This document is a Bridge Inspection Report for the College Creek Bridge (Structure No. 4290-023P) within the Colonial National Historical Park in Virginia. The report provides a detailed inspection of the bridge's condition, including recommendations for maintenance, rehabilitation, and reconstruction work. Key findings include the need to remove vegetation growth, replace missing and leaning object markers, backfill erosion, repair grout pads under beams, and stabilize erosion of the north downstream channel bank. The report also includes the bridge's load rating, inventory and appraisal data, and condition assessments.
The related federal contract opportunity is for the Rehabilitation of Seven Bridges (Structure No. 4290-023P and six others) within the Colonial National Historical Park. The project, valued between $2,000,000 - $5,000,000, consists of repairing concrete spalls, cleaning and resealing joints, cleaning and painting structural steel, cleaning and sealing concrete decks, repairing timber decks, and other miscellaneous work. The solicitation is set aside for certified Small Business Concerns, with bid documents expected to be issued on or about May 1, 2024. Bidders must be registered in the System for Award Management (SAM) database.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - Project VA NP COLO 1C15 1D48 1E15.pdf | ||
| IFB Solicitation - VA NP COLO 1C14 1D48 1E15.pdf | ||
| Plans - NP COLO 1C14 1D48 1E15.pdf | ||
| Categorical Exclusion Form (NEPA).pdf | ||
| Bridge Inspection Report 4290-026P.pdf | ||
| Bridge Inspection Report 4290-029P.pdf | ||
| VETS-4212 Form.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| Bridge Inspection Report 4290-025P.pdf | ||
| Bridge Inspection Report 4290-024P.pdf | ||
| Bridge Inspection Report 4290-028P.pdf | ||
| FP14_Eng.pdf | ||
| Bridge Inspection Report 4290-031P.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
COLLEGE CREEK BRIDGE
COLONIAL PARKWAY OVER COLLEGE CREEK
COLONIAL NATIONAL HISTORICAL PARK
LN
STRUCTURE NO. 4290-023P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 6/14/2023
WU
Report prepared by:
Federal Highway Administration MILE POINT: 16.04 FLH Office of Bridges and Structures Bridge Inspection Program 22001 Loudoun County Parkway, Building E2, Suite 200 Ashburn, VA 20147
KILOMETER POINT: 25.81
https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 4290-023P
COLLEGE CREEK BRIDGE INSPECTION DATE: 06/14/2023
have stabilized erosion near the bridge. However, beyond the limits of the riprap the site exhibits high vertical cut slopes with downed and undermined trees.
Missing "College Creek" and "No fishing or diving from bridge" signs at west side of north approach replaced since previous inspection.
Concrete repairs, superstructure repainting, cleaning and sealing of the joints, and cleaning and sealing of the deck are scheduled to be completed under COLO 1C14, 1D48, and, 1E15. Therefore, no recommendations or project costs are included for these elements.
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 4290-023P
COLLEGE CREEK BRIDGE INSPECTION DATE : 06/14/2023
226 PRIORITY OF IMPROVEMENT D
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
Item No.
Maintenance Recommendations
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
60.6
REMOVE VEGETATION GROWTH ON SOUTH WINGWALLS.
222.7
REPLACE MISSING AND RESET LEANING OBJECT
MARKERS.
PRELIM. MAINTENANCE TOTAL :
Item REHABILITATION/RECONSTRUCTION
UNIT
UNIT PRELIM. COST ESTIMATES
No. (TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. COST
REHAB RECONSTR
222.5 BACKFILL EROSION WITH UNDERMINING OF
EAST CURB AT SOUTH APPROACH AND WEST
CURB AT NORTH APPROACH.
59.1 REPAIR GROUT PADS UNDER BEAMS AT
SOUTH ABUTMENT.
61.2 STABILIZE EROSION OF NORTH DOWNSTREAM
CHANNEL BANK.
CONTRACT COSTS FOR MOBILIZATION,
TRAFFIC CONTROL, AND CONTINGENCIES.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 4290-023P
COLLEGE CREEK BRIDGE INSPECTION DATE : 06/14/2023
226 PRIORITY OF IMPROVEMENT D
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL :
PRELIM. REHABILITATION TOTAL :
PRELIM. RECONSTRUCTION TOTAL : ..
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL * :
(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)
Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
Consideration should be given to replacing the bridge with a longer structure that is adequate for the waterway.
Concrete repairs, superstructure repainting, cleaning and sealing of the joints, and cleaning and sealing of the deck are scheduled to be completed under COLO 1C14, 1D48, and, 1E15. Therefore, no recommendations or project costs are included for these elements.
