Building RR531-RR532 SR.pdf

PDF 88 KB Posted

Attached to
MARSOC Buildings RR531 and RR532 Flooring Repairs
Solicitation number
N4008526R9045
Issued by

About this file

This is a Submittal Register template used to track construction contract submittals and their approval status throughout a project lifecycle. The form serves as a centralized log for managing contractor-submitted documents, scheduling review periods, and documenting approvals from the government or contract authority.

The register captures submittals across three primary categories: SD-01 Preconstruction Submittals, SD-06 Test Reports, SD-07 Certificates, SD-11 Closeout Submittals, and SD-03 Product Data. Preconstruction submittals include the Accident Prevention Plan (APP), Quality Control (QC) Plan, Construction Schedule, Equipment Delivery Schedule, Activity Hazard Analysis (AHA), crane-related plans and certifications, traffic control plans, environmental protection plans, and permits. Test Reports and Certificates encompass backflow preventer testing, confined space entry permits, third-party certifications for barge-mounted cranes, and compliance documentation. Closeout submittals include the interim DD1354 Transfer & Acceptance form and complete submittal packages. The template includes columns for tracking action codes, dates of action, submission dates, approval needs, material delivery deadlines, and remarks. The form also accommodates contractor action schedules and approving authority timelines, enabling project managers to monitor document flow and ensure compliance with contract requirements throughout project execution and closure.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NO.

CONTRACTOR

SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

01 20 00

1.3

01 30 00

1.4.1

01 31 50

1.2

01 32 16

1.2

1.3

01 33 00

1.4.1

1.6.1

01 35 29

1.9

1.10

1.9.1

1.9.1

1.7.1.4

1.14

1.14.1

1.14.3

1.14.4

1.14.5

1.11

1.14.6

1.14.7

01 45 10

1.6

01 50 00

1.6.2.1

2.1

3.1

SD-03 PRODUCT DATA

Backflow Preventers (If Applicable)

SD-06 TEST REPORTS

SD-07 CERTIFICATES

SD-01 PRECONSTRUCTION SUBMITTALS

Traffic Control Plan (If Applicable)

Crane Critical Lift Plan (If Applicable)

Crane Operators (If Applicable)

Reports

Accident Reports

Monthly Exposure Reports

Regulatory Citations and Violations

Crane Reports

(Enter Contract No. Here)

SD-01 PRECONSTRUCTION SUBMITTALS

Accident Prevention Plan (APP)

SD-01 PRECONSTRUCTION SUBMITTALS

Equipment Delivery Schedule

SD-01 PRECONSTRUCTION SUBMITTALS

SUBMITTAL REGISTER

P A R A G R A P H

N O

S P E C

S E C T

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W R

(Enter Contractor Name Here)

Qaulity Control Plan (QC Plan)

Crane Work Plan (If Applicable)

Activity Hazard Analysis (AHA)

SD-06 TEST REPORTS

Certificate of Compliance

SD-01 PRECONSTRUCTION SUBMITTALS

TITLE AND LOCATION

(Enter Contract Title and Locaiton Here)

Schedule of Prices

List of Contact Personnel

Construction Schedule of Military Real Property (If Applicable)

A C T I V I T Y

N O

T R A N S M I T T A L

N O

(d)

DESCRIPTION ITEM SUBMITTED

SD-11 CLOSEOUT SUBMITTALS

SD-11 CLOSEOUT SUBMITTALS

Interim DD1354, Transfer & Acceptance

SD-11 CLOSEOUT SUBMITTALS

Submittal Register

Complete Submittal Package

Backflow Preventer Tests (If Applicable)

SD-07 CERTIFICATES

Third Party Certification of Barge-

Mounted Movile Cranes

Confined Space Entry Permit

Approving AuthorityContractor Schedule Dates

Contractor Action

1.3

01 57 19

1.6.1

1.6.4

1.7.2

1.7

1.7

PAGE 1 OF _

Backflow Preventers Certificate (If Applicable)

SUBMITTAL FORM, JAN 96 PREVIOUS EDITION OBSOLETE

MSDS for Class I ODS Waivered Product

SD-01 PRECONSTRUCTION SUBMITTALS

Permit for Storm Water Discharge (If applicable)

Environmental Protection Plan

Preconstruction Survey

Notice of Intent (If applicable)

Backflow Tester Certification (If Applicable)

File details come from the government source that posted it. Updated .