This is a Project Specific Specifications document for the Brighton to Roxford Double Track Project, Segment 4 - Polk Street Grade Crossing (Contract No. PS2415-3412), prepared by the Los Angeles Metropolitan Transportation Authority (Metro) in coordination with the Cities of Los Angeles and Sylmar. The document, issued September 22, 2026 for bidding purposes only, provides comprehensive technical specifications across 34 specification sections covering work including selective site clearing and demolition, lead assessment and hazardous material management, concrete forming, handrails and pedestrian gates, painting and coatings, roadway signage, roadway lighting, earthwork, aggregate base course, flexible paving, curbs and sidewalks, pavement striping and markings, chain link fencing, drainage infrastructure, and railway signal systems. The specifications address work windows restricted to Monday through Friday (4:30 AM to 9:00 PM Monday-Thursday, 4:30 AM to 11:00 PM Friday) with no track access allowed Monday mornings 2:30 AM to 4:30 AM, and no construction during specified holidays including New Year's, Easter, Memorial Day, July 4th, Labor Day, Thanksgiving, and Christmas periods. The project involves coordination with multiple City departments including the Bureau of Street Lighting, Department of Transportation, Bureau of Engineering, and utility providers including the Department of Water and Power.
The specifications establish strict quality assurance requirements with submittals requiring professional engineer review and sealing, third-party inspections, and City Representative approval prior to construction. Aerially deposited lead contamination is documented in the project limits between stations 23+00 to 27+30 with contaminated soils requiring specialized handling, dust control, and hazardous waste manifest procedures in compliance with DTSC, Cal/OSHA, and EPA regulations. Temporary and permanent street lighting must maintain or exceed existing illumination levels during construction phases with light trespass limited to one foot-candle above ambient levels at adjacent properties. Most earthwork and incidental work including lead compliance, backfill, and demolition-related excavation are considered incidental to primary contract items with no separate payment, while specific items including roadway excavation, roadway signage, and roadway lighting are measured and paid by unit, cubic yard, or lump sum as specified. The contractor must obtain all required encroachment permits, coordinate with Metro as the Railroad Work Inspector Coordinator (RWIC), reimburse Metro for cancelled RWIC work without 48-hour notice, and comply with all federal, state, and local environmental and safety regulations throughout the construction period.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION NO. TITLE TYPE PAGES
SUBMITTAL
DATE
01 11 16 Work by SCRRA M 3 9/22/2026
01 14 00 Work Restrictions M 3 9/22/2026
01 71 14 Selective Site Clearing and Demolition (Public ROW) S 5 9/22/2026
02 26 26 Lead Assessment S 5 9/22/2026
03 10 00 Concrete Forming and Accessories S 7 9/22/2026
05 52 00 Hand Rails and Railing M 1 9/22/2026
05 52 10 Pedestrian Swing Gates M 1 9/22/2026
09 90 00 Painting and Coating M 1 9/22/2026
10 14 54 Roadway Signage (Public ROW) S 5 9/22/2026
26 50 10 Roadway Lighting S 12 9/22/2026
31 20 00 Earthwork M 3 9/22/2026
31 20 10 Earthwork (Public ROW) M 11 9/22/2026
32 11 10 Aggregate Base Course (Public ROW) M 3 9/22/2026
32 12 10 Flexible Paving (Public ROW) S 6 9/22/2026
32 16 10 Curbs, Gutter, Sidewalks and Driveways (Public ROW) S 3 9/22/2026
32 17 24 Pavement, Striping and Markings (Public ROW) S 8 9/22/2026
32 31 14 Chain Link Fence and Gates (Public ROW) S 3 9/22/2026
33 42 00 Culvert and Drainage Pipe M 1 9/22/2026
VOLUME 2
Division 02 – Existing Conditions
Division 03 – Concrete
Division 05 – Metals
Division 31 - Earthwork
Division 32 – Exterior Improvements
Division 33 – Utilities
Division 34 – Transportation
Track Materials
Division 26 – Electrical
LOS ANGELES METRPOLITAN TRANSPORTATION AUTHORITY
BRIGHTON TO ROXFORD
DOUBLE TRACK PROJECT
SEGMENT 4 - POLK STREET GRADE CROSSING
CONTRACT NO. PS2415-3412
FOR BIDDING PURPOSES ONLY
September 22, 2026
PROJECT SPECIFIC SPECIFICATIONS
TABLE OF CONTENTS
VOLUME 1
Division 09 – Finishes
Division 10 – Specialties
Division 01 – General Requirements
Los Angeles Metropolitan Transportation Authority
Brighton – Roxford Double Track
Contract No. PS2415-3412
Table of Contents - 1
FOR BIDDING PURPOSES ONLY
SECTION NO. TITLE TYPE PAGES
SUBMITTAL
DATE
34 11 27 Sub-Ballast and Aggregate Base M 1 9/22/2026
34 41 00 Roadway Signaling and Control Equipment M 7 9/22/2026
34 42 00 General Signal Requirements M 2 9/22/2026
34 42 18 Conduits and Pull Boxes M 2 9/22/2026
34 42 58 Signal System Testing M 2 9/22/2026
Railway Signals
END OF SECTION
Roadway Signals
Los Angeles Metropolitan Transportation Authority
Brighton – Roxford Double Track
Contract No. PS2415-3412
Table of Contents - 2
Los Angeles Metropolitan Transportation Authority Engineer’s Seal - 1 Brighton – Roxford Double Track
BRIGHTON TO ROXFORD DOUBLE TRACK
SEGMENT 4 – POLK STREET GRADE CROSSING
PROJECT-SPECIFIC SPECIFICATIONS
ENGINEER’S SEAL PAGE
The Professional Engineer’s seal and signature affixed hereon indicates the Engineer’s review and participation in the preparation of the Project Specifications. Participation is limited to the following Specifications Sections:
01 11 16 Work by SCRRA
01 14 00 Work Restrictions
01 71 14 Selective Site Clearing and Demolition (Public ROW)
Zafer Mudar , PE Engineer’s Name Engineer’s Seal
STV Incorporated Firm
Los Angeles Metropolitan Transportation Authority Engineer’s Seal - 2
The Professional Engineer’s seal and signature affixed hereon indicates the Engineer’s review and participation in the preparation of the Project Specifications. Participation is limited to the following Specifications Sections:
02 26 26 Lead Assessment
03 10 00 Concrete Forming and Accessories
05 52 00 Hand Rails and Railing
05 52 10 Pedestrian Swing Gates
09 90 00 Painting and Coating
10 14 54 Roadway Signage (Public ROW)
31 20 00 Earthwork
31 20 10 Earthwork (Public ROW)
32 11 10 Aggregate Base Course (Public ROW)
32 12 10 Flexible Paving (Public ROW)
32 16 10 Curbs, Gutter, Sidewalks and Driveways (Public ROW)
