C02 Attachment 1 - Submission Requirements Checklist_3.docx

DOCX document 32 KB Posted

Attached to
BDO Scour Hole Federal contract opportunity
Solicitation number
140R2021R0002
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document provides details for a federal contract opportunity to perform architectural and engineering services related to reducing predation at a scour hole located near the intersection of the San Joaquin River and Old River in Lathrop, California. The Bureau of Reclamation seeks to award a firm-fixed price contract between $1,000,000 and $5,000,000 for a three-year period of performance beginning in April 2021. Services will include evaluating the physical characteristics of the scour hole, assessing potential solutions, developing design and cost estimates for three solutions, and preparing environmental documents. The solicitation is set aside for small businesses only under NAICS code 541330 with a size standard of $16,500,000. Responses are due by April 5, 2021 and selection will be a two-phase qualifications-based process evaluating professional qualifications, specialized experience, past performance, and knowledge of the project locality.

View the file

Other files for this federal contract opportunity

Other files attached to BDO Scour Hole, newest first.
File Type Posted
C02 Attachment 5 - Questions and Answers_3.docx DOCX document
C02 Attachment 4 - Draft PWS_3.docx DOCX document
C02 Attachment 3 - Blank SF-330_3.pdf PDF
C02 Request for SF 330 Packages_3.docx DOCX document
C02 Attachment 2 - Past Performance Questionnaire_3.docx DOCX document
C02 Attachment 3 - Blank SF-330_2.pdf PDF
C02 Attachment 2 - Past Performance Questionaire_2.docx DOCX document
C02 Attachment 1 - Submission Requirements Checklist_2.docx DOCX document
C02 Attachment 4 - Draft PWS_2.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140R2021R0002

SUBMISSION REQUIREMENTS CHECKLIST

SECTION
REFERENCE
GENERAL INFORMATION / INSTRUCTIONS
PAGE

LIMIT

CHECK IF SUBMITTED

Cover Letter
Optional, can give company overview, name, etc.
1
Table of Contents (TOC) and Tabs
Include TOC and “separate” each Section with a tab, e.g., I, II, III, etc. Tabs may cover folder labels. Prefer “Company Name” visible, if possible.
1
I
SF 330 Part I, Sections A – C

(Attachment b)

Solicitation/Contract – Specific Qualifications
6

Section C Block 9 Firm Name – Provide DUNS for Prime and Subcontractor(s) following the name of the firm, e.g., ABC Corp (DUNS # 999999999). The DUNS # provided will be used with NAICS 541330 to query CPARS/FAPIIS for performance ratings.

II
SF 330 Part I, Section D
Organization Chart of Proposed Team

Fold out is allowed.

III
SF 330 Part I,

Section E

Resumes of Key Personnel – 1 page maximum per key person
16
IV
SF 330 Part I,

Section F – Prime Contractor

Example Projects Prime Contractor (Ref Attachment 2 - Limit 7 projects max)
14
SF 330 Part I, Section F – Subcontractor(s)
Example Projects Subcontractor(s) (Ref Attachment 2 – Limit 3 projects max)
6
V
SF 330 Part I,

Section G

Key Personnel in Example Projects - Do not provide separate Section G matrices for prime and/or subcontractor(s).
2
Block 26
Name of Key Personnel (from Section E block 12) - Add name of firm where individual is employed, e.g., John Smith (ABC Corp)
Block 28
Example Projects Listed in Section F - Provide “up to” 10 projects listed consecutively / horizontally across the page, e.g., “1 2 3 …10”
Block 29
Example Projects Key - List projects provided in Section F. Limit 10 projects.
VI
SF 330 Part I, Section H
Additional Information. Comments for any CPARS/ACASS ratings, if applicable.
2
SECTION
REFERENCE
GENERAL INFORMATION / INSTRUCTIONS (Continued)
PAGE

LIMIT

CHECK IF SUBMITTED

Additional Information (Teaming Capabilities)

2. Teaming Information and management information on projects submitted (Limit of 7 projects max). First line to identify “Project Title” and Period of Performance “PoP”.

3. Summary of Qualifications for prime and subcontractors in narrative discussion addressing the primary and secondary task areas. Include DUNS and CAGE (limit 3 pages).
3
4. Letters of Commendation or awards
3
VII
SF 330 Part II
General Qualifications. (Limit 1 page per prime and each proposed subcontractor(s)). A Part II is required for each office (Prime and/or subcontractor(s)) that will perform services.
1 ea.
X
Past Performance Questionnaire (Attachment 2)
Provide Past Performance Questionnaire (Attachment 2), as applicable – The number of questionnaires you submit shall correspond to how many projects you list in SF 330 Part I,

Section F.

1 attachment 2 per project submitted max

NOTES:

1) Ensure all blocks are addressed in the SF-330 and this checklist, if not applicable then mark as N/A.

2) Attachment 2 is filled out by the customer for the project. Suggest compiling copies of the responses yourself to ensure they are received and submitted with the SF 330.

File details come from the government source that posted it. Updated .