C006430 Addendum No. 2 tlk.pdf
PDF 130 KB Posted
- Solicitation number
- ITB-06743
- Issued by
- Orange County, Florida
About this file
This document is Addendum No. 2 issued by the Central Florida Tourism Oversight District for the Rapid Infiltration Basins (RIBS) Renovation project under Bid #C006430. The project involves the rehabilitation of deteriorated RIBS over a three-year period, consisting of removal and disposal of existing liners and installation of new 60 mil HDPE liners, earthwork and grading, and concrete work as needed. The work is divided into three fiscal years, with specific RIB cells to be rehabilitated each year. The addendum addresses a question regarding the reuse of existing batten bars, indicating that the existing bars will be reused where possible.
The related state and local contract opportunity involves the same RIBS Rehabilitation Project, covering the rehabilitation of 12 RIB cells across Orange County and Lakeland City in the state of Florida over the three-year period from fiscal year 2024 to 2026. The work includes excavation, backfilling, and sodding in addition to the liner and concrete work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C006430 - Sign-In Log.pdf | ||
| C006430 Addendum No. 1 tlk.pdf | ||
| C006430 ITB.pdf | ||
| C006430 Exhibit B Bid Pricing Form r1 TLK.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 2
Issue Date: October 20, 2023
Title: Rapid Infiltration Basins (RIBS) Renovation for Fiscal Years 2024, 2025, Bid #: C006430 To: All Bidders Issued By: Central Florida Tourism Oversight District
Andrea Osinski, Senior Procurement Analyst aosinski@oversightdistrict.org
(689) 254-4346
NOTICE TO ALL BIDDERS
This addendum shall be made part of the ITB and shall be binding as if part of the original documents. Bidders should acknowledge receipt of this Addendum No. 2 in the appropriate space provided of the Bid Pricing Form.
It is the Bidder’s responsibility to identify all addendums before placing a bid.
PART A. QUESTIONS/REPONSES
Question 1: Do we need to completely supply new batten bar, or do you want us to re-use the existing bar when possible (as was with previous bid)?
Response 1: If possible, we will reuse the existing batten bar.
END OF ADDENDUM