32 17 24 Pavement, Striping and Markings (Public ROW)
32 31 14 Chain Link Fence and Gates (Public ROW)
33 42 00 Culvert and Drainage Pipe
34 11 27 Sub-Ballast and Aggregate Base
Zafar Mudar , PE
Los Angeles Metropolitan Transportation Authority Engineer’s Seal - 3
The Professional Engineer’s seal and signature affixed hereon indicates the Engineer’s review and participation in the preparation of the Project Specifications. Participation is limited to the following Specifications Sections:
34 42 00 General Signal Requirements
34 42 18 Conduits and Pull Boxes
34 42 58 Signal System Testing
Carrene Gilbert , PE
Pacific Railway Enterprises, Inc
Los Angeles Metropolitan Transportation Authority Engineer’s Seal - 4
The Professional Engineer’s seal and signature affixed hereon indicates the Engineer’s review and participation in the preparation of the Project Specifications. Participation is limited to the following Specifications Sections:
26 50 10 Roadway Lighting
34 41 00 Roadway Signaling and Control Equipment
William Sun , PE
Project Specific Specifications Brighton - Roxford Double Track FOR BIDDING PURPOSES ONLY 01 11 16- 1 Issued: 09-22-2026
SECTION 01 11 16
WORK BY SCRRA
The following are modifications to the SCRRA Standard Specifications:
PART 1 – GENERAL
Replace: existing paragraph 4.02.B with the following:
4.02 PAYMENT
B. If the contractor cancels scheduled RWIC work and does not make arrangements with the RWIC 48 hours in advance for cancellation, the contractor shall reimburse Metro for the cost of the RWIC. If the contractor sets up Form B or other type of protection required to be in the next day’s SCRRA Railroad Bulletin, and the contractor does not work or cancels the RWIC for reasons other than Force Majeure, the contractor shall reimburse Metro for the cost of the RWIC.
END OF SECTION 01 11 16
FOR BIDDING PURPOSES ONLY 01 14 00- 1 Issued: 09-22-2026
SECTION 01 14 00
WORK RESTRICTIONS
The following are modifications to the SCRRA Standard Specifications:
1.02 RELATED REQUIREMENTS
E. Section 01 57 19 Temporary Environmental Controls
Add: paragraph 1.08N with the following:
1.08 CONTRACTOR USE OF WORKSITE
N. Contractor shall obtain all required encroachment permits prior to start of Work.
Replace: existing paragraph 1.17 with the following:
1.17 HOURS OF OPERATIONS
A. Work windows that apply to this project are as follows:
a. Monday through Friday:
i. Form B available 4:30 AM to 9 PM, Monday through Thursday, and 4:30 AM to 11:00 PM on Friday.
ii. No track access will be allowed on Monday mornings from 2:30 AM to 4:30 AM. This period will not be available for track access regardless of signal testing work actually in progress at the work site.
iii. Track and time may be requested at any other time.
b. Additional Requirements and Notes that pertain to work windows:
i. For Metrolink revenue service times, refer to the latest version of the Metrolink Passenger Timetable on the Metrolink website:
www.metrolink.com
FOR BIDDING PURPOSES ONLY 01 14 00- 2 Issued: 09-22-2026
ii. No construction work shall be performed during the following periods when Construction Management staff, or AUTHORITY furnished labor or equipment are not available:
1. New Year’s holiday
2. Good Friday and Easter weekend
3. Memorial Day weekend
4. July 4th holiday and weekend (three-day weekend)
5. Labor Day holiday and weekend
6. Thanksgiving week and holiday weekend
7. Christmas Eve, Christmas day, and week between Christmas Day and New Year’s Day
iii. The Contractor shall make requests for all work windows in accordance with the latest version of SCRRA Form 37 and Section 01 14 00 1.10..
iv. The Contractor shall require prior approval from SCRRA and local jurisdictions for any Work outside the allotted approved work window days and hours.
END OF SECTION 01 14 00
Brighton to Roxford Double Track FOR BIDDING PURPOSES ONLY 01 71 14 - 1 Issued: 09-22-2026
SECTION 01 71 14
SELECTIVE SITE CLEARING AND DEMOLITION (PUBLIC ROW)
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Performing operations to clear, demolish, remove, store and/or dispose of infrastructure and street furniture from the worksite within the City of Los Angeles and City of Sylmar jurisdiction.
C. For removal of street lighting refer to Section 26 56 10, Exterior Lighting / Street Lighting (Public ROW).
D. For removal of traffic control equipment refer to Section 34 41 10, Roadway Signaling and Control Equipment (Public ROW).
E. For tree removal refer to Section 01 56 39, Temporary Tree and Plant Protection
F. Refer to Specification Section 01 35 44 - Environmental Mitigation and Monitoring for VIS- 2 Replace for Tree Removal and CON-69 Avoidance of Migratory Bird Nesting Season.
1.02 RELATED SECTIONS
A. Section 01 31 30 Interface with Other Jurisdictions
B. Section 01 33 00 Submittal Procedures
C. Section 01 35 43 Environmental Procedures for Contaminated and Hazardous Materials
D. Section 01 43 20 Project Quality Program Requirements – Design/Bid/Build
E. Section 01 56 28 Construction Fencing (Chain Link)
F. Section 01 56 39 Temporary Tree and Plant Protection
G. Section 01 57 19 Temporary Environmental Controls
H. Section 01 71 24 Pre-construction Surveys
I. Section 01 74 00 Waste Management and Disposal
J. Section 26 56 10 Exterior Lighting / Street Lighting (Public ROW)
K. Section 31 20 10 Earthwork (Public ROW)
PROJECT: BRIGHTON TO ROXFORD DOUBLE TRACK PROJECT
FOR BIDDING PURPOSES ONLY 01 71 14 - 2 Issued: 09-22-2026
L. Section 32 31 13 Chain Link Fence and Gates (Public ROW)
M. Section 34 41 10 Roadway Signaling and Control Equipment (Public ROW)
1.03 REFERENCES
A. CITY OF LOS ANGELES
1. Greenbook: Standard Specifications for Public Works Construction (SSPWC), 2012Edition.
2. City of Los Angeles Brown Book 2014 Edition and City of Los Angeles, Bureau of Engineering, Special Order 001-0912.
B. EPA Federal Insecticide, Fungicide, and Rodenticide Act
1.04 QUALITY ASSURANCE
A. Comply with Section 01 43 20, Project Quality Program Requirements – Design/Bid/Build.
B. Perform work in compliance with requirements of governing authorities having jurisdiction, and as specified.
1.05 SUBMITTALS
A. Refer to Section 01 33 00, Submittal Procedures, for submittal requirements.
B. City of Los Angeles
1. Pre-Construction
a. Comply with Waste Management and Disposal Requirements in Section 01 74 19.
