Brooksville East Avenue - 100% Plans (1).pdf
PDF 13 MB Posted
- Attached to
- East Avenue Drainage Project
- Solicitation number
- RFP-PM-224-2021
- Issued by
- Hernando County, Brownsville CDP, Florida
About this file
These are 100% construction plans for the East Avenue Drainage Channel Maintenance Improvements project for the City of Brooksville, located in Hernando County, Florida. The project involves maintenance and improvements to an existing drainage channel running along East Avenue, spanning from a force main aerial crossing on the northern property line to a large stormwater culvert at the southwest corner of the property. The project will be constructed in two phases and includes channel regrading, installing sand-cement bag retaining walls, replacing a concrete spillway, removing and replacing existing vegetation, and stabilizing slopes with sod. The work involves approximately 1.61 acres of total site area, with 1.00 acres of active construction area.
The project plans are prepared by Cardno, Inc. and include detailed civil engineering documents such as site demolition plans, grading plans, cross-sections, and site development details. The construction will utilize specific materials including sand-cement bags, filter fabric, concrete, and rip-rap, with careful attention to erosion control, stormwater management, and maintaining existing site features. The project requires compacted granular backfill, adherence to Florida Department of Transportation (FDOT) specifications, and implementation of a comprehensive Stormwater Pollution Prevention Plan. Funding appears to be through the City of Brooksville Department of Public Works, with the project designed to improve stormwater conveyance and channel maintenance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| East Ave.Drainage Project.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THOMAS F. BURKE, P.E.
58566LIC. NO.:
02/22/2021
B R
O O
K S V I L L E
C O
R T E Z
B L V D
B R O
O K S V I L L E
F L
T E L
A X w w w c a r d n o c o m
C e r t if ic a t e o f
A u t h o r iz a t io n
N o
CHECKED
SHEET NUMBER
PROJECT #
SHEET TITLE
DESIGNED
DATE
DRAWN
DE
SC
RI
PT
IO
N
DA
TE
BY
Fil e:
J:\
6\0
4.0
1\A
CA
D\ dw g\C 1.0
0_ Co ve r S he et.
dw g, Ta b:
Co ve r Pl ot St am p:
2/2 2/2
1 4
:59 :16
P M
- M ich ae l D ets is
CI
TY
O F
BR
OO
KS
VI
LL
E
BR
OO
KS
VI
LL
E, H
ER
NA
ND
O
CO
UN
TY
, F
LO
RI
DA
MD
TFB
00316-004.01
E
S T
V E
N U
E
D
R A
I N
A G
E
C
H A
N N
E L
M A
I N
T E
N A
N C
E
I M
P R
O V
E M
E N
T S
CITY OF BROOKSVILLE
DEPARTMENT OF PUBLIC WORKS
600 S BROOKSVILLE AVENUE, BROOKSVILLE, FL 34601
EAST AVENUE & PEYTON PLACE, BROOKSVILLE, FL 34601
SECTION 22, TOWNSHIP 22S, RANGE 19E
CITY OF BROOKSVILLE
EAST AVENUE DRAINAGE CHANNEL
MAINTENANCE IMPROVEMENTS
CONTRACT DOCUMENTS
NOT TO SCALE
HERNANDO COUNTY
VICINITY MAP
PROJECT
VICINITY
OWNER:
CITY OF BROOKSVILLE
DEPARTMENT OF PUBLIC WORKS
ATTN: JON DOWLER
600 S BROOKSVILLE AVENUE
BROOKSVILLE, FL 34601
PHONE: (352) 540-4336
CIVIL:
CARDNO, INC.
ATTN: THOMAS BURKE
20215 CORTEZ BOULEVARD
BROOKSVILLE, FL 34601
PHONE: (352) 754-4551
SURVEY
D.C. JOHNSON ASSOCIATES
ATTN: ANDREW GETZ
11911 S CURLEY STREET
SAN ANTONIO, FL 33576
PHONE: (352) 588-2768
DESIGN TEAM
GOVERNING STANDARDS AND SPECIFICATIONS:
· FLORIDA DEPARTMENT OF TRANSPORTATION,
STANDARD PLANS FOR ROAD & BRIDGE
CONSTRUCTION, 2020-2021 EDITION.
· FLORIDA DEPARTMENT OF TRANSPORTATION,
STANDARD SPECIFICATIONS FOR ROAD & BRIDGE
CONSTRUCTION, JULY 2020 EDITION.
· AMENDED BY CONTRACT DOCUMENTS.
· CONSTRUCTION MATERIALS QUALITY AND
WORKMANSHIP SHALL BE IN ACCORDANCE WITH
THE CITY OF BROOKSVILLE LAND DEVELOPMENT
CODE.
ELEVATIONS BASED ON:
NORTH AMERICAN VERTICAL DATUM 1988 (NAVD 88)
CONVERSION: NAVD 88 TO NGVD 29 = + 0.823 FT
CITY OF BROOKSVILLE
CITY COUNCIL MEMBERS
JOE BERNARDINI MAYOR
PAT BRAYTON VICE MAYOR
ROBERT BATTISTA COUNCIL MEMBER
WILLIAM KEMERER COUNCIL MEMBER
BETTY ERHARD COUNCIL MEMBER
NOT TO SCALE
LOCATION MAP
PROJECT
LOCATION
PREPARED FOR:
C1.00
COVER SHEET
FOR REFERENCE ONLY
1 OF 1 TOPOGRAPHIC SURVEY
Sheet List Table
Sheet Number Sheet Title
C1.00 COVER SHEET
C1.01 GENERAL NOTES
C1.02 STORMWATER POLLUTION PREVENTION PLAN
C1.03
EROSION CONTROL NOTES AND DETAILS (1)
C1.04
EROSION CONTROL NOTES AND DETAILS (2)
C2.00 SITE DEMOLITION PLAN
C3.00 SITE AND GRADING PLAN
C3.01
CROSS SECTIONS (1)
C3.02
CROSS SECTIONS (2)
C3.03
CROSS SECTIONS (3)
C4.00 SITE DEVELOPMENT DETAILS
02/22/2021
B R
O O
K S V I L L E
C O
R T E Z
B L V D
B R O
O K S V I L L E
T E L
X w w w c a r d n o c r t if ic a t e o f
A u t h o r iz a t io n
N o
CHECKED
SHEET NUMBER
PROJECT #
SHEET TITLE
DESIGNED
DATE
DRAWN
DE
SC
RI
PT
IO
N
DA
TE
BY
Fil e:
J:\
6\0
4.0
1\A
CA
D\ dw g\C 1.0
1_ Ge ne ra l N ote s.d wg
, T ab
: G
EN
ER
AL
N
OT
ES
Pl ot St am p:
2/2 2/2
1 4
:59 :32
P M
- M ich ae l D ets is
CI
TY
O F
BR
OO
KS
VI
LL
E
BR
OO
KS
VI
LL
E, H
ER
NA
ND
O
CO
UN
TY
, F
LO
E
N U
E
D
R A
I N
A G
E
C
H A
N N
E L
M A
I N
T E
N A
N C
E
I M
P R
O V
E M
E N
T S
GENERAL NOTES
1. ALL WORKMANSHIP AND MATERIALS USED IN THE CONSTRUCTION OF THIS PROJECT SHALL
CONFORM TO FDOT "STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION," 2020
EDITION, AND THE LATEST LOCAL GOVERNMENT AGENCY UTILITIES AND FDOT STANDARDS,
DETAILS AND SPECIFICATIONS UNLESS OTHERWISE INDICATED.
2. THE ELEVATIONS SHOWN HEREON ARE BASED ON NAVD 1988 DATUM. REFER TO SURVEY
PREPARED BY D.C. JOHNSON ASSOCIATES, DATED 10/15/2020.
3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO USE WHATEVER MEANS NECESSARY TO
CONTROL AND PREVENT EROSION AND TRANSPORT OF SEDIMENT TO SURFACE DRAINS AND
DURING CONSTRUCTION. SEE EROSION CONTROL NOTES, DETAILS AND STORMWATER
POLLUTION PREVENTION PLAN FOR ADDITIONAL INFORMATION.
4. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONSTRUCTION SAFETY. SPECIAL
PRECAUTIONS MAY BE REQUIRED IN THE VICINITY OF POWER LINES AND OTHER UTILITIES.
5. THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY. THE
CONTRACTOR IS SOLELY RESPONSIBLE FOR MEANS AND METHODS FOR CONSTRUCTION SAFETY.
6. ALL WORK PERFORMED SHALL COMPLY WITH THE REGULATIONS AND ORDINANCES OF THE
VARIOUS GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER THE WORK.
7. ALL CONCRETE SHALL HAVE A MINIMUM ULTIMATE COMPRESSIVE STRENGTH OF 4,000 PSI (28 DAY
STRENGTH), UNLESS OTHERWISE NOTED.
8. ALL DISTURBED GRASSED AREAS SHALL BE RESODDED WITHIN 72 HOURS UNLESS OTHERWISE
INDICATED.
9. CONTRACTOR TO RESTORE ALL AREAS DISTURBED BY HIS OPERATION TO THEIR ORIGINAL OR
BETTER CONDITION.
10. THE CONTRACTOR WILL BE RESPONSIBLE FOR MAKING A VISUAL INSPECTION OF THE SITE AND
WILL BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF ALL UNDERGROUND AND ABOVE
GROUND IMPROVEMENTS THAT WILL NOT BE INCORPORATED WITH THE NEW FACILITIES TO THE
PROPERTY LINE AT A MINIMUM. SHOULD ANY DISCREPANCIES EXIST WITH THE PLANS, THE
CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING THE ENGINEER AND REQUESTING A
CLARIFICATION OF PLANS PRIOR TO DEMOLITION.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY AND ALL REQUIRED ROAD CROSSING
PERMITS, AND OTHER CONSTRUCTION PERMITS NOT FURNISHED BY THE OWNER, PRIOR TO THE
START OF ANY CONSTRUCTION OR DEMOLITION.
12. SPECIAL CARE IS TO BE TAKEN SO THAT PROTECTED TREES REMAIN UNHARMED DURING
CONSTRUCTION. IN ANY EVENT, NO TREE(S) SHALL BE REMOVED UNLESS DESIGNATED FOR
REMOVAL ON THE PLANS.
13. REFERENCED INDEX NUMBERS REFER TO FLORIDA DEPARTMENT OF TRANSPORTATION ROAD
DESIGN STANDARDS, 2019-2020 EDITION.
