This is a set of architectural construction drawings for ceiling renovations at Bradley Academy in Murfreesboro, Tennessee, prepared by Johnson + Bailey Architects P.C. for the Murfreesboro City Schools. The project, identified as Project No. 2506 and dated March 4, 2026, encompasses comprehensive ceiling system renovations across both the first and second floors of the facility located at 511 Dr. Martin Luther King Jr. Blvd. The scope of work includes demolition of existing acoustical and plaster ceiling systems, removal of non-structural wood framing and furring, abatement of approximately 250 linear feet of asbestos-containing water pipe insulation, and installation of new suspended acoustical tile ceiling systems with updated light fixtures, HVAC diffusers, and mechanical/electrical components. The drawings provide detailed reflected ceiling plans, demolition plans, new work plans, asbestos abatement plans, and construction details for both floors, along with specific notes regarding equipment protection, temporary storage of existing furnishings, maintenance of emergency egress pathways, and coordination with existing building systems including fire alarm, PA systems, and occupancy sensors.

The renovation specifications require the contractor to verify the operation of all existing fire alarm, PA system, and equipment components prior to demolition work, document any findings, and coordinate with the Murfreesboro City Schools maintenance supervisor. Existing ceiling-mounted equipment, light fixtures, and mechanical items are to be removed, stored, and reinstalled at their original locations following installation of new systems. The contractor must protect existing interior finishes during demolition, repair any damage to pre-construction condition, and secure all work areas at the end of each work day. Specialized work requirements include installation of new moisture and mold-resistant gypsum board above the kitchen hood, two-hour fire protection firestopping for water pipe and electrical conduit penetrations, proper support of existing low-voltage cables on new steel unistruts in compliance with 2017 NEC requirements, and maintenance of existing control methods for lighting systems.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Johnson + Bailey Architects P.C.

Murfreesboro City Schools

Index of Drawings

B r a d le y

A c a d e m y

C e il in g

R e n o v a t io n s

J

B

P r o j e c t

N o

Ceiling Renovations Bradley Academy

Murfreesboro, TN 37130 511 Dr. Martin Luther King Jr. Blvd.

PROJECT ADDRESS:

March 4, 2026

EXP

E X P

E X P

EXP

EXP

EXP

EXP

EXP

EXP

EXP

EXP

S

S C

OS

S

S

S

OS

CH

OS

C

WF

OS

S

OS

S

WF

OS

S

S SOSOS S SCCSS OS

S

S

OS

WFOSOS WFOS WF

WF OS WF OS WF OS

WF

OS

WF

OS

WF

OS

OS

WF

S

OS

C

S

S

C

OS

CH

S

S

OS

S

S

OS

C

S

OS

S

WF

WF

OS

WF

OS

WF

OS

WF

OS

WF

OS

S

WF

OSS

WF

OS

WF

OS

WF

OS

WF

OS

WF

OS

S

WF

CC

WF

OS OS S

WF

WF

S

D

A1.1 08'

SCALE 1/16" = 1'-0"

32'16'16'

MASTER REFLECTED CEILING PLAN

FIRST FLOOR

SECOND FLOOR

NOTES:

REVISIONS DATE

PERMISSION OF THE ARCHITECT

IN ANY WAY WITHOUT THE WRITTEN

REPRODUCED, PUBLISHED, OR USED

THIS DRAWING SHALL NOT BE

PROJECT NO.

DATE

DRAWN BY

CHECKED BY

B.D.S.

Murfreesboro, TN

Renovations Ceiling

K.S.P.

Academy Bradley

03/04/26

AREA OF WORK

AREA OF WORK

AREA OF WORK

A1.2 08'

SCALE 1/16" = 1'-0"

32'16'16'

MASTER STORAGE SPACE PLAN

NOTES:

REVISIONS DATE

PERMISSION OF THE ARCHITECT

IN ANY WAY WITHOUT THE WRITTEN

REPRODUCED, PUBLISHED, OR USED

THIS DRAWING SHALL NOT BE

PROJECT NO.

DATE

DRAWN BY

CHECKED BY

B.D.S.

Murfreesboro, TN

Renovations Ceiling

K.S.P.

Academy Bradley

03/04/26

P A T I

O

R E

A D I

N G

O U T

D O

O R

INTER.

PASS.

CORRIDOR

WOMENS

INTER.

STAGE

CAFETERIA

KITCHEN

TLT.

VEST.

OFFICE

STORAGE

GYM

OFFICE

MECH.

STORAGE

CLASSROOM

LIFE & PHYSICAL ARTS

CLINIC

OFFICE

CONF.

PRINC.

ASST.

PRINC.

OFFICE

SCHOOL

ROOM

WORK

REC.

/JAN.

MECH.

TLT.

W.

TLT.

M.

TLT.

B.

TLT.

G.

OFFICE

ESP

CLASSROOM

ART STUDIO

STORAGE

ART

CLASSROOM

KEYBOARD LAB

INSTRUMENTAL MUSIC/

STORAGE

INSTR.

CLASSROOM

DRAMA

STORAGE

DRAMA

STORAGE

CHORAL

CLASSROOM

CHORAL MUSIC

ROOM

WORK

EQUIP.

MEDIA

VIDEO

PUBLISH

CENTER

MEDIA

CLO.

CLO.

INTER.INTER.

MENS

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

EMERGENCY EGRESS

CLEAR SPACE FOR

MAINTAIN 42" WIDE

EQUIPMENT/ FURNISHINGS

STORAGE AREA FOR KITCHEN

STORAGE SPACE NOTES

STORAGE SPACE LEGEND

EXISTING SCHOOL FURNITURE AND FURNISHINGS.

SPACE AVAILABLE FOR TEMPORARY STORAGE OF

THAT PROTECTS KITCHEN EQUIPMENT FROM DAMAGE.

DEMOLITION PROCEDURES SHALL BE PERFORMED IN A MANNER

WORK FROM DAMAGE, DUST AND CONSTRUCTION DEBRIS.