b. Construction Work Plan
1) Means and Methods
2) Describe how the waste will be handled and where it will be disposed.
c. Product Data
1). Tree Pruning Fungicide
2) Insecticide
d. City permits obtained by Contractor for demolition, removal, transport and disposal of debris.
e. Provide documentation of existing condition of Street Furniture and Pavement per Contract Specification 01 71 24.
f. Letter documenting arrangements for disposing of waste and excess materials at a legally licensed landfill/disposal facility outside Worksite.
2. Post Construction
a. As-built locations and depths of house connections and laterals and termination points of capped utilities.
FOR BIDDING PURPOSES ONLY 01 71 14 - 3 Issued: 09-22-2026
b. Signed letter of receipt that the furniture or equipment has been returned or reinstated to its original location.
c. Recycling Facility receipt.
1.06 COORDINATION
A. Coordinate with the City of Los Angeles per requirements in the Notice to Contractor section of the General Notes sheets in the Contract Drawings.
PART 2 - PRODUCTS
2.01 MATERIALS
A. Tree Pruning Fungicide and Insecticide
1. Acceptable to the EPA under the Federal Insecticide, Fungicide, and Rodenticide Act and approved by the agency having jurisdiction before application.
PART 3 - EXECUTION
3.01 STREET FURNITURE REMOVAL
A. Coordinate removal of street furniture with Metro, City of Los Angeles, and the respective owner.
B. City of Los Angeles
1. Bus Stops and associated Furniture - Transit Shelters/Trash Receptacles, Public Amenity Kiosks, Newsstand Vending Kiosks, Automated Public Toilets, and Bus Benches.
2. Coordinate with City of Los Angeles Bureau of Street Service (BSS) the removal of all other street furniture and equipment.
3. Coordinate with Metro and the City of Los Angeles Engineer removal, storage and reinstatement of all other street furniture and equipment.
3.02 PROTECT IN-PLACE
A. Trees and shrubs in accordance with Section 01 56 39 Shrub and Tree Protection and Mitigation Measure VIS-2 as specified in Section 01 35 44 - Environmental Mitigation and Monitoring.
B. Utilities, pavements and facilities from damage caused by demolition vehicle equipment, settlement, lateral movement, undermining, washout and other hazards created by the demolition operations.
FOR BIDDING PURPOSES ONLY 01 71 14 - 4 Issued: 09-22-2026
C. Active sewer, water, gas, electric, and other utilities; and drainage and irrigation lines indicated or, when not indicated, found or otherwise made known to the Contractor before or during demolition work. If a utility is damaged, immediately notify the utility owner for corrective action.
D. Call underground service alert (USA) at (800) 227-2600 a minimum of 48 hours (not including weekends) before commencement of clearing and demolition work.
E. Barricade excavations and depressions in accordance with CAL-OSHA standards.
F. Excavations accessible by the public - Post warning lights and signage at perimeters of open depressions and excavations. Operate warning lights during hours from dusk to dawn each day and as otherwise required.
3.03 CONSTRUCTION NOISE AND VIBRATION
A. Comply with Section 01 56 19, Construction Noise and Vibration Control.
3.04 EXISTING STRUCTURES AND RELATED FACILITIES
A. Demolish structures, including foundations and base slabs, as required, and remove. Use methods in accordance with local City Ordinance and regulations, and as specified.
1. Proceed with demolition work in a systematic manner in accordance with Demolition Plans.
2. Remove poles (including sign, power, telephone and other poles), signs and fences, including footings unless otherwise noted to remain. Poles owned by utility company(s) will be removed by utility company(s) unless specified otherwise. Poles and signs belonging to local authorities shall be salvaged and returned to the owner or stored and reinstalled on completion of the Project as specified.
3.05 PAVEMENT, SIDEWALK, AND CURB AND GUTTER
A. Perform the demolition and removal in accordance with the submitted and approved Demolition Plans.
B. Remove bituminous pavement, concrete pavement, concrete curb, walk, gutters, driveway, and alley intersections in accordance with Green Book Section 300-1.3. Where a portion of the surface is to remain, saw a neat line along the edge and protect in-place the portion to remain.
3.06 SECTION WIRING AND POLES
A. Remove wiring and poles in accordance with the approved Demolition Plans and after clearance to proceed has been provided by City, where applicable.
FOR BIDDING PURPOSES ONLY 01 71 14 - 5 Issued: 09-22-2026
3.07 BACKFILL OF DEMOLITION EXCAVATIONS
A. Excavations created by demolition activities shall be backfilled in the same manner as excavations created for the location of existing underground utilities. Refer to Section 31 20 10, Earthwork (Public ROW).
B. Backfill and compact depressions, including cavities, caused by excavation, demolition or removal.
3.08 SALVAGE OR DISPOSAL OF MATERIALS
A. Materials indicated to be removed or demolished become the property of the Contractor, except as noted herein. Remove from Worksite and recycle or dispose of at legal disposal sites. Arrange for and pay required fees.
B. Do not allow non-salvageable material demolished or removed to accumulate at Worksite.
Remove from the project site at frequent intervals, or as directed by City.
C. Burning of materials at the Worksite or street is not allowed.
D. Achieve a minimum of 80% for recycling of all demolition waste. Recycling facilities' acceptance of concrete, brick, stone, metal, glass, wood, interior and exterior architectural details, etc. are to be provided to City, City of Sylmar, and Metro. Meet noise and dust control requirements during loading of all materials into dump trucks.