14. ALL SODDING, SEEDING AND MULCHING SHALL INCLUDE WATERING AND FERTILIZATION AND
SHALL BE IN ACCORDANCE WITH LOCAL GOVERNMENT AGENCY LAND DEVELOPMENT CODE. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THESE AREAS UP TO AND INCLUDING
THE INITIAL MOWING.
15. CONTRACTOR IS ADVISED TO BECOME FAMILIAR WITH THE OVERALL SCOPE OF WORK TO BE
PERFORMED PRIOR TO CONSTRUCTION.
16. THE CONTRACTOR SHALL PROVIDE CERTIFIED STORMWATER RECORD DRAWINGS (AS-BUILTS), SIGNED AND SEALED BY A PROFESSIONAL LAND SURVEYOR LICENSED IN THE STATE OF FLORIDA
PRIOR TO CERTIFICATION BY THE ENGINEER OF RECORD. THE RECORD DRAWINGS SHALL SHOW
FINAL GRADES AND LOCATIONS ON ALL STORMWATER FACILITIES, DRAINAGE STRUCTURES,
BERMS & SWALES. THE RECORD DRAWINGS MUST COMPLY WITH THE SOUTHWEST FLORIDA
WATER MANAGEMENT DISTRICT'S (SWFWMD) "AS-BUILT" DRAWINGS AND INFORMATION
CHECKLIST, FORM 62-330.310(1) PER SWERP RULE 62-330.310(4)(a),F.A.C. THE CONTRACTOR SHALL
PROVIDE SUFFICIENT (MIN 1) COPIES OF THE CERTIFIED RECORD DRAWINGS TO THE ENGINEER
OF RECORD FOR THE PURPOSE OF CERTIFYING THE STORMWATER MANAGEMENT SYSTEM.
17. THE CONTRACTOR SHALL LOCATE AND STAKE ALL PROPERTY CORNERS PRIOR TO FINAL
ENGINEERING INSPECTION AND CERTIFICATION. IT SHALL BE THE CONTRACTORS RESPONSIBILITY
TO RE-ESTABLISH THE PROPERTY CORNERS WHICH HAVE BEEN LOST DURING CONSTRUCTION BY
A PROFESSIONAL LAND SURVEYOR.
18. WORK SHALL NOT COMMENCE UNTIL ALL PERMITS REQUIRED FOR THE SUBJECT PORTION OF THE
PROJECT ARE OBTAINED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO HAVE ALL REQUIRED
PERMITS AND/OR EVIDENCE OF COMPLIANCE WITH APPLICABLE REGULATIONS ON SITE AT ALL
TIMES DURING THE EXECUTION OF WORK. SPECIFIC PERMITS MAY BE REQUIRED FOR THE
INSTALLATION OF POTABLE WATER LINES, SANITARY SEWER LINES, STORMWATER PIPES, ETC.
TREE BARRICADES AND EROSION SILTATION CONTROL MUST BE INSTALLED AND MAINTAINED
PRIOR TO COMMENCING CONSTRUCTION.
19. CONSTRUCTION SHALL PROCEED SUCH THAT ALL STORMWATER FACILITIES WITHIN A
WATERSHED AREA ARE IN PLACE AND OPERATIONAL PRIOR TO DEMOLITION AND/OR
CONSTRUCTION OF IMPERVIOUS SURFACES WITHIN THAT AREA (IF APPLICABLE).
20. NO STOCKPILING OF MATERIALS IN ROADWAY ROW OR ON SIDEWALK. ROW, ROADS AND
SIDEWALKS TO BE SWEPT DAILY AS PART OF DAILY CLEAN UP.
21. CONTRACTOR IS TO EXERCISE CAUTION IN THE VICINITY OF TREES TO REMAIN AND IS
RESPONSIBLE FOR ANY DAMAGE RESULTING FROM HIS WORK.
22. GENERAL CONTRACTOR SHALL COORDINATE LOCATION AND INSTALLATION OF ELECTRICAL
SERVICE EQUIPMENT IN ACCORDANCE WITH THE LOCAL AUTHORITY HAVING JURISDICTION.
23. CONTRACTOR TO FAMILIARIZE THEMSELVES WITH THE PROJECT GEOTECHNICAL REPORT AND
ADHERE TO THE RECOMMENDATIONS FOR PAVEMENT SECTIONS AND ANY OTHER
RECOMMENDATIONS RELATED TO CONSTRUCTION OF THIS PROJECT.
24. CONTRACTOR SHALL BECOME FAMILIAR WITH WATER MANAGEMENT DISTRICT PERMIT, FDEP
NOTICE OF INTENT, FDEP GENERIC PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND
SMALL CONSTRUCTION ACTIVITIES, PROJECT STORMWATER POLLUTION PREVENTION PLAN
(ATTACHED), RIGHT-OF-WAY, UTILITY, AND ALL PERMITS ASSOCIATED WITH THE PROJECT.
25. ALL NOTES APPLY TO ALL SHEETS WHERE APPLICABLE.
TRAFFIC CONTROL/MOT NOTES
1. THE CONTRACTOR IS REQUIRED TO PREPARE AND SUBMIT A TRAFFIC CONTROL PLAN TO LOCAL
GOVERNMENT AGENCY FOR REVIEW AND APPROVAL.
2. THE CONTRACTOR SHALL INSTALL ALL APPROVED TRAFFIC CONTROL DEVICES PRIOR TO
COMMENCING CONSTRUCTION.
3. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION, INSTALLATION, AND COORDINATION OF
ALL TRAFFIC SIGNS AND BARRICADES WITH LOCAL GOVERNMENT AGENCY.
4. THE CONTRACTOR SHALL NOTIFY THE LOCAL GOVERNMENT AGENCY PUBLIC WORKS OFFICE,
RIGHT-OF-WAY, THE FIRE DEPARTMENT, THE POLICE DEPARTMENT, ALL GOVERNMENTAL TRAFFIC
DEPARTMENTS, AND ANY ADJACENT BUSINESSES PRIOR TO ANY STREET BEING CLOSED OR MADE
IMPASSABLE.
5. THE CONTRACTOR SHALL PROVIDE TEMPORARY GRADE TRANSITIONS DURING CONSTRUCTION TO
ALLOW VEHICULAR ACCESS TO ADJACENT RESIDENTS, AS NECESSARY TO PROVIDE ACCESS.
6. SIGNS & BARRICADES SHALL BE IN ACCORDANCE WITH THE U.S. DEPARTMENT OF
TRANSPORTATION'S "MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES" AND THE FDOT
"ROADWAY AND TRAFFIC DESIGN STANDARDS" INDEXES 102-600 THRU 102-670 (2019-2020 EDITION).
7. MAINTENANCE OF TRAFFIC FOR THE WORK TO BE PERFORMED WITHIN THE RIGHT-OF-WAY SHALL
BE IN ACCORDANCE WITH FDOT STANDARD INDEX NUMBERS 102-600, 102-622, 102-623, AND
102-660. NO LANE CLOSURES ARE PERMITTED WITHOUT PRIOR APPROVAL HAVING BEEN
OBTAINED FROM LOCAL GOVERNMENT AGENCY INSPECTOR.
8. CONTRACTOR TO REFER TO FDOT INDEX NO. 102-660 FOR ALL MAINTENANCE OF PEDESTRIAN
TRAFFIC AND CONTROL FOR SIDEWALK CLOSURES.
9. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN A SAFE AND EASILY ACCESSIBLE PAVED OR
UNPAVED PATHWAY FOR PEDESTRIAN TRAFFIC THROUGH THE WORK ZONE FOR THE DURATION
OF THE PROJECT. IF THE PATHWAY LIES ALONG A DESIGNATED SCHOOL ROUTE, THEN THE
CONTRACTOR MUST PROVIDE ADEQUATE SUPERVISION AND/OR GUIDANCE TO THE SCHOOL AGED
STUDENTS AS THEY TRAVERSE THRU THE WORK ZONE.
10. THE CONTRACTOR SHALL BE REQUIRED TO NOTIFY ALL APPROPRIATE AGENCIES (PARTIAL LIST
BELOW) PRIOR TO ANY LANE CLOSURES ON AN ARTERIAL OR COLLECTOR ROADWAY THAT WOULD
EXCEED ONE HOUR IN LENGTH.
A) PUBLIC WORKS
B) SHERIFF'S OFFICE
C) TRANSIT AUTHORITY
D) SCHOOL TRANSPORTATION
E) EMS & FIRE ADMINISTRATION
11. FOR WORK WITHIN FDOT RIGHT-OF-WAY, THE FDOT REQUIRES DOCUMENTATION FOR
SUCCESSFUL COMPLETION OF AN APPROVED WORK ZONE TRAFFIC CONTROL TRAINING COURSE
FOR THE AGENCY, UTILITY, OR CONTRACTOR EMPLOYEE(S) DESIGNING, INSTALLING, AND/OR
MAINTAINING THE APPROVED MAINTENANCE OF TRAFFIC PLAN IN ACCORDANCE WITH
DEPARTMENT PROCEDURE, TOPIC NO. 625-010-010. ALL TEMPORARY TRAFFIC CONTROL DEVICES
FOR SR 80 SHALL BE DESIGNED AND INSTALLED TO MEET THE EXISTING POSTED SPEED LIMIT.
GENERAL UTILITY NOTES GENERAL SANITARY SEWER NOTES
1. MANHOLES SHALL BE INSPECTED BY THE OWNING UTILITY AND ENGINEER AFTER THE
COMPLETION OF ALL BASE WORK, AND PRIOR TO SURFACE TREATMENT.
2. ALL OPENINGS IN PRE-CAST MANHOLES SHALL BE CAST AT TIME OF MANUFACTURE.
CONNECTIONS TO EXISTING MANHOLES SHALL BE CORE ENTRY ONLY.
3. ALL MANHOLES SHALL BE SET PLUMB TO LINE AND GRADE AN SHOWN ON PLANS.
4. ALL P.V.C. GRAVITY SEWER MAINS SHALL CONFORM TO A.S.T.M. D-3034, S.D.R.-26, LATEST
REVISIONS, WITH PUSH-ON RUBBER GASKET JOINTS.
5. ALL D.I.P. GRAVITY SEWER PIPES SHALL BE CLASS 52, EPOXY LINED OR AS OTHERWISE APPROVED
BY THE ENGINEER.
6. NO SERVICE CONNECTIONS, WYES, SERVICES OR VALVES WILL BE PERMITTED IN DRIVEWAYS, EXCEPT UPON APPROVAL OF THE OWNING UTILITY OR ENGINEER.
