contractor shall restore the road to its prior condition within a reasonable period of time.

3. The contractor shall remove all excess materials and debris from asphalt roadways and trails immediately after backfilling has been completed. This may require brooming and hosing down with water.

4. On completion and acceptance of work requirements, including acceptance of road maintenance by the Forest Service, contractor road maintenance responsibility shall terminate.

22. SPECIAL EQUIPMENT CLEANING REQUIREMENTS

All earth moving equipment (loaders, excavators, dump trucks, etc.) moved to the job site shall be cleaned of weeds and their seeds prior to each entrance onto the National Forest lands. Cleaning shall consist of the removal of all dirt, grease, debris, and materials that may harbor noxious weeds and their seeds. This may require the use of a pressure hose.

Equipment shall be made available for visual inspection by the Forest Service prior to entering Forest Service lands. The contractor shall advise of a proposed date for mobilization. Inspections will take place at mutually agreeable in route locations in advance of entry onto National Forest lands.

Special care shall be taken to assure removal of noxious weeds and their seeds:

The contractor shall take special care under this contract to prevent contamination of water at the work sites with any petroleum residues from mechanical equipment operations. This shall include daily inspection and cleaning as appropriate.

23. MOISTURE SENSTIVE SOILS

Contractors are cautioned that the roadway structure is designed so that the completed road will support highway legal loads during a limited use season. Construction equipment often subjects the uncompleted roadway structure to loadings it is not designed to support. This is especially critical during periods of excessive moisture and will require careful selection and scheduling to permit efficient operation. Any damage resulting from operations which renders the material unsuitable for use or results in potential siltation of streams will be corrected by the contractor at its expense.

24. PROTECTION OF CULTURAL RESOURCES

Location of known historic or prehistoric sites, buildings, objects and properties related to American history, architecture, archaeology and culture, such as settler or Indian artifacts, protected by American Antiquities Act of 1906 (16 U.S.C. 431-433), National Historic Preservation Act of 1966 (16 U.S.C. 470) and the Archaeological Resources Protection Act of 1969 (PL 96-95 and 36 CFR 261.9(e)) shall be identified on the ground by the Forest Service. Forest Service may unilaterally modify, or cancel, this contract to protect an area, object of antiquity, artifact or similar object which is, or may be, entitled to protection under these Acts regardless of when the area, object or artifact is discovered or identified. Discovery of such areas or objects by either party shall be promptly reported to the other party.

Contractor shall protect all known and identified historic or prehistoric sites, buildings, objects and properties related to American history, architecture, archaeology and culture against destructions, obliteration, removal or damage during contractor’s operations. In accordance with 36 CFR 296.14(c), the contractor shall bear costs of restoration, provided that such payment shall not relieve the contractor from civil or criminal remedies otherwise provided by law.

Wheeled or track-laying equipment shall not be operated within such areas, except on roads. Unless agreed otherwise, trees will not be felled into such areas.

25. LANDSCAPE PRESERVATION AND HAZARDOUS MATERIALS

(a) The contractor shall confine operations to within the clearing limits or other areas designated in the contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the contracting officer. The contractor shall make all reasonable attempts to preserve the scenic and natural environment within and adjacent to this construction project.

(b) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, lakes, reservoirs, and other surface waters.

(1) Wash water or waste from concrete, aggregate or other operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

(2) Mechanized equipment shall not be operated in live streams without written approval by the contracting officer.

(c) No petroleum products or other hazardous substances shall be released on or into land or rivers, streams, impoundments or other waters, or into natural or manmade channels leading thereto or therefrom. Servicing of all equipment shall be done only in the areas approved by the contracting officer. The contractor shall transport off government lands all waste oil, vehicle oil filters (drained of free-flowing oil), and oily rags and shall dispose of such materials in accordance with applicable State and Federal regulations.

(1) If the total on-site oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, the contractor shall prepare and implement a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer. This plan shall include notification of appropriate state and local officials, the contracting officer and other appropriate agencies.

