140R2021R0002
SUBMISSION REQUIREMENTS CHECKLIST
| SECTION |
| REFERENCE |
| GENERAL INFORMATION / INSTRUCTIONS |
| PAGE |
LIMIT
CHECK IF SUBMITTED
| Cover Letter |
| Optional, can give company overview, name, etc. |
| 1 |
| Table of Contents (TOC) and Tabs |
| Include TOC and “separate” each Section with a tab, e.g., I, II, III, etc. Tabs may cover folder labels. Prefer “Company Name” visible, if possible. |
| 1 |
| I |
| SF 330 Part I, Sections A – C |
(Attachment b)
| Solicitation/Contract – Specific Qualifications |
| 6 |
Section C Block 9 Firm Name – Provide DUNS for Prime and Subcontractor(s) following the name of the firm, e.g., ABC Corp (DUNS # 999999999). The DUNS # provided will be used with NAICS 541330 to query CPARS/FAPIIS for performance ratings.
| II |
| SF 330 Part I, Section D |
| Organization Chart of Proposed Team |
Fold out is allowed.
Section E
| Resumes of Key Personnel – 1 page maximum per key person |
| 16 |
Section F – Prime Contractor
| Example Projects Prime Contractor (Ref Attachment 2 - Limit 3 projects max) |
| 3 |
| SF 330 Part I, Section F – Subcontractor(s) |
| Example Projects Subcontractor(s) (Ref Attachment 2 – Limit 3 projects max) |
| 3 |
Section G
| Key Personnel in Example Projects - Do not provide separate Section G matrices for prime and/or subcontractor(s). |
| 2 |
| Block 26 |
| Name of Key Personnel (from Section E block 12) - Add name of firm where individual is employed, e.g., John Smith (ABC Corp) |
| Block 28 |
| Example Projects Listed in Section F - Provide “up to” 8 projects listed consecutively / horizontally across the page, e.g., “1 2 3…8” |
| Block 29 |
| Example Projects Key - List projects provided in Section F. Limit 10 projects. |
| VI |
| SF 330 Part I, Section H |
| Additional Information. Comments for any CPARS/ACASS ratings, if applicable. |
| 2 |
| SECTION |
| REFERENCE |
| GENERAL INFORMATION / INSTRUCTIONS (Continued) |
| PAGE |
LIMIT
CHECK IF SUBMITTED
Additional Information (Teaming Capabilities)
2. Teaming Information and management information on projects submitted (Limit of 7 projects max). First line to identify “Project Title” and Period of Performance “PoP”.
| 3. Summary of Qualifications for prime and subcontractors in narrative discussion addressing the primary and secondary task areas. Include DUNS and CAGE (limit 3 pages). |
| 6 |
| 4. Letters of Commendation or awards |
| 3 |
| VII |
| SF 330 Part II |
| General Qualifications. (Limit 1 page per prime and each proposed subcontractor(s)). A Part II is required for each office (Prime and/or subcontractor(s)) that will perform services. |
| 1 ea. |
NOTES:
Ensure all blocks are addressed in the SF-330 and this checklist, if not applicable then mark as N/A.