EQUIPMENT SHALL BE FULLY PROTECTED DURING RENOVATION

RENOVATION WORK. PERMANENTALY CONNECTED KITCHEN

IN THE CAFETERIA DURING PERFORMANCE OF KITCHEN CEILING

TO BUILDING UTILITIES TO A TEMPORARY STORAGE LOCATION

AND FURNISHINGS THAT ARE NOT PERMANENTLY CONNECTED

CONTRACTOR TO MOVE ALL EXISITING KITCHEN EQUIPMENT 5.

STORAGE AREAS AS INDICATED ON THIS DRAWING.

MAINTAIN A 42" CLEAR EMERGENCY EGRESS PATHWAY AT4.

UNDAMAGED CONDITION.

RETURNED TO THEIR ORIGINAL LOCATION IN THE ORIGINAL

EXISTING SCHOOL FURNITURE AND FURNISHINGS ARE TO BE

AT THE CONCLUSION OF WORK AT EACH CLASSROOM, THE3.

AS INDICATED ON THIS DRAWING.

WORK IS NOT IN PROGRESS, OR OTHER AVAILABLE SPACE

TEMPORARLY STORED IN OTHER RENOVATION AREAS WHERE

EXISTING SCHOOL FURNITURE AND FURNINGS MAY BE2.

THE PERFORMANCE OF WORK IN EACH CLASSROOM.

TO OCCUR TO A TEMPORARY STORAGE LOCATION DURING

FURNISHINGS LOCATED IN CLASSROOMS WHERE WORK IS

CONTRACTOR TO MOVE EXISTING SCHOOL FURNITURE AND1.

WALL SYMBOLS LEGEND

EXISTING PARTITION TO REMAIN

EXISTING C.M.U. PARTITION - 1 HOUR FIRE RATED

EXISTING C.M.U. PARTITION - 2 HOUR FIRE RATED

EXISTING C.M.U. WALL - 4 HOUR FIRE RATED

A2.1 04'

SCALE 1/8" = 1'-0"

16'8'8'

FIRST FLOOR

ASBESTOS ABATEMENT PLAN

NOTES:

REVISIONS DATE

PERMISSION OF THE ARCHITECT

IN ANY WAY WITHOUT THE WRITTEN

REPRODUCED, PUBLISHED, OR USED

THIS DRAWING SHALL NOT BE

PROJECT NO.

DATE

DRAWN BY

CHECKED BY

B.D.S.

Murfreesboro, TN

Renovations Ceiling

K.S.P.

Academy Bradley

03/04/26

F E C

PASS.

CONTAINING INSULATION.

(3" OR LESS IN DIAMETER), WITH ASBESTOS

EXISTING 4 FOOT HORIZONTAL WATER PIPE

WOMENS

INTER.

STAGE

CAFETERIA

KITCHEN

STORAGE

GYM

OFFICE

MECH.

CLO.

CLO.

U P

U P

UP

INTER.INTER.

MENS

BOTTOM OF DECK AND SEAL.

TO TOP OF CONCRETE BLOCK WALL OR

REMOVE ASBESTOS CONTAINING INSULATION

BLOCK CAVITY OR INTO DECK ABOVE.

WATER PIPES EXTENDS INTO CONCRETE

BOTTOM OF DECK AND SEAL.

TO TOP OF CONCRETE BLOCK WALL OR

REMOVE ASBESTOS CONTAINING INSULATION

BLOCK CAVITY OR INTO DECK ABOVE.

WATER PIPES EXTENDS INTO CONCRETE

BOTTOM OF DECK AND SEAL.

TO TOP OF CONCRETE BLOCK WALL OR

REMOVE ASBESTOS CONTAINING INSULATION

BLOCK CAVITY OR INTO DECK ABOVE.

WATER PIPES EXTENDS INTO CONCRETE

BOTTOM OF DECK AND SEAL.

TO TOP OF CONCRETE BLOCK WALL OR

REMOVE ASBESTOS CONTAINING INSULATION

BLOCK CAVITY OR INTO DECK ABOVE.

WATER PIPES EXTENDS INTO CONCRETE

BOTTOM OF DECK AND SEAL.

TO TOP OF CONCRETE BLOCK WALL OR

REMOVE ASBESTOS CONTAINING INSULATION

BLOCK CAVITY OR INTO DECK ABOVE.

WATER PIPES EXTENDS INTO CONCRETE

BOTTOM OF DECK AND SEAL.

TO TOP OF CONCRETE BLOCK WALL OR

REMOVE ASBESTOS CONTAINING INSULATION

BLOCK CAVITY OR INTO DECK ABOVE.

WATER PIPES EXTENDS INTO CONCRETE

INSULATION TO REMAIN.

EXISTING NON-ASBESTOS PIPE

INSULATION TO REMAIN.

EXISTING NON-ASBESTOS PIPE

INSULATION TO REMAIN.

EXISTING NON-ASBESTOS PIPE

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

ASBESTOS ABATEMENT NOTES

ASBESTOS PIPE INSULATION LEGEND

WATER PIPE ASBESTOS CONTAINING INSULATION IS REMOVED.

INSTALL NEW WATER PIPE INSULATION WHERE EXISTING2.

ASBESTOS CONTAINING MATERIALS.

INSULATION AS PER PROJECT SPECIFICATIONS FOR

ABATE EXISTING WATER PIPE ASBESTOS CONTAINING1.

DIAMETER), WITH ASBESTOS CONTAINING INSULATION.

EXISTING (250 LINEAR FEET) WATER PIPE (3" OR LESS IN

S

OS

C

S

S

C

OS

CH

S

S

OS

S

S

OS

C

S

OS

S

WF

WF

OS

WF

OS

WF

OS

WF

OS

WF

OS

S

WF

OSS

WF

OS

WF

OS

WF

OS

WF

OS

WF

OS

EXP

EXP

EXP

S

WF

CC

WF

OS OS S

WF

WF

S

D

A3.1 04'

SCALE 1/8" = 1'-0"

16'8'8'

MATCHLINE

DEMOLITION - FIRST FLOOR

REFLECTED CEILING PLAN

NOTES:

REVISIONS DATE

PERMISSION OF THE ARCHITECT

IN ANY WAY WITHOUT THE WRITTEN

REPRODUCED, PUBLISHED, OR USED

THIS DRAWING SHALL NOT BE

PROJECT NO.