3.09 PROTECTION AND CLEANUP
A. Protect all permanent work until final acceptance by the City.
B. Leave worksite clean and orderly at the end of each day.
C. Comply with Sections 01 74 00 Cleaning and 01 74 19, Waste Management and Disposal.
END OF SECTION 01 71 14
FOR BIDDING PURPOSES ONLY 02 26 26 - 1 Issued: 09-22-2026
SECTION 02 26 26
LEAD ASSESSMENT
Add this new Specification.
1.01 SUMMARY
A. This section includes specifications for hazardous waste management while excavating, stockpiling, transporting, placing, and disposing of material containing hazardous waste concentrations of aerially deposited lead (ADL).
B. ADL is present within the project limits.
1.02 DEFINITIONS
A. Type Y-1: Material that contains ADL in average concentrations (using the 90 percent Upper Confidence Limit) of 1.5 mg/L or less extractable lead (based on a modified waste extraction test using deionized water as the extractant) and 1,411 mg/kg or less total lead. This material is a California hazardous waste that may be reused as permitted under the variance of the DTSC provided that the lead contaminated soil is placed a minimum of 5 feet above the maximum historic water table elevation and covered with at least 1 foot of non-hazardous soil.
B. Type Y-2: Material that contains ADL in average concentrations (using the 90 percent Upper Confidence Limit) that exceed either 1.5 mg/L extractable lead (based on a modified waste extraction test using deionized water as the extractant) or 1,411 mg/kg total lead but are less than 150 mg/L extractable lead (based on a modified waste extraction test using deionized water as the extractant) and less than 3,397 mg/kg of total lead. This material is a California hazardous waste that may be reused as permitted under the variance of DTSC provided that the lead contaminated soil is placed a minimum of 5 feet above the maximum historic water table elevation and protected from infiltration by a pavement structure which will be maintained by the Authority.
C. Type Z-2: Material that contains ADL in average concentrations (using the 95 percent Upper Confidence Limit) greater than or equal to 1,000 mg/kg total lead, greater than or equal to 5.0 mg/L soluble lead (as tested using the California Waste Extraction Test), and the material is surplus; or material that contains ADL in average concentrations greater than 150 mg/L extractable lead (based on a modified waste extraction test using deionized water as the extractant) or greater than 3,397 mg/kg total lead. This material is a Authority-generated California hazardous waste and must be transported to and disposed of at a California Class I disposal site.
Section 02 26 26 LEAD ASSESSMENT
FOR BIDDING PURPOSES ONLY 02 26 26 - 2 Issued: 09-22-2026
D. Type Z-3: Material that contains ADL in average concentrations (using the 95 percent Upper Confidence Limit) greater than 5.0 mg/L soluble lead, (as tested using the Toxicity Characteristic Leaching Procedure). This material is a Authority-generated federal hazardous waste and must be transported to and disposed of at a California Class I disposal site.
1.03 SITE CONDITIONS
A. ADL concentration data and samples locations are included in the report (Final
Aerially Deposited Lead Report, EMI, June 10, 2014) found in Attachment A of this specification.
B. Type Z-2 material exists between 35 and 70 feet, measured horizontally from the curb face, from 23+00 to 27+30 station, and a depth of 1.5 feet below existing grade.
1.04 SUBMITTALS
A. Lead Compliance Plan
1. Regulations containing specific Cal/OSHA requirements when working with lead include 8 CA Code of Regs § 1532.1.
2. Submit a plan:
a. That documents your compliance program to prevent or minimize worker exposure to lead
b. Including the items listed in 8 CA Code of Regs § 1532.1(e)(2)(B)
c. Signed and sealed by a Certified Industrial Hygienist (CIH).
3. Allow 7 days for the Engineer's review. Obtain authorization for the plan before starting any activity that presents the potential for lead exposure.
4. Before starting any activity that presents the potential for lead exposure to employees who have no prior training, including State employees, provide a safety training program to these employees that complies with 8 CA Code of Regs § 1532.1 and your lead compliance plan.
5. Submit copies of air monitoring or job site inspection reports made by or under the direction of the CIH under 8 CA Code of Regs § 1532.1 within 10 days after the date of monitoring or inspection.
6. Supply personal protective equipment, training, and washing facilities required by your lead compliance plan for 5 State employees.
FOR BIDDING PURPOSES ONLY 02 26 26 - 3 Issued: 09-22-2026
B. Excavation and Transportation Plan
1. Within 7 days after approval of the Contract, submit 3 copies of an excavation and transportation plan. Allow 7 days for review. If revisions are required, as determined by the Engineer, submit the revised plan within 7 days of receipt of the Engineer's comments. For the revision, allow 7 days for the review. Minor changes to or clarifications of the initial submittal may be made and attached as amendments to the excavation and transportation plan. In order to allow construction to proceed, the Engineer may conditionally approve the plan while minor revisions or amendments are being completed.
2. Prepare the written, project specific excavation and transportation plan establishing the procedures you will use to comply with requirements for excavating, stockpiling, transporting, and placing or disposing of material containing ADL. The plan must comply with the regulations of the DTSC and Cal/OSHA and the requirements of the variance. The sampling and analysis portions of the excavation and transportation plan must meet the requirements for the design and development of the sampling plan, statistical analysis, and reporting of test results contained in US EPA, SW 846, "Test Methods for Evaluating Solid Waste," Volume II: Field Manual Physical/Chemical, Chapter Nine, Section 9.1. The plan must include the following elements:
a. Excavation schedule by location and date
b. Dust control measures
c. Site for disposal of hazardous waste
C. Quality Control and Assurance
1. Excavation, reuse, and disposal of material with ADL must comply with rules and regulations of the following agencies:
a. US DOT
b. US EPA
c. California Environmental Protection Agency
d. CDPH
e. DTSC
f. Cal/OSHA
g. California Department of Resources Recycling and Recovery
FOR BIDDING PURPOSES ONLY 02 26 26 - 4 Issued: 09-22-2026
h. RWQCB, Region 4, Los Angeles
i. California Air Resources Board
j. South Coast Air Quality Management District
2. Transport and dispose of material containing hazardous levels of lead under federal and state laws and regulations and county and municipal ordinances and regulations. Laws and regulations that govern this work include:
a. Health & Safety Code, Division 20, Chp 6.5 (California Hazardous
Waste Control Act)
b. 22 CA Code of Regs, Div. 4.5 (Environmental Health Standards for the Management of Hazardous Waste)
c. 8 CA Code of Regs
PART 2 – PRODUCTS (Not used)
PART 3 – EXECUTION
3.01 MATERIAL MANAGEMENT
A. Transport excavated Type Z-2 material using:
1. Hazardous waste manifest
2. Hazardous waste transporter with a current DTSC registration certificate and CA Highway Patrol (CHP) Biennial Inspection of Terminals (BIT) Program compliance documentation.