7. MANHOLE FRAMES THAT ARE NOT SUPPORTED BY ASPHALT OR CONCRETE SHALL BE ATTACHED
TO THE PRE-CAST STRUCTURE WITH A MINIMUM OF TWO 3/4" 316 STAINLESS STEEL BOLTS, NUTS
AND WASHERS. FRAMES SHALL BE SEALED WITH A MINIMUM OF TWO 1/2" BEADS OF RAM-NEK
CAULKING.
8. TRENCHES SHALL BE DE-WATERED TO ENABLE PIPE AND APPURTENANCES TO BE INSTALLED
FREE OF WATER ON UNDISTURBED SOIL. IF UNSUITABLE SUBSURFACE MATERIAL IS
ENCOUNTERED, EXCAVATE EXTRA 6" AND BACK FILL WITH 3/4" GRAVEL.
9. P.V.C. PIPES SHALL BE LAID IN STRICT CONFORMANCE TO THE MANUFACTURER'S SPECIFICATIONS
BACKFILLING OF UTILITY TRENCHES WILL NOT BE ALLOWED UNTIL INSPECTED BY THE OWNING
UTILITY AND ENGINEER.
10. BACK FILL MATERIAL FOR SEWER MAIN AND LINES SHALL BE NON-COHESIVE, NON-PLASTIC
MATERIAL FREE OF ALL DEBRIS, LUMPS AND ORGANIC MATTER. BACK FILL MATERIAL PLACED
WITHIN 1' OF PIPING AND APPURTENANCES SHALL NOT CONTAIN ANY SOLID MATERIAL LARGER
THAN 2" IN DIAMETER (1" FOR P.V.C. PIPE), AND NO SOLID MATERIAL LARGER 6" IN DIAMETER WILL
BE PERMITTED IN ANY BACK FILL MATERIAL.
11. ALL EXCAVATION IN EXISTING RIGHT OF WAY SHALL BE BACK FILLED AND STABILIZED AT THE END
OF EACH DAY. CONTRACTOR SHALL EXECUTE PERMITTED SAFETY PRECAUTIONS PER FDOT
MAINTENANCE OF TRAFFIC STANDARDS, TO PERMIT PEDESTRIAN AND VEHICULAR TRAFFIC PRIOR
TO LEAVING THE CONSTRUCTION SITE.
12. IN ANY INSTANCE WHERE SEWER LINES ARE NOT INSTALLED WITHIN PUBLIC RIGHTS-OF-WAY, ALL
LINES SHALL BE LOCATED IN A PUBLIC UTILITY EASEMENT, AND OWNING UTILITY MAINTENANCE
RESPONSIBILITY IS MANHOLE TO MANHOLE ONLY.
13. UPON COMPLETION OF THE WORK AND PRIOR TO PLACEMENT OF ASPHALT A VISUAL INSPECTION
AND REQUIRED TESTING SHALL BE MADE OF THE COMPLETED SYSTEM. THE OWNING UTILITY
SHALL APPROVE THE SYSTEM PRIOR TO IT BEING PLACED IN SERVICE, AND BEING ACCEPTED FOR
MAINTENANCE.
14. THE CONTRACTOR SHALL PROVIDE CERTIFIED SANITARY SEWER RECORD DRAWINGS (AS-BUILTS), SIGNED AND SEALED BY A PROFESSIONAL LAND SURVEYOR LICENSED IN THE STATE OF FLORIDA
PRIOR TO CERTIFICATION BY THE ENGINEER OF RECORD. THE RECORD DRAWINGS SHALL SHOW
COMPLETE "AS-BUILT" INFORMATION RELATIVE TO MANHOLES, VALVES, SERVICES, FITTINGS, PIPE
LENGTHS, INVERTS AND SLOPES AND SHALL BE ACCURATELY RECORDED. THE CONTRACTOR
SHALL PROVIDE SUFFICIENT COPIES (MIN 1) OF THE CERTIFIED RECORD DRAWINGS TO THE
ENGINEER OF RECORD.
15. AT THE END OF THE WARRANTY PERIOD THE OWNING UTILITY WILL T.V. INSPECT, AND CHECK
MANHOLE JOINTS AND CONNECTIONS TO DETERMINE IF REPAIRS ARE NECESSARY BEFORE THE
WARRANTY BOND IS RELEASED.
16. ONLY EIGHT(8") INCH MAINS (PRIVATE), WILL BE VISUALLY INSPECTED AND VIDEO RECORDED.
EIGHT(8") INCH PIPE LESS THAN SIXTY(60') FEET LONG WILL BE EXEMPT. COPIES OF ALL VIDEO
TAPES WILL BE PROVIDED TO THE CERTIFYING ENGINEER.
1. ALL COMPONENTS OF THE WATER SYSTEM, INCLUDING FITTINGS, THRUST BLOCKING,
HYDRANTS, CONNECTIONS, AND VALVES SHALL REMAIN UNCOVERED UNTIL PROPERLY
PRESSURE TESTED AND ACCEPTED BY THE OWNER'S ENGINEER. PRESSURE TESTS TO BE IN
ACCORDANCE WITH OWNING UTILITY SPECIFICATIONS.CONTRACTOR TO NOTIFY OWNER'S
ENGINEER AND OWNING UTILITY INSPECTORS 48 HOURS IN ADVANCE OF PERFORMING
TESTS.
2. INSPECTION BY THE BUILDING DEPARTMENT MAY BE REQUIRED AND MUST COMPLY WITH
FLORIDA BUILDING CODE (FBC). THESE FBC COMPLIANCE INSPECTIONS ARE LIMITED TO THE
DOWNSTREAM SIDE OF BACKFLOW PREVENTORS TO THE BUILDING.
WATER SYSTEM TESTING AND
INSPECTION REQUIREMENT NOTES
1. EXCEPT WHERE THE PLANS AND SPECIFICATIONS PROVIDE THAT SUCH WORK SHALL BE
PERFORMED UNDER THE CONTRACT FOR THIS PROJECT, ALL UTILITIES INTERFERING WITH
CONSTRUCTION SHALL BE REMOVED, RELOCATED, OR ADJUSTED BY THEIR OWNERS, AT THEIR
EXPENSE. THE CONTRACTOR SHALL ARRANGE HIS SCHEDULE TO ALLOW UTILITY OWNERS TIME
FOR THE NECESSARY RELOCATION AND ADJUSTMENT OF UTILITIES AND RELATED STRUCTURES.
2. ABOVE GROUND AND/OR UNDERGROUND UTILITIES MAY BE IN THE AREA OF THIS PROJECT -
PROCEED WITH CAUTION - THE CONTRACTOR SHALL CALL "SUNSHINE STATE ONE CALL" AND
THE UTILITY OWNERS IN ADVANCE OF BEGINNING WORK, IN ACCORDANCE WITH CHAPTER 556,
FLORIDA STATUTES, UNDERGROUND FACILITY DAMAGE PREVENTION & SAFETY. ALL UTILITY
OWNERS MAY NOT BE A MEMBER, REQUIRING DIRECT CONTACT. THE CONTRACTOR SHALL
FURTHER COORDINATE WITH UTILITY OWNERS TO RESOLVE CONFLICTS THAT MAY ARISE IN THE
FIELD DURING CONSTRUCTION. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY UTILITIES
DAMAGED AS A RESULT OF THE CONTRACTOR'S FAILURE TO CALL "SUNSHINE STATE ONE CALL"
AND THE UTILITY OWNERS.
3. THE CONTRACTOR IS REQUIRED TO COORDINATE AND/OR PROVIDE FOR THE
BRACING/SUPPORT OF EXISTING UTILITY POLES WITH THE UTILITY OWNERS, PRIOR TO THE
COMMENCEMENT OF EXCAVATION/CONSTRUCTION ACTIVITIES.
4. THE CONTRACTOR SHALL PROVIDE TEMPORARY FACILITIES AS REQUIRED TO ISOLATE PIPELINES
INSTALLED UNDER THIS CONTRACT FOR THE PERFORMANCE OF TESTING UNDER THIS CONTRACT.
LIKEWISE, PROVIDE TEMPORARY FACILITIES AS REQUIRED TO MAINTAIN WASTEWATER SERVICE
THROUGHOUT THE CONSTRUCTION PERIOD.
5. ALL EXISTING WATER MAINS, SANITARY SEWER LINES, WATER/SEWER PUMP STATIONS AND
OTHER UTILITIES SHALL REMAIN IN SERVICE UNTIL THE RELOCATED UTILITIES ARE PLACED IN
SERVICE. COORDINATE ALL UTILITY RELATED CONSTRUCTION ACTIVITIES WITH THE OWNER OF
THESE UTILITIES.
6. ALL CONSTRUCTION WITHIN THE RIGHT-OF-WAY WILL BE IN ACCORDANCE WITH THE PRACTICES
REQUIRED BY FDOT AND LOCAL GOVERNMENT AGENCY LAND DEVELOPMENT CODE ALONG WITH
THE FDOT UTILITY ACCOMMODATION MANUAL (2017 EDITION).
7. CONTRACTOR WILL NOTIFY THE RESPONSIBLE UTILITY FOR RELOCATION OF METER BOXES FOR
POTABLE WATER AND NON-POTABLE WATER SERVICES.
8. THE LOCATIONS AND SIZE OF THE EXISTING UTILITIES AS SHOWN ON THE PLANS ARE
APPROXIMATE ONLY. FURTHER, THERE IS NO GUARANTEE THAT ALL EXISTING FACILITIES HAVE
BEEN FOUND OR SHOWN. THE CONTRACTOR IS FOREWARNED TO ASCERTAIN AND DETERMINE
PRECISE LOCATIONS PRIOR TO EXCAVATING. THE CONTRACTOR SHALL BECOME FAMILIAR WITH
ALL VOLTAGES CARRIED IN OVERHEAD OR UNDERGROUND UTILITY SERVICES. NO CLAIM FOR
EXTRA COST SHALL BE MADE AGAINST THE OWNER OR ENGINEER AS A RESULT OF THE
AFOREMENTIONED APPROXIMATIONS. THE CONTRACTOR SHALL LOCATE EXACTLY ALL UTILITIES
THAT CROSS THE PROPOSED PROJECT LIMITS PRIOR TO CONSTRUCTION.
9. THE CONTRACTOR SHALL NOTIFY THE ENGINEER, OWNER, CITY AND COUNTY INCLUDING ALL
UTILITY COMPANIES AT LEAST 48 HOURS BEFORE BEGINNING CONSTRUCTION. CONTRACTOR
SHALL CALL "SUNSHINE STATE ONE CALL" (811) A MINIMUM OF 2-DAYS AND A MAXIMUM OF 5-DAYS
PRIOR TO START OF CONSTRUCTION. CONTRACTOR SHALL NOTIFY AND COORDINATE WATER AND
SEWER SERVICES WITH LOCAL GOVERNMENT AGENCY.