(2) At all on-site work areas (including contractor storage, transfer, fueling, mixing sites, etc., for oil, oil products or any hazardous materials), the contractor shall take appropriate preventive measures to insure that any release of hazardous products does not enter any stream or other waters of the United States or any of the individual States and shall conform to the federal, state and local regulations. Planned spill containment locations in stream courses shall be established prior to commencement of work activities. These locations will be reviewed by the contracting officer or representative. When deemed appropriate; additional planned preventive measures shall be established for review by the contracting officer or representative.

(3) The contractor, acting independently, shall immediately take action to notify the appropriate agencies including the contracting officer, and to contain and clean up, without expense to the government, all petroleum products or other hazardous substance releases which are on or in the vicinity of the project and which are caused by the contractor's employees, directly or indirectly. The contractor shall have the necessary materials on site to contain a spill which may occur on land or within live streams as appropriate for any potential flow conditions likely to occur. This may require absorbent pads and/or booms or other containment devices. In the event the government determines that additional resources beyond those of the contractor is required, the contractor may be held liable for all damages and costs including, but not limited to additional labor, subsistence, equipment, supplies and transportation deemed necessary by the government for the containment and clean-up of petroleum products or other hazardous substance releases caused by contractor's employees or resulting from or related to construction operations.

(4) The contractor shall notify the contracting officer of any hazardous materials to be used on the job and shall have Material Safety Data Sheets (MSDS) for those materials available on the job.

26. LOCAL DISPOSAL SITES

Debris encountered in the construction (i.e.; metals) and other waste materials generated in the construction (cartons, scrap, etc.) shall be removed and disposed off of National Forest Service Land, unless other disposal means are authorized in the plans or specifications.

27. STORAGE AND STOCKPILING OF MATERIALS

Materials shall be stored to assure the preservation of quality and fitness for the work. Stored materials shall be located to facilitate their prompt inspection. Sites on Forest Service administered land (identified elsewhere herein) and approved by the Forest Service may be used for storage purposes and for the placing of contractor's plant equipment. All storage sites provided by the Forest Service shall be restored at the contractor's expense. Contractor shall be responsible for making arrangements for storage on other than Forest Service administered lands.

28. LOAD LIMITS

All vehicles and equipment shall not exceed State legal highway loads and widths or posted limits without valid State and Forest Service overload, over width permits. Forest Service overload permit applications for this project may be obtained from the COR.

29. CONTRACTOR'S USE OF EXISTING ROADS

The contractor is authorized to use roads in the immediate construction project area for performance of work under this contract. The authorization is limited to roads necessary for direct access between the construction area and storage sites, disposal areas, and other work areas designated in the contract.

The roads authorized for use will be subject to the following general conditions:

(1) State laws governing traffic rules and equipment requirements on State and County Highways.

(2) Federal Regulations contained in 36 CFR 261.12. These regulations prohibit use in excess of

State Codes for weight and size, damaging a road while using it, and blocking a road open to use by others.

The contractor shall be responsible for and perform road maintenance commensurate with his use of Forest Service roads in the construction area.

30. INSURANCE COVERAGE

Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:

(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.

(b) General Liability. (1) The Contractor shall have bodily injury liability coverage written on a comprehensive form of policy of at least $500,000 per occurrence. (2) The Contractor shall have property damage liability insurance shall be required in the amount of $1,000,000 per occurrence.

(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.

(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.

31. ATTACHMENTS

Attachment 1 – White River Irving Peak Road Repairs Contract Drawings

Attachment 2 – White River Irving Peak Road Repairs FSSS

Attachment 3 – Wage Determination (Davis-Bacon Act)

Attachment 4 – Camping Permit

Attachment 5 – Fire Protection and Suppression (Forms R6-FS-6300-52 / R6-FS-6300-54)

Attachment 6 – Fire Plan (Form R6-FS-6300-55)

(End of Statement of Work)

CLAUSES

Definitization of Equitable Adjustments for Change Orders Pursuant to FAR 36.101-4(b), information regarding USDA’s definitization of equitable adjustments for change orders under construction contracts may be found at Contracting with USDA under “Federal Acquisition Regulation 36.101-4”. USDA’s procedures that apply to the definitization of equitable adjustments for change orders under construction contracts may be found in AGAR

443.304 -70.