DATE

DRAWN BY

CHECKED BY

B.D.S.

Murfreesboro, TN

Renovations Ceiling

K.S.P.

Academy Bradley

03/04/26

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

41 3

41 3

41 3

41 3

41 3

41 3

41 3

41 3

1 3

1 3

1 3

1 3

1 3

1 3

1 3

1 3

1 3

KEYED DEMOLITION PLAN NOTES

1.

2.

GENERAL DEMOLITION NOTES

3.

LOCATION AFTER INSTALLATION OF NEW CEILING SYSTEM.

REMOVE EXISTING LIGHT FIXTURES. STORE AND REINSTALL AT SAME

AT SAME LOCATION AFTER INSTALLATION OF NEW CEILING SYSTEM.

REMOVE EXISTING CEILING MOUNTED EQUIPMENT. STORE AND REINSTALL

REMOVE EXISTING ACOUSTICAL CEILING SYSTEM.

REMOVE EXISTING CONCEALED SPLINE CEILING SYSTEM.

FRAMING AND FURRING.

REMOVE EXISTING ABOVE CEILING NON-STRUCTURAL WOOD

WORK AREA IS TO BE SECURED AT END OF EACH WORK DAY.

ARE REMOVED TO MATCH ADJACENT EXISTING CONSTRUCTION.

PATCH & REPAIR EXISTING CONSTRUCTION WHERE EXISTING ITEMS

NON-STRUCTURAL FRAMING.

REMOVE EXISTING PLASTER CEILING SYSTEM AND ASSOCIATED

ELECTRICAL SERVICE BACK TO SOURCE.

REMOVE EXISTING ABOVE CEILING MOUNTED LIGHT FIXTURE AND

NEW CEILING SYSTEM.

INSTALL COVER PLATE ON JUNCTION BOX AND MOUNT ABOVE

CLOSE EXISTING CEILING MOUNTED ELECTRICAL OUTLET ACCESS.

ASSOCIATED NON-STRUCTURAL WOOD FRAMING.

AND DIFFUSERS. REMOVE EXISTING PLASTER BULKHEAD AND

NON-STRUCTURAL WOOD FRAMING. REMOVE EXISTING LIGHT FIXTURES

REMOVE EXISTING PLASTER CEILING SYSTEM AND ASSOCIATED

11 REMOVE EXISTING LIGHT FIXTURE AND RETURN TO OWNER.

GRILLES AND DIFFUSERS AS REQUIRED.

OF NEW CEILING SYSTEM. NEW DUCT MATERIAL TO REINSTALL

STORE AND REINSTALL AT SAME LOCATION AFTER INSTALLATION

REMOVE EXISTING CEILING MOUNTED GRILLES AND DIFFUSERS.

4.

SUSPENDED CEILING GRID.

REMOVE EXISTING ACOUSTICAL CEILING TILES, CLEAN EXISTING

CONSTRUCTION. REPAIR ANY DAMAGE TO PRE-CONSTRUCTION CONDITION.

PROTECT EXISTING INTERIOR FINISHES FROM DAMAGED DURING

DOCUMENTED TO THE ARCHITECT PRIOR TO ANY DEMOLITION WORK STARTING.

FINDINGS OF THESE SYSTEMS OPERATION OR LACK OF, ARE TO BE

DOCUMENTED PRIOR TO ANY DEMOLITION WORK IN THE SCHOOL. THE

RECEIVERS & WIRING. THIS WORK MUST BE CHECKED, VERIFIED &

ALL CONTROL PANELS, STROBES, PULL STATIONS, SPEAKERS, AMPS,

CITY SCHOOLS MAINTENANCE SUPERVISOR. INCLUDING BUT NOT LIMITED TO

SCHOOL FIRE ALARM, P.A. SYSTEM AND EQUIPMENT WITH MURFREESBORO

CONTRACTOR IS TO CHECK AND VERIFY THE OPERATION OF THE EXISTING

41 3

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

1 43

10 11

2 10

S

S

EXP. EXPOSED TO STRUCTURE ABOVE

OS

REFLECTED CEILING PLAN LEGEND

IN NEW METAL SUSPENSION SYSTEM

NEW ACOUSTICAL CEILING TILES

EXISTING CEILING MOUNTED SUPPLY AIR DIFFUSER

EXISTING CEILING MOUNTED RETURN AIR/EXHAUST GRILLE

EXISTING CEILING MOUNTED LIGHT FIXTURES

EXISTING CEILING MOUNTED EXIT LIGHT

EXISTING CEILING MOUNTED SPEAKER

EXISTING CEILING MOUNTED SMOKE DETECTOR

EXISTING CEILING MOUNTED OCCUPANCY SENSOR

METAL SUSPENSION SYSTEM TO BE REMOVED

EXISTING ACOUSTICAL CEILING TILES IN

C EXISTING CEILING MOUNTED SECURITY CAMERA

WF

EXISTING CEILING MOUNTED CHARGE STATUSCH

EXISTING CEILING MOUNTED POWER OUTLET

EXISTING CEILING MOUNTED PROJECTOR SUPPORT

EXISTING CEILING MOUNTED INTERNET ROUTER

D EXISTING CEILING MOUNTED DATA OUTLET

TO BE REMOVED.

EXISTING CEILING MOUNTED SUPPLY AIR DIFFUSER

NEW CEILING MOUNTED SUPPLY AIR DIFFUSER

TO BE REMOVED.

EXISTING CEILING MOUNTED RETURN AIR/EXHAUST GRILLE

NEW CEILING MOUNTED RETURN AIR/EXHAUST GRILLE

TO BE REMOVED.