10. ALL UNDERGROUND UTILITIES MUST BE INSTALLED BEFORE ROADWAY BASE AND SURFACE ARE
CONSTRUCTED.
11. ALL PIPE LENGTHS ARE PLUS OR MINUS.
12. PIPE MEASUREMENTS ARE TO CENTER OF STRUCTURES OR FITTINGS. PIPE MEASUREMENTS FOR
MITERED END SECTIONS ARE TO END OF STRUCTURE.
13. CONTRACTOR SHALL VERIFY THE LOCATION AND ELEVATION OF ALL UTILITY CONNECTION POINTS
PRIOR TO STARTING CONSTRUCTION AND SHALL IMMEDIATELY NOTIFY THE ENGINEER AND
OWNER OF ANY DISCREPANCIES FOUND.
14. ADJUSTMENT OF INLETS, JUNCTION BOXES, MANHOLE TOPS, WATER VALVES, WATER METERS, ETC., SHALL BE INCLUDED AND NO CLAIM SHALL BE MADE AGAINST THE OWNER OR ENGINEER
FOR THESE ADJUSTMENTS, IF REQUIRED.
15. ALL BACKFILL OVER ANY PIPE (STORM SEWER, SANITARY SEWER, OR WATERLINES) THAT IS
INSTALLED UNDER ROADWAYS OR WITHIN THE EMBANKMENT OF THE ROADWAY, SHALL BE
COMPACTED IN ACCORDANCE WITH FLORIDA D.O.T. STANDARD SPECIFICATIONS, SECTION 120, 2020 EDITION OR LOCAL GOVERNMENT AGENCY REQUIREMENTS.
16. ALL EXISTING UTILITIES (INCLUDING STORMWATER FACILITIES) SHALL BE KEPT IN OPERATION
EXCEPT WITH THE EXPRESS WRITTEN CONSENT OF THE UTILITY OWNER. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO PRESERVE EXISTING UTILITIES AND ANY AND ALL DAMAGE
TO EXISTING UTILITIES AS A RESULT OF THE CONTRACTORS ACTIONS SHALL BE REPAIRED AT THE
CONTRACTORS EXPENSE.
17. CONTRACTOR TO REPAIR IN KIND ANY DISTURBED AREAS DUE TO UTILITY INSTALLATIONS.
CONTRACTOR TO ROOT PRUNE ANY TREES IN VICINITY OF PROPOSED UTILITY INSTALLATIONS.
WATER SYSTEM NOTES
1. ALL CONSTRUCTION SHALL CONFORM TO THE APPLICABLE OWNING UTILITY STANDARDS,
SPECIFICATIONS, ORDINANCES AND REGULATIONS. POTABLE AND GRAY WATER CONNECTIONS
FROM THE DOWNSTREAM SIDE OF BACKFLOW PREVENTORS TO BUILDING MUST COMPLY WITH
LATEST FBC PLUMBING VOLUME.
2. WATER MAIN SHALL BE LAID 3 FEET OR MORE BELOW PROPOSED GRADE (UNLESS OTHERWISE
NOTED ON PLANS OR CONTRACT DOCUMENTS AND SPECIFICATIONS).
3. CONFLICTS BETWEEN WATER AND STORM, SANITARY SEWER AND UNDERDRAIN SYSTEMS ARE TO
BE RESOLVED BY ADJUSTING WATER LINES, AS NECESSARY AND MEETING REQUIRED
CLEARANCE, UPON APPROVAL BY OWNER AND OWNER'S ENGINEER. BUILDING CONNECTIONS OF
WATER AND SEWER SHALL COMPLY WITH FBC PLUMBING SECTION.
4. FIRE HYDRANTS SHALL BE INSTALLED WITH HOSE NOZZLE FACING STREETS OR AS DIRECTED BY
THE OWNING UTILITY. ALL FIRE HYDRANTS SHALL BE CONSTRUCTED IN A MANNER THAT
MAINTAINS AT LEAST SIX (6) FEET OF CLEARANCE BETWEEN BACK OF CURB AND THE HYDRANT.
5. THE CONTRACTOR SHALL NOTIFY THE APPROPRIATE PUBLIC AGENCY(IES) PRIOR TO COMMENCING
WORK WITHIN THEIR JURISDICTION(S).
6. THE CONTRACTOR SHALL MAINTAIN COPIES OF ALL APPLICABLE PERMITS ON-SITE AND SHALL BE
RESPONSIBLE TO ADHERE TO ALL PERMIT CONDITIONS DURING CONSTRUCTION.
7. ALL WORK WITHIN RIGHTS-OF-WAY AND EASEMENTS WILL REQUIRE A SEPARATE PERMIT AND MAY
REQUIRE AN ALTERATION TO CONSTRUCTION MATERIALS SHOWN ON THESE PLANS.
RIGHT-OF-WAY PERMIT APPLICATIONS SHOULD BE SUBMITTED NO LATER THAN THIRTY (30) DAYS
BEFORE THAT RIGHT-OF-WAY OR EASEMENT WORK IS TO COMMENCE.
8. THE CONTRACTOR IS RESPONSIBLE FOR ADJUSTMENTS OF VALVE BOX COVERS, MANHOLE RIMS
AND COVER, GRATES, ETC., NECESSARY TO MATCH FINAL GRADES.
9. ALL PIPE LENGTHS ARE APPROXIMATE AND ARE TYPICALLY MEASURED FROM CENTER OF FITTINGS
AND STRUCTURES.
10. ALL UNDERGROUND UTILITIES WITHIN PAVEMENT MUST BE INSTALLED BEFORE ROADWAY BASE
AND SUBSURFACE COURSES ARE CONSTRUCTED.
11. COMPACTION FOR PIPE BACKFILL SHALL COMPLY WITH AASHTO T-99 (100%) (UNLESS OTHERWISE
NOTED IN CONTRACT DOCUMENTS AND SPECIFICATIONS).
12. ALL WATER MAINS SHALL BE DUCTILE IRON UNLESS OTHERWISE SPECIFIED. WATER MAINS SHALL
CONFORM TO AWWA C 151/A21.51MINIMUM CLASS 50. PIPE SHALL BE FURNISHED IN 18 OR 20-
FOOT LAYING LENGTHS. PIPE SHALL BE LINED WITH A STANDARD THICKNESS CEMENT MORTAR
LINING AND SEAL COATED IN ACCORDANCE WITH THE LATEST EDITION OF AWWA C 104/A21.4. PIPE
THICKNESS CLASS SHALL BE CLASS 50 UNLESS OTHERWISE SPECIFIED. ALL JOINTS SHALL BE IN
ACCORDANCE WITH THE LATEST EDITION OF ANSI/AWWA C 111/A21.11. IN AREAS WHERE THE SOIL
IS DETERMINED TO BE CORROSIVE OR HIGH GROUND WATER IS EXPECTED, THE PIPE SHALL BE
INSTALLED IN LOOSE POLYETHYLENE ENCASEMENT NOT LESS THAN 8 MILS THICK AND INSTALLED
IN ACCORDANCE WITH ANSI SPECIFICATION A21.51.
13. A MINIMUM 6-FOOT HORIZONTAL SEPARATION SHALL BE MAINTAINED BETWEEN ANY TYPE OF
SEWER AND WATER MAIN IN PARALLEL INSTALLATIONS WHENEVER POSSIBLE. IN CASES WHERE IT
IS NOT POSSIBLE TO MAINTAIN A 6-FOOT HORIZONTAL SEPARATION, THE WATER MAIN MUST BE
LAID IN A SEPARATE TRENCH OR ON AN UNDISTURBED EARTH SHELF LOCATED ON ONE SIDE OF
THE SEWER OR FORCE MAIN AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS
AT LEAST 6 INCHES ABOVE THE TOP OF THE SEWER. WHERE IT IS NOT POSSIBLE TO MAINTAIN A
VERTICAL DISTANCE OF 18 INCHES IN PARALLEL INSTALLATIONS, THE WATER MAIN SHALL BE
CONSTRUCTED OF DIP AND THE SEWER OR THE FORCE MAIN SHALL BE CONSTRUCTED OF DIP (IF
AVAILABLE IN THE SIZE PROPOSED) WITH A MINIMUM VERTICAL DISTANCE OF 12 INCHES. THE
WATER MAIN SHOULD ALWAYS BE ABOVE THE SEWER. JOINTS ON THE WATER MAIN SHALL BE
LOCATED AS FAR APART AS POSSIBLE FROM JOINTS ON THE SEWER OR FORCE MAIN (STAGGERED
JOINTS).
14. SANITARY SEWERS, FORCE MAINS AND STORM SEWERS CROSSING WATER MAIN SHALL BE LAID
TO PROVIDE A MINIMUM VERTICAL DISTANCE OF 18 INCHES BETWEEN THE INVERT OF THE UPPER
PIPE AND THE CROWN OF THE LOWER PIPE WHENEVER POSSIBLE. WHERE THE SANITARY
SEWERS, FORCE MAINS, RECLAIMED WATER MAINS AND STORM SEWERS MUST CROSS A
POTABLE WATER MAIN WITH LESS THAN 12 INCHES VERTICAL DISTANCE: (1) BOTH THE SEWER
AND WATER MAIN SHALL BE CONSTRUCTED OF DUCTILE IRON PIPE (DIP) AT CROSSING. (DIP IS
NOT REQUIRED FOR STORM SEWERS IF IT IS NOT AVAILABLE IN THE SIZE PROPOSED / ALSO, A
SANITARY SEWER OR FORCE MAIN MAY BE C900 PVC AT THE CROSSING). SUFFICIENT LENGTHS OF
DIP MUST BE USED TO PROVIDE A MINIMUM SEPARATION OF 10 FEET BETWEEN ANY TWO JOINTS.
(2) ALTERNATIVELY, ONE OF THE CROSSING MAINS SHALL BE ENCLOSED WITHIN A 20 FOOT LONG
STEEL OR PVC CASING CENTERED ON THE CROSSING. WHERE WATER MAINS CROSSES BELOW
SEWER MAIN, ENCASEMENT OF BOTH MAINS IS MANDATORY. ALL JOINTS ON THE WATER MAIN
WITHIN 20 FEET OF THE CROSSING MUST BE LEAK FREE AND MECHANICALLY RESTRAINED. A
MINIMUM VERTICAL CLEARANCE OF 6 INCHES MUST BE MAINTAINED AT THE CROSSING. ALL
CROSSINGS SHALL BE ARRANGED SO THAT THE SEWER PIPE JOINTS AND THE WATER MAIN
JOINTS ARE EQUIDISTANT FROM THE POINT OF CROSSING (PIPES CENTERED ON THE CROSSING).