Federal Acquisition Regulation (FAR) and United States Department of Agriculture Acquisition Regulation (AGAR) Clauses and Provisions The clauses and provisions contained herein are applicable to any order awarded as a result of this solicitation. The terms and conditions set forth herein supersede all other terms and conditions.

Acceptance of the order in accordance with (IAW) FAR 12.201-1(b)(2) constitutes acceptance of all terms and conditions contained herein.

As part of the Revolutionary FAR Overhaul (RFO), system updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in this solicitation. Contracting officers will rely on representations from offers based on provisions in the solicitation. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

52.252-2 Clauses Incorporated by Reference (Feb 1998) This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also the full text of the clause may be accessed electronically at Internet address https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

52.212-4 Terms and Conditions—Commercial Products and Commercial Services (Nov 2025)

This is a commercial construction acquisition. FAR 52.212-4 is amended as follows:

(b) Inspection/Acceptance. Inspection and Acceptance will be conducted in accordance with FAR 52.246-12, Inspection of Construction (Aug 1996).

(d) Changes. Changes will be handled in accordance with the following FAR clause(s):

☒ FAR 52.243-4, Changes (Nov 2025)

52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.222-50 Combating Trafficking in Persons (Nov 2025) 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-3 Protest After Award (Sep 2025) 52.233-4 Applicable Law for Breach of Contract Claim (Sep 2025) 52.240-91 Security Prohibitions and Exclusions (Nov 2025) 52.244-6 Subcontracts for Commercial Products and Commercial Services (Nov 2025)

The following clauses are applicable if checked:

☒ 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) with Alternate I (Nov 2021) of 52.203-6 ☐ 52.203-13 Contractor Code of Business Ethics and Conduct (Nov 2021) ☒ 52.204-9 Personal Identity Verification of Contractor Personnel Jan 2011 ☒ 52.204-13 System for Award Management—Maintenance (Nov 2025) ☐ 52.204-91 Contractor identification (Nov 2025) ☒ 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Sep 2025) ☒ 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Sep 2025) ☒ 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Sep 2025) ☐ 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Nov 2025) ☒ 52.219-6 Notice of Total Small Business Aside (Nov 2025) ☐ 52.219-8 Utilization of Small Business Concerns (Nov 2025) ☐ 52.219-9 Small Business Subcontracting Plan (Nov 2025)

☐ Alternate III (Nov 2025) of 52.219-9.

☐ Alternate IV (Nov 2025) of 52.219-9

☒ 52.219-14 Limitations on Subcontracting (Nov 2025) ☐ 52.219-16 Liquidated Damages—Subcontracting Plan (Nov 2025) ☐ 52.219-33 Nonmanufacturer Rule (Nov 2025) ☒ 52.222-3 Convict Labor (June 2003)

☒ 52.222-19 Child Labor—Cooperation with Authorities and Remedies (Nov 2025) ☒ 52.222-35 Equal Opportunity for Veterans (Nov 2025) ☒ 52.222-36 Equal Opportunity for Workers with Disabilities (Nov 2025) ☒ 52.222-37 Employment Reports on Veterans (Nov 2025) ☒ 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) ☒ 52.222-54 Employment Eligibility Verification (Nov 2025) ☒ 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) ☒ 52.222-90 Addressing DEI Discrimination by Federal Contractors (Apr 2026) ☒ 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (Nov 2025) ☐ 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) ☐ 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Nov 2025) ☐ 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Nov 2025) ☒ 52.223-23 Sustainable Products and Services (Nov 2025) ☐ 52.224-3 Privacy Training (Jan 2017)

☐ Alternate I (Jan 2017) of 52.224-3 ☐ 52.225-1 Buy American-Supplies (Nov 2025)

☐ Alternate I (Oct 2022) of 52.225-1 ☐ 52.225-3 Buy American--Free Trade Agreements--Israeli Trade Act (Nov 2025)

☐ Alternate II (Nov 2025) of 52.225-3.