EXISTING CEILING MOUNTED LIGHT FIXTURES

NEW CEILING MOUNTED LIGHT FIXTURES

STUD FRAMING ATTACHED TO STRUCTURE ABOVE.

NEW GYPSUM BOARD BULKHEAD ON NEW METAL

GENERAL DETAIL NOTES

FOR TYPICAL SECOND FLOOR CORRIDOR WALL CONDITION, SEE DETAIL 1/A5.24.

FOR TYPICAL FIRST FLOOR CORRIDOR WALL CONDITION, SEE DETAIL 3/A5.13.

FOR TYPICAL SECOND FLOOR WINDOW CONDITION, SEE DETAIL 2/A5.12.

FOR TYPICAL FIRST FLOOR WINDOW CONDITION, SEE DETAIL 1/A5.11.

S C

OS

S

S

S

OS

CH

OS

C

WF

OS

S

OS

S

WF

OS

S

S SOSOS S SCCSS OS

S

S

OS

WFOSOS WFOS WF

WF OS WF OS WF OS

WF

OS

WF

OS

WF

OS

OS

WF

A3.2

04'

SCALE 1/8" = 1'-0"

16'8'8'

DEMOLITION - SECOND FLOOR

REFLECTED CEILING PLAN

NOTES:

REVISIONS DATE

PERMISSION OF THE ARCHITECT

IN ANY WAY WITHOUT THE WRITTEN

REPRODUCED, PUBLISHED, OR USED

THIS DRAWING SHALL NOT BE

PROJECT NO.

DATE

DRAWN BY

CHECKED BY

B.D.S.

Murfreesboro, TN

Renovations Ceiling

K.S.P.

Academy Bradley

03/04/26

1 2 3

4 5

1 2 3

1 2 3

1 2 3

1 2 3

41 3

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

1 3

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

1 3

1 3

KEYED DEMOLITION PLAN NOTES

1.

2.

GENERAL DEMOLITION NOTES

3.

LOCATION AFTER INSTALLATION OF NEW CEILING SYSTEM.

REMOVE EXISTING LIGHT FIXTURES. STORE AND REINSTALL AT SAME

AT SAME LOCATION AFTER INSTALLATION OF NEW CEILING SYSTEM.

REMOVE EXISTING CEILING MOUNTED EQUIPMENT. STORE AND REINSTALL

REMOVE EXISTING ACOUSTICAL CEILING SYSTEM.

REMOVE EXISTING CONCEALED SPLINE CEILING SYSTEM.

FRAMING AND FURRING.

REMOVE EXISTING ABOVE CEILING NON-STRUCTURAL WOOD

WORK AREA IS TO BE SECURED AT END OF EACH WORK DAY.

ARE REMOVED TO MATCH ADJACENT EXISTING CONSTRUCTION.

PATCH & REPAIR EXISTING CONSTRUCTION WHERE EXISTING ITEMS

NON-STRUCTURAL FRAMING.

REMOVE EXISTING PLASTER CEILING SYSTEM AND ASSOCIATED

ELECTRICAL SERVICE BACK TO SOURCE.

REMOVE EXISTING ABOVE CEILING MOUNTED LIGHT FIXTURE AND

NEW CEILING SYSTEM.

INSTALL COVER PLATE ON JUNCTION BOX AND MOUNT ABOVE

CLOSE EXISTING CEILING MOUNTED ELECTRICAL OUTLET ACCESS.

ASSOCIATED NON-STRUCTURAL WOOD FRAMING.

AND DIFFUSERS. REMOVE EXISTING PLASTER BULKHEAD AND

NON-STRUCTURAL WOOD FRAMING. REMOVE EXISTING LIGHT FIXTURES

REMOVE EXISTING PLASTER CEILING SYSTEM AND ASSOCIATED

11 REMOVE EXISTING LIGHT FIXTURE AND RETURN TO OWNER.

GRILLES AND DIFFUSERS AS REQUIRED.

OF NEW CEILING SYSTEM. NEW DUCT MATERIAL TO REINSTALL

STORE AND REINSTALL AT SAME LOCATION AFTER INSTALLATION

REMOVE EXISTING CEILING MOUNTED GRILLES AND DIFFUSERS.

4.

SUSPENDED CEILING GRID.

REMOVE EXISTING ACOUSTICAL CEILING TILES, CLEAN EXISTING

CONSTRUCTION. REPAIR ANY DAMAGE TO PRE-CONSTRUCTION CONDITION.

PROTECT EXISTING INTERIOR FINISHES FROM DAMAGED DURING

DOCUMENTED TO THE ARCHITECT PRIOR TO ANY DEMOLITION WORK STARTING.

FINDINGS OF THESE SYSTEMS OPERATION OR LACK OF, ARE TO BE

DOCUMENTED PRIOR TO ANY DEMOLITION WORK IN THE SCHOOL. THE

RECEIVERS & WIRING. THIS WORK MUST BE CHECKED, VERIFIED &

ALL CONTROL PANELS, STROBES, PULL STATIONS, SPEAKERS, AMPS,

CITY SCHOOLS MAINTENANCE SUPERVISOR. INCLUDING BUT NOT LIMITED TO

SCHOOL FIRE ALARM, P.A. SYSTEM AND EQUIPMENT WITH MURFREESBORO

CONTRACTOR IS TO CHECK AND VERIFY THE OPERATION OF THE EXISTING

S

S

EXP. EXPOSED TO STRUCTURE ABOVE

OS

REFLECTED CEILING PLAN LEGEND

IN NEW METAL SUSPENSION SYSTEM

NEW ACOUSTICAL CEILING TILES

EXISTING CEILING MOUNTED SUPPLY AIR DIFFUSER

EXISTING CEILING MOUNTED RETURN AIR/EXHAUST GRILLE

EXISTING CEILING MOUNTED LIGHT FIXTURES

EXISTING CEILING MOUNTED EXIT LIGHT

EXISTING CEILING MOUNTED SPEAKER

EXISTING CEILING MOUNTED SMOKE DETECTOR

EXISTING CEILING MOUNTED OCCUPANCY SENSOR

METAL SUSPENSION SYSTEM TO BE REMOVED

EXISTING ACOUSTICAL CEILING TILES IN

C EXISTING CEILING MOUNTED SECURITY CAMERA

WF

EXISTING CEILING MOUNTED CHARGE STATUSCH

EXISTING CEILING MOUNTED POWER OUTLET

EXISTING CEILING MOUNTED PROJECTOR SUPPORT

EXISTING CEILING MOUNTED INTERNET ROUTER

D EXISTING CEILING MOUNTED DATA OUTLET

TO BE REMOVED.