WHERE A NEW PIPE CONFLICTS WITH AN EXISTING PIPE, THE NEW PIPE SHALL BE CONSTRUCTED
OF DIP AND THE CROSSING SHALL BE ARRANGED TO MEET THE REQUIREMENTS ABOVE.
15. ALL ON-SITE PVC WATER MAINS 4-12 INCHES SHALL BE IN ACCORDANCE WITH AWWA C-900 CLASS
150 DR 18 STANDARDS. ALL ON-SITE PVC WATER MAINS 2-3 INCHES SHALL BE CLASS 1120 OR 1220
(SDR 21) AND MEET REQUIREMENTS OF ASTM D-2241. WATER MAINS SMALLER THAN 2 INCHES
SHALL BE CLASS 1120 OR 1220 SCHEDULE 80 AND MEET REQUIREMENTS OF ASTM D-1785. (REFER
TO CONTRACT DOCUMENTS AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS).
16. PE PIPE 2" OR SMALLER SHALL MEET REQUIREMENTS OF ASTM D-1248.
17. ALL WATER MAIN JOINTS SHALL BE RESTRAINED JOINTS WHERE APPLICABLE AND SHALL
CONFORM TO THE OWNING UTILITY SPECIFICATIONS AND DETAILS.
18.COMPLETE "AS-BUILT" INFORMATION RELATIVE TO VALVES, SERVICES, FIRE HYDRANTS, FITTINGS, PIPE LENGTHS, INVERTS AND SLOPES SHALL BE ACCURATELY RECORDED AND TEN (10) COPIES
MUST BE SUBMITTED TO THE ENGINEER. ALL COPIES MUST BE SIGNED AND SEALED BY A
REGISTERED ENGINEER OR LAND SURVEYOR.
CONTRACTOR IS REQUIRED TO PROVIDE ALL TESTING IN ACCORDANCE WITH LATEST EDITION OF
LOCAL GOVERNMENT AGENCY AND THE 2019-2020 FDOT DESIGN MANUALS AND SPECIFICATIONS, IN ADDITION TO THOSE STATED WITHIN THE CONSTRUCTION DOCUMENTS AND SPECIFICATIONS
FOR THIS PROJECT. TESTING TO INCLUDE, BUT NOT LIMITED TO ALL REQUIRED COMPACTION
TESTING, BORINGS, ASPHALT GRADATION, EXTRACTION TESTS, CORES, AND CONCRETE TESTING, ETC.
TESTING REQUIREMENTS
EROSION CONTROL MEASURES NOTE:
REQUIRED EROSION CONTROL MEASURES MUST REMAIN INTACT THROUGHOUT CONSTRUCTION.
FAILURE TO INSTALL OR PROPERLY MAINTAIN THESE BARRICADES WILL RESULT IN ENFORCEMENT
ACTION WHICH MAY INCLUDE CITATIONS, AS PROVIDED BY CHAPTER 373 F.S. INITIATION OF CIVIL
PENALTY PROCEDURES PURSUANT TO SECTION 373.129, F.S., CAN RESULT IN A PENALTY NOT TO
EXCEED $10,000 PER OFFENSE WITH EACH DATE DURING WHICH SUCH VIOLATION OCCURS
CONSTITUTING A SEPARATE OFFENSE. CONTRACTOR TO ADHERE TO GENERAL DUST CONTROL
NOTES, EROSION, SILTATION, AND SEDIMENT CONTROL NOTES, AND SILT FENCE, TURBIDITY
BARRIER, AND TREE BARRICADE DETAILS INCLUDED IN THESE DOCUMENTS.
1. ALL ELECTRICAL SERVICE SHALL BE INSTALLED UNDERGROUND.
2. ELECTRIC SERVICE TO POINTS OF CONNECTION TO BE PROVIDED BY UTILITY OWNER;
CONTRACTOR TO COORDINATE.
3. CONTRACTOR TO INSTALL PVC CONDUITS FOR ELECTRICAL AND TELEPHONE SERVICE (TO
PROPERTY LINE) AND COORDINATE INSTALLATION OF SERVICES AND LIGHTING DESIGN WITH
UTILITY AGENCY.
4. CONTRACTOR TO COORDINATE WITH UTILITY COMPANY FOR RELOCATION OF ANY POWER
POLES WITHIN PROJECT AREA AND RIGHT-OF-WAYS.
5. CONTRACTOR TO EXERCISE EXTREME CARE IN NEW CONSTRUCTION AREAS TO AVOID
IMPACTS TO HIGHLY SENSITIVE UTILITIES.
C1.01
ELECTRICAL AND TELEPHONE NOTES
GENERAL NOTES
INLET PROTECTION:
INLETS SHALL BE PROTECTED FROM SEDIMENT INTAKE UNTIL PROJECT IS COMPLETE. APPROVED
BARRIERS OR OTHER APPROVED SEDIMENT CONTROL DEVICES SHALL BE INSTALLED AROUND
INLET TOP. A SECOND ROW OF APPROVED BARRIERS OR OTHER APPROVED SEDIMENT CONTROL
DEVICES SHALL BE PLACED AROUND INLET APPROXIMATELY 4' OUTSIDE FIRST ROW. BETWEEN
ROWS THERE SHALL BE A DEPRESSION TO ACT AS A SEDIMENT BASIN. COMPLETED INLETS IN
PAVED AREAS SHALL ALSO BE PROTECTED WITH A SINGLE LINE OF APPROVED BARRIERS OR
OTHER APPROVED SEDIMENT CONTROL DEVICES TO PREVENT SEDIMENT INTAKE FROM OTHER
AREAS.
OTHER CONTROLS/WASTE DISPOSAL:
OFFSITE VEHICLE TRACKING:
STABILIZED CONSTRUCTION ENTRANCES SHALL BE PROVIDED TO HELP REDUCE VEHICLE
TRACKING OF SEDIMENTS. THE PAVED STREETS WILL BE CLEANED AS NEEDED TO REMOVE ANY
EXCESS MUD, DIRT OR ROCK TRACKED FROM THE SITE. DUMP TRUCKS HAULING MATERIAL FROM
OR TO THE SITE WILL BE COVERED WITH A TARP AT ALL TIMES.
WASTE MATERIALS:
ALL WASTE MATERIAL WILL BE COLLECTED AND STORED IN DUMPSTERS PER LOCAL SOLID WASTE
REGULATIONS. ALL TRASH AND CONSTRUCTION DEBRIS FROM THE SITE WILL BE DEPOSITED IN
THE DUMPSTER. THE DUMPSTER WILL BE DUMPED A MINIMUM OF TWICE A WEEK OR MORE OFTEN
IF NECESSARY, AND THE TRASH WILL BE HAULED TO THE APPROPRIATE LOCATION FOR DUMPING.
NO CONSTRUCTION MATERIALS WILL BE BURIED ON-SITE. ALL PERSONNEL WILL BE INSTRUCTED
REGARDING THE CORRECT PROCEDURE FOR WASTE DISPOSAL. NOTICES STATING THESE
PRACTICES WILL BE POSTED IN THE ON- SITE OFFICE TRAILER AND THE CONSTRUCTION MANAGER
RESPONSIBLE FOR THE DAY-TO-DAY SITE OPERATIONS, WILL BE RESPONSIBLE FOR SEEING THAT
THESE PROCEDURES ARE FOLLOWED.
THE CONTRACTOR SHALL PROVIDE LITTER CONTROL AND COLLECTION WITHIN THE PROJECT
BOUNDARIES DURING CONSTRUCTION ACTIVITIES. ANY CHEMICAL CONTAINERS SHALL BE
DISPOSED OF BY THE CONTRACTOR ACCORDING TO EPA'S STANDARD PRACTICES AS DETAILED
BY THE MANUFACTURER. NO SOLID MATERIALS INCLUDING BUILDING & CONSTRUCTION
MATERIALS SHALL BE DISCHARGE TO ADJACENT WATERWAYS OR WETLANDS OR BURIED ON SITE.
HAZARDOUS WATER:
THE CONTRACTOR WILL IMMEDIATELY NOTIFY THE PERMITTING AGENCY IN WRITING IF ANY
HAZARDOUS WASTE MATERIAL IS ENCOUNTERED DURING SITE INVESTIGATION AND
CONSTRUCTION.
THE CONTRACTOR WILL ALSO BE RESPONSIBLE FOR NOTIFYING THE DEPARTMENT OF
ENVIRONMENTAL PROTECTION (FDEP) WITHIN 24 HOURS OF DISCOVERY.
IF ENCOUNTERED, HAZARDOUS WASTE MATERIALS WILL BE DISPOSED OF IN THE MANNER
SPECIFIED BY LOCAL, STATE AND FEDERAL REGULATIONS. THE CONTRACTOR WILL BE
RESPONSIBLE FOR SEEING THAT THESE PRACTICES ARE FOLLOWED.
SANITARY WASTE:
ALL SANITARY WASTE WILL BE COLLECTED FROM PORTABLE UNITS A MINIMUM OF THREE TIMES
PER WEEK BY A LICENSED SANITARY WASTE MANAGEMENT CONTRACTOR, IN ACCORDANCE WITH
FDOT STANDARD SPEC. FOR ROAD AN BRIDGE CONSTRUCTION 2010 EDITION SECTION 7-6, AND AS
REQUIRED BY LOCAL REGULATIONS.
TIMING OF CONTROL MEASURES
AS INDICATED IN THE SEQUENCE OF MAJOR ACTIVITIES, STAKED SILT BARRIERS, EROSION
CONTROL, AND STABILIZED CONSTRUCTION ENTRANCES CONSTRUCTED PRIOR TO GRUBBING OR
GRADING OF ANY OTHER PORTIONS OF THE SITE. AREAS WHERE CONSTRUCTION ACTIVITY
TEMPORARILY CEASES FOR MORE THAN 7 DAYS WILL BE STABILIZED WITH A TEMPORARY GRASS
AND MULCH WITHIN 7 DAYS OF THE LAST DISTURBANCE. ONCE CONSTRUCTED ACTIVITY CEASES
PERMANENTLY IN THAT AREA, THAT AREA WILL BE STABILIZED WITH PERMANENT SOD. AFTER THE
ENTIRE SITE IS STABILIZED, THE ACCUMULATED SEDIMENT WILL BE REMOVED FROM THE TRAPS
AND THE STAKED SILT BARRIERS WILL BE REMOVED.
MAINTENANCE INSPECTION PROCEDURES
EROSION AND SEDIMENT CONTROL INSPECTION AND MAINTENANCE PRACTICES:
THESE ARE THE INSPECTION AND MAINTENANCE PRACTICES THAT SHALL BE USED TO MAINTAIN
EROSION AND SEDIMENT CONTROL.
