BR114_-_20.jpg
JPG image 149 KB Posted
- Attached to
- Guardrail Repairs, various locations
- Solicitation number
- M-26-0006A
- Issued by
- Hamilton County, Indiana
About this file
This is a photographic documentation file supporting a competitive quotation solicitation issued by the Hamilton County Highway Department in Indiana for guardrail repair and replacement services. The procurement encompasses approach guardrail repair and replacement at three locations: Bridge No. 110 on 186th Street (approximately 0.01 miles west of Grassy Branch Road) in the northwest intersection quadrant, Bridge No. 114 on 206th Street (approximately 0.24 miles west of State Road 37) in all four bridge quadrants, and a small structure on Southeastern Parkway (approximately 0.30 miles north of 113th Street) along the west side of the roadway. Contractors are required to replace all damaged approach guardrail components, including end treatments, railing posts, rub rails, and attachment hardware at each specified location. The quotation was posted on April 24, 2026, with quotations due by May 5, 2026. No site visits, bidders' meetings, or question submission procedures are documented in the available solicitation materials.
All work must comply with the most recent Manual on Uniform Traffic Control Devices (MUTCD) standards and 2026 Indiana Department of Transportation (INDOT) Standard Drawings and Specifications, with contractors responsible for all labor, materials, installation, equipment, and traffic maintenance necessary to complete the project. No award values, budget ranges, or contract value estimates are disclosed in the posted opportunity information. The procurement documents do not identify any set-asides, restrictions on contractor qualifications, disadvantaged enterprise designations, or incumbent vendors. Awards will be determined through competitive pricing evaluation, with specific evaluation criteria beyond compliance with technical standards not detailed in the posted materials. Supervision and all related work required for project completion shall be included in identified pay items on the quotation sheet.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .