C006430 Exhibit B Bid Pricing Form r1 TLK.xlsx

XLSX spreadsheet 48 KB Posted

Attached to
Rapid Infiltration Basins (RIBS) Fiscal Years 2024, 2025, 2026
Solicitation number
ITB-06743
Issued by
Orange County, Florida

About this file

This document is a Bid Pricing Form for the Rapid Infiltration Basins (RIBS) Renovation Project for Fiscal Years 2024, 2025, and 2026. The project is being managed by the state of Florida, specifically Orange County and the city of Lakeland. The scope of work includes the rehabilitation of deteriorated RIBS over a three-year period, involving the removal and disposal of existing liners, and the installation of new 60 mil HDPE liners, along with associated earthwork, grading, and concrete repairs as needed. The project is broken down into yearly phases, with specific RIB cells to be addressed in each fiscal year. Bidders are required to provide unit pricing for the various RIB cell rehabilitation activities, as well as a yearly allowance for concrete repairs.

The bid pricing form includes an estimated three-year total of $45,000 for the concrete repair allowance. Pricing for the actual RIB cell rehabilitation work is to be provided by the bidder. This contract opportunity is funded by the state and local jurisdictions involved, and the term of the contract is for three fiscal years, with no renewal options mentioned.

View the file

Other files

File Type Posted
C006430 - Sign-In Log.pdf PDF
C006430 Addendum No. 2 tlk.pdf PDF
C006430 Addendum No. 1 tlk.pdf PDF
C006430 ITB.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Pricing Form

EXHIBIT C – Bid Pricing Form
ITB No.:C006430
Project:RAPID INFILTRATION BASINS (RIBS) RENOVATION FOR FISCAL YEARS 2024, 2025,
Company Name:
Note: Fill In All Pink Areas And Totals Should Automatically Tabulate.

Included within this bid submittal is a yearly allowance towards Concrete Repair. This allowance will only be used on an as needed basis.

ITEM
NO.ITEM DESCRIPTIONUNITQTYUNIT PRICE PER SERVICEESTIMATED ANNUAL TOTAL
YEAR ONE (10/01/2023 TO 09/30/2024)
1RIB Cell 32LOT1$ - 0
2RIB Cell 33LOT1$ - 0
3RIB Cell 34LOT1$ - 0
4RIB Cell 35LOT1$ - 0
Allowance for Concrete RepairLOT1$ 15,000.00$ 15,000.00
ESTIMATED YEAR 1 ANNUAL TOTAL$ 15,000.00
YEAR TWO (10/01/2024 TO 09/30/2025)
5RIB Cell 14LOT1$ - 0
6RIB Cell 15LOT1$ - 0
7RIB Cell 16LOT1$ - 0
8RIB Cell 17LOT1$ - 0
Allowance for Concrete RepairLOT1$ 15,000.00$ 15,000.00
ESTIMATED YEAR 2 ANNUAL TOTAL$ 15,000.00
YEAR THREE (10/01/2025 TO 09/30/2026)
9RIB Cell 18LOT1$ - 0
10RIB Cell 55LOT1$ - 0
11RIB Cell 56LOT1$ - 0
12RIB Cell 59LOT1$ - 0
Allowance for Concrete RepairLOT1$ 15,000.00$ 15,000.00
ESTIMATED YEAR 3 ANNUAL TOTAL$ 15,000.00
ESTIMATED THREE YEAR TOTAL$ 45,000.00

image1.png

File details come from the government source that posted it. Updated .