EXISTING CEILING MOUNTED SUPPLY AIR DIFFUSER

NEW CEILING MOUNTED SUPPLY AIR DIFFUSER

TO BE REMOVED.

EXISTING CEILING MOUNTED RETURN AIR/EXHAUST GRILLE

NEW CEILING MOUNTED RETURN AIR/EXHAUST GRILLE

TO BE REMOVED.

EXISTING CEILING MOUNTED LIGHT FIXTURES

NEW CEILING MOUNTED LIGHT FIXTURES

STUD FRAMING ATTACHED TO STRUCTURE ABOVE.

NEW GYPSUM BOARD BULKHEAD ON NEW METAL

GENERAL DETAIL NOTES

FOR TYPICAL SECOND FLOOR CORRIDOR WALL CONDITION, SEE DETAIL 1/A5.24.

FOR TYPICAL FIRST FLOOR CORRIDOR WALL CONDITION, SEE DETAIL 3/A5.13.

OS

C

S

S

C

OS

CH

S

S

OS

S

S

OS

C

S

OS

S

WF

WF

OS

WF

OS

WF

OS

WF

OS

WF

OS

S

WF

OSS

WF

OS

WF

OS

WF

OS

WF

OS

WF

OS

EXP

EXP

EXP

S

WF

CC

WF

OS OS S

WF

WF

S

D

A4.1 04'

SCALE 1/8" = 1'-0"

16'8'8'

MATCHLINE

NEW WORK - FIRST FLOOR

REFLECTED CEILING PLAN

NOTES:

REVISIONS DATE

PERMISSION OF THE ARCHITECT

IN ANY WAY WITHOUT THE WRITTEN

REPRODUCED, PUBLISHED, OR USED

THIS DRAWING SHALL NOT BE

PROJECT NO.

DATE

DRAWN BY

CHECKED BY

B.D.S.

Murfreesboro, TN

Renovations Ceiling

K.S.P.

Academy Bradley

03/04/26

KEYED RENOVATION PLAN NOTES

1.

2.

GENERAL RENOVATION NOTES

3.

SYSTEM AND REINSTALLED LIGHT FIXTURES.

SYSTEM AS REQUIRED TO ATTACH HANGER WIRES FOR NEW CEILING

INSTALL NEW UNISTRUTS ABOVE SUSPENDED ACOUSTICAL TILE CEILING

WORK AREA IS TO BE SECURED AT END OF EACH WORK DAY.

ARE REMOVED TO MATCH ADJACENT EXISTING CONSTRUCTION.

PATCH & REPAIR EXISTING CONSTRUCTION WHERE EXISTING ITEMS

CONDITION

CONSTRUCTION. REPAIR ANY DAMAGE TO PRE-CONSTRUCTION

PROTECT EXISTING INTERIOR FINISHES FROM DAMAGED DURING

INSTALL NEW BULKHEAD - SEE 2/A5.2

INSTALL NEW BULKHEAD - SEE 3/A5.2

TWO HOUR FIRE PROTECTION.

WALLS AND CEILINGS WITH PENETRATION FIRESTOPPING FOR

SEAL WATER PIPE AND ELECTRICAL CONDUIT PENETRATIONS IN

AT SAME HEIGHT AS EXISTING. UNLESS OTHERWISE NOTED.

INSTALL NEW SUSPENDED ACOUSTICAL TILE CEILING SYSTEM

INSTALL NEW BULKHEAD - SEE 4/A5.2

AT LOCATIONS SHOWN ON PLANS.

AT 10'-0" A.F.F. INSTALL NEW LIGHT FIXTURES AND DIFFUSERS

INSTALL NEW SUSPENDED ACOUSTICAL TILE CEILING SYSTEM

CEILING GRID.

INSTALL NEW ACOUSTICAL CEILING TILES IN EXISTING SUSPENDED

METAL STUD FRAMING ABOVE EXISTING KITCHEN HOOD AND PAINT.

INSTALL NEW MOISTURE & MOLD-RESISTANT GYPSUM WALL BOARD ON

1 2

1 2

1 2

1 2 1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 21 2

1 2

1 2

1 2 1 2

1 2

1 2

1 2

1 2

1 21 2

1 2 21

212121

1 21 2

1 2

1 2

1 2

1 2

1 21 2

1 2

7 7

9 9

AT THESE AREAS

ACOUSTICAL CEILING TILES

INSTALL MOISTURE-PROOF

S

S

EXP. EXPOSED TO STRUCTURE ABOVE

OS

REFLECTED CEILING PLAN LEGEND

IN NEW METAL SUSPENSION SYSTEM

NEW ACOUSTICAL CEILING TILES

EXISTING CEILING MOUNTED SUPPLY AIR DIFFUSER

EXISTING CEILING MOUNTED RETURN AIR/EXHAUST GRILLE

EXISTING CEILING MOUNTED LIGHT FIXTURES

EXISTING CEILING MOUNTED EXIT LIGHT

EXISTING CEILING MOUNTED SPEAKER

EXISTING CEILING MOUNTED SMOKE DETECTOR

EXISTING CEILING MOUNTED OCCUPANCY SENSOR

METAL SUSPENSION SYSTEM TO BE REMOVED

EXISTING ACOUSTICAL CEILING TILES IN

C EXISTING CEILING MOUNTED SECURITY CAMERA

WF

EXISTING CEILING MOUNTED CHARGE STATUSCH

EXISTING CEILING MOUNTED POWER OUTLET

EXISTING CEILING MOUNTED PROJECTOR SUPPORT

EXISTING CEILING MOUNTED INTERNET ROUTER

D EXISTING CEILING MOUNTED DATA OUTLET

TO BE REMOVED.