3.02 DUST CONTROL
A. Excavation, transportation, placement, and handling of material containing ADL must result in no visible dust migration. A water truck or tank must be on the job site at all times while clearing and grubbing or performing earthwork operations in work areas containing ADL. Apply water to prevent visible dust.
3.03 MATERIAL TRANSPORTATION
A. Before traveling on public roads, remove loose and extraneous material from surfaces outside the cargo areas of the transporting vehicles and cover the cargo with tarpaulins or other cover, as outlined in the approved excavation and transportation plan. You are responsible for costs due to spillage of material containing lead during transport. Transportation routes for Type Y-1 or Y-2 material must only include the highway.
FOR BIDDING PURPOSES ONLY 02 26 26 - 5 Issued: 09-22-2026
3.04 DISPOSAL
A. In order to minimize or eliminate the need for off-site disposal, The Contractor shall prioritize type Y1 material for placement as fill in locations of suitable depth for legal on-site burial as recommended in Section 4.4 of Final Aerially Deposited Lead Report, EMI, June 10, 2014 (the Lead Assessment Report), the approved Lead Compliance Plan, and as allowed by Federal, State, and Local regulations.
B. The Contractor shall notify Metro of any surplus type Y1 material that could not be legally placed on site. Upon written direction from Metro, the Contractor shall analyze and legally dispose of the materials off-site.
C. Analyze surplus material for which the lead content is not known for lead before removing the material from within the project limits. Submit a sampling and analysis plan and the name of the analytical laboratory at least 15 days before beginning sampling and analysis. Use a CDPH ELAP certified laboratory. Sample at a minimum rate of 1 sample for each 200 cu yd of surplus material and test for lead using US EPA Method 6010B or 7000 series.
PART 4 – MEASUREMENT AND PAYMENT
A. Lead compliance plan, and all work necessary for type X and type Y1 contaminated soils to perform material management, dust control, testing, stockpiling, onsite burial, and all other work required to conform to requirements of the Lead Compliance Plan shall be considered incidental to Contract work items requiring earthwork. No separate measurement or payment shall be made for Lead Compliance Plan or work associated with type X and Y1 soils.
B. Measurement and Payment for off-site disposal of surplus type Y1 material, if required, shall be negotiated as a Change Order.
END OF SECTION
Project Specific Specification
03 10 00 - 1
Issued: 09-22-2026
SECTION 03 10 00
CONCRETE FORMING AND ACCESSORIES
Add this new Specification
PART 1 - GENERAL
1.01 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.02 SUMMARY
A. Section Includes:
1. Formliners.
B. Related Requirements:
1. Section 03 31 00 "Structural Concrete" General Requirements
1.03 DEFINITIONS
A. Form-Facing Material: Temporary structure or mold for the support of concrete while the concrete is setting and gaining sufficient strength to be self-supporting.
B. Formwork: The total system of support of freshly placed concrete, including the mold or sheathing that contacts the concrete, as well as supporting members, hardware, and necessary bracing.
1.04 REFERENCES
A. American Concrete Institute (ACI): ACI 117 – Tolerances for Concrete Construction and Materials.
B. ASTM International (ASTM):
1. ASTM D 624 – Standard Test Method for Tear Strength of Conventional Vulcanized Rubber and Thermoplastic Elastomers.
2. ASTM D 648 – Standard Test Method for Deflection Temperature of Plastics Under Flexural Load in the Edgewise Position.
3. ASTM D 695 – Standard Test Method for Compressive Properties of Rigid Plastics.
4. ASTM D 790 – Standard Test Methods for Flexural Properties of Unreinforced and
Reinforced Plastics and Electrical Insulating Materials.
Section 03 10 00 CONCRETE FORMING AND ACCESSORIES
03 10 00 - 2
5. ASTM D 792 – Standard Test Methods for Density and Specific Gravity (Relative Density) of Plastics by Displacement.
6. ASTM D 1525 – Standard Test Method for Vicat Softening Temperature of Plastics.
7. ASTM D 2240 – Standard Test Method for Rubber Property Durometer Hardness, Shore A; A Scale Test.
1.05 ACTION SUBMITTALS
A. Product Data: Manufacturer's data sheets on each product to be used, including:
1. Printed product data and installation guidelines for formliner system.
2. Manufacturers installation instructions, showing required preparation and installation procedures.
3. Storage and handling requirements and recommendations.
4. Installation Methods.
5. Cleaning and maintenance instructions.
B. Shop Drawings: Prepared by, and signed and sealed by, a qualified professional engineer responsible for their preparation, detailing fabrication, assembly, and support of forms.
1. For exposed vertical concrete walls, indicate dimensions and form tie locations.
2. Indicate dimension and locations of construction and movement joints required to construct the structure in accordance with ACI 301.
a. Location of construction joints is subject to approval of the Engineer.
3. Indicate location of waterstops.
4. Indicate form liner layout and form line termination details.
5. Indicate proposed schedule and sequence of stripping of forms, shoring removal, and reshoring installation and removal.
C. Samples:
1. For Formliners: 12-inch by 12-inch sample, indicating actual products, styles, colors, patterns, and textures.
D. Warranty: Copy of manufacturer’s standard warranty.
1.06 QUALITY ASSURANCE
A. Single Source Requirements: Primary and secondary components required for installation of formliner systems shall be components of system recommended by single source.
B. Manufacturer Qualifications: Minimum 5 years’ experience manufacturing similar products.
C. Installer Qualifications:
03 10 00 - 3
1. Experienced and competent in architectural concrete installation.
2. If requested, submit a list of recently completed projects using similar materials.
1.07 DELIVERY, STORAGE, AND HANDLING
A. Materials shall be delivered to the location in unopened factory containers. Upon arrival, materials shall be inspected for damage and manufacturer informed of any discrepancies. Deficient materials shall not be used.