LESS THAN ONE HALF OF THE SITE WILL BE DENUDED AT ONE TIME PRIOR TO ESTABLISHING
EROSION CONTROL MANAGEMENT ALL CONTROL MEASURES WILL BE INSPECTED ONCE PER DAY
AND FOLLOWING ANY STORM EVENT OF 0.5 INCHES OR GREATER BY A CONTRACTOR'S
REPRESENTATIVE.
ALL MEASURES WILL BE MAINTAINED IN GOOD WORKING ORDER; IF A REPAIR IS NECESSARY, IT
WILL BE INITIATED WITHIN 24 HOURS OF REPORT.
BUILT UP SEDIMENT WILL BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE
HEIGHT OF THE FENCE. SILT FENCE WILL BE INSPECTED REGULARLY FOR DEPTH OF SEDIMENT, TEARS, TO SEE IF THE FABRIC IS SECURELY ATTACHED TO THE FENCE POSTS, AND TO SEE THAT
THE FENCE POSTS ARE FIRMLY IN THE GROUND.
IF APPLICABLE, THE SEDIMENT BASINS WILL BE INSPECTED FOR DEPTH OF SEDIMENT, AND BUILT
UP SEDIMENT WILL BE REMOVED WHEN IT REACHES 10 PERCENT OF THE DESIGN CAPACITY OR AT
THE END OF THE JOB.
A MAINTENANCE INSPECTION REPORT SHALL BE MADE AFTER EACH INSPECTION BY THE
CONTRACTOR AND SHALL BE KEPT IN AN ACTIVE LOG READILY AVAILABLE AT THE JOB SITE
CONSTRUCTION TRAILER. THE SITE SUPERINTENDENT WILL SELECT INDIVIDUALS WHO WILL BE
RESPONSIBLE FOR MAINTENANCE AND REPAIR ACTIVITIES. FILLING OUT THE INSPECTION AND
MAINTENANCE REPORT WILL BE BY THE CONTRACTOR. PERSONNEL SELECTED FOR
MAINTENANCE RESPONSIBILITIES WILL RECEIVE TRAINING FROM THE SITE SUPERINTENDENT.
THEY WILL BE TRAINED IN ALL MAINTENANCE PRACTICES NECESSARY FOR KEEPING THE EROSION
AND SEDIMENT CONTROLS USED ON-SITE IN GOOD WORKING ORDER.
STORMWATER MANAGEMENT
THE DRAINAGE CHANNEL IS A PART OF THE CITY'S STORMWATER CONVEYANCE SYSTEM AND THE
PROPOSED IMPROVEMENTS WILL CONTINUE TO CONVEY RUNOFF THROUGH THE CITY'S SYSTEM.
WETLAND MITIGATION
WETLAND MITIGATION IS NOT APPLICABLE FOR THE PROPOSED PROJECT.
NON-STORM WATER DISCHARGES
IT IS EXPECTED THAT THE FOLLOWING NON-STORM WATER DISCHARGES WILL OCCUR FROM THE
SITE DURING THE CONSTRUCTION PERIOD:
1. PAVEMENT WASH WATERS (WHERE NO SPILL OR LEAKS OF TOXIC OR VEHICLE AND HAZARDOUS
MATERIALS HAVE OCCURRED).
ALL NON-STORM WATER DISCHARGES WILL BE DIRECTED TO THE SEDIMENT BASIN PRIOR TO
DISCHARGE OR AS DIRECTED BY THE ENGINEER. IF CONTAMINATED SOIL OR GROUNDWATER IS
ENCOUNTERED, THE CONTRACTOR MUST NOTIFY THE OWNER AND ENGINEER.
MAINTENANCE AND INSPECTION:
ALL OF THE CONTROLS SHALL BE MAINTAINED AT ALL TIMES. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR DAILY INSPECTION AND MAINTENANCE OF ALL EROSION CONTROL DEVICES
THROUGHOUT THE CONSTRUCTION PHASE OF THE PROJECT. MAINTENANCE SHALL BE IN
ACCORDANCE WITH LOCAL GOVERNMENT AGENCY TECHNICAL SPECIFICATIONS, AND THE
PROJECT CONSTRUCTION CONTRACT.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETING THE FDEP NPDES / STORMWATER
POLLUTION PREVENTION PLAN (SWPPP) CONSTRUCTION INSPECTION REPORT AFTER ANY 1/2 INCH
RAINFALL OR WEEKLY IF NO RAIN EVENT OCCURRED. IT IS THE CONTRACTOR'S RESPONSIBILITY
TO MAINTAIN RAIN GAUGES ON THE PROJECT SITE AND RECORD WEEKLY RAIN FALL.
CONTRACTOR SHALL ALSO COMPLETE THE NPDES COMPLIANCE CHECKLIST FOR CONSTRUCTION
SITES.
STORMWATER POLLUTION PREVENTION PLAN
PROJECT NAME: CITY OF BROOKSVILLE EAST AVENUE DRAINAGE CHANNEL MAINTENANCE
IMPROVEMENTS
PROJECT ADDRESS:
EAST AVENUE AND PEYTON PLACE
BROOKSVILLE, FL 34601
OWNER'S ADDRESS:
600 S BROOKSVILLE AVENUE
BROOKSVILLE, FL 34601
DESCRIPTION OF PURPOSE AND TYPES OF SOIL DISTURBING ACTIVITIES:
PROPERTY AREA APPROXIMATELY = ±1.61 ACRES
PROJECT AREA APPROXIMATELY = ±1.00 ACRES
CONSTRUCTION PROPOSED: IMPROVEMENTS INCLUDE MAINTENANCE IMPROVEMENTS TO
EXISTING DRAINAGE CHANNEL
SOIL DISTURBING ACTIVITIES WILL INCLUDE:
CLEARING EXISTING VEGETATION AND TREE REMOVAL
WETLAND ACTIVITIES INCLUDE:
NO WETLAND IMPACTS ARE PROPOSED FOR THE PROJECT
CONSTRUCTION REMOVAL ACTIVITIES WILL INCLUDE:
REMOVE EXISTING VEGETATION AND TREE REMOVAL
STORMWATER DRAINAGE AREA:
BASIN AREA: --- ACRES
PRE-DEVELOPMENT CURVE NUMBER (CN): N/A
POST DEVELOPMENT CURVE NUMBER (CN): N/A
WATER QUALITY: N/A
WATER QUANTITY: N/A
SEQUENCE OF MAJOR ACTIVITIES:
1. INSTALL STAKED SILT FENCE AS SHOWN ON THE DEMOLITION PLAN.
2. INSTALL STABILIZED CONSTRUCTION ENTRANCE.
3. EXCAVATE STORMWATER POND AND/OR UNDERGROUND EXFILTRATION SYSTEM.
4. COMPLETE SITE PREPARATION PLAN, PAVING, GRADING, AND DRAINAGE PLAN, AND UTILITY
PLAN.
5. INSTALL NEW UTILITIES, STORM SYSTEMS, PARKING, AND BUILDING.
6. FILL AND GRADE DISTURBED AREAS.
7. REPAIR ANY WASHED OUT AREAS, INSTALL PLANTING MATERIAL AS SHOWN ON LANDSCAPE
PLAN. SOD, SEED, AND MULCH DISTURBED AREAS AS INDICATED ON PLANS.
8. WHEN CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE STABILIZED, REMOVE EROSION
PROTECTION DEVICES AND CONSTRUCTION ENTRANCE AS REQUIRED.
NAME OF RECEIVING WATERS:
THE PROPOSED IMPROVEMENTS WILL RESTORE THE STORMWATER CONVEYANCE IN THE
CHANNEL AND CONTINUE TO CONVEY RUNOFF TO THE TOM VARN PARK DETENTION AREA.
CONTROLS:
EROSION AND SEDIMENT CONTROLS
CONTRACTOR TO USE BEST MANAGEMENT PRACTICES (BMPs) DURING AND AFTER
CONSTRUCTION TO MINIMIZE EROSION AND SEDIMENTATION AND TO PROPERLY MANAGE RUNOFF
FOR BOTH STORMWATER QUANTITY AND QUALITY. CONTRACTOR TO ADHERE TO FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION EROSION AND SEDIMENTATION CONTROL
MANUAL.
BEFORE SITE DISTURBANCE OCCURS, PERIMETER CONTROLS, SEDIMENT TRAPS, BASINS, AND
DIVERSIONS MUST BE SET IN PLACE BY THE CONTRACTOR TO CONTROL RUNOFF AND CAPTURE
SEDIMENTS. THE CONTRACTOR IS REQUIRED TO REVIEW THE SITE SPECIFIC EROSION CONTROL
PLAN AS SHOWN ON THE CONSTRUCTION DOCUMENTS.
THE CONTRACTOR MAY ALSO BE REQUIRED TO MODIFY THE PLAN OR MATERIALS TO ADAPT TO
SEASONAL VARIATIONS OR SITE CONDITIONS. CONTRACTOR WILL COMPLY WITH EROSION
CONTROL PLAN AND DETAILS. ANY MODIFICATIONS TO THIS PLAN MUST BE SIGNED BY A
PROFESSIONAL ENGINEER REPRESENTING THE CONTRACTOR. CONTRACTOR SHALL REMOVE ALL
SEDIMENT THAT HAS MIGRATED OFF-SITE. THE EROSION CONTROL DEVISES FOR THESE
ACTIVITIES ARE SPECIFIED IN THE PLANS AND ACCORDING TO "DESIGN STANDARDS FOR DESIGN, CONSTRUCTION, MAINTENANCE AND UTILITY OPERATIONS ON THE STATE HIGHWAY SYSTEM
(CURRENT EDITION), SECTION 104. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING IF
ADDITIONAL CONTROLS ARE NEEDED AND DEPLOYMENT SCHEDULES FOR THE IMPLEMENTATION
OF ALL EROSION CONTROL DEVICES.
STABILIZATION PRACTICES:
WIND EROSION STABILIZATION:
THE CONTRACTOR SHALL DENUDE ONLY AREAS WHERE IT IS EXPECTED TO BE GRADED OR
ALTERED WITHIN A TWO (2) WEEK TIME- FRAME. FINAL GRADES SHALL BE PERFORMED AND
TEMPORARY OR PERMANENT SOIL STABILIZATION SHALL BE APPLIED. AREAS WHERE
CONSTRUCTION OPERATIONS WILL BE CONTINUOUS, FUGITIVE DUST SHALL BE MANAGED BY
APPLYING A WATER SPRAY TO SATURATE THE SURFACE SOILS CONTINUOUSLY AND ADDITIONAL
MEASURES MAY NEED TO BE TAKEN CONTROL OFF-SITE TRANSPORT OF UNACCEPTABLE LEVELS
OF DUST.