STRUCTURE LOAD RATING STRUCTURE NO. 4290-023P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 28 25 47 43
HS 32 29 54 49
TYPE 3 31 28 52 47
TYPE 3S2 39 35 65 59
TYPE 3-3 44 40 74 67
DESIGN LOADING: 2 - H 15
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
X ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 08/23/2015
LOAD RATING CONTROLLED BY: INTERIOR GIRDER
REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 4290-023P
STRUCTURE IDENTIFICATION
(201) PARK: COLONIAL NATIONAL HISTORICAL PARK
(202) STRUCTURE NAME:..............COLLEGE CREEK BRIDGE
(203) STRUCTURE KIND:............... 1 - BRIDGE
(204) STRUCTURE NUMBER:.........4290-023 P
3 - NORTHEAST(205) NPS REGION:
(206) ROUTE CODE NUMBER:
(207) ROAD SECTION NO:............. 023P
(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD
(209) WITHIN NPS BNDRY?:.......... Yes
(210) OPERATING UNIT:.................PARK
(211) PROJECT NO(S):................... 1D18
(212) DRAWING NUMBERS:...........3003B
(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE
(22) OWNER:................................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY / PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR:
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORIC DESIGNATION:
513 - VIRGINIA
51095 JAMES CITY
00000
1 6 1 00001 0
COLLEGE CREEK
COLONIAL PARKWAY
4290023P0000000
1.6 MILES SOUTH OF VA ROUTE 199.
99.99 FT ( 99.99 M)
16.04 (KM PT: 25.81)
3 - ON FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL:..........3 - STEEL
(43B) MAIN STR. TYPE:.................. 02 - STRINGER/MULTI-BEAM OR
GIRDER
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:..............87 FT ( 26.5 M)
(49) STRUCTURE LENGTH:........... 87.0 FT ( 26.5 M)
(216A) ABUTMENT #1 FDN:........... 3 - SPREAD FOOTING ON PILES
(216B) ABUTMENT #2 FDN:........... 3 - SPREAD FOOTING ON PILES
(217A) PREDOM. PIER FDN:.......... 6 - N/A
(217B) SECOND. PIER FDN:.......... 6 - N/A
(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL:............ 0 - Other
(44B) APPR. STR. TYPE:.................... 00 - OTHER
(46) NO OF APPROACH SPANS:
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE:.. 1 - MONOLITHIC CONCRETE
(CONCURRENTLY PLACED WITH
STRUCTURAL DECK)
B) TYPE MEMBRANE:................. 0 - NONE
C) TYPE PROTECTION:.............. 0 - NONE
(218) IS SALT USED?.......................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD:.........................2 - H 15 (41) LOAD RESTRICTION:.................. A - OPEN
(66) INVENTORY RATING:..............32 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGALTONS ( 29
LOADS
(64) OPERATING RATING:..............54 TONS ( 49 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 06/14/2023 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N
(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY MONTHS - LAST INSP:
(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... Y
INSP. EVERY 60 MONTHS - LAST INSP: 06/26/2023
(C) SPECIAL INSPECTION:........ N
INSP. EVERY MONTHS - LAST INSP:
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 4290-023P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE:................................ 37° 13'33 90" (51) CURB TO CURB WIDTH:............ 32.0 FT ( 9.8 M)
(17) LONGITUDE:............................ 76°41 '41 00" (52) DECK WIDTH:.......................... 36.3 FT ( 11.1 M)
(19) DETOUR LENGTH:.................. 5 MI ( 8 KM) (32) APPR. ROADWAY WIDTH:...... 50.0 FT ( 15.2 M)
(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 30.0 FT ( 9.1 M)
(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... 10.0 FT ( 3 M)
(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 10.0 FT ( 3 M)
(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN
(29) AVG DAILY TRAFFIC:..............3274 (34) SKEW ANGLE:......................... 30 °
(30) YEAR OF ADT:......................... 2007 (35) STRUCTURE FLARED:............ 0 - NO FLARE
(114) FUTURE ADT:.........................3601 (47) TOTAL HORIZ. CLEARANCE:.. 32 FT ( 9.8 M)
(115) YEAR OF FUTURE ADT:........2027 (50) SIDEWALKS
(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)
(38) NAVIGATION CONTROL:.........0 RIGHT:.................................. 0 0 FT ( 0 M)
(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE
(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:...... 1 - FULL HEIGHT (NO PARAPET)