EXISTING CEILING MOUNTED SUPPLY AIR DIFFUSER

NEW CEILING MOUNTED SUPPLY AIR DIFFUSER

TO BE REMOVED.

EXISTING CEILING MOUNTED RETURN AIR/EXHAUST GRILLE

NEW CEILING MOUNTED RETURN AIR/EXHAUST GRILLE

TO BE REMOVED.

EXISTING CEILING MOUNTED LIGHT FIXTURES

NEW CEILING MOUNTED LIGHT FIXTURES

STUD FRAMING ATTACHED TO STRUCTURE ABOVE.

NEW GYPSUM BOARD BULKHEAD ON NEW METAL

GENERAL DETAIL NOTES

FOR TYPICAL SECOND FLOOR CORRIDOR WALL CONDITION, SEE DETAIL 1/A5.24.

FOR TYPICAL FIRST FLOOR CORRIDOR WALL CONDITION, SEE DETAIL 3/A5.13.

S C

OS

S

S

S

OS

CH

OS

C

WF

OS

S

OS

S

WF

OS

S

S SOSOS S SCCSS OS

S

S

OS

WFOSOS WFOS WF

WF OS WF OS WF OS

WF

OS

WF

OS

WF

OS

OS

WF

A4.2

04'

SCALE 1/8" = 1'-0"

16'8'8'

NEW WORK - SECOND FLOOR

REFLECTED CEILING PLAN

NOTES:

REVISIONS DATE

PERMISSION OF THE ARCHITECT

IN ANY WAY WITHOUT THE WRITTEN

REPRODUCED, PUBLISHED, OR USED

THIS DRAWING SHALL NOT BE

PROJECT NO.

DATE

DRAWN BY

CHECKED BY

B.D.S.

Murfreesboro, TN

Renovations Ceiling

K.S.P.

Academy Bradley

03/04/26

KEYED RENOVATION PLAN NOTES

1.

2.

GENERAL RENOVATION NOTES

3.

SYSTEM AND REINSTALLED LIGHT FIXTURES.

SYSTEM AS REQUIRED TO ATTACH HANGER WIRES FOR NEW CEILING

INSTALL NEW UNISTRUTS ABOVE SUSPENDED ACOUSTICAL TILE CEILING

WORK AREA IS TO BE SECURED AT END OF EACH WORK DAY.

ARE REMOVED TO MATCH ADJACENT EXISTING CONSTRUCTION.

PATCH & REPAIR EXISTING CONSTRUCTION WHERE EXISTING ITEMS

CONDITION

CONSTRUCTION. REPAIR ANY DAMAGE TO PRE-CONSTRUCTION

PROTECT EXISTING INTERIOR FINISHES FROM DAMAGED DURING

INSTALL NEW BULKHEAD - SEE 2/A5.2

INSTALL NEW BULKHEAD - SEE 3/A5.2

TWO HOUR FIRE PROTECTION.

WALLS AND CEILINGS WITH PENETRATION FIRESTOPPING FOR

SEAL WATER PIPE AND ELECTRICAL CONDUIT PENETRATIONS IN

AT SAME HEIGHT AS EXISTING. UNLESS OTHERWISE NOTED.

INSTALL NEW SUSPENDED ACOUSTICAL TILE CEILING SYSTEM

INSTALL NEW BULKHEAD - SEE 4/A5.2

AT LOCATIONS SHOWN ON PLANS.

AT 10'-0" A.F.F. INSTALL NEW LIGHT FIXTURES AND DIFFUSERS

INSTALL NEW SUSPENDED ACOUSTICAL TILE CEILING SYSTEM

CEILING GRID.

INSTALL NEW ACOUSTICAL CEILING TILES IN EXISTING SUSPENDED

METAL STUD FRAMING ABOVE EXISTING KITCHEN HOOD AND PAINT.

INSTALL NEW MOISTURE & MOLD-RESISTANT GYPSUM WALL BOARD ON

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 21 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2

S

S

EXP. EXPOSED TO STRUCTURE ABOVE

OS

REFLECTED CEILING PLAN LEGEND

IN NEW METAL SUSPENSION SYSTEM

NEW ACOUSTICAL CEILING TILES

EXISTING CEILING MOUNTED SUPPLY AIR DIFFUSER

EXISTING CEILING MOUNTED RETURN AIR/EXHAUST GRILLE

EXISTING CEILING MOUNTED LIGHT FIXTURES

EXISTING CEILING MOUNTED EXIT LIGHT

EXISTING CEILING MOUNTED SPEAKER

EXISTING CEILING MOUNTED SMOKE DETECTOR

EXISTING CEILING MOUNTED OCCUPANCY SENSOR

METAL SUSPENSION SYSTEM TO BE REMOVED

EXISTING ACOUSTICAL CEILING TILES IN

C EXISTING CEILING MOUNTED SECURITY CAMERA

WF

EXISTING CEILING MOUNTED CHARGE STATUSCH

EXISTING CEILING MOUNTED POWER OUTLET

EXISTING CEILING MOUNTED PROJECTOR SUPPORT

EXISTING CEILING MOUNTED INTERNET ROUTER

D EXISTING CEILING MOUNTED DATA OUTLET

TO BE REMOVED.

EXISTING CEILING MOUNTED SUPPLY AIR DIFFUSER

NEW CEILING MOUNTED SUPPLY AIR DIFFUSER

TO BE REMOVED.

EXISTING CEILING MOUNTED RETURN AIR/EXHAUST GRILLE

NEW CEILING MOUNTED RETURN AIR/EXHAUST GRILLE

TO BE REMOVED.

EXISTING CEILING MOUNTED LIGHT FIXTURES

NEW CEILING MOUNTED LIGHT FIXTURES

STUD FRAMING ATTACHED TO STRUCTURE ABOVE.