TEMPORARY STABILIZATION:
TOP OF SOIL STOCK PILES AND DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION
ACTIVITY TEMPORARILY CEASES FOR AT LEAST 7 DAYS WILL BE STABILIZED WITH TEMPORARY
GRASS AND MULCH NO LATER THAN 7 DAYS FROM THE LAST CONSTRUCTION ACTIVITY. GRASS
SEED SHALL BE A MIXTURE OF 20 PARTS OF BERMUDA SEED AND 80 PARTS OF PENSACOLA BAHIA.
THE SEPARATE TYPES OF SEED USED SHALL BE THOROUGHLY DRY MIXED IMMEDIATELY BEFORE
SOWING. SEED WHICH HAS BECOME WET SHALL NOT BE USED. THE MULCH MATERIAL USED SHALL
NORMALLY BE DRY MULCH. DRY MULCH SHALL BE STRAW OR HAY, CONSISTING OF OAT, RYE OR
WHEAT STRAW, OR OF PANGOLA, PEANUT, COASTAL BERMUDA OR BAHIA GRASS HAY. ONLY
UNDETERIORATED MULCH, WHICH CAN BE READILY CUT INTO THE SOIL, SHALL BE USED. AREAS
OF THE SITE, WHICH ARE TO BE PAVED, WILL BE TEMPORARILY STABILIZED BY APPLYING
STABILIZATION AND BASE. TREE BARRICADES WHERE REQUIRED.
PERMANENT STABILIZATION:
DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES PERMANENTLY CEASES
SHALL BE STABILIZED WITH SOD NO LATER THAN 7 DAYS AFTER THE LAST CONSTRUCTION
ACTIVITY.
SEDIMENT BASINS:
IF APPLICABLE, SEDIMENT BASINS TO BE CONSTRUCTED BY THE CONTRACTOR TO DETAIN
SEDIMENT-LADEN RUNOFF FROM DISTURBED AREAS LONG ENOUGH FOR MOST OF THE SEDIMENT
TO SETTLE OUT. SEDIMENT BASINS SHOULD BE USED TOGETHER WITH EROSION CONTROL
PRACTICES SUCH AS TEMPORARY SEEDING, MULCHING, DIVERSION BERMS, ETC., TO REDUCE THE
AMOUNT SEDIMENT FLOWING INTO THE STORM SYSTEM.
DEWATERING:
DEWATERING IS NOT PROPOSED WITH THIS PROJECT. IF CONTRACTOR IS PLANNING TO DEWATER, THE CONTRACTOR MUST APPLY TO THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
AND ALL OTHER LOCAL GOVERNING AGENCIES.
STRUCTURAL PRACTICES:
STAKED SILT FENCES:
THE STAKED SILT FENCES WILL BE CONSTRUCTED ALONG THE CONSTRUCTION LIMITS OR AS
DEPICTED ON THE EROSION CONTROL & DEMOLITION PLANS AND/OR ON OTHER CONSTRUCTION
PLANS. THESE DEVICES WILL STOP AND DIVERT RUNOFF FROM THE SITE TO OTHER SURFACE
WATERS.
WATER MANAGEMENT DISTRICT - KEY PROVISIONS:
STORMWATER MANAGEMENT APPROVAL WILL BE SECURED FROM THE SOUTHWEST FLORIDA
WATER MANAGEMENT DISTRICT (SWFWMD). THE FOLLOWING KEY PROVISIONS MUST BE
MAINTAINED BY THE PERMITTEE AND CONTRACTOR: (IN ACCORDANCE WITH THE BASIS OF REVIEW
FOR ENVIRONMENTAL RESOURCE PERMIT (ERP) APPLICATIONS):
THE PERMITTEE AND CONTRACTOR SHALL AMEND THE CONSTRUCTION SURFACE WATER
MANAGEMENT PLAN WHENEVER THE PROJECT IS ALTERED OR MODIFIED IN A MANNER THAT WILL
RESULT IN:
1. THE POTENTIAL DISCHARGE OF POLLUTANTS
2. A CHANGE IN THE AMOUNT OF DISCHARGE
3. A CHANGE IN THE NUMBER OF LOCATION OF STORM WATER DISCHARGE POINTS, OR
4. ADVERSE IMPACTS TO WETLANDS, AND SUCH CHANGE(S) HAVE NOT OTHERWISE BEEN
PREVIOUSLY ADDRESSED IN THE APPROVED PLAN. THE PERMITTEE AND CONTRACTOR SHALL
ALSO AMEND THE PLAN IF ITS IMPLEMENTATION DOES NOT ELIMINATE OR MINIMIZE EROSION AND
SEDIMENT DEPOSITION, OFF-SITE FLOODING, ADVERSE IMPACTS TO WETLAND, OR VIOLATIONS OF
STATE WATER QUALITY STANDARDS. AMENDMENTS TO THE PLAN SHALL BE PREPARED AND KEPT
AS SEPARATE DOCUMENTS ALONG WITH THE ORIGINAL PLAN. ALL ALTERATIONS TO THE SYSTEM
MUST BE SHOWN ON THE AMENDED PLAN ALONG WITH THE DOCUMENTATION OR REQUIRED
APPROVAL(S).
SPILL PREVENTION:
MATERIAL MANAGEMENT PRACTICES
THE FOLLOWING ARE THE MATERIAL MANAGEMENT PRACTICES THAT WILL BE USED TO REDUCE
THE RISK OF SPILLS OR OTHER ACCIDENTAL EXPOSURE OF MATERIALS AND SUBSTANCES TO
STORM WATER RUNOFF.
GOOD HOUSEKEEPING
THE FOLLOWING GOOD HOUSEKEEPING PRACTICES SHALL BE FOLLOWED ON-SITE DURING THE
CONSTRUCTION PROJECT:
AN EFFORT SHALL BE MADE TO STORE ONLY ENOUGH PRODUCTS REQUIRED TO DO THE JOB.
ALL MATERIALS STORED ON-SITE SHALL BE STORED IN A NEAT, ORDERLY MANNER IN THEIR
APPROPRIATE CONTAINERS AND, IF POSSIBLE, UNDER A ROOF OR OTHER CONTAINED
ENCLOSURE.
PRODUCTS SHALL BE KEPT IN THEIR ORIGINAL MANUFACTURER'S LABELED CONTAINERS.
SUBSTANCES SHALL NOT BE MIXED WITH ONE ANOTHER UNLESS RECOMMENDED BY THE
MANUFACTURER. WHENEVER POSSIBLE, ALL OF A PRODUCT SHALL BE USED UP BEFORE
DISPOSING OF THE CONTAINER. MANUFACTURERS RECOMMENDATIONS FOR PROPER USE AND
DISPOSAL SHALL BE FOLLOWED.
THE SITE SUPERINTENDENT SHALL INSPECT DAILY TO ENSURE PROPER USE AND DISPOSAL OF
MATERIALS ON-SITE.
THE CONTRACTOR MUST IDENTIFY A DESIGNATED FUEL TANK STORAGE AREA, AWAY FROM
DRAINAGE STRUCTURES, PONDS, BASINS, WATERWAYS, AND WETLANDS, WITH SECONDARY
CONTAINMENT (SPILL COLLECTION).
PETROLEUM PRODUCTS
ALL ON-SITE VEHICLES WILL BE MONITORED FOR LEAKS AND RECEIVE REGULAR PREVENTIVE
MAINTENANCE TO REDUCE THE CHANCE OF LEAKAGE. PETROLEUM PRODUCTS WILL BE STORED
IN TIGHTLY SEALED CONTAINERS, WHICH ARE CLEARLY LABELED. ANY ASPHALT SUBSTANCES
USED ON-SITE WILL BE APPLIED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS.
FERTILIZERS
FERTILIZERS USED WILL BE APPLIED ONLY IN THE MINIMUM AMOUNTS RECOMMENDED BY THE
MANUFACTURER. ONCE APPLIED, FERTILIZER WILL BE WORKED INTO THE SOIL TO LIMIT
EXPOSURE TO STORM WATER. STORAGE WILL BE IN A SEALABLE PLASTIC BIN TO AVOID SPILLS.
CONCRETE TRUCKS
CONTRACTOR SHALL DESIGNATE AN AREA AWAY FROM DRAINAGE STRUCTURES, PONDS, BASINS,
WATERWAYS, AND WETLANDS FOR DISCHARGE OF SURPLUS CONCRETE OR DRUM WASH WATER
AND SHALL INSTALL A CONTAINMENT BERM AROUND THIS AREA TO PREVENT RUNOFF TO THE
REMAINDER OF THE SITE. HARD DEBRIS SHALL BE DISPOSED OF BY CONTRACTOR UPON
COMPLETION OF THE PROJECT. CONTRACTOR TO PREPARE A DETAILED SITE PLAN FOR
APPROVAL FOR THE CONCRETE DISCHARGE AND WASH DOWN ACTIVITIES.
SPILL CONTROL PRACTICES
IN ADDITION TO THE GOOD HOUSEKEEPING AND MATERIALS MANAGEMENT PRACTICES
DISCUSSED IN THE PREVIOUS SECTIONS OF THIS PLAN, THE FOLLOWING PRACTICES WILL BE
FOLLOWED FOR SPILL PREVENTION AND CLEANUP:
* MANUFACTURERS' RECOMMENDED METHODS FOR SPILL CLEANUP WILL BE CLEARLY POSTED
AND SITE PERSONNEL WILL BE MADE AWARE OF THE PROCEDURES AND THE LOCATION OF THE
INFORMATION CLEANUP SUPPLIES.
*ALL SPILLS WILL BE CLEANED UP IMMEDIATELY AFTER DISCOVERY.
*THE SPILL AREA WILL BE KEPT WELL VENTILATED AND PERSONNEL WILL WEAR APPROPRIATE
PROTECTIVE CLOTHING TO PREVENT INJURY FROM CONTACT WITH A HAZARDOUS SUBSTANCE.
*SPILLS OF TOXIC OR HAZARDOUS MATERIAL WILL BE REPORTED TO THE APPROPRIATE STATE OR
LOCAL GOVERNMENT AGENCY, REGARDLESS OF THE SIZE.