(111) ABUT OR PIER PROT:........... MATERIAL:........................... 1 - CONCRETE
LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL
(55) RIGHT:...............................00 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... 2 50 FT ( 0.76 M)
(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)
(54) MIN. VRT. UNDRCLRANCE:... 0 00 FT ( 0 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:....................................... 7 (67) STRUCTURAL EVALUATION:
(59) SUPERSTRUCTURE:...............7 (68) DECK GEOMETRY:
(60) SUBSTRUCTURE:.......... 6 (69) UNDERCLEARANCES:................ N
(61) CHANNEL:................................6 (71) WATERWAY ADEQUACY:
(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:
(222) APPROACHES:...................... 6 (113) SCOUR CRITICAL:.................... 7 - COUNTERMEASURES INSTALLED
TO CORRECT SCOUR PROBLEM
(223) RETAINING WALL:.................N (225) PURPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION
(36) TRAFFIC SAFETY FEAT: 1 1 1 1 (226) PRIORITY OF IMPROVEMENT: D - MINOR
(75A) TYPE OF WORK:................... (227) MAINTENANCE COST:
(75B) WORK DONE BY:.................. (228) REHAB / RECNSTR COST:
(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1985-JT. REPAIR. 2011-SUPERSTR. CLEANED AND PAINTED; CONC. REPAIRS TO CURBS, RAILINGS, AND SUBSTR; RIPRAP PLACED AT ABUTMENTS. 2014
-RIPRAP PLACED AT NORTH D/S CHANNEL BANK.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIGURATION INFORMATION:
Inspector: Nate Brown Structure Number: 4290023P0000000
Inspection Date: 06/14/2023 Facility Carried: COLONIAL PARKWAY
Bridge Inspection Report
Pictures
PHOTO 3
Description LOOKING SOUTHBOUND TOWARD JAMESTOWN
PHOTO 4
Description EAST (DOWNSTREAM) SIDE; NOTE CHANNEL WIDER THAN STRUCTURE OPENING
Bridge Inspection Report
Pictures
PHOTO 5
Description GENERAL TOPSIDE VIEW LOOKING NORTH
PHOTO 6
Description BENT AND LEANING OBJECT MARKER AT SOUTHEAST CORNER
Bridge Inspection Report
Pictures
PHOTO 7
Description UNDERMINING OF EAST CURB AT SOUTH APPROACH
PHOTO 8
Description DECAY IN EAST TRANSITION RAILING AT SOUTH ABUTMENT
Bridge Inspection Report
Pictures
PHOTO 9
Description TYPICAL CHECKING AND SPLINTERING OF TIMBER APPORACH GUARDRAIL WITH DECAY;
EAST GUARDRAIL AT SOUTH APPROACH SHOWN
PHOTO 10
Description TYPICAL DETERIORATION OF POURABLE SEALANT AT RELIEF JOINTS; SOUTH RELIEF
JOINT SHOWN
Bridge Inspection Report
Pictures
PHOTO 11
Description TYPICAL TRANSVERSE CRACKING OF DECK SURFACE; NORTHBOUND LANE SHOWN
PHOTO 12
Description TYPICAL DEBRIS ACCUMULATION ALONG CURBLINES; EAST CURBLINE SHOWN
Bridge Inspection Report
Pictures
PHOTO 13
Description TYPICAL CRACKING AND SCALING OF CURBS; EAST CURB AT NORTH APPROACH SHOWN
PHOTO 14
Description DELAMINATION AND SPALL AT EAST EDGE OF NORTH APPROACH SLAB
Bridge Inspection Report
Pictures
PHOTO 15
Description GENERAL UNDERSIDE VIEW LOOKING SOUTH
PHOTO 16
Description GENERAL VIEW OF NORTH ABUTMENT
Bridge Inspection Report
Pictures
PHOTO 17
Description TYPICAL VEGETATION GROWTH ON WINGWALLS; SOUTHWEST WINGWALL SHOWN
PHOTO 18
Description TYPICAL MAP AND VERTICAL CRACKING WITH EFFLORESCENCE ON ABUTMENT
BREASTWALLS; SOUTH ABUTMENT, WEST END SHOWN; NOTE SPALLS WITH EXPOSED
REBAR
Bridge Inspection Report
Pictures
PHOTO 19
Description TYPICAL RUSTING ALONG BEAM BOTTOM FLANGES; BEAM #4 SHOWN
PHOTO 20
Description TYPICAL DETERIORATION OF GROUT PADS BELOW BEARINGS AT SOUTH ABUTMENT;
BEAM #2 SHOWN; ALSO NOTE CRACKING, DELAMINATION, AND SPALLING OF BEARING
SEAT
Bridge Inspection Report
Pictures
PHOTO 21
Description SPALL WITH EXPOSED REBAR ON WEST FASCIA NEAR SOUTH ABUTMENT
PHOTO 22
Description TYPICAL PACK RUST BETWEEN BEARING PLATES; BEAM #7 AT NORTH ABUTMENT
SHOWN
Bridge Inspection Report
Pictures
PHOTO 23
Description SPALL WITH EXPOSED REBAR IN DECK UNDERSIDE AT NORTH ABUTMENT BEHIND END
DIAPHRAGM IN BAY #1
PHOTO 24
Description DELAMINATION OF NORTHWEST CHEEKWALL; NOTE TYPICAL MAP CRACKING WITH
EFFLORESCENCE ON ABUTMENT BREASTWALLS AND WINGWALLS
Bridge Inspection Report
Pictures
PHOTO 25
Description TYPICAL EXPANSION OF NORTH ABUTMENT BEARINGS; WEST SIDE OF BEAM #3 SHOWN
PHOTO 26
Description UPSTREAM CHANNEL
Bridge Inspection Report
Pictures
PHOTO 27
Description DOWNSTREAM CHANNEL
PHOTO 28
Description EROSION OF NORTH DOWNSTREAM CHANNEL BANK BEYOND RIPRAP