Bus Stops in ROW Engineering LCTA notes.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
RFP #26-07-001 LCTA Engineering For Bus Stop Improvements
Solicitation number
Not on record
Issued by
Luzerne County, Pennsylvania

About this file

This file is an engineering priority assessment document for the Luzerne County Transportation Authority (LCTA) bus stop improvement project, coordinated with the Pennsylvania Department of Transportation (PennDOT). The document outlines 51 prioritized bus stops across the LCTA service area in Pennsylvania requiring accessibility improvements to achieve Americans with Disabilities Act (ADA) and Public Right of Way Accessibility Guidelines (PROWAG) compliance. The improvements focus on concrete construction modifications, bus loading pads, sidewalk work, curb ramps, shelter installations, and amenities such as benches and trash cans at existing bus stops located in municipalities including Wilkes-Barre, Nanticoke, Kingston, Wyoming, Hanover Township, Pittston, and Plains Township. Stops are ranked by tier priority (Tier 1 being highest) and categorized by road ownership (local or state). The LCTA determination column indicates which stops should proceed with planned improvements and any special considerations, such as shelter relocations or utility conflicts requiring additional assistance.

The document identifies 27 bus stops ultimately selected for engineering design work under RFP #26-07-001, which represents the Phase I engineering phase with Phase II construction bidding to follow upon completion. Selected improvements vary by location but commonly include concrete work addressing slope and boarding dimensions, bus loading pad installations, sidewalk segments, curb ramp additions, and the addition of shelters or benches. Recommended amenities include ECO-seats (solar seating), lighting, trash cans, and shelters, with specific stops marked for relocation or removal of existing infrastructure. The project is federally funded and requires Section 106 review and Categorical Exclusion documentation; however, curb cuts and electrification design are excluded from scope. Engineering proposals must be submitted electronically via PennBid with separate technical qualifications and cost proposals, along with completed Bidder/Proposer List Applications and all required federal forms and certifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Priority Stops

RankStop ID and NameStop TierLocation (Municipality)Road OwnerExisting AmenitiesPlan RecommendationsLCTA DeterminationTrash Can Recommended
1Stop 1602: B'nai B'rith Apartments O1WILKES BARRE CITYLOCALLCTA BenchConcrete and new shelterProceed with plan and add shelter. Heavily used-Tier 1.SHELTERYes
2Stop 1647: Bus Stop Cafe1NANTICOKE CITYLOCALShelterFix concrete, remove paversProceed with plan. Minimal work needed but heavily used.-Tier 1.No
3Stop 1679: S Washington St at Washington Sq O1WILKES BARRE CITYLOCALShelterBus loading pad and concrete work, DWS addProceed with plan-Tier 1.Yes
4Stop 1685: Market St and Rutter Ave I2KINGSTON BOROLOCALShelterBus loading pad and concrete workN/A. LCTA went through PennDOT engineering review, advise not altering.No
7Stop 1245: Wyoming and Seventh O2WYOMING BOROSTATEBus loading pad / Sidewalk / BenchProceed with plan and add benchBENCHNo
8Stop 1692: Market St and 3rd Ave I3WILKES BARRE CITYSTATEShelterRelocate shelter / Concrete work / curb cutProceed with plan. Shelter passed D4 agreement but the location is interrupted by a electrical utility line we cannot move. Assist with HOP.No
9Stop 1155: Sherman St and Amber Ln I3WILKES BARRE CITYSTATEShelterConcrete work / curb cutProceed with plan. Old Lamar location that received concrete and needs updating.Yes
10Stop 1586: General Hospital I2WILKES BARRE CITYLOCALShelterFix concrete / curb transitionProceed with plan / + sidewalk segment to meet crosswalk for full pedestrian access.Yes
11Stop 1419: Lee Park Ave and Olive St O3WILKES BARRE CITYSTATEBus loading / Sidewalk / Curb rampProceed with planNo
13Stop 1821: E Main and Chestnut3NANTICOKE CITYSTATESimmeBus loading / Sidewalk / Curb rampProceed with plan. Seat was added to existing concrete space and could use updating.No
14Stop 1420: Lee Park and Regina I2HANOVER TWPSTATESimmeBus loading pad and concrete work + solar seatProceed with plan add solar seatECO-SEATYes
16Stop 1474: River and Courtright I2CITY OF WILKES-BARRESTATECity BenchBus loading / Concrete repair / Repair benchProceed with plan and add LCTA bench and concrete segment to remove trip hazard. (move bench from B'nai B'rith?)RELOCATE B'NAI BENCH TO THIS LOCATION ASK BILL HARRIS CITYNo
17Stop 1339: Park Ave and Dana I2WILKES BARRE CITYSTATELCTA BenchBus loading / Sidewalk / Curb rampProceed with planYes
22Stop 1806: Kidder and Salvation Army2WILKES BARRE CITYLOCALBus loading pad / Sidewalk / Curb ramp / Solar light and Simme addProceed with plan. Location is complex but heavily used / Install concrete and ramp add solar seat (already in inventory)ECO-SEATYes
23Stop 1120: Market St and Page Ave I3KINGSTON BOROLOCALShelterRemove entire shelter, rework slope, two curb rampsConcrete segments- notify municipality of curb cuts at cornersYes
25Stop 1582: Rte 315 and Laird St WB3PLAINS TWPSTATETwo curb ramps, add concreteProceed with plan-complex location.No
26Stop 1657: Kennedy and William I3PITTSTON CITYSTATEConcrete minor addition (7 SY)Proceed with plan. Easy upgrade. Having engineering plan will assist HOP.No
29Stop 1697: Boscovs O1WILKES BARRE CITYSTATESimmeRemove and replace boarding area (slope issue) /Repair connection to curb / Install shelter and pad (requires stop relocation to the west) / Install electrical sourceProceed with plan add new shelter and necessary concrete additons. Assit with HOP. Heavily used and central location. Tier 1.SHELTERYes
30Stop 1707: Wyoming Ave and Hoyt St I3KINGSTON BOROSTATEBus loading pad / SidewalkProceed with plan. HOP assistance.No
31Stop 1500: River and Hancock St I3PLAINS TWPSTATEBus loading pad / SidewalkProceed with plan. HOP assistance.No
36Stop 1704: Coal St and N Empire Ct I1WILKES BARRE CITYLOCALShelterBus loading pad / SidewalkProceed with plan. Replaced shelter on existing legacy pad. Could use upgrades. Tier 1.Yes
41Stop 1194: Pierce St and 3rd Ave I3KINGSTON BOROLOCALShelterCurb ramp / 11 SY concreteProceed with planNo
43Stop 1252: Kingston Corners O2KINGSTON BOROSTATESimmeBus loading padProceed with planYes
46Stop 1247: Wyoming and Union O3KINGSTON BOROSTATEBus loading / Sidewalk / Curb rampProceed with planNo
47Stop 1821: E Main and Chestnut3NANTICOKE CITYSTATEBus loading / Sidewalk / Curb ramp / Install simmeN/A - notify municipality of curb cuts at corners, Simme already installedYes
49Stop 1600: Pennsylvania Ave @ Union St O3WILKES BARRE CITYLOCALBus loading pad / SidewalkProceed with planNo
51Stop 1272: Wyoming Ave and Dorrance O3KINGSTON BOROSTATEBus loading / Sidewalk / Curb rampProceed with plan. HOP assistance.No