*THE SPILL PREVENTION PLAN WILL BE PREPARED BY THE CONTRACTOR AND KEPT IN THE
CONSTRUCTION OFFICE TRAILER AND WILL INCLUDE MEASURES TO PREVENT THIS TYPE OF SPILL
FROM REOCCURRING AND HOW TO CLEAN UP THE SPILL IF THERE ARE OTHERS. A DESCRIPTION
OF THE SPILL, WHAT CAUSED IT, AND THE CLEANUP MEASURES WILL ALSO BE INCLUDED. ALL
SPILLS AND RESPONSES WILL BE REPORTED TO THE APPROPRIATE AGENCY.
*THE CONTRACTOR WILL BE RESPONSIBLE FOR SPILL PREVENTION AND CLEANUP COORDINATION.
HE WILL DESIGNATE OTHER SITE PERSONNEL WHO WILL RECEIVE SPILL PREVENTION AND
CLEANUP TRAINING. THESE INDIVIDUALS WILL EACH BECOME RESPONSIBLE FOR A PARTICULAR
PHASE OF PREVENTION AND CLEANUP. THE NAMES OF RESPONSIBLE SPILL PERSONNEL WILL BE
POSTED IN THE MATERIAL STORAGE AREA AND IN THE OFFICE TRAILER ON SITE. *USE AND
CHARACTERISTICS OF FUEL OR CHEMICAL STORAGE TANK ON SITE SHALL COMPLY WITH ALL
RELATED FEDERAL, STATE, AND LOCAL REGULATIONS. STORAGE TANKS MUST BE LOCATED AS
FAR AS POSSIBLE FROM ANY DRAINAGE STRUCTURES, DITCHES, AND/OR SURFACE WATERS. IN
ADDITION, THE CONTRACTOR MUST PROVIDE A SECONDARY CONTAINMENT WITH A LINER
CHEMICALLY RESISTANT TO THE FUEL OR CHEMICAL STORED ON SITE. THE SECONDARY
CONTAINMENT MUST BE SIZED TO CONTAIN MINIMUM OF ONE AND A HALF TIME THE TOTAL
CAPACITY OF STORAGE TANK BEING USED. CONTRACTOR HAS TO PROVIDE A DAILY INSPECTION
LOG FOR THE SECONDARY CONTAINMENT WITH INDICATION OF DATE, INSPECTORS NAME AND
INSPECTION REPORT.
FURTHERMORE, ANY CONTAMINATION HAS TO BE IMMEDIATELY CONTAINED AND THE OWNERS,
ENGINEER OF RECORD AND PERMITTING AGENT INSPECTOR MUST BE NOTIFIED OF THE NATURE
AND EXTEND OF THE CONTAMINATION.
INVENTORY FOR POLLUTION PREVENTION PLAN:
THE MATERIALS OR SUBSTANCES LISTED BELOW ARE EXPECTED, BUT NOT LIMITED, TO BE
PRESENT ON-SITE DURING CONSTRUCTION:
CONCRETE FERTILIZERS
DETERGENTS PETROLEUM BASED PRODUCTS AND FUELDS
TAR CLEANING SOLVENTS
SAND WOOD
STONE
POLLUTION PREVENTION PLAN CERTIFICATION:
I CERTIFY UNDER PENALTY OF LAW THAT THIS DOCUMENT AND ALL ATTACHMENTS HAVE BEEN
READ BY ME OR MY DESIGNATED REPRESENTATIVE AND UNDERSTAND THAT THIS SYSTEM HAS
BEEN PREPARED TO ASSURE THAT QUALIFIED PERSONNEL PROPERLY GATHER AND EVALUATE
THE INFORMATION SUBMITTED. BASED ON MY INQUIRY OF THE PERSONS WHO MANAGE THE
SYSTEM, OR THOSE PERSONS DIRECTLY RESPONSIBLE FOR GATHERING THE INFORMATION
SUBMITTED IS, TO THE BEST OF MY KNOWLEDGE AND BELIEF, TRUE, ACCURATE AND COMPLETE. I
AM AWARE THAT THERE ARE SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATION,
INCLUDING THE POSSIBILITY OF FINE AND IMPRISONMENT FOR KNOWING VIOLATIONS.
OWNER: CITY OF BROOKSVILLE DEPARTMENT OF PUBLIC WORKS
AUTHORIZED AGENT: JON DOWLER
SIGNATURE:
ADDRESS: 600 S BROOKSVILLE AVENUE
BROOKSVILLE, FL 34601
PH: (352) 540-4336
DATE:
CONTRACTOR'S AND ENGINEER'S CERTIFICATION:
I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND THE TERMS AND CONDITIONS OF THE
GENERAL NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT THAT
AUTHORIZES THE STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY FROM
THE CONSTRUCTION SITE IDENTIFIED AS PART OF THIS CERTIFICATION. I UNDERSTAND, AND
SHALL COMPLY WITH THE TERMS AND CONDITIONS OF THE STATE OF FLORIDA "GENERIC PERMIT
FOR STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES" (CGP), AND
THIS STORMWATER POLLUTION PREVENTION PLAN PREPARED FOR CITY OF BROOKSVILLE EAST
AVENUE DRAINAGE CHANNEL MAINTENANCE IMPROVEMENTS.
CONTRACTOR:
AUTHORIZED AGENT:
TITLE:
SIGNATURE:
ADDRESS:
P: F:
DATE:
CERTIFIED ENGINEER:
THOMAS F. BURKE, PE
FL REGISTRATION No: 58566
COMPANY: CARDNO
ADDRESS 20215 CORTEZ BOULEVARD
BROOKSVILLE, FLORIDA 34601
T: (352) 754-4551 F: (352) 754-5222
DATE:
NPDES NOTIFICATION (NATIONAL POLLUTION DISCHARGE ELIMINATION
SYSTEM):
ATTENTION: FAILURE TO MAINTAIN EROSION AND/OR SEDIMENTATION CONTROLS OR ANY ILLICIT
DISCHARGE RESULTING FROM THEIR FAILURE WILL LIKELY RESULT IN FINE CITATIONS. CODE
REGULATIONS AUTHORIZES PENALTIES OF UP TO $10,000 FOR EACH OFFENSE.
ALL ACTIVITIES MUST CONFORM WITH FDEP NOTICE OF INTENT TO USE GENERIC PERMIT FOR
STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES. POLLUTION
PREVENTION FROM THE PROPOSED CONSTRUCTION ACTIVITIES WILL BE IMPLEMENTED IN
ACCORDANCE WITH SWFWMD BASIS OF REVIEW SUBSECTION 2.8.4.
KEY PROVISIONS:
1. IMPLEMENTATION OF THIS STORMWATER POLLUTION PREVENTION PLAN (SWPPP).
2. CONDUCTING AND DOCUMENTING ROUTINE INSPECTIONS AS REQUIRED.
3. RETENTION OF RECORDS REQUIRED BY THE PERMIT, INCLUDING RETENTION OF A COPY OF THE
SWPPP AT THE CONSTRUCTION SITE, FROM THE DATE OF PROJECT INITIATION TO THE DATE OF
FINAL SITE STABILIZATION.
NOTICE OF INTENT (NOI):
A "NOTICE OF INTENT TO USE GENERIC PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND
SMALL CONSTRUCTION ACTIVITIES" (NOI) IS REQUIRED FOR THIS SITE SINCE THE PROJECT AREA
IS GREATER THAN ONE ACRE IN SIZE.
THOMAS F. BURKE, P.E.
58566LIC. NO.:
02/22/2021
B R
O O
K S V I L L E
C O
R T E Z
B L V D
B R O
O K S V I L L E
T E L
X w w w c a r d n o c r t if ic a t e o f
A u t h o r iz a t io n
N o
CHECKED
SHEET NUMBER
PROJECT #
SHEET TITLE
DESIGNED
DATE
DRAWN
DE
SC
RI
PT
IO
N
DA
TE
BY
Fil e:
J:\
6\0
4.0
1\A
CA
D\ dw g\C 1.0
1_ Ge ne ra l N ote s.d wg
, T ab
: S
TO
RM
W
AT
ER
P
OL
LU
TI
ON
P
RE
VE
NT
IO
N
PL
AN
Pl ot St am p:
2/2 2/2
1 4
:59 :41
P M
- M ich ae l D ets is
CI
TY
O F
BR
OO
KS
VI
LL
E
BR
OO
KS
VI
LL
E, H
ER
NA
ND
O
CO
UN
TY
, F
LO
E
N U
E
D
R A
I N
A G
E
C
H A
N N
E L
M A
I N
T E
N A
N C
E
I M
P R
O V
E M
E N
T S
C1.02
STORMWATER POLLUTION
PREVENTION PLAN
l o w
NOTES:
1. DROP INLET SEDIMENT BARRIERS ARE TO BE USED FOR SMALL,
NEARLY LEVEL DRAINAGE AREAS. (LESS THAN 5%)
2. USE 2"x 4" WOOD OR EQUIVALENT METAL STAKES. (3 FT. MIN. LENGTH)
3. INSTALL 2"x 4" WOOD TOP FRAME TO INSURE STABILITY.
4. THE TOP OF THE FRAME (PONDING HEIGHT) MUST BE WELL BELOW
THE GROUND ELEVATION DOWNSLOPE TO PREVENT RUNOFF FROM
BYPASSING THE INLET. A TEMPORARY DIKE MAY BE NECESSARY ON
THE DOWNSLOPE SIDE OF THE STRUCTURE.
PONDING HT.
TOP FRAME NECESSARY
FOR STABILITY
2"x 4" WOOD FRAME
4 SIDES OF D.I.
ATTACH FILTER FABRIC
SECURELY TO 2"x 4" WOOD
FRAME, OVERLAPPING
FABRIC TO NEXT STAKE
M
A X
M
A X
M
I N
GATHER EXCESS
FABRIC AT CORNERS
2" x 4" WOOD FRAME
M
A X
M
I N
ISOMETRIC VIEW
Elevation of Stake and
Fabric Orientation
STAKE
FABRIC
M
I N
SPECIFIC APPLICATION
THIS METHOD OF INLET PROTECTION IS APPLICABLE
WHERE THE INLET DRAINS IN A RELATIVELY FLAT
AREA (SLOPE NO GREATER THAN 5%) WHERE THE
INLET SHEET OF OVERLAND FLOWS (NOT
EXCEEDING 1 C.F.S.) ARE TYPICAL. THE METHOD
SHALL NOT APPLY TO INLETS RECEIVING
CONCENTRATED FLOWS, SUCH AS IN STREET OR
HIGHWAY MEDIANS.
STAKED SEDIMENT BARRIER
FILTERED WATER
RUNOFF WATER
WITH SEDIMENT
AREA INLET
WITH GRATE
A A
THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE THE INLET
DRAINS A RELATIVELY FLAT AREA (SLOPES NO GREATER THAN 5%)