NEW GYPSUM BOARD BULKHEAD ON NEW METAL

GENERAL DETAIL NOTES

FOR TYPICAL SECOND FLOOR CORRIDOR WALL CONDITION, SEE DETAIL 1/A5.24.

FOR TYPICAL FIRST FLOOR CORRIDOR WALL CONDITION, SEE DETAIL 3/A5.13.

A5.1

1DETAIL

A5.1 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

DEMOLITION NEW WORK

2DETAIL

A5.1 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

DEMOLITION NEW WORK

3DETAIL

A5.1 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

DEMOLITION NEW WORK

NOTES:

REVISIONS DATE

PERMISSION OF THE ARCHITECT

IN ANY WAY WITHOUT THE WRITTEN

REPRODUCED, PUBLISHED, OR USED

THIS DRAWING SHALL NOT BE

PROJECT NO.

DATE

DRAWN BY

CHECKED BY

B.D.S.

Murfreesboro, TN

Renovations Ceiling

K.S.P.

Academy Bradley

03/04/26

REMOVE EXISTING INSULATION

SPLINE CEILING SYSTEM

REMOVE EXISTING CONCEALED

ACOUSTICAL TILE CEILING SYSTEM

REMOVE EXISTING SUSPENDED

REMOVE EXISTING WOOD TRIM

& FURRING

ABOVE CEILING WOOD FRAMING

REMOVE EXISTING NON-STRUCTURAL

FIXTURE HANGER WIRES

REMOVE EXISTING LIGHT

NEW CEILING GRID

TO BE REINSTALLED IN

EXISTING LIGHT FIXTURES

NEW CEILING GRID

TO BE REINSTALLED IN

EXISTING LIGHT FIXTURES

HEIGHT AS EXISTING

TILE CEILING SYSTEM AT SAME

NEW SUSPENDED ACOUSTICAL

CORRIDORS

AT SPACES OTHER THAN

NEW ACOUSTICAL BATT

LIGHT FIXTURE

EACH EXISTING 2X4

4 NEW HANGER WIRES AT

MOULDING AT WINDOWS

NEW 8" TALL FASCIA

NEW CEILING GRID

TO BE REINSTALLED IN

EXISTING LIGHT FIXTURES

REMOVE EXISTING INSULATION

SPLINE CEILING SYSTEM

REMOVE EXISTING CONCEALED

ACOUSTICAL TILE CEILING SYSTEM

REMOVE EXISTING SUSPENDED

REMOVE EXISTING WOOD TRIM

& FURRING

ABOVE CEILING WOOD FRAMING

REMOVE EXISTING NON-STRUCTURAL

FIXTURE HANGER WIRES

REMOVE EXISTING LIGHT

HEIGHT AS EXISTING

TILE CEILING SYSTEM AT SAME

NEW SUSPENDED ACOUSTICAL

CORRIDORS

AT SPACES OTHER THAN

NEW ACOUSTICAL BATT

NEW CEILING GRID

TO BE REINSTALLED IN

EXISTING LIGHT FIXTURES

LIGHT FIXTURE

EACH EXISTING 2X4

4 NEW HANGER WIRES AT

MOULDING AT WINDOWS

NEW 8" TALL FASCIA

NEW CEILING GRID

TO BE REINSTALLED IN

EXISTING LIGHT FIXTURES

FIXTURE HANGER WIRES

REMOVE EXISTING LIGHT

REMOVE EXISTING INSULATION

SPLINE CEILING SYSTEM

REMOVE EXISTING CONCEALED

& FURRING

ABOVE CEILING WOOD FRAMING

REMOVE EXISTING NON-STRUCTURAL

REMOVE EXISTING WOOD TRIM

ACOUSTICAL TILE CEILING SYSTEM

REMOVE EXISTING SUSPENDED

NEW CEILING GRID

TO BE REINSTALLED IN

EXISTING LIGHT FIXTURES

LIGHT FIXTURE

EACH EXISTING 2X4

4 NEW HANGER WIRES AT

HEIGHT AS EXISTING

TILE CEILING SYSTEM AT SAME

NEW SUSPENDED ACOUSTICAL

CORRIDORS

AT SPACES OTHER THAN

NEW ACOUSTICAL BATT

GENERAL NOTES

SECTION 393.14. INCLUDING WALL SPEAKERS AND SPEAKER CABLES.

TIES, STRAPS, CLAMPS, OR HANGERS, TO COMPLY WITH 2017 NEC

SIDE WALL OR TO THE BUILDING STRUCTURE WITH J HOOKS, CABLE

ON TOP OF EXISTING SUSPENDED ACOUSTICAL TILE CEILINGS TO A

SUPPORT EXISTING LOW VOLTAGE CABLES PREVIOUSLY LAYING3.

FOR INSTALLATION AT SAME LOCATION ON NEW STEEL UNISTRUTS.

ON OR SUPPORTED BY EXISTING NON-STRUCTURAL WOOD

SAVE EXISTING MECHANICAL AND ELECTRICAL ITEMS MOUNTED2.

ACOUSTICAL TILE CEILING SYSTEM.

FOR INSTALLATION AT SAME LOCATION IN OR ON NEW SUSPENDED

OR ON EXISTING SUSPENDED ACOUSTICAL TILE CEILING SYSTEMS

SAVE EXISTING MECHANICAL AND ELECTRIAL ITEMS MOUNTED IN1.

A5.2

1DETAIL

A5.2 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

DEMOLITION NEW WORK

2DETAIL

A5.2 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

3DETAIL

A5.2 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

4DETAIL

A5.2 06" 6" 1'3"

SCALE 1 1/2" = 1'-0"

NOTES:

REVISIONS DATE

PERMISSION OF THE ARCHITECT

IN ANY WAY WITHOUT THE WRITTEN

REPRODUCED, PUBLISHED, OR USED

THIS DRAWING SHALL NOT BE

PROJECT NO.

DATE

DRAWN BY

CHECKED BY

B.D.S.