☐ Alternate III (Nov 2025) of 52.225-3.

☐ Alternate IV (Oct 2022) of 52.225-3

☐ 52.225-5 Trade Agreements (Nov 2023) ☒ 52.232-33 Payment by Electronic Funds Transfer— System for Award Management (Oct 2018) ☒ 52.242-13 Bankruptcy (July 1995) ☒ 52.246-21 Warranty of Construction (Mar 1994)

The Contractor shall comply with the following FAR Clauses for Commercial Construction.

52.222-6 Construction Wage Rate Requirements 52.222-7 Withholding of Funds 52.222-8 Payrolls and Basic Records 52.222-9 Apprentices and Trainees 52.222-10 Compliance with Copeland Act Requirements 52.222-11 Subcontracts (Labor Standards) 52.222-12 Contract Termination-Debarment 52.222-14 Disputes Concerning Labor Standards 52.222-15 Certificate of Eligibility 52.236-5 Material and Workmanship

The following clauses are applicable when checked:

☒ 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Pricing Method (Aug 2018) ☒ 52.225-9 Buy American-Construction Materials (Nov 2025) ☒ 52.228-2 Additional Bond Security (Oct 1997) ☒ 52.228-5 Insurance-Work on Government Installation (Jan 1997) ☒ 52.228-11 Individual Surety-Pledge of Assets (Feb 2021) ☐ 52.228-13 Alternative Payment Protections (Jul 2020) ☒ 52.228-14 Irrevocable Letter of Credit (Nov 2014) ☒ 52.228-15 Performance and Payment Bonds-Construction (Jun 2020) ☒ 52.228-17 Individual Surety-Pledge of Assets (Bid Guarantee) (Feb 2021) ☒ 52.236-2 Differing Site Conditions (Jul 2025) ☒ 52.236-3 Site Investigation and Conditions Affecting the Work (Jul 2025) ☒ 52.236-6 Superintendent by the Contractor (Jul 2025) ☒ 52.236-7 Permits and Responsibilities (Jul 2025) ☒ 52.236-8 Other Contracts (Jul 2025) ☒ 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Jul 2025) ☒ 52.336-10 Operations and Storage Areas (Jul 2025) ☒ 52.236-11 Use and Possession Prior to Completion (Jul 2025) ☒ 52.236-12 Cleaning Up (Jul 2025) ☒ 52.236-13 Accident Prevention (Jul 2025) ☐ 52.236-14 Availability and Use of Utility Services (Jul 2025) ☒ 52.236-15 Schedules for Construction Contracts (Jul 2025) ☐ 52.236-16 Quantity Surveys (Jul 2025) ☐ 52.236-17 Layout of Work (Jul 2025) ☒ 52.236-21 Specifications and Drawings for Construction (Jul 2025) ☒ 52.242-14 Suspension of Work (Apr 1984) ☒ 52.248-3 Value Engineering (Oct 2025)

Other Applicable Clauses

52.217-7 Option for Increased Quantity - Separately Priced Line Item (Mar 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within the award date to 3/1/2029. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

AGAR Clauses

452.203-71 Anti-Discrimination and Diversity, Equity, and Inclusion (DEI) Compliance (Dec 2025)

(a) By entering into this contract, the contractor certifies that:

(1) It is compliant with all applicable Federal anti-discrimination laws and the Equal Protection principles of the U.S. Constitution, and it will remain compliant for the duration of the contract.

(2) Neither it nor any subcontractor or teaming partner operates or funds any program, policy, or initiative that promotes DEI in a manner that violates any applicable Federal anti-discrimination laws, including but not limited to Title VI and VII of the Civil Rights Act of 1964, or the Equal Protection principles of the U.S.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .