C006482 EXHIBIT B.xlsx
XLSX spreadsheet 48 KB Posted
- Attached to
- CEP & NSCEP Chiller Overhauls
- Solicitation number
- ITB-07068
- Issued by
- Orange County, Florida
About this file
This document is an Exhibit B - Bid Pricing Form for a state and local contract opportunity entitled "CEP & NSCEP Chiller Overhauls" issued by the state of Florida, specifically Orange County and Lakeland City. The scope of work includes labor, materials, equipment, and tools necessary to provide turnkey services for motors, compressors, and condenser tubes for York-manufactured centrifugal chillers at the Central Energy Plant (CEP) and the North Studios Central Energy Plant (NSCEP). The bid form includes pricing for 7 CEP chiller tasks and 3 NSCEP chiller tasks, such as motor removal and inspection, compressor inspection, and condenser tube testing. All labor, incidental materials, equipment, tools, testing, and reporting are to be included in the quoted unit prices.
The bid pricing form requires bidders to fill in all pink areas, with totals automatically calculated. Pricing is requested for each individual task as well as a grand total for the CEP chiller work and the NSCEP chiller work. No other pricing details, set asides, incumbents, funding sources, or contract term information is provided in this exhibit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C006482 Addendum 2.pdf | ||
| C006482 Addendum 1.pdf | ||
| C006482 MFMP ITB Flyer.pdf | ||
| ITB C006482 CEP & NSCEP Chiller Overhauls.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| EXHIBIT B – Bid Pricing Form (REVISED 11/29/2023) | |
| Bid # | C006482 |
| Project: | CEP & NSCEP Chiller Overhauls |
| Bidder: |
| Fill In All Pink Areas And Totals Should Automatically Tabulate. | |||||
| ITEM | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| PART A. CEP CHILLER 7 | |||||
| 1.1 | Removal of Motor | 1 | LS | $ - 0 | $ - 0 |
| 1.2 | Shipping of Motor To and From Repair Facility | 1 | LS | $ - 0 | $ - 0 |
| 1.3 | Inspection of Motor (Repair Facility Cost) | 1 | LS | $ - 0 | $ - 0 |
| 1.4 | Motor Reassembly Including Replacement of Bearings and Rubber Goods* | 1 | LS | $ - 0 | $ - 0 |
| 1.5 | Compressor Inspection Including Replacement of Rubber Goods and Oil Change* | 1 | LS | $ - 0 | $ - 0 |
| 1.6 | Condenser Tube Eddy Current Testing Including Replacement of Rubber Goods* | 1 | LS | $ - 0 | $ - 0 |
| GRAND TOTAL | $ - 0 | ||||
| *All labor, incidental materials (not listed), equipment, tools, testing (not listed) and reports shall be included. |
| ITEM | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| PART B. NSCEP CHILLER 3 | |||||
| 2.1 | Removal of Motor | 1 | LS | $ - 0 | $ - 0 |
| 2.2 | Shipping of Motor To and From Repair Facility | 1 | LS | $ - 0 | $ - 0 |
| 2.3 | Inspection of Motor (Repair Facility Cost) | 1 | LS | $ - 0 | $ - 0 |
| 2.4 | Motor Reassembly Including Replacement of Bearings and Rubber Goods* | 1 | LS | $ - 0 | $ - 0 |
| 2.5 | Compressor Inspection Including Replacement of Rubber Goods and Oil Change* | 1 | LS | $ - 0 | $ - 0 |
| 2.6 | Condenser Tube Eddy Current Testing Including Replacement of Rubber Goods* | 1 | LS | $ - 0 | $ - 0 |
| GRAND TOTAL | $ - 0 | ||||
| *All labor, incidental materials (not listed), equipment, tools, testing (not listed) and reports shall be included. | |||||
| V.2 (November 29, 2023 |
image1.png
File details come from the government source that posted it. Updated .