Murfreesboro, TN

Renovations Ceiling

K.S.P.

Academy Bradley

03/04/26

NEW CEILING GRID

TO BE REINSTALLED IN

EXISTING LIGHT FIXTURES

FIXTURE HANGER WIRES

REMOVE EXISTING LIGHT

REMOVE EXISTING INSULATION

SPLINE CEILING SYSTEM

REMOVE EXISTING CONCEALED

ACOUSTICAL TILE CEILING SYSTEM

REMOVE EXISTING SUSPENDED

& FURRING

ABOVE CEILING WOOD FRAMING

REMOVE EXISTING NON-STRUCTURAL

REMOVE EXISTING WOOD TRIM

NEW CEILING GRID

TO BE REINSTALLED IN

EXISTING LIGHT FIXTURES

LIGHT FIXTURE

EACH EXISTING 2X4

4 NEW HANGER WIRES AT

HEIGHT AS EXISTING

TILE CEILING SYSTEM AT SAME

NEW SUSPENDED ACOUSTICAL

CORRIDORS

AT SPACES OTHER THAN

NEW ACOUSTICAL BATT

GENERAL NOTES

SECTION 393.14. INCLUDING WALL SPEAKERS AND SPEAKER CABLES.

TIES, STRAPS, CLAMPS, OR HANGERS, TO COMPLY WITH 2017 NEC

SIDE WALL OR TO THE BUILDING STRUCTURE WITH J HOOKS, CABLE

ON TOP OF EXISTING SUSPENDED ACOUSTICAL TILE CEILINGS TO A

SUPPORT EXISTING LOW VOLTAGE CABLES PREVIOUSLY LAYING3.

FOR INSTALLATION AT SAME LOCATION ON NEW STEEL UNISTRUTS.

ON OR SUPPORTED BY EXISTING NON-STRUCTURAL WOOD

SAVE EXISTING MECHANICAL AND ELECTRICAL ITEMS MOUNTED2.

ACOUSTICAL TILE CEILING SYSTEM.

FOR INSTALLATION AT SAME LOCATION IN OR ON NEW SUSPENDED

OR ON EXISTING SUSPENDED ACOUSTICAL TILE CEILING SYSTEMS

SAVE EXISTING MECHANICAL AND ELECTRIAL ITEMS MOUNTED IN1.

STEEL STRUCTURE ABOVE

@ 16" O.C. - ATTACH TO

NEW 3†" METAL STUD FRAMING

KICKERS @ 48" O.C.

NEW 3†" METAL STUD

CEILING

NEW ACOUSTICAL

GRILLE

REINSTALL HVAC

DUCT LOCATIONS

STUD FRAMING W/

COORDINATE METAL

EXISTING DUCT -

CEILING

NEW ACOUSTICAL

GYP. BOARD - PAINTED

NEW †" TYPE "X"

NEW ACOUSTICAL CEILING

STRUCTURE ABOVE

@ 16" O.C. - ATTACH TO

NEW 3†" METAL STUD FRAMING

ATTACH TO STRUCTURE ABOVE

KICKERS @ 48" O.C. -

NEW 3†" METAL STUD

EXISTING CONC. BEAM

GYP. BOARD - PAINTED

NEW †" TYPE "X"

STEEL STRUCTURE ABOVE

@ 16" O.C. - ATTACH TO

NEW 3†" METAL STUD FRAMING

KICKERS @ 48" O.C.

NEW 3†" METAL STUD

NEW ACOUSTICAL CEILING

DUCT LOCATIONS

STUD FRAMING W/

COORDINATE METAL

EXISTING DUCT -

EXISTING WALL

GRILLE

REINSTALL HVAC

@ 16" O.C.

STUD FRAMING

NEW 3†" METAL

BOARD - PAINTED

MOLD-RESISTANT GYP.

NEW †" MOISTURE &

A6.1

02'

SCALE 1/4" = 1'-0"KITCHEN ELECTRICAL/ LIGHTING DEMOLITION FLOOR PLAN

4'4' 8'

02'

SCALE 1/4" = 1'-0"KITCHEN ELECTRICAL/ LIGHTING NEW WORK FLOOR PLAN

4'4' 8'

NOTES:

REVISIONS DATE

PERMISSION OF THE ARCHITECT

IN ANY WAY WITHOUT THE WRITTEN

REPRODUCED, PUBLISHED, OR USED

THIS DRAWING SHALL NOT BE

PROJECT NO.

DATE

DRAWN BY

CHECKED BY

B.D.S.

Murfreesboro, TN

Renovations Ceiling

K.S.P.

Academy Bradley

03/04/26

GENERAL NOTES

A

A

AAAAA

A A

BBBBBBB

B

120V 39W LED 1X4 LAY-IN

COLUMBIA LCAT14-35MLG-EDU

120V 39W LED 2X4 LAY-IN

COLUMBIA LCAT24-35MLG-EDU

MAINTAIN EXISTING LIGHTING CONTOL METHOD.

EXISTING CIRCUITING AS REQUIRED FOR NEW FIXTURES.

RECONNECT NEW LIGHT FIXTURES TO EXISTING CIRCUITING. REWORKA.

AND TURN OVER TO OWNER (TYP. THIS SPACE).

REMOVE EXISTING 2X2 FLUSH MOUNT LIGHT FIXTURE

3 OVER TO OWNER (TYP. THIS SPACE).

REMOVE EXISTING 2X4 LAY-IN LIGHT FIXTURE AND TURN

MAINTAIN EXISTING CEILING-MOUNTED DATA BOX LOCATION.

MAINTAIN EXISTING CIRCUITRY (TYP. THIS SPACE).

CONDUIT AND WIRING TO ABOVE NEW KITCHEN CEILING -

RELOCATE EXISTING ELECTRICAL AND LOW VOLTAGE

2506_zCover
2506_zA11
2506_zA12
2506_zA21
2506_zA31
2506_zA32
2506_zA41
2506_zA42
2506_zA51
2506_zA52
2506_zA61

File details come from the government source that posted it. Updated .