B. Materials shall be stored in a protected location and safeguarded from damage.
C. Store formliners in a covered location, elevated off the exposed ground. Prolonged high or low temperatures will cause a permanent distortion and deterioration of physical properties.
1.08 COORDINATION/SCHEDULING
A. Coordinate installation of formliner panel systems with related wall elements, including, opening, signage, flashings, sealants, weather resistive barrier, sealant tapes and membranes, supporting wall framing and sheathing, surface mounted objects, etc.
1. Coordinate with installation of flashing, coping and sealants to ensure that materials are installed in accordance with manufacturer's instructions.
2. Coordinate with installation of surface-mounted objects to ensure that watertight seal is provided.
PART 2 - PRODUCTS
2.01 PERFORMANCE REQUIREMENTS
A. Concrete Formwork: Design, engineer, erect, shore, brace, and maintain formwork, shores, and reshores in accordance with ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads, so that resulting concrete conforms to the required shapes, lines, and dimensions.
1. Design wood panel forms in accordance with APA's "Concrete Forming Design/Construction Guide."
2. Design formwork to limit deflection of form-facing material to 1/240 of center-to-center spacing of supports.
2.02 FORMLINERS
A. Form Liners:
1. Basis-of-Design Product: Subject to compliance with requirements, provide formliner "14305 Fluted Rib - 0.5" deep, 1.5" on center", manufactured by
03 10 00 - 4
Fitzgerald Formliners, 1500 E. Chestnut Ave. ; Santa Ana, CA 92701; Tel: 714- 547-6710; Email:info@formliners.com; Web: www.formliners.com or comparable product by one of the following:
a. Fitzgerald Formliners.
b. Sika Corporation.
c. Spec Formliners, Inc.
2. Size: 48" Wide x 120" Long.
3. Face Pattern: Fluted Rib.
2.03 RELATED MATERIALS
A. Reglets: Fabricate reglets of not less than 0.022-inch- thick, galvanized-steel sheet.
Temporarily fill or cover face opening of reglet to prevent intrusion of concrete or debris.
B. Dovetail Anchor Slots: Hot-dip galvanized-steel sheet, not less than 0.034 inch thick, with bent tab anchors. Temporarily fill or cover face opening of slots to prevent intrusion of concrete or debris.
C. Chamfer Strips: Wood, metal, PVC, or rubber strips, 3/4 by 3/4 inch, minimum.
D. Rustication Strips: Wood, metal, PVC, or rubber strips, kerfed for ease of form removal.
E. Form-Release Agent: Commercially formulated form-release agent that does not bond with, stain, or adversely affect concrete surfaces and does not impair subsequent treatments of concrete surfaces.
1. Formulate form-release agent with rust inhibitor for steel form-facing materials.
2. Form release agent for form liners shall be acceptable to form liner manufacturer.
F. Form Ties: Factory-fabricated, removable or snap-off, glass-fiber-reinforced plastic or metal form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.
1. Furnish units that leave no corrodible metal closer than 1 inch to the plane of exposed concrete surface.
2. Furnish ties that, when removed, leave holes no larger than 1 inch in diameter in concrete surface.
3. Furnish ties with integral water-barrier plates to walls indicated to receive dampproofing or waterproofing.
PART 3 - EXECUTION
3.01 EXAMINATION
A. Install in accordance with manufacturer's written instructions as applicable to each type of substrate required. Install in accordance with specified pattern and mortar.
03 10 00 - 5
B. Tolerances: Dimensions of the finished panel, at the time of erection in the structure, shall conform to the tolerances for precast, non-prestressed elements in ACI 117, unless otherwise specified by the Architect.
3.02 INSTALLATION OF FORMWORK
A. Comply with ACI 301.
B. Construct formwork, so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117 and to comply with the Surface Finish designations specified in Section 03 30 00 "Cast-In-Place Concrete" for as-cast finishes .
C. Limit concrete surface irregularities as follows:
1. Surface Finish-1.0: ACI 117 Class D, 1 inch.
2. Surface Finish-2.0: ACI 117 Class B, 1/4 inch.
3. Surface Finish-3.0: ACI 117 Class A, 1/8 inch.
D. Construct forms tight enough to prevent loss of concrete mortar.
1. Minimize joints.
2. Exposed Concrete: Symmetrically align joints in forms.
E. Construct removable forms for easy removal without hammering or prying against concrete surfaces.
1. Provide crush or wrecking plates where stripping may damage cast-concrete surfaces.
2. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical.
3. Install keyways, reglets, recesses, and other accessories, for easy removal.
F. Do not use rust-stained, steel, form-facing material.
G. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces.
1. Provide and secure units to support screed strips
2. Use strike-off templates or compacting-type screeds.
H. Provide temporary openings for cleanouts and inspection ports where interior area of formwork is inaccessible.
1. Close openings with panels tightly fitted to forms and securely braced to prevent loss of concrete mortar.
2. Locate temporary openings in forms at inconspicuous locations.
I. Chamfer exterior corners and edges of permanently exposed concrete.
J. At construction joints, overlap forms onto previously placed concrete not less than 12 inches.
03 10 00 - 6
K. Form openings, chases, offsets, sinkages, keyways, reglets, blocking, screeds, and bulkheads required in the Work.
1. Determine sizes and locations from trades providing such items.
2. Obtain written approval of Architect prior to forming openings not indicated on
Drawings.
L. Construction and Movement Joints:
1. Construct joints true to line with faces perpendicular to surface plane of concrete.
2. Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect.
3. Place joints perpendicular to main reinforcement.
4. Locate joints for beams, slabs, joists, and girders in the middle third of spans.
a. Offset joints in girders a minimum distance of twice the beam width from a beam-girder intersection.
5. Locate horizontal joints in walls and columns at underside of floors, slabs, beams, and girders and at the top of footings or floor slabs.
6. Space vertical joints in walls as indicated on Drawings .
a. Locate joints beside piers integral with walls, near corners, and in concealed locations where possible.
M. Provide temporary ports or openings in formwork where required to facilitate cleaning and inspection.
1. Locate ports and openings in bottom of vertical forms, in inconspicuous location, to allow flushing water to drain.
2. Close temporary ports and openings with tight-fitting panels, flush with inside face of form, and neatly fitted, so joints will not be apparent in exposed concrete surfaces.
N. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete.
O. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment.
P. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement.
3.03 INSTALLATION OF EMBEDDED ITEMS
A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete.
1. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
2. Install anchor rods, accurately located, to elevations required and complying with tolerances in Section 7.5 of AISC 303.
03 10 00 - 7
3. Install reglets to receive waterproofing and to receive through-wall flashings in outer face of concrete frame at exterior walls, where flashing is shown at lintels, shelf angles, and other conditions.
4. Install dovetail anchor slots in concrete structures, as indicated on Drawings.
5. Clean embedded items immediately prior to concrete placement.
3.04 REMOVING AND REUSING FORMS
A. Formwork for sides of beams, walls, columns, and similar parts of the Work that does not support weight of concrete may be removed after cumulatively curing at not less than 50 deg F for 24 hours after placing concrete. Concrete has to be hard enough to not be damaged by form-removal operations, and curing and protection operations need to be maintained.
1. Leave formwork for beam soffits, joists, slabs, and other structural elements that support weight of concrete in place until concrete has achieved at least 70 percent of its 28-day design compressive strength.
2. Remove forms only if shores have been arranged to permit removal of forms without loosening or disturbing shores.
B. Clean and repair surfaces of forms to be reused in the Work.
1. Split, frayed, delaminated, or otherwise damaged form-facing material is unacceptable for exposed surfaces.
2. Apply new form-release agent.
C. When forms are reused, clean surfaces, remove fins and laitance, and tighten to close joints.
1. Align and secure joints to avoid offsets.
2. Do not use patched forms for exposed concrete surfaces unless approved by
Engineer.
PART 4 - MEASUREMENT AND PAYMENT
A. Work of this Section is considered incidental to work under other payment items and no separate measurement and payment will be made to the Contractor for Work of this Section. Work of this section shall include furnishing all labor, materials, tools, equipment, supplies, supervision, and incidentals, and doing all work, as shown on the Plans, and as specified in these Specifications, and as directed by the Engineer.
FOR BIDDING PURPOSES ONLY 05 52 00 - 1 Issued: 09-22-2026
SECTION 05 52 00
HANDRAILS AND RAILINGS
The following are modifications to the SCRRA Standard Specifications.
Replace PART 4 – MEASUREMENT AND PAYMENT, 4.02 PAYMENT, Paragraph B with the following:
B. Full compensation for furnishing and placing concrete footings and for connecting new railing to structures and existing cross railing, including all labor, materials, tools, equipment, and incidentals, shall be considered as incidental in the compensation for other payment items and no separate payment will be made to the Contractor for this Work.
END OF SECTION 05 52 00
FOR BIDDING PURPOSES ONLY 05 52 10 - 1 Issued: 09-22-2026
SECTION 05 52 10
PEDESTRIAN SWING GATES
The following are modifications to the SCRRA Standard Specifications:
1.01 SUMMARY
Remove: Paragraph B.2 – Section 05 12 23 Structural Steel
PART 4 – MEASUREMENT AND PAYMENT
Replace PART 4 – MEASUREMENT AND PAYMENT, 4.02 PAYMENT, Paragraph B with the following:
B. Full compensation for furnishing and placing concrete footings and for connecting to structures and existing railing, including all labor, materials, tools, equipment, and incidentals, shall be considered as incidental in the compensation for other payment items and no separate payment will be made to the Contractor for this Work.
END OF SECTION 05 52 10
FOR BIDDING PURPOSES ONLY 09 90 00 - 1 Issued:09-22-2026
SECTION 09 90 00
PAINTING AND COATINGS
Revise paragraph 1.01.:
Delete paragraph B and replace with the following paragraph:
B. Painting shall include shop coat and field finish painting of all metal surfaces, including the complete railings, handrail, base plates, covers, connecting hardware, mounting brackets designated to be painted in the drawings; field painting of railings and guardrails, fences flashings, pipe bollards, and exposed mechanical or electrical equipment, including housing; and the finish painting over shop coated exposed equipment.
Add subparagraph 1.01.C.4:
4. Section 09 90 01 – High Performance Coatings.
Revise paragraph 1.04.A:
A. Application: Shall be by an experienced painter with a minimum of 3 years of experience painting projects of similar size and scope or a painting firm employing experienced personnel with a minimum of 3 years of experience painting projects of similar size and scope.
END OF SECTIO N
FOR BIDDING PURPOSES ONLY 10 14 54 - 1 Issued: 09-22-2026
PART 1 - GENERAL
SECTION 10 14 54
ROADWAY SIGNAGE (PUBLIC ROW)
1.01 SECTION INCLUDES
A. Designing, fabricating, furnishing and installing traffic signs within city of Los Angeles and Sylmar right-of-way. All new signs shall be installed on metal poles unless otherwise indicated on the Contract Drawings.
1.02 RELATED SECTIONS
A. Section 01 33 00 Submittal Procedures
B. Section 01 43 10 Project Quality Program Requirements
C. Section 01 55 26 Controlling Traffic
D. Section 01 66 00 Product Storage and Handling Requirements
E. Section 10 14 53 Roadway Signage (Public Row)
F. Section 32 17 24 Pavement Striping and Markings
G. Section 34 41 00 Roadway Signaling and Control Equipment
1.03 REFERENCES
A. Caltrans: State of California Department of Transportation, Standard and Specifications.
B. California Manual on Uniform Traffic Control Devices (CAMUTCD).
C. Where work is performed within the City of Los Angeles:
1. LADOT Geometric Design Standards.
2. LADOT Standard Drawings Section 531.0, ‘Application and Design for Striping, Channelization & Special Signing’, Drawings No. S-481.0, latest edition.
D. Where work is performed within the City of Sylmar:
1. Utilize City of Los Angeles Standards.
1.04 QUALITY ASSURANCE
A. Comply with Section 01 43 10, Project Quality Program Requirements.
Section 10 14 54 ROADWAY SIGNAGE (PUBLIC ROW)
FOR BIDDING PURPOSES ONLY 10 14 54 - 2 Issued: 09-22-2026
B. Fabricator and Installer Qualifications: Shop that employs skilled workers who custom-fabricate products similar to those required for this project and whose products have a record of successful in-service performance in excess of five years on project of a similar size and nature.
