Brush Creek Transmission Main Bid Tab.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Brush Creek Transmission Main Replacement
- Solicitation number
- 52-59-773-522306
- Issued by
- Gilpin County, Colorado
About this file
The document is a bid tabulation (Bid Tab) for the Town of Eagle, Colorado's Brush Creek Transmission Main and Schoolhouse Pressure Reducing Valve (PRV) project. The contract opportunity involves installing approximately 5,600 linear feet of 24" HDPE waterline, including buried and exposed valves, electrical connections, a PRV vault, and associated infrastructure. The bid tab details 14 distinct line items covering project components such as mobilization, erosion control, traffic management, waterline installation, valve installations, fire hydrants, connections, potholing, and trench-related work. The project requires various pipe diameters (24", 16", 12", 8", 6") and includes specific equipment like gate valves, butterfly valves, tees, reducers, and air release vaults.
The bid tabulation provides a comprehensive breakdown of estimated quantities and unit prices for each project element, allowing potential contractors to understand the scope and potential cost structure. While specific pricing details are not fully populated in the document, the bid tab suggests a structured approach to project costing with itemized categories for civil works and waterline installation. The project appears to be funded by the Town of Eagle and is focused on infrastructure improvement for the local water transmission system. The bid tab indicates multiple technical complexities, including different pipe materials (HDPE), various valve types, connection requirements, and specific site management considerations like trench dewatering and potholing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Brush Creek Transmission Main Plans.pdf | ||
| Brush Creek Transmission Main Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| TOWN OF EAGLE, COLORADO |
| BRUSH CREEK TRANSMISSION MAIN AND |
| SCHOOLHOUSE PRESSURE REDUCING VALVE (PRV) |
| ITEM # | ITEM DESCRIPTION | UNIT | QUANTITY | ESTIMATED UNIT PRICE | TOTAL COST |
| General | |||||
| 1 | Mobilization | Lump Sum | 1 | ||
| 2 | Erosion Control/Storm Water Management | Lump Sum | 1 | ||
| 3 | Traffic Control | Lump Sum | 1 | ||
| Subtotal (A): | |||||
| Civil - Waterline Installation - To Connection #3 and PRV | 10-inch Meter and Meter Assembly | Each | 1 | ||
| 4 | PRV Equipment - Includes all plumbing and appurtenances interior to vault, rehab of vault | Lump Sum | 1 | ||
| 5 | HDPE Pipe in Trench (24" DR11) | Linear Feet | 5600 | ||
| 5a | HDPE Pipe in Trench (1.5" Service)(Includes main and terminal connections) | Linear Feet | 240 | ||
| 6 | Fire Hydrant (included DIP lateral in trench) | Each | 4 | ||
| 7 | 6" Gate Valve | Each | 5 | ||
| 7a | 12" Gate Valve | Each | 4 | ||
| 7b | 16" Gate Valve | Each | 2 | ||
| 7c | 16" Butterfly Valve | Each | 1 | ||
| 7d | 24"x8"x8" Tee | Each | 3 | ||
| 7e | 16"x16"x8" Tee | Each | 1 | ||
| 7f | 12"x12"x6" Tee | Each | 2 | ||
| 7g | 8"x6" Reducer | Each | 2 | ||
| 8 | 6' Diameter Manhole (Air Release Vault) | Each | 2 | ||
| 9 | Air Release Vault Equipment (Includes all plumbing and appurtenances interior to vault, excavation and demo) | Each | 2 | ||
| 10 | Connection #1 (includes anchor, MJ coupler, and reducer) | Each | 1 | ||
| 10a | Connection #2 (includes anchors, reducers, MJ couplers, restraints, 12" DIP exterior to vault) | Each | 1 | ||
| 10b | Connection #3 (includes anchors, 45 deg. bends, MJ couplers, 16" DIP, coupling) | Each | 1 | ||
| 11 | Potholing | Each | 10 | ||
| 12 | Plug and Abandon Existing | Lump Sum | 1 | ||
| 13 | Trench Dams | Each | 7 | ||
| 14 | Trench Dewatering | Day | 35 | ||
| Subtotal (B): |
Total (A+B)
File details come from the government source that posted it. Updated .