1.05 SUBMITTALS
A. Submit under Section 01 33 00, Submittal Procedures.
B. Product Data:
1. For each type of product indicated.
C. Shop Drawings:
1. Fabrications and installation details for signs.
2. Sign mounting heights and accessories.
3. Message list, typestyles, graphic elements, including tactile characters and Braille, and layout for each sign.
D. Samples for initial selection:
1. Manufacturer's color charts consisting of actual units or sections of units showing the full range of colors available for the following:
a. Aluminum.
b. Porcelain Enamel.
c. Dimensional Characters: Full-size samples of each type of dimensional character (letter, number, and graphic element)
d. High intensity retro reflective sheeting.
E. Samples for Verification:
1. For each of the following products and for the full range of color, texture, and sign material indicated, of sizes indicated:
a. Aluminum: For each form, finish, and color, on 6-inch-long sections of extrusions and squares of sheet at least 4 by 4 inches.
b. Porcelain Enamel: 8 by 10 inches for each color enamel.
c. Panel Signs: Not less than 12 inches square including border.
d. Frame: 6-inch-long sections of each profile.
e. Accessories: Manufacturer’s full-size unit.
f. High intensity retro reflective sheeting.
FOR BIDDING PURPOSES ONLY 10 14 54 - 3 Issued: 09-22-2026
F. Qualification data:
1. For installer and fabricator.
1.06 DEFINITIONS
A. Sign Panels are defined as marker panels: Type N, Type P, and Type R mounted on a post with a traffic sign.
1.07 DELIVERY, STORAGE, AND HANDLING
A. In accordance with Section 01 66 00, Product Storage and Handling Requirements.
1.08 WARRANTY
A. Manufacturer's standard form in which manufacturer agrees to repair or replace components of signs that fail in materials or workmanship within five years from date of installation.
1. Failures include, but are not limited to, deterioration of finishes beyond normal weathering and deterioration of embedded graphic image.
PART 2 - PRODUCTS
2.01 DESCRIPTION
A. Source Limitations for Signs: Obtain each sign type indicated from one source from a single manufacturer.
B. Regulatory Requirements: Comply with applicable accessibility provisions of CBC, including Sections 1117B.5 and 1129B.4 and ADA Standards for Accessible Design, 28 CFR Part 36, Appendix A.
2.02 MATERIALS
A. Aluminum Sheet: Provide aluminum sheet of alloy and temper recommended by the sign manufacturer for the type of use and finish indicated, and with not less than the strength and durability properties specified in ASTM B209 for 5005-H15.
B. Porcelain Enamel Face Sheet: Cold-rolled, enameling grade steel especially processed for temperatures used in coating porcelain on steel. Coat exposed face and edges with minimum 3 coat process consisting of ground coat, cover coat and color coat. Coat concealed face with a 2 coat process consisting of ground coat and cover coat. Fuse each coat to steel at manufacturer's standard firing temperatures, but not less than 1200 deg F.
C. Mounting Posts: Unistrut posts or approved equal. Galvanized steel pipe, ASTM A53, seamless, minimum size 1-3/4 inch diameter. Locate as indicated on drawings.
Provide in length to allow sign to be set at height required by governing authority for intended application, plus an additional 36 inches to allow post to be set in concrete footing.
FOR BIDDING PURPOSES ONLY 10 14 54 - 4 Issued: 09-22-2026
D. Galvanized metal parts of traffic sign mountings after fabrication. Galvanizing shall conform to Section 75-1.05 of Caltrans Standard Specifications.
E. Fasteners: Recommended by manufacturer for substrate.
F. Sign Panel Fastening Hardware for multiple sign installations.
1. Frame assemblies for multiple sign installations shall be fabricated of structural steel conforming to ASTM A36 or of aluminum alloy, as indicated. Frames fabricated of structural steel to be hot-dip galvanized after fabrication.
2. Back braces shall be commercial quality, mild steel, hot dip galvanized after fabrication.
3. Straps and saddle brackets for mounting sign panels on electroliers, sign structure posts, and traffic signal standards to be corrosion-resisting chromium nickel steel conforming to ASTM A167, Type 302. Theft-proof bolts indicated to be stainless steel with a chromium content of not less than 17 percent and a nickel content of not less than eight percent.
4. Lag screws, bolts (except theft-proof bolts), metal washers, and nuts - Commercial quality steel, hot-dip galvanized after fabrication. Fiber washers to be of Commercial quality.
G. Brackets: Fabricate brackets and fittings for bracket mounted signs from steel to suit sign panel construction and mounting conditions indicated. Factory paint brackets in color matching background color of sign panel. Refer to Contract Drawings for sizes and other details.
H. Anchors and Inserts: Nonferrous metal or hot-dipped galvanized anchors and inserts for exterior installations and elsewhere as required for corrosion resistance.
Use toothed steel or lead expansion bolt devices for drilled in place anchors. Furnish inserts, as required, to be set into concrete or masonry work.
2.03 FABRICATION
A. Signage
1. Panel Signs - General: Comply with requirements indicated for materials, thicknesses, finishes, colors, designs, shapes, sizes, and details of construction.
a. Produced smooth, even, level sign panel surfaces, constructed to remain flat under installed conditions within a tolerance of plus or minus 1/16 inch measured diagonally.
b. Graphic Content and Style: Provide sign complying with requirements indicated for size, style, spacing, content, position, material, finishes, and colors of letters, numbers, and other graphic devices.
c. Copy Application: Die-cut self-adhesive vinyl or silkscreen.
FOR BIDDING PURPOSES ONLY 10 14 54 - 5 Issued: 09-22-2026
2. Signage: Conform to Caltrans Standard Plans and Caltrans Standard Specifications Section 56-2, Signs, and California Manual on Uniform Traffic Control Devices (CAMUTCD).
3. Finishes
a. Colors: For code-required signage, conform to standard colors as required by code. All other colors shall be as selected by Metro and the governed jurisdiction.
PART 3 - EXECUTION
3.01 INSTALLATION
A. Traffic Signage:
1. Existing traffic signs shall not be removed until replacement signs have been installed or until the existing signs are no longer required for the direction of public traffic, unless otherwise directed by Metro and the governed jurisdiction.
Set height of pole mounted signs and other way finding signs as specified by local agencies having jurisdiction or other governing authority for the intended application.
2. Install traffic signs and sign posts shall conform to the provisions in Section 56-2, Signs, of California Standard Specifications.
a. For City of Los Angeles: LADOT Geometric Design Standards, LADOT Standard Drawings Section 531.0, and conform to the provisions in Section 56-2, Signs, of Caltrans